Superheated steam generator
Patent Information
- Application Number
- HK42026126386
- Authority / Receiving Office
- HK · HK
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-02-17
- Filing Date
- 2026-07-20
- Publication Date
- 2026-09-11
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
(19) State Intellectual Property Office (21) Application No. 202511698407.0 (12) Invention Patent Application (10) Application Publication No. CN 122072079 A (43) Application Publication Date 2026. 05.22 F22G 5 / 00 (2006.01) (22) Application Date 2025.11.19 (30) Priority Data 2024- 202741 2024.11.20 JP 2025- 023510 2025.02.17 JP (71) Applicant: Tokuden Co., Ltd. Address: Kyoto Prefecture, Japan (72) Inventor: Toru Tomomura (74) Patent Agency: Beijing Xinhui Yongguang Intellectual Property Agency Co., Ltd. 11290 Patent Attorneys: Cui Yingbin, Lu Yi (51) Int.CI. F22B / / 28 (2006.01) F22B 35 / 00 (2006.01) F22G 1 / 16 (2006.01) Claims 2 pages Description 9 pages Drawings 5 pages (54) Invention Title Superheated Steam Generating Apparatus (57) Abstract The present invention provides a superheated steam generating apparatus that prevents damage to the steam generating section in a device that controls the amount of steam generated according to electrical force, comprising: a steam generating section (2), which generates steam from water by induction heating of a spiral first conductor tube (21); The superheated steam generating unit (3) generates superheated steam from water vapor by induction heating of the spiral second conductor tube (31); the control unit (61) controls the amount of water vapor generated by the water vapor generating unit according to the electrical force supplied to the water vapor generating unit; and the safety device (12) prevents damage to the water vapor generating unit or the superheated steam generating unit based on the pressure or temperature of the water vapor in the water vapor generating unit. The first conductor tube has a first wound tube section (21a) wound into a spiral shape, and the second conductor tube has a second wound tube section (31a) wound into a spiral shape. The safety device is provided in the first wound tube section or a connecting tube section that connects the first wound tube section and the second wound tube section. I§ CN '122072079 A Claims 1 / 2 pages 1. A superheated steam generating apparatus, comprising: a steam generating unit that induction heats a spiral first conductor tube to generate steam from water; a superheated steam generating unit that induction heats a spiral second conductor tube to generate superheated steam from the steam; a control unit that controls the amount of steam generated by the steam generating unit based on an electrical force supplied to the steam generating unit; and a safety device that prevents damage to the steam generating unit or the superheated steam generating unit based on the pressure or temperature of the steam in the steam generating unit, wherein the first conductor tube has a first wound tube portion wound into a spiral shape, and the second conductor tube has a second wound tube portion wound into a spiral shape.1. The safety device is disposed in the first winding tube section or in a connecting tube section connecting the first winding tube section and the second winding tube section. 2. The superheated steam generating device according to claim 1, wherein the first conductor tube has a first outlet tube section having a first outlet port for discharging water vapor, the second conductor tube has a second inlet tube section having a second inlet port for discharging water vapor, and the connecting tube section includes at least the first outlet tube section and the second inlet tube section. 3. The superheated steam generating device according to claim 1 or 2, wherein the safety device has a discharge section disposed in the first winding tube section or in a connecting tube section connecting the first winding tube section and the second winding tube section, for discharging the water vapor to the outside. 4. The superheated steam generating apparatus according to claim 1, wherein the safety device comprises: a pressure sensor disposed in the first winding tube section or in a connecting pipe section connecting the first winding tube section and the second winding tube section, for detecting the pressure of the steam; and a safety circuit for outputting an alarm signal based on the pressure detected by the pressure sensor. 5. The superheated steam generating apparatus according to claim 1, wherein the safety device comprises: a temperature sensor disposed in the first winding tube section or in a connecting pipe section connecting the first winding tube section and the second winding tube section, for detecting the temperature of the steam; and a safety circuit for outputting an alarm signal based on the temperature detected by the temperature sensor. 6. The superheated steam generating apparatus according to claim 1, wherein the safety device comprises: a pressure sensor disposed in the first winding tube section or a connecting pipe section connecting the first winding tube section and the second winding tube section, for detecting the pressure of the steam; a temperature sensor disposed in the first winding tube section or a connecting pipe section connecting the first winding tube section and the second winding tube section, for detecting the temperature of the steam; and a safety circuit for outputting an alarm signal based on the pressure detected by the pressure sensor and the temperature detected by the temperature sensor. 7. The superheated steam generating apparatus according to any one of claims 4 to 6, wherein the safety circuit outputs a warning signal in the stage prior to outputting the alarm signal. 8. The superheated steam generating apparatus according to claim 1, wherein the safety device is further disposed in the second winding tube section or a second outlet pipe section having a second outlet for discharging superheated steam, for preventing damage to the steam generating section or the superheated steam generating section based on the pressure or temperature of the superheated steam. 3 CN '122072079 A Specification 1 / 9 pages Superheated Steam Generating Device Technical Field
[0001] This invention relates to a superheated steam generating device. Background Art
[0002] As a conventional superheated steam generating device, as shown in Patent Document 1, consider the following superheated steam generating device (electrically controlled method): it has: a water vapor generating unit of induction heating method, which heats water to generate water vapor; and a superheated steam generating unit of induction heating method, which heats water vapor to generate superheated steam, and the amount of water vapor generated by the water vapor generating unit is controlled according to the electrical power supplied to the water vapor generating unit. Prior Art Documents Patent Documents
[0003] Patent Document 1: Japanese Patent Application Publication No. 2019-113282 Summary of the Invention Problem to be Solved by the Invention
[0004] In this superheated steam generating device of the electrically controlled method, the amount of heat per unit weight of water turning into water vapor under a specified pressure is fixed as a physical constant. Therefore, by converting the heat of the generated water vapor into electricity and supplying it, high controllability of the generated water vapor amount can be obtained.
