Multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation

HK30137559AActive Publication Date: 2026-09-11SHENZHEN ZHONGXINWAN BIOTECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
HK32026125587
Authority / Receiving Office
HK · HK
Patent Type
Applications
Current Assignee / Owner
Filing Date
2026-07-02
Publication Date
2026-09-11

Smart Images

  • Figure 00000017_0000
    Figure 00000017_0000
  • Figure 00000018_0000
    Figure 00000018_0000
Patent Text Reader

Abstract

This invention relates to the field of bioengineering technology and discloses a multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation with high reliability and good stability. The system includes a nitrogen tank (110), at least one reducing agent storage tank (150), and multi-stage anaerobic seed tanks (120-140) in series. At least one anaerobic seed tank is used to store fruit and vegetable raw materials and anaerobic bacteria. The anaerobic seed tanks (120-140) are used to receive high-purity nitrogen and fermentation aids to maintain an anaerobic environment. This allows the anaerobic seed tanks (120-140) to propagate highly active anaerobic bacteria and to conduct step-by-step amplification of the anaerobic bacteria.
Need to check novelty before this filing date? Find Prior Art

Description

1. Description of a Multi-Stage Anaerobic Seed Tank Processing System for Fruit and Vegetable Fermentation Technical Field 5 This invention relates to the field of bioengineering technology, and more specifically, to a multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation. Background Technology With the widespread application of fermentation industry in food, medicine, chemical and other fields, especially the rapid development of fruit and vegetable fermentation for enzyme production, traditional natural fermentation processes have many technical bottlenecks. In the existing technology, the production of fruit and vegetable enzymes mostly adopts natural fermentation or traditional anaerobic fermentation processes, which have the following problems: The traditional fermentation process cycle is usually 6 months to 2 years, with low production efficiency, making it difficult to meet the needs of large-scale industrial production; Microorganisms on the surface of fruits and vegetables are difficult to control, especially in high temperature and high sugar environments, they are easily contaminated by miscellaneous bacteria, affecting product quality and safety; Existing anaerobic fermentation systems are prone to "acidification," leading to fermentation failure, difficulty in system recovery, and high maintenance costs; The lack of an efficient step-by-step amplification culture system for strains results in low inoculation efficiency and poor bacterial activity, affecting the fermentation effect. 20 Currently, although some enterprises have attempted to use multi-stage seed tanks for microbial propagation, the lack of systematic equipment integration and process control still results in problems such as complex operation, long inoculation time, and poor system stability. Summary of the Invention The technical problem this invention aims to solve is to provide a highly reliable and stable multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation, addressing the aforementioned shortcomings of existing technologies such as long fermentation cycles, high risk of contamination by other microorganisms, poor system stability, and difficulty in microbial propagation. The technical solution adopted by this invention to solve its technical problem is as follows: A multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation is constructed, comprising: a nitrogen tank for storing high-purity nitrogen; at least one reducing agent storage tank for storing fermentation aids; and a multi-stage series-connected anaerobic seed tank, wherein at least one of the anaerobic seed tanks is used to collect fruit and vegetable raw materials and anaerobic bacteria; and an inlet end of the anaerobic seed tank is connected to the outlet end of the nitrogen tank via a pipeline to receive the high-purity nitrogen, thereby maintaining an anaerobic environment in the anaerobic seed tank.The other air inlet of the anaerobic seed tank is connected to the output of the reducing agent storage tank through a pipeline, and is used to receive the fermentation aid so that the anaerobic seed tank can propagate highly active anaerobic bacteria and the anaerobic bacteria can be scaled up step by step. 10. In some embodiments, the anaerobic seed tank includes a primary anaerobic seed tank, a secondary anaerobic seed tank, and a tertiary anaerobic seed tank connected in series. The primary anaerobic seed tank is used to store the fruit and vegetable raw materials and the anaerobic bacteria. An air inlet of each of the primary, secondary, and tertiary anaerobic seed tanks is connected via a pipeline to the output of a nitrogen tank to receive high-purity nitrogen, thereby maintaining an anaerobic environment in the primary, secondary, and tertiary anaerobic seed tanks. An air inlet of each of the primary, secondary, and tertiary anaerobic seed tanks is connected via a pipeline to the output of a reducing agent storage tank to receive the fermentation aid, enabling the primary, secondary, and tertiary anaerobic seed tanks to propagate highly active anaerobic bacteria, and to progressively scale up the anaerobic bacteria. 