Construction method for an underground structure

FR3170529A1Pending Publication Date: 2026-06-26SOLETANCHE FREYSSINET SAS
4 Cites 0 Cited by

Patent Information

Application Number
FR2024015211
Authority / Receiving Office
FR · FR
Patent Type
Applications
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2026-06-26
Patent Text Reader

Abstract

Method for constructing an underground structure. Method for constructing an underground structure, in particular a tunnel segment, using at least one prefabricated caisson (10; 20), comprising the steps of: Constructing pre-support with at least upper reinforcing tubes (31) arranged above an excavation zone; Progressively excavating the ground in the excavation zone in front of the prefabricated caisson; Progressively driving the prefabricated caisson into the ground as excavation progresses, with adjustable-height sliding lower supports (90) interposed between the prefabricated caisson and the floor of the excavated cavity. Figure for the abstract: Fig. 3
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Plant for producing an elongate structure

    EP0278078A1

  • Underground structure construction method and concrete box used therein

    JP2023174120A

  • SG10201704749a

  • SG10201901625a