[0005] However, in the electrically controlled method, since the electricity required to generate the desired amount of water vapor is supplied, the amount of water vapor can be generated stably, but the ejection pressure is naturally adjusted according to the amount of water vapor generated. That is, the ejection pressure increases with the load loss of the steam flow path, and in the worst case, the ejection pressure rises until the device is destroyed.
[0006] Therefore, the present invention was made to solve the above-mentioned problems, and its main objective is to prevent damage to the steam generation section or the superheated steam generation section in a device that controls the amount of steam generated according to electrical force.
[0007] The means for solving the problem is that the superheated steam generating apparatus of the present invention is characterized by comprising: a steam generating section that generates steam from water by induction heating a spiral first conductor tube; a superheated steam generating section that generates superheated steam from the steam by induction heating a spiral second conductor tube; a control section that controls the amount of steam generated by the steam generating section according to an electrical force supplied to the steam generating section; and a safety device that prevents damage to the steam generating section or the superheated steam generating section based on the pressure or temperature of the steam in the steam generating section, wherein the first conductor tube has a first wound tube section wound into a spiral shape, the second conductor tube has a second wound tube section wound into a spiral shape, and the safety device is provided in the first wound tube section or in a connecting tube section between the first wound tube section and the second wound tube section. [000S] In electrically controlled superheated steam generating devices, for example, when the evaporation temperature increases by 10°C from 120°C to 130°C, the pressure increases by approximately 1.36 times from approximately 0.199 MPa to approximately 0.27 MPa, but the required enthalpy remains at 1.0055 times, increasing from 2706 kJ / kg to 2721 kJ / kg. Although it is difficult to consider a method where the pressure also increases by 36%, even so, the steam generation rate is controlled within a variation of 0.55%. Furthermore, when the evaporation temperature increases by 55°C from 120°C...At 175°C, the pressure increases by approximately 4.49 times from approximately 0.199 MPa to 0.892 MPa, but the required enthalpy remains at 1.0251 times, decreasing from 2706 kJ / kg to 2774 kJ / kg, while the steam generation rate is controlled within a variation of 2.51%. The superheated steam generating device of this invention (CN 122072079 A specification, pages 2 / 9) can activate the safety device when the stability of the steam generation rate is set within, for example, ±1%, at a pressure of 0.35 MPa (enthalpy approximately 2730 kJ / kg). At a pressure of 0.35 MPa, compared to 99.63°C (pressure 0.1 MPa and enthalpy approximately 2675 kJ / kg), the flame intensity increases by approximately 2.0%, and the variation in steam generation rate can be controlled within ±1%. Temperature (r) Pressure (M, Pa) Pressure ratio (kMcg) Enthalpy ratio 120 0.1955 - 2706 - 130 0.2701 1 36 2721 1.0055 175 0.3920 4.49 1.0251
[0009] Furthermore, according to the present invention, even if the ejection pressure (and the ejection temperature corresponding to the ejection pressure) increases with the increase of load loss in the steam flow path such as the first conductor tube, damage to the steam generation section or the superheated steam generation section can be prevented by the safety device. In addition, in the present invention, even if the strength of the conductor tube decreases with the increase of temperature, damage to the conductor tube can be prevented by the safety device.
[0010] In particular, in this invention, the safety device is provided in the first winding section of the first conductor tube or in a connecting pipe section that connects the first winding section of the first conductor tube to the second winding section of the second conductor tube. Therefore, it is possible to directly detect the pressure rise or temperature rise of water vapor in the water vapor generation section, and to prevent damage to the water vapor generation section or the superheated water vapor generation section. Here, the connecting pipe section includes at least a first outlet pipe section and a second inlet pipe section. The first outlet pipe section has a first outlet port for discharging water vapor from the first conductor tube, and the second inlet pipe section has a second inlet port for inleting water vapor from the second conductor tube.