20. In some embodiments, the tertiary anaerobic seed tank is connected to the anaerobic tank via an inoculation pump. The tertiary anaerobic seed tank is used to inoculate the anaerobic strains of the composite microorganisms after scale-up cultivation into the anaerobic tank. In some embodiments, the fermentation aid is sodium bicarbonate solution, sodium sulfide solution, or hydrolyzed acidified slurry. 25. In some embodiments, a first stirring motor is provided in the primary anaerobic seed tank, and a first double-layer spiral stirrer is provided on the shaft of the first stirring motor. The first double-layer spiral stirrer is placed in the primary anaerobic seed tank to fully mix the components in the tank. A second stirring motor is provided in the secondary anaerobic seed tank, and a second double-layer spiral stirrer is provided on the shaft of the second stirring motor. The second double-layer spiral stirrer is placed in the secondary anaerobic seed tank to maintain large-scale mixing and safe bubble control in the tank.5. A third stirring motor is installed in the tertiary anaerobic seed tank, and a third double-layer spiral stirrer is installed on the shaft of the third stirring motor. The third double-layer spiral stirrer is placed inside the tertiary anaerobic seed tank to achieve large-scale homogenization and flow monitoring within the tank. In some embodiments, the volume of the primary anaerobic seed tank is selected as 200L, the volume of the secondary anaerobic seed tank is selected as 2m³, and the volume of the tertiary anaerobic seed tank is selected as 60m³. In some embodiments, a methane flow meter is also included on the vent pipe branch of the tertiary anaerobic seed tank to monitor the biogas production flow rate. In some embodiments, the volume of the anaerobic tank is selected as 150m³. 15. The multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation described in this invention includes a nitrogen tank, at least one reducing agent storage tank, and a multi-stage series-connected anaerobic seed tank. At least one anaerobic seed tank is used to store fruit and vegetable raw materials and anaerobic bacteria. The anaerobic seed tank is used to receive high-purity nitrogen and fermentation aids to maintain an anaerobic environment. This allows the anaerobic seed tank to propagate highly active anaerobic bacteria and to progressively scale up the anaerobic bacteria. Compared with existing technologies, this invention utilizes a nitrogen tank 20, a reducing agent storage tank, and a multi-stage series anaerobic seed tank in conjunction, connected by pipelines to maintain the anaerobic environment and add fermentation aids. It integrates three functional modules: nitrogen supply, fermentation aid addition, and microbial culture, forming a complete seed tank processing system. The introduction of high-purity nitrogen precisely maintains the anaerobic conditions within the tank, ensuring the activity of the anaerobic bacteria and guaranteeing the controllability of the anaerobic environment. The addition of fermentation aids provides suitable nutrition and environment for the microorganisms, enabling rapid propagation of highly active anaerobic bacteria. Through progressive scaling up, it lays the foundation for subsequent multi-stage series structures, achieving a smooth transition from laboratory-scale to industrial-scale. The accompanying drawings illustrate the invention. Figure 1 is a flowchart of an embodiment of the multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation provided by this invention.Figure 2 is a cross-sectional view of an embodiment of the anaerobic seed tank provided by the present invention. Detailed Embodiment 10: To provide a clearer understanding of the technical features, objectives, and effects of the present invention, specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings. As shown in Figure 1, in the first embodiment of the multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation of the present invention, the multi-stage anaerobic seed tank treatment system 100 for fruit and vegetable fermentation includes at least a nitrogen tank 110, multi-stage anaerobic seed tanks (120, 130, 140) in series, and at least one reducing agent storage tank 150. The nitrogen tank 110 stores and supplies high-purity nitrogen (≥99.99%), and introduces it into each stage of the anaerobic seed tank (120, 130, 140) through pipeline 110a to replace the oxygen in the air inside the tank, creating strict anaerobic conditions. The anaerobic seed tanks (120, 130, 140) are used to introduce a small amount (approximately 4 liters) of precious microbial strains into a small-scale environment, allowing them to adapt to the fruit and vegetable raw material slurry, restore their activity, and achieve initial population growth. The system also receives the bacterial solution after primary culture and... Further propagation is carried out at double the volume, while the gas production intensity is controlled by adjusting the stirring speed (30rpm → <10rpm) to prevent "boiling over". Secondary bacterial solutions are received and expanded to an industrial-grade inoculum sufficient for efficient inoculation of large anaerobic tanks (e.g., 150m³). Gas production is monitored using a methane flow meter (>10m³ / hr) to determine the inoculation timing. For example, a smooth transition from 4 liters of inoculum → 200L → 2m³ → 60m³ is achieved, avoiding stress to the microbial community caused by drastic environmental changes. Each stage gradually adapts to larger-scale fermentation conditions (stirring, tank pressure, nutrient concentration), ultimately obtaining a robust industrial-grade microbial community. At least one 150m³ reducing agent storage tank is used to store fermentation aids such as sodium bicarbonate solution, sodium sulfide solution, or hydrolyzed acidified slurry (HK 30137559 A 5). pH is adjusted (buffered) by adding sodium bicarbonate solution to adjust the pH within the tank. The pH is stabilized at 7.0~8.0 to prevent acidification; and an anaerobic environment (reduction) is maintained by adding sodium sulfide solution to consume residual dissolved oxygen in the tank, reduce the oxidation-reduction potential (ORP), and strengthen anaerobic conditions; and nutrients (carbon source) are provided by adding hydrolyzed acidified slurry to provide the organic carbon source and nutrients required for the growth of the microbial community; or two reducing agent tanks (151 / 152) and one conditioning agent tank 153 can be set in the reducing agent storage tank 150, wherein the reducing agent (sodium sulfide) works in conjunction with the nitrogen system to consume dissolved oxygen and maintain a strict anaerobic environment;10. The regulator (sodium bicarbonate) stabilizes the pH at 7.0-8.0 and prevents acidification. As the core components of the "fermentation aid", both work together to create an ideal metabolic environment of "anaerobic + suitable acid" for anaerobic bacteria, achieving the technical effect of "gas production rate per unit volume ≥6, complete elimination of acidification, and stable operation for 6-12 months". Specifically, nitrogen tank 110 is used to store high-purity nitrogen; at least one reducing agent storage tank 150 is used to store fermentation aids; among them, there are multi-stage series-connected anaerobic seed tanks (120, 130, 140), of which at least one anaerobic seed tank is used to store fruit and vegetable raw materials and anaerobic bacteria. The fruit and vegetable raw materials are rich in sugars, organic acids, cellulose, vitamins and trace elements, which serve as the initial carbon source, nutrients and substrate for hydrolysis and acidification of anaerobic bacteria; 20 plays a dual role in this system as "initial nutrient substrate" and "hydrolysis and acidification initiator", providing carbon source and energy for anaerobic bacteria, supporting their expansion from a small number of bacteria to a highly active, high-gas-producing industrial-grade bacterial community, which is the material basis for achieving key technical indicators such as "rapid gas production in 6-12 hours" and "gas production rate per unit volume ≥6"; the anaerobic bacteria, as decomposers, decompose the complex organic matter in the fruit and vegetable raw materials into biogas, and the two 25 It is a symbiotic relationship between the substrate and the decomposer—the fruit and vegetable raw materials provide nutritional support for the proliferation of the microbial strain, while the microbial strain converts the fruit and vegetable raw materials into biogas, jointly achieving the technical effect of "rapid gas production in 6-12 hours, gas production rate per unit volume ≥ 6, and stable operation for 6-12 months"; HK ​​30137559 A 6 Further, one air inlet end of the anaerobic seed tank (120, 130, 140) (corresponding to 120b, 130b, 140b) is connected to the output end of the nitrogen tank 110 through pipeline 110a, which is used to receive high-purity nitrogen input from the nitrogen tank 110, so as to maintain the anaerobic environment in the anaerobic seed tank (120, 130, 140); Further, the other air inlet end of the anaerobic seed tank (120, 130, 140) (corresponding to 120d, 130d, 140d) is connected to the reducing agent storage tank 150 through pipeline 150a. The output end is connected to receive the fermentation aid input from the reducing agent storage tank 5 150, so that the anaerobic seed tanks (120, 130, 140) can proliferate highly active anaerobic strains, and perform primary, secondary and tertiary amplification culture of the anaerobic strains in the tanks, before inoculating them into the anaerobic tank (not shown). Using this technical solution, the nitrogen tank, reducing agent storage tank and multi-stage series anaerobic seed tanks work together, and the anaerobic environment is maintained and the fermentation aid is added through pipeline connection; 10 The three major functional modules of nitrogen supply, fermentation aid addition and strain culture are integrated to form a complete seed tank processing system; By introducing high-purity nitrogen, the anaerobic conditions in the tank are precisely maintained, ensuring the activity of the anaerobic bacteria and ensuring the controllability of the anaerobic environment;By adding fermentation aids, suitable nutrition and environment are provided for the strains, enabling the rapid propagation of 15 highly active anaerobic bacteria. Through step-by-step scale-up, the foundation is laid for subsequent