[0011] As a specific embodiment of the safety device, it is preferable that the safety device has a discharge section, which is provided in the first winding section or in the connecting pipe section that connects the first winding section to the second winding section, to discharge the water vapor to the outside.
[0012] As another specific embodiment of the safety device, the safety device preferably includes: a pressure sensor disposed in the first winding tube section or a connecting tube section connecting the first winding tube section and the second winding tube section, for detecting the pressure of the water vapor; and a safety circuit that outputs an alarm signal based on the pressure detected by the pressure sensor. Specifically, the safety circuit can be considered to trigger an alarm signal if the fluctuation of the target water vapor generation exceeds a certain threshold.The point pressure is compared with the detection pressure of the pressure sensor, and an alarm signal is output when the detection pressure becomes the boundary point pressure. In this structure, the enthalpy value calculated based on the saturated steam temperature is converted into the amount of steam generated, and an alarm is issued when the boundary point pressure exceeds the fluctuation range of the target steam generation amount. In the electrically controlled superheated steam generator, since there is no pressure reducing valve, steam quantity adjustment valve, or electric proportional valve, the steam pressure is lower, and the saturated steam pressure of 0.1 MPa, saturated steam temperature of 99.63 °C, and enthalpy of 2675 kJ / kg can be considered as the minimum values. For example, if the fluctuation range of the target steam generation amount is ±1.5%, the enthalpy is 2675 x 1.03 = 2755 kJ / kg, and the corresponding saturated steam pressure is 0.6 MPa and the saturated steam temperature is 158.84 °C. In this case, the boundary point pressure is set to, for example, 0.6 MPa. That is, if the enthalpy of 2715 kJ / kg used for steam generation is converted into electricity and applied, even if the ejection pressure becomes 0.6 MPa due to increased load pressure loss, the amount of steam generated decreases by approximately 1.47% (2755 / 2715) - 1 = 0.0147. Conversely, when the load pressure loss decreases to 0.1 MPa, it increases by approximately 1.47% (1 - (2675 / 2715) > 0.0147). Therefore, the amount of steam generated varies by approximately ±1.5%. Furthermore, the actual electricity input considers the heat generated to raise the water temperature and the efficiency of heat dissipation devices, but the above calculations only consider the steam generation. [00131 As another specific embodiment of the safety device, the safety device preferably includes: a temperature sensor, which is installed in the first winding tube section or a connecting tube section connecting the first winding tube section and the second winding tube section, to detect the temperature of the tX vapor; and a safety circuit, which outputs an alarm signal based on the detected temperature of the temperature sensor. Specifically, the safety circuit preferably compares the boundary point temperature exceeding the variation range of the target water vapor production amount with the detected temperature of the temperature sensor, and outputs an alarm signal when the detected temperature becomes the boundary point temperature. In this structure, the enthalpy value calculated based on the saturated vapor temperature is converted into the amount of water vapor generated, and an alarm is issued at the boundary point temperature exceeding the variation range of the target water vapor production amount. If the variation range of the target water vapor production amount is ±1.5% as described above, the boundary point temperature can be set, for example, to 158.84°C.
[0014] As another specific embodiment of the safety device, the safety device preferably includes: a pressure sensor, which is installed in the first winding tube section or a connecting tube section connecting the first winding tube section and the second winding tube section, to detect the temperature of the tX vapor; and a safety circuit, which outputs an alarm signal based on the detected temperature of the temperature sensor. Specifically, the safety circuit preferably compares the boundary point temperature exceeding the variation range of the target water vapor production amount with the detected temperature of the temperature sensor, and outputs an alarm signal when the detected temperature becomes the boundary point temperature. In this structure, the enthalpy value calculated based on the saturated vapor temperature is converted into the amount of water vapor generated, and an alarm is issued at the boundary point temperature exceeding the variation range of the target water vapor production amount. If the variation range of the target water vapor production amount is ±1.5%, the boundary point temperature can be set to, for example, 158.84°C.The pressure of the water vapor is detected at the first winding tube section or the connecting tube section connecting the first winding tube section and the second winding tube section; a temperature sensor is provided at the first winding tube section or the connecting tube section connecting the first winding tube section and the second winding tube section to detect the temperature of the water vapor; and a safety circuit outputs an alarm signal based on the detected pressure of the pressure sensor and the detected temperature of the temperature sensor.
[0015] Preferably, the safety circuit outputs a warning signal in the stage before outputting the alarm signal. If this is the configuration, the warning signal is output before the alarm signal is output, thus prompting the inspection of the user-side equipment of the superheated steam generating device 100.