multi-level tandem structures, achieving a smooth transition from laboratory scale to industrial scale. In some embodiments, as shown in Figure 1, for scale-up cultivation, anaerobic seed tanks (120, 130, 140) can be connected in series: a primary anaerobic seed tank 120, a secondary anaerobic seed tank 130, and a tertiary anaerobic seed tank 140. The primary, secondary, and tertiary anaerobic seed tanks 120, 130, and 140 are all hollow and sealed structures with identical structures (as shown in Figure 2). In this technical solution, Figure 2 only shows the structural schematic of the primary anaerobic seed tank 120. The structural shapes of the secondary, 130, and 140 are the same as those of the primary anaerobic seed tank 120. The structures shown in Figure 2 can be used to understand the secondary and 140. The volume of the primary anaerobic seed tank 120 is selected as 200L. (HK 30137559 A 7) The volume of the secondary anaerobic seed tank 130 is selected as 2m³, and the volume of the tertiary anaerobic seed tank 140 is selected as 60m³. Specifically, an inlet 123 is opened at the upper left side of the primary anaerobic seed tank 120. Fruit and vegetable raw materials and anaerobic bacteria are injected through the inlet 123. One air inlet end (corresponding to 120b) of the primary anaerobic seed tank 120 is connected to the output end of the nitrogen tank 5 110 through pipeline 110a to receive high-purity nitrogen. A transfer pump 160a, valve 160b, and valve 110b are installed in pipeline 110a. That is, the nitrogen tank 110 sends high-purity nitrogen into the primary anaerobic seed tank 120 through the transfer pump 160a, valve 160b, and valve 110b to maintain the anaerobic environment. One air inlet end (corresponding to 120d) of the primary anaerobic seed tank 120 is connected to the nitrogen tank 5 110 through pipeline 150a. Connected to the output of reducing agent storage tank 150, it is used to receive fermentation aids; 10 Specifically, 100L of hydrolyzed acidified slurry is added to the primary anaerobic seed tank 120, the pH is adjusted to 7.0-8.0, high-purity nitrogen gas (15L / min) is introduced, the temperature is kept constant at 35-38℃, and 2%-5% by volume of 2%-7% sodium bicarbonate solution and 2%-5% by volume of 1%-5% sodium sulfide solution are added sequentially under stirring; After stirring for 30 minutes, 4L of composite optimized anaerobic bacterial seed liquid is injected under nitrogen protection; After stirring for another 30 minutes, nitrogen supply is stopped, the tank is sealed, the vent valve is retained and a water seal observation device is connected;After standing for several hours until stable gas production occurs for 3-8 hours, the first stage of culture is complete, and the culture can be inoculated into the second-stage anaerobic seed tank 130. Furthermore, one inlet end (corresponding to 130b) of the secondary anaerobic seed tank 130 is connected to the output end of the nitrogen tank 110 via pipeline 110a to receive high-purity nitrogen. A transfer pump 160a, valve 160b, and valve 110c are installed in pipeline 110a. That is, the nitrogen tank 110 delivers high-purity nitrogen into the secondary anaerobic seed tank 130 through the transfer pump 160a, valve 160b, and valve 110c to maintain the anaerobic environment. One inlet end (corresponding to 130d) of the secondary anaerobic seed tank 130 is connected to the output end of the reducing agent storage tank 150 via pipeline 150a to receive fermentation aids. Specifically, 6 hours after feeding into the primary tank, 2000L of hydrolyzed acidified slurry is added to the secondary tank, and the pH is adjusted to 25°C. To a temperature of 7.0–8.0, introduce high-purity nitrogen (80 L / min), maintain a constant temperature of 35–38°C, and add 2%–5% (by volume) of 2%–7% sodium bicarbonate solution and 2%–5% (by volume) of 1%–5% sodium sulfide solution sequentially while stirring (30 rpm). Continue stirring for 30 minutes, then close all valves and maintain tank pressure <0.5 kPa. Continue nitrogen flow for at least 1 hour. Before shutting off the nitrogen, close all inlet and outlet valves, allow to stand for 1–2 hours, then restart nitrogen flow (15 L / min for stage 1, 80 L / min for stage 2) for inoculation. After inoculation, maintain nitrogen flow in the stage 2 tank (80 L / min, <0.5 kPa) and install a water seal observation device. When gas production is vigorous, shut off the nitrogen, reduce stirring to below 10 rpm, and strictly control the temperature to 37–38°C and tank pressure ≤2 kPa to prevent boiling over. Once a large amount of gas is produced, inoculate the tertiary anaerobic seed tank 140. Furthermore, one inlet end (corresponding to 140b) of the tertiary anaerobic seed tank 140 is connected to the output end of the nitrogen tank 110 via pipeline 110a for receiving high-purity nitrogen. A transfer pump 160a, valves 160b, 110c, and 110d are installed in pipeline 110a. That is, the nitrogen tank 110 delivers high-purity nitrogen into the tertiary anaerobic seed tank 140 via the transfer pump 160a, valves 160b, 110c, and 110d to maintain an anaerobic environment. One inlet end (corresponding to 140d) of the tertiary anaerobic seed tank 140 is connected to the output end of the reducing agent storage tank 150 via pipeline 150a for receiving fermentation