[0016] It is conceivable that the safety device is also provided at the second winding tube section or the second outlet tube section having a second outlet for superheated steam to prevent damage to the water vapor generating section or the superheated steam generating section based on the pressure or temperature of the superheated steam. If this structure is used, the pressure rise or temperature rise in the steam generation section can be indirectly detected by means of the pressure or temperature of the superheated steam in the superheated steam generation section, thus preventing damage to the steam generation section or the superheated steam generation section. Effects of the Invention
[0017] According to the present invention configured in this way, in a device that controls the amount of steam generated according to electrical force, damage to the steam generation section or the superheated steam generation section can be prevented. Brief Description of the Drawings
[0018] FIG1 is a diagram schematically showing the structure of the superheated steam generation device of the first embodiment. FIG2 is a diagram showing an example of a hollow conductor tube of the same embodiment. FIG3 is a diagram mainly showing the core structure of each steam generation section of the same embodiment. FIG4 is a diagram showing a modified example of the core structure of each steam generation section of the same embodiment. FIG5 is a diagram showing the wiring of the induction coil in each steam generation section of the same embodiment. FIG6 is a diagram schematically showing the structure of the control device of the same embodiment. FIG7 is a diagram schematically showing the structure of the superheated steam generation device of the second embodiment. FIG8 is a graph showing the operation of the superheated steam generation device of the same embodiment. Figure 9 is a schematic diagram showing the structure of a superheated steam generating apparatus according to a modified embodiment. Figure 10 is a schematic diagram showing the structure of a superheated steam generating apparatus according to a modified embodiment. 6 CN*122072079 A Specification 4 / 9 pages Detailed Embodiments
[0019] <First Embodiment> Hereinafter, a first embodiment of the superheated steam generating apparatus of the present invention will be described with reference to the accompanying drawings.
[00201] The superheated steam generating apparatus 100 of this embodiment heats water to generate superheated steam exceeding 10 (rC (200°C to 2000°C)).
[0021] Specifically, as shown in Figure 1, the superheated steam generating apparatus 100 includes: a steam generating unit 2 (hereinafter referred to asSaturated water vapor generating unit 2 heats water to generate saturated water vapor; and superheated water vapor generating unit 3 heats saturated water vapor to generate superheated water vapor. The power supply circuit is omitted from the figure.
[0022] <Structure of Saturated Water Vapor Generating Unit 2> The saturated water vapor generating unit 2 is an induction heating unit, comprising: a first conductor tube 21 wound into a spiral shape; and a magnetic flux generating mechanism 22 for induction heating of the first conductor tube 21.
[0023] As shown in FIG2, the first conductor tube 21 is formed from a metal tube, having a wound portion wound into a spiral shape, namely a first wound tube portion 21a. A first inlet port P1 for introducing water is formed at one end, and a first outlet port P2 for discharging the generated saturated water vapor is formed at the other end. The first inlet port P1 is formed in a first inlet tube portion 21b extending outward from one end of the first wound tube portion 21a. Furthermore, the first outlet P2 is formed in the first outlet tube 21c extending outward from the other end of the first winding tube 21a. The first conductor tube 21 serves as a container for generating saturated water vapor. Additionally, the first conductor tube 21 can be made of austenitic stainless steel such as SUS304, or alloys such as nickel-iron alloys, which have high heat resistance and mechanical strength. Furthermore, the adjacent winding portions of the first conductor tube 21 are electrically connected by welding or the like.
[0024] The magnetic flux generating mechanism 22 includes an iron core 22a and an induction coil 22b wound along the iron core 22a. An AC power source is connected to the induction coil 22b, supplying controlled power. The power frequency of the AC power source is a commercial frequency of 50Hz or 60Hz. The induction coil 22b, powered by the AC power source, is a primary coil. As a result of being powered by the primary coil, an induced current flows in the first conductor tube 21, which is a secondary coil wound once. Furthermore, the first conductor tube 21 generates Joule heating, and the water inside the first conductor tube 21 is heated to generate saturated water vapor. Additionally, water is stored in the first conductor tube 21 to a predetermined height.
[0025] <Structure of the Superheated Steam Generating Unit 3> The superheated steam generating unit 3 is an induction heating unit, comprising: a second conductor tube 31 wound into a spiral shape; and a magnetic flux generating mechanism 32 for induction heating of the second conductor tube 31.