aids.Specifically, 12 hours before feeding into the secondary anaerobic seed tank 130, 40 m³ of hydrolyzed acidified slurry is added to the tertiary anaerobic seed tank 140 (60 m³), ​​stirred (15 rpm), and all valves and manholes are closed except for the vent valve. After the inoculation from the primary to the secondary stage is completed, the pH is adjusted to 7.0–8.0, and 2%–5% (by volume) of 2%–7% sodium bicarbonate solution and 2%–5% (by volume) of 1%–5% sodium sulfide solution are added sequentially, while all valves are closed. Before inoculation, the vent valve of the tertiary tank is opened, and after inoculation, the vent valve is closed. The branch pipe is opened to connect the methane flow meter and the water tank observation device. When the biogas flow rate is >10 m³ / h, the vent valve is opened first, and then the inoculation pump is started to inoculate into the 150 m³ anaerobic tank. That is, through the primary anaerobic seed tank 120, the secondary anaerobic seed tank 130, and the tertiary anaerobic seed tank 140... Highly active anaerobic strains are propagated and then progressively scaled up. In some embodiments, as shown in Figure 1, the output end (corresponding to 25 140c) of the three-stage anaerobic seed tank 140 is connected to the anaerobic tank (not shown) via an inoculation pump to inoculate the scaled-up composite microbial anaerobic strain into the anaerobic tank (not shown). The volume of the anaerobic tank is selected as 150 m³. Specifically, when the biogas flow rate of the three-stage anaerobic seed tank 140 is >10 m³ / h, its vent valve is opened first, and then the inoculation pump is started to inoculate the microbial community into the 150 m³ anaerobic tank. The inoculation time is <1 hour. Gas production can begin 6–12 hours after inoculation. The operation should be observed and adjusted within one month after inoculation. If the inoculation is successful, stable operation can be maintained for 6–12 months without the need for re-inoculation. 5. In some embodiments, the fermentation aid is sodium bicarbonate solution, sodium sulfide solution, or hydrolyzed acidified slurry. Sodium bicarbonate solution stabilizes the pH and prevents acidification; sodium sulfide solution maintains the anaerobic environment; and hydrolyzed acidified slurry provides carbon source nutrition. 10. These three components work synergistically as "fermentation aids" to create an ideal propagation environment for anaerobic bacteria that is "food-sufficient, pH-suitable, and anaerobic and safe," jointly achieving the technical effects of "rapid gas production in 6-12 hours, gas production rate per unit volume ≥6, and stable operation for 6-12 months." In some embodiments, as shown in Figure 1, a first stirring motor 122 is installed in the primary anaerobic seed tank 120. A first double-layer spiral stirrer 122b is installed on the shaft 122a of the first stirring motor 122. 15. The first double-layer spiral stirrer 122b is placed inside the inner cavity 120a of the primary anaerobic seed tank 120 to thoroughly mix the components within the tank.A second stirring motor 132 is installed in the secondary anaerobic seed tank 130. A second double-layer spiral stirrer 132b is installed on the rotating shaft 132a of the second stirring motor 132. The second double-layer spiral stirrer 132b is placed inside the inner cavity 130a of the secondary anaerobic seed tank 130 to maintain large-scale mixing and safe bubble control within the tank. A third stirring motor 142 is installed in the tertiary anaerobic seed tank 140. A third double-layer spiral stirrer 142b is installed on the rotating shaft 142a of the third stirring motor. The third double-layer spiral stirrer 142b is placed inside the inner cavity 140a of the tertiary anaerobic seed tank 140 to achieve large-scale homogenization and flow monitoring within the tank. 25. In some embodiments, as shown in Figure 1, a level sensor 121 and at least one monitor 124 are installed on one side of the primary anaerobic seed tank 120. The level sensor 121 is used to detect the level parameters inside the tank, and the monitor 124 can be used to detect parameters such as temperature, pressure, and HP value inside the tank, and feed these parameters back to the main control system. The secondary anaerobic seed tank 130 and the tertiary anaerobic seed tank 140 are both equipped with level sensors and at least one monitor, whose functions are the same as those of the level sensor 121 and monitor 124 in the primary anaerobic seed tank 120, and will not be described in detail here. 5. In some embodiments, a methane flow meter is also included on the vent pipe branch of the tertiary anaerobic seed tank 140, which is used to monitor the biogas production flow rate. The specific process for a primary anaerobic seed tank 120 (200L scale) is as follows: 1. Add culture medium: Pour 100L of hydrolyzed acidified slurry into the primary anaerobic seed tank as the initial culture medium; 2. Adjust the pH value: Use a 5mol / L sodium hydroxide solution to adjust the pH value of the hydrolyzed acidified slurry in the tank to 7.0-8.0; 3. Establish an anaerobic and constant temperature environment: Turn on the stirrer and continuously introduce high-purity nitrogen gas into the tank at a flow rate of 15L / min, maintaining the temperature inside the tank at 35-38℃; 4. Add a pH buffer: After stirring for 30 minutes, add a 2%-7% sodium bicarbonate solution at a concentration of 2%-5% of the slurry volume; 5. Add a reducing agent: Add a 1%-5% sodium sulfide solution at a concentration of 2%-5% of the slurry volume; 6. Inoculate with anaerobic bacteria, continue to introduce high-purity nitrogen gas, and stir for 30 minutes. Minutes. Then, using the pressure of high-purity nitrogen gas, under anaerobic conditions, the 4-liter composite optimized anaerobic bacterial seed culture prepared in advance in the anaerobic inoculum bottle was pressed into the primary anaerobic seed tank 120;7. Seal and set up a gas production observation device. After stirring for 30 minutes, stop the supply of high-purity nitrogen gas, close all inlet and outlet valves of the seed tank, leaving only one vent valve open; connect a latex tube with an inner diameter of 10 mm to the outlet end of the vent valve, insert the end of the latex tube into a 500 mL Erlenmeyer flask containing 300 mL of tap water, with the tube opening 10 mm below the water surface, for observing biogas production at 25°C; 8. Observe gas production. After several hours of static cultivation, biogas production begins (manifested as continuous bubbles at the outlet of the latex tube); HK 30137559 A 11 9. Determine the end point of cultivation. After observing stable gas production for 3-8 hours, the primary anaerobic seed tank cultivation is considered complete, and preparations can be made to inoculate the secondary anaerobic seed tank 130. The specific process for the secondary anaerobic seed tank 130 (2m³ scale) is as follows: Stage 1: Culture medium preparation and condition adjustment 1. Add culture medium: 6 hours after adding hydrolyzed acidified slurry to the primary anaerobic seed tank 120, add 2000L of hydrolyzed acidified slurry to the secondary anaerobic seed tank 130; 2. Adjust the pH value: turn on the stirrer, set the speed to 30rpm, and use 5mol / L sodium hydroxide solution to adjust the pH value of the slurry in the tank to 7.0-8.0; 3. Establish the anaerobic environment: close all valves except for one vent valve, introduce high-purity nitrogen into the tank at a flow rate of 80L / min, maintain the stirring speed at 30rpm, and keep the temperature constant at 35-38℃; 4. Add fermentation aids: after stirring for 30 minutes, add the following in sequence: 2%-5% sodium bicarbonate solution with a concentration of 2%-7% according to the volume of the slurry in the tank; Add 1%–5% sodium sulfide solution according to 2%–5% of the volume of slurry in the tank; 5. Deep deoxygenation and stabilization: continue stirring for 30 minutes, keep high-purity nitrogen gas flowing in (80L / min), close all valves except the vent valve, control the tank pressure <0.5kPa, keep the temperature constant at 35–38℃, and continue for more than 1 hour. Stage Two: Preparation and Inoculation Operation 6. Turn off the nitrogen gas (preparation before inoculation): before turning off the high-purity nitrogen gas, all inlet and outlet valves on the secondary anaerobic seed tank 130 must be closed first, and then stop the nitrogen gas flow; 7. Re-circulate nitrogen gas before inoculation: keep stirring for 30 minutes, turn off the nitrogen gas and let it stand for 1–2 hours to prepare for inoculation. Before inoculation, re-circulate high-purity nitrogen gas into the primary and secondary anaerobic seed tanks 130: Primary seed tank: 15L / min Secondary seed tank: 80L / min At the same time, open the vent valves of each seed tank;25 8. Inoculate the seed tank. After inoculation, continue stirring (30 rpm), close the nitrogen valve of the primary anaerobic seed tank 120, and continue to purge nitrogen into the secondary anaerobic seed tank 130 (80 L / min) to maintain the tank pressure <0.5 kPa. HK 30137559 A 12 Phase Three: Gas Production Monitoring and Safety Control 9. Install a gas production observation device. In the secondary anaerobic seed tank 130, close all valves except for one open vent valve. Connect a 10mm inner diameter latex tube to the outlet of the vent valve, inserting the end into a 500mL Erlenmeyer flask containing 300mL of tap water. The tube opening should be 30mm below the water surface for observing biogas production. 10. After gas production, turn off the nitrogen gas. Several hours later, when the gas output from the latex tube becomes increasingly vigorous, it indicates that a large amount of biogas has been produced. At this time, the high-purity nitrogen valve can be closed. 