[0026] As shown in FIG2, the second conductor tube 31 is formed from a metal tube, having a wound portion wound into a spiral shape, namely a second wound tube portion 31a. A second inlet P3 is formed at one end to introduce water vapor from the saturated water vapor generating unit 2, and a second outlet P4 is formed at the other end to discharge the generated superheated steam. The second inlet P3 is formed at the second inlet tube portion 31b extending outward from one end of the second wound tube portion 31a. Furthermore, the second outlet P4 is formed at...A second outlet tube 31c extends outward from the other end of the second winding tube 31a. This second conductor tube 31 serves as a container for generating superheated steam. Furthermore, the second conductor tube 31 can be made of austenitic stainless steel such as SUS304, or alloys such as chromium-nickel-iron alloys, which have high heat resistance and mechanical strength. Additionally, adjacent winding portions of the second conductor tube 31 are electrically connected by welding or the like. [C°°27] An external pipe or the first outlet P2 of the first conductor tube 21 of the saturated steam generation unit 2 is connected to the second inlet P3. This external pipe supplies steam from the saturated steam generation unit 2 to the second conductor tube 31. That is, the first winding tube 21a of the first conductor tube 21 and the second winding tube 31a of the second conductor tube 31 are connected by a connecting tube CP, which includes at least the first outlet tube 21c and the second inlet tube 31b. In addition, in the presence of external piping, the external piping also becomes part of the connecting pipe section CP, as described on page 5 / 9 of the specification 7 CN'122072079 A. Furthermore, an external piping for supplying the generated superheated steam to the utilization side (e.g., the heat treatment chamber) is connected to the second outlet P4.
[0028] The flux generating mechanism 32 includes an iron core 32a and an induction coil 32b wound along the iron core 32a. An AC power supply is connected to the induction coil 32b, and controlled power is supplied. In addition, the power frequency of the AC power supply is a commercial frequency of 50Hz or 60Hz. The induction coil 32b powered by the AC power supply is a primary coil, and as a result of being powered by the primary coil, an induced current flows in the second conductor tube 31, which is a secondary coil wound once. Furthermore, the second conductor tube 31 is Joule heated, and the water vapor flowing inside is heated.
[0029] As shown in Figures 3 and 4, in the superheated steam generating apparatus 100 of this embodiment, in addition to the iron core 22a of the saturated steam generating section 2 and the iron core 32a of the superheated steam generating section 3, a common iron core 41 is also provided, which serves as a common path for the magnetic flux generated by the two iron cores 22a and 32a. Furthermore, by connecting the iron cores 42 and 43, the common iron core 41 and the upper and lower parts of the two iron cores 22a and 32a are respectively connected to form a single three-legged iron core. According to this structure, the overall size of the iron core can be reduced, thereby achieving a compact overall apparatus. That is, the superheated steam generating apparatus 100 of this embodiment uses a single three-legged iron core to construct the saturated steam generating section 2 and the superheated steam generating section 3.
[0030] Furthermore, in Figures 3 and 4, in top view, each iron core 22a.32a.41 is arranged at the vertex of a triangle, and the connecting iron cores 42 and 43 are bent with the common iron core 41 as the bending point in top view. As a result, the distance between the two iron cores 22a.32a can be reduced, and the overall width dimension of the tripod iron core can be reduced, thereby saving space.
[0031] Furthermore, in this embodiment, the induction coil 22b of the saturated steam generating unit 2 and the induction coil 32b of the superheated steam generating unit 3 are connected in a Scott connection manner to convert the three-phase AC power from the three-phase AC power supply 5 into two single-phase AC power (see FIG5). That is, the superheated steam generating device 100 of this embodiment is configured to have a Scott connection transformer with a single three-legged iron core. When the Scott connection transformer is composed of a main transformer and a T-type transformer, the part corresponding to the saturated steam generating unit 2 becomes the main transformer, and the part corresponding to the superheated steam generating unit 3 becomes the T-type transformer.
[0032] In addition, as shown in FIG5, a first control device 10 for controlling voltage or current is provided on one of the two phases on the input side of the main transformer. In addition, in FIG5, a semiconductor control element such as a thyristor, which serves as the first control device 10, is provided on the V phase on the input side of the main transformer. Furthermore, a second control device 11 for controlling voltage or current is provided on one end of the primary coil (induction coil 32b) of the T-type transformer (U-phase side or midpoint 0 side of the primary coil of the T-type transformer). This second control device 11 is also the same as the first control device 10, using semiconductor control elements such as thyristors. Moreover, the control device 6 is configured to control the voltage applied to the primary coil (induction coil 22b) of the main transformer and the voltage applied to the primary coil (induction coil 32b) of the T-type transformer separately by controlling the first control device 10 and the second control device 11. In addition, the control device 6 is a computer with a CPU, memory, input / output interface, etc.
[0033] <Control of superheated steam generating device 100> The control device 6 controls the amount of saturated steam in the saturated steam generating unit 2 as follows.