11. Safety control during peak gas production (critical): Closely observe the biogas production. When the biogas approaches the eruption level, immediately reduce the stirring speed to below 10rpm. Safety Points: 10. Strictly control the tank temperature between 37 and 38℃. Strictly control the tank pressure to not exceed 2kPa. Be prepared to adjust the vent valve at any time to prevent violent eruptions such as "boiling over" or "volcanic eruption". Stage 4: Transfer to the tertiary anaerobic seed tank 140 15 12. Determine the timing of the transfer. Once a large amount of biogas is produced in the tank (similar to a "volcanic eruption"), determine that the secondary anaerobic seed tank 130 has completed cultivation and immediately prepare to inoculate the tertiary anaerobic seed tank 140. The specific process for the tertiary anaerobic seed tank 140 (60m³ scale) is as follows: Stage 1: Pre-feeding and initial condition setting 1. Add culture medium 20 12 hours before adding hydrolyzed acidified slurry to the secondary anaerobic seed tank 130, add 40m³ of hydrolyzed acidified slurry to the tertiary anaerobic seed tank 140; 2. Initial stirring and sealing. After adding the slurry, turn on the stirrer and set the speed to 15rpm. Except for leaving one vent valve open, all valves on the tertiary seed tank and the manhole on the top of the tank must be closed. Phase Two: Pre-inoculation Adjustment and Addition of Fermentation Aids 25 3. Adjust pH value: After the inoculation from the primary anaerobic seed tank 120 to the secondary anaerobic seed tank 130 is completed, keep the tertiary anaerobic seed tank 140 stirred (15 rpm) and use 5 mol / L sodium hydroxide solution to adjust the pH value of the slurry in the tank to 7.0-8.0; HK 30137559 A 13 4. Add sodium bicarbonate solution (pH buffer): After the pH adjustment is completed, keep stirring (15 rpm) and immediately add sodium bicarbonate solution with a concentration of 2%-7% according to 2%-5% of the volume of the slurry in the tank;5. Add sodium sulfide solution (reducing agent), then add sodium sulfide solution with a concentration of 1% to 5% according to 2% to 5% of the volume of slurry in the tank; 6. Seal and let stand, close all valves on the tertiary anaerobic seed tank 140, and keep stirring (15 rpm). Stage 3: Inoculation Operation 7. Exhaust air before inoculation. Before inoculating from the secondary anaerobic seed tank 130 to the tertiary anaerobic seed tank 140, the exhaust valve of the tertiary anaerobic seed tank 140 must be opened before the inoculation operation can begin; 8. Implement inoculation. Inoculate from the secondary anaerobic seed tank 130 to the tertiary anaerobic seed tank 140 (the inoculation method refers to the aforementioned nitrogen pressure delivery or inoculation pump delivery). Phase 4: Gas Production Monitoring and Flow Recording 9. Install a methane flow meter and observation device. After inoculation, immediately close the vent valve of the tertiary anaerobic seed tank 140, and simultaneously open the valve on the branch pipe of the vent pipe; connect a 25mm diameter plastic pipe to the outlet end of the branch pipe, and connect this plastic pipe to the gas inlet of the methane flow meter; connect another plastic pipe of the same diameter to the outlet end of the flow meter, and insert the pipe end into a 15cm diameter bucket 50mm below the water surface to observe the biogas production; 10. Continuously monitor the gas production flow rate, record the biogas flow rate data displayed by the methane flow meter, and simultaneously observe the bubble generation in the bucket. Phase 5: Judgment and Operation of Inoculation into Anaerobic Tanks 11. Determine the inoculation timing: When the methane flow meter shows a biogas flow rate > 10 m³ / h, the tertiary anaerobic seed tank 140 is considered mature and ready for inoculation into the final anaerobic tank. 12. To inoculate into the anaerobic tank, first open the vent valve of the tertiary anaerobic seed tank 140, then start the inoculation pump between the tertiary anaerobic seed tank 140 and the anaerobic tank to begin inoculation. Anaerobic Tank (150 m³ scale) Inoculation and Operation Process Phase 1: Inoculation Condition Judgment 25 1. Determine the inoculation timing: When the methane flow meter of the tertiary anaerobic seed tank 140 shows a biogas flow rate > 10 m³ / h, the tertiary anaerobic seed tank 140 is considered mature and ready for inoculation into the anaerobic tank. Phase Two: Inoculation Operation HK 30137559 A 14 2. Safety Confirmation Before Inoculation: Before inoculating into the anaerobic tank, the vent valve of the three-stage anaerobic seed tank 140 must be opened to release the pressure inside the tank and prevent pressure shock during inoculation; 3. Start Inoculation: After confirming that the vent valve is open, start the inoculation pump between the three-stage anaerobic seed tank 140 and the anaerobic tank to transport the highly active anaerobic bacteria in the three-stage anaerobic seed tank 140 to the anaerobic tank; Inoculation Time Control: The entire inoculation process should be completed within <1 hour. 5 Phase Three: Gas Production Start-up 4. Gas Production Observation: After inoculation, maintain the anaerobic tank at the set anaerobic environment and temperature (35-38℃);Typically, the anaerobic digester can begin to stably produce biogas 6-12 hours after inoculation. Phase Four: Operation and Management 10 5. Post-inoculation observation period (short-term): After the anaerobic digester is inoculated once, the production and operation status (including parameters such as gas production, pH value, temperature, and tank pressure) should be continuously observed and adjusted within one month to assess the adaptability of the microbial community and the stability of the system; 6. Stable operation period (long-term): If the "Compound Optimized Anaerobic Microbial Community" is successfully inoculated once, the anaerobic digester can maintain stable operation for 6-12 months. During this period, no further inoculation is required, significantly reducing operating costs and maintenance frequency. 