[0034] As shown in FIG. 6, the control device 6 includes a water vapor quantity control unit 61, which controls the amount of saturated water vapor generated by the saturated water vapor generating unit 2 based on the electrical force supplied to the saturated water vapor generating unit 2. Furthermore, the control device 6 also includes a relational data storage unit 62, which stores relational data representing the relationship between the amount of water vapor generated by the saturated water vapor generating unit 2 and the electrical force supplied to the saturated water vapor generating unit 2.
[0035] The relational data stored in the relational data storage unit 62 is obtained by actually measuring the amount of water vapor generated by the saturated water vapor generating unit 2 and the electrical force supplied to the saturated water vapor generating unit 2. Moreover, this relational data is data actually measured when the first outlet P2 of the first conductor tube 21 of the saturated water vapor generating unit 2 is open at atmospheric pressure (atmospheric pressure conditions).
[0036] In addition, the water vapor quantity control unit 61 obtains data from a power meter 7 that measures the amount of electricity supplied to the saturated water vapor generating unit 2.The electrical power data is obtained, and the first control device 10 is controlled using the relational data to achieve a predetermined amount of steam. Specifically, the steam quantity control unit 61 controls the first control device 10 so that the electrical power obtained by the power meter 7 becomes the target electrical power calculated based on the relational data and the predetermined amount of steam. In addition, the power meter 7 is installed on any one of the two phases of the input side of the main transformer constituting the saturated steam generation unit 2. That is, in this embodiment, the saturated steam quantity is controlled solely based on the electrical power obtained by the power meter 7.
[0037] In the superheated steam generation device 100 that performs this steam quantity control, the saturated steam generation unit 2 and the superheated steam generation unit 3 operate under atmospheric pressure conditions. Furthermore, specifically, in the connecting pipe section CP between the saturated steam generation unit 2 and the superheated steam generation unit 3, no pressure reducing valve, steam quantity adjustment valve, electric proportional valve, etc., are provided.
[0038] Furthermore, during the period from startup to the aforementioned steam quantity control, the control device 6 controls the first control device 10 to supply the power to the saturated steam generating unit 2 at a value below the maximum value or the value at which no malfunction occurs in each part. Then, this control is performed until the water in the saturated steam generating unit 2 is about to reach 100°C, for example, 95°C, after which the control device 6 switches to the aforementioned steam quantity control.
[0039] In addition, the control device 6 controls the temperature of the superheated steam generated by the superheated steam generating unit 3 as follows.
[0040] In the superheated steam generating apparatus 100 of this embodiment, the temperature of the superheated steam discharged from the second conductor pipe 31 of the superheated steam generating unit 3 or the piping temperature of the second outlet P4 of the second conductor pipe 31 is detected by the temperature detector 8.
[0041] Furthermore, the control device 6 also includes a temperature control unit 63, which inputs a control signal corresponding to the deviation between the detected temperature obtained by the temperature detector 8 and the target temperature of the superheated steam into the second control device 11 to control the AC voltage applied to the induction coil 32b. The temperature control unit 63 performs feedback control on the temperature of the superheated steam heated by the second conductor tube 31 so that its deviation from the target temperature is less than ±rc.
[0042] Furthermore, in this embodiment, a safety device 12 is also provided, which prevents the saturated steam generating unit 2 from breaking based on the pressure or temperature of the steam generated by the steam generating unit 2.
[0043] The safety device 12 shown in FIG1 is provided between the saturated steam generating unit 2 or between the steam generating unit 2 and the superheated steam generating unit 3, and has a discharge section 12a that releases the steam generated by the saturated steam generating unit 2 to the outside.
[0044] The discharge section 12a is a safety valve that releases steam to the outside when a set pressure is reached. Specifically, when the pressure of the steam is less than the set pressure of 1 MPa (equivalent to 179.88°C), the safety valve lh opens the inner valve of the first conductor tube 21.The steam inside the first conductor tube 21 is released to the outside. The superheated steam generating device 100 of this embodiment is equivalent to a small once-through boiler or a simple once-through boiler according to the boiler and pressure vessel safety regulations. The safety valve 12a releases the steam inside the first conductor tube 21 to the outside, for example, at a steam pressure of 0.4 MPa (specifically 0.4758 MPa (equivalent to 150°C)). Furthermore, the safety valve 12a is provided in the first wound tube section 21a or the connecting tube section CP of the first conductor tube 21, which connects the first wound tube section 21a of the first conductor tube 21 to the second wound tube section 31a of the second conductor tube 31. In this embodiment, the safety valve 12a is provided in the first outlet tube section 21c within the connecting tube section CP. Alternatively, the safety valve 12a may be provided at the upper part of the first wound tube section 21a. Furthermore, the safety valve 12a may also be provided in the second inlet tube section 31b of the second conductor tube 31.
[0045] According to the superheated steam generating device 100 configured in this way, since the electricity required to generate the desired amount of steam is supplied, the amount of steam generated can be stably generated. As a result, the output of superheated steam at a specified temperature can be stabilized within an error range of ±1%. Furthermore, even if the ejection pressure increases with the increase of load loss in the steam flow path, when the specified pressure is reached (see page 7 / 9 of the specification 9 CN'122072079 A), the safety valve 12a releases the steam inside the first conductor tube 21 to the outside, thus preventing damage to the superheated steam generating device, including the steam generating section 2.
[0046] Steam heating is a heating method in which even loads with complex shapes can be heated relatively uniformly by bypassing them with steam, and because it is extremely low in oxygen, it is safe in terms of explosion-proof and flammability. In addition, since the energy supplied by steam is basically proportional to the product of steam temperature and steam quantity, conventional boilers control the amount of steam by controlling the steam pressure through pressure reducing valves and adjusting the steam flow path area through proportional valves. The control of valves based on such mechanical structures is difficult to achieve precise control and reproducibility, therefore steam heating cannot be applied to precision machining. The electric control method of this embodiment solves this difficulty, realizing steam heating as a uniform and high-precision heating method.
[0047] <Second Embodiment> Next, the superheated steam generating device 100 of the second embodiment will be described with reference to FIG7. Compared with the first embodiment, the superheated steam generating device 100 of the second embodiment has the same structure of saturated steam generating unit 2 and superheated steam generating unit 3, but the structure of safety device 12 is different.
[0048] Specifically, as shown in FIG7, the safety device 12 has: a pressure sensor 12b, which detects the generation of saturated steam.The pressure sensor 12b generates water vapor; the temperature sensor 12c detects the temperature of the water vapor generated by the saturated water vapor generating unit 2; and the safety circuit 12d outputs an alarm signal to cut off or limit the power supply to the saturated water vapor generating unit 2 based on the pressure detected by the pressure sensor 12b and the temperature detected by the temperature sensor 12c. The pressure sensor 12b and the temperature sensor 12c are disposed between the water vapor generating unit 2 or between the water vapor generating unit 2 and the superheated water vapor generating unit 3. Specifically, the pressure sensor 12b and the temperature sensor 12c are disposed at the first winding tube section 21a or the connecting tube section CP of the first conductor tube 21, which connects the first winding tube section 21a of the first conductor tube 21 to the second winding tube section 31a of the second conductor tube 31. Furthermore, the water vapor quantity control unit 61 cuts off or limits the power supply to the saturated water vapor generating unit 2 based on the alarm signal output from the safety circuit 12d. Furthermore, the safety circuit 12d can also issue an alarm signal to the user based on the detected pressure of the pressure sensor 12b and the detected temperature of the temperature sensor 12c.
[0049] Here, the safety circuit 12d compares the detected pressure of the pressure sensor 12b with a threshold pressure less than 1 MPa (e.g., 0.35 MPa), and outputs an alarm signal if the detected pressure is above the threshold pressure. Furthermore, the safety circuit 12d compares the detected temperature of the temperature sensor 12c with a threshold temperature less than 179.88°C, and outputs an alarm signal if the detected temperature is above the threshold temperature.
[0050] Thus, the safety circuit 12d sets a threshold temperature (alarm temperature) or a threshold pressure (alarm pressure) based on the variation range (e.g., ±1%) of the target water vapor generation. Therefore, countermeasures can be taken on the user side to reduce the pressure loss value of the water vapor flow path. In the power control mode, the stability of the generated water vapor quantity can be clearly defined numerically, improving user convenience.
[0051] Specifically, the safety circuit 12d can also compare the boundary point pressure exceeding the target steam generation variation range with the detection pressure of the pressure sensor 12b, and output an alarm signal when the detection pressure is the boundary point pressure. Furthermore, the steam quantity control unit 61 can also cut off or limit the power supply to the saturated steam generation unit 2 when an alarm signal is output from the safety circuit 12d. In the electrically controlled superheated steam generation device, since no pressure reducing valve, steam quantity adjustment valve, or electric proportional valve is provided, the steam pressure is lower, and the saturated steam pressure of 0.1 MPa, saturated steam temperature of 99.63°C, and enthalpy of 2675 kJ / kg can be considered as the minimum values. For example, if the target steam generation variation range is ±1.5%, the enthalpy is 2675 x 1.03 = 2755 kJ / kg, and the corresponding saturated steam pressure...The pressure is 0.6 MPa, and the saturated steam temperature is 158.84°C. In this case, the boundary point pressure is set to, for example, 0.6 MPa. Additionally, the boundary point pressure can be set to a pressure lower than the set pressure of the discharge section 12a, as per page 8 / 9 of the specification 10 Cn'122072079 A.