15 The embodiments of the present invention have been described above with reference to the accompanying drawings. However, the present invention is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art, under the guidance of the present invention, can make many other forms without departing from the spirit and scope of the claims, and these all fall within the protection scope of the present invention. 20 HK 30137559 A 1 Claim 1. A multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation, characterized in that it comprises: a nitrogen tank for storing high-purity nitrogen; at least one reducing agent storage tank for storing fermentation aids; and a multi-stage series-connected anaerobic seed tank, wherein at least one of the anaerobic seed tanks is used to receive fruit and vegetable raw materials and anaerobic bacteria, and an air inlet of the anaerobic seed tank is connected to the output end of the nitrogen tank through a pipeline for receiving the high-purity nitrogen, so as to maintain an anaerobic environment in the anaerobic seed tank;The other air inlet of the anaerobic seed tank is connected to the output of the reducing agent storage tank through a pipeline, and is used to receive the fermentation aid so that the anaerobic seed tank can propagate highly active anaerobic strains and the anaerobic strains can be scaled up step by step. 2. The multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation according to claim 1, characterized in that the anaerobic seed tank comprises a primary anaerobic seed tank, a secondary anaerobic seed tank, and a tertiary anaerobic seed tank connected in series, wherein the primary anaerobic seed tank is used to store the fruit and vegetable raw materials and the 15 types of anaerobic bacteria; one air inlet of the primary anaerobic seed tank, the secondary anaerobic seed tank, and the tertiary anaerobic seed tank is connected to the output end of the nitrogen tank via a pipeline to receive the high-purity nitrogen gas, so as to maintain the anaerobic environment of the primary anaerobic seed tank, the secondary anaerobic seed tank, and the tertiary anaerobic seed tank; one air inlet of the primary anaerobic seed tank, the secondary anaerobic seed tank, and the tertiary anaerobic seed tank is connected to the output end of the reducing agent storage tank via a pipeline to receive the fermentation aid, so as to propagate the highly active anaerobic bacteria in the primary anaerobic seed tank, the secondary anaerobic seed tank, and the tertiary anaerobic seed tank, and to carry out the anaerobic bacteria culture at each stage. 3. The multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation according to claim 2, characterized in that, 25, the three-stage anaerobic seed tank is connected to the anaerobic tank via an inoculation pump, and the three-stage anaerobic seed tank is used to inoculate the anaerobic strains of the composite microorganisms after amplification culture into the anaerobic tank. HK 30137559 A 2 4. The multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation according to claim 3, characterized in that, the fermentation aid is sodium bicarbonate solution, sodium sulfide solution, or hydrolyzed acidified slurry. 5. The multi-stage anaerobic seed tank processing system for fruit and vegetable fermentation according to claim 3, characterized in that: 5 a first stirring motor is provided in the first-stage anaerobic seed tank, and a first double-layer spiral stirrer is provided on the rotating shaft of the first stirring motor; the first double-layer spiral stirrer is placed in the first-stage anaerobic seed tank to fully mix the components in the tank; 5 a second stirring motor is provided in the second-stage anaerobic seed tank, and a second double-layer spiral stirrer is provided on the rotating shaft of the second stirring motor; the second double-layer spiral stirrer is placed in the second-stage anaerobic seed tank to maintain large-scale mixing and safe foam control in the tank;A third stirring motor is installed in the three-stage anaerobic seed tank, and a third double-layer spiral stirrer is installed on the rotating shaft of the third stirring motor. The third double-layer spiral stirrer is placed inside the three-stage anaerobic seed tank to achieve large-scale homogenization and flow monitoring within the tank. 6. The multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation according to claim 5, characterized in that the volume of the first-stage anaerobic seed tank is selected as 200L, the volume of the second-stage anaerobic seed tank is selected as 2m³, and the volume of the third-stage anaerobic seed tank is selected as 60m³. 7. The multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation according to claim 6, characterized in that it further includes a methane flow meter installed on the branch pipe of the vent pipe of the third-stage anaerobic seed tank, which is used to monitor the biogas production flow rate. 8. The multi-stage anaerobic seed tank treatment system for fruit and vegetable fermentation according to any one of claims 1-7, characterized in that the volume of the anaerobic tank is selected as 150m³. 5 10 15 20 25 HK 30137559 A 1 Instruction Manual Attachments Figure 1 HK 30137559 A 2 Figure 2 HK 30137559 A;