[0052] Furthermore, the safety circuit 12d can also output a warning signal if the detected pressure of the pressure sensor 12b exceeds the boundary point pressure (e.g., 0.6 MPa) or is lower than a predetermined threshold pressure (caution pressure, e.g., 0.30 MPa) than the threshold pressure (alarm pressure, e.g., 0.35 MPa). Here, the warning pressure is set to a pressure at which the user-side equipment of the superheated steam generator 100 will not be damaged. By outputting a warning signal based on the warning pressure in this way, inspection of the user-side equipment of the superheated steam generator 100 can be prompted.
[0053] Furthermore, the safety circuit 12d can also compare the boundary point temperature exceeding the target water vapor generation variation range with the detection temperature of the temperature sensor 12c, and output an alarm signal if the detected temperature is the boundary point temperature. Furthermore, the water vapor quantity control unit 61 can also cut off or limit the power supply to the saturated water vapor generation unit 2 if an alarm signal is output from the safety circuit 12d. If the target water vapor generation variation range is ±1.5% as described above, the boundary point temperature can be set to, for example, 158.84°C. Additionally, the boundary point temperature is set to a temperature at which the corresponding saturated steam pressure is less than the set pressure of the discharge unit 12a.
[0054] Furthermore, the safety circuit 12d can also output a warning signal if the temperature detected by the temperature sensor 12c exceeds the boundary point temperature (e.g., 158.84°C) or a predetermined threshold temperature (caution temperature) lower than the threshold temperature (alarm temperature). Here, the warning temperature is set to a temperature at which the user-side equipment of the superheated steam generation device 100 will not be damaged. By outputting a notice signal based on the notice temperature, it is possible to prompt the inspection of the user-side equipment of the superheated steam generator 100.
[0055] As the heat required for the steam generator 2, there is also heat to make the water temperature 99.63 °C, but this is an inherent value for each model. If the inlet water temperature range is specified, there will be no large variation. In addition, heat dissipation from piping, etc. is also related to temperature, but the generated steam temperature is a relatively low value of 100 to 18 °C, and since heat insulation is implemented, it is a small value compared to the latent heat of vaporization, and the impact is slight. By taking this heat dissipation into account in the calculation of the actual measured variation value, the boundary point pressure or boundary point temperature can be calculated accurately.
[00561] In addition, the safety device 12 may also have the structure of the discharge section 12a of the first embodiment described above, based on the structure of FIG7.
[0057] The safety device 12 is structured with a discharge section 12a based on the safety circuit 12d. As shown in FIG8, the superheated steam generating device 100 performs the following phased operations: as a first phase, it outputs a warning signal (preparatory alarm) based on the warning pressure (warning temperature); as a second phase, it cuts off or restricts the power supply to the saturated steam generating unit 2 based on the alarm pressure (alarm temperature); and as a third phase, it releases steam to the outside through the discharge section 12a.
[0058] Furthermore, the safety device 12 may also be structured without the temperature sensor 12c as in FIG7. In this case, the safety circuit 12d outputs an alarm signal based on the detected pressure of the pressure sensor 12b, which is used to cut off or restrict the power supply to the saturated steam generating unit 2.
[0059] Also, the safety device 12 may also be structured without the pressure sensor 12b as in FIG7. In this case, the safety circuit 12d outputs an alarm signal based on the detected temperature of the temperature sensor 12c, which is used to cut off or restrict the power supply to the saturated steam generating unit 2. [C0060] <Other Modified Embodiments> In addition to a safety valve that opens when a set pressure is reached, the discharge section 12a of the safety device 12 can also be a device that releases water vapor to the outside based on an opening signal from the outside. In this case, as shown in FIG9, the safety circuit 12d can output an opening signal to the discharge section 12a based on the pressure detected by the pressure sensor 12b or the temperature detected by the temperature sensor 12c. 11 CN'122072079 A Specification 9 / 9 pages
[0061] Furthermore, as shown in FIG10, the safety device 12 can be provided in the second winding tube section 31a or the second outlet tube section 31c of the superheated steam generating section 3, or it can be provided in the water vapor generating section 2 or the water supply pipe 13 that supplies water to the water vapor generating section 2. In addition, these structures can also be added to the structure in which the above-mentioned safety device 12 is provided in the first winding tube section 21a or the connecting pipe section CP.
[0062] When the safety device 12 is installed in the superheated steam generating section 3, as shown in FIG10, it is possible to install the above-mentioned discharge section 12a or pressure sensor 12b via the measuring tube 14 at or near the second outlet P4 of the second outlet section 31c of the second conductor tube 31 (e.g., the straight pipe section). Alternatively, the above-mentioned temperature sensor 12c can be installed at or near the second outlet P4 of the second outlet section 31c of the second conductor tube 31 (e.g., the straight pipe section). Furthermore, the safety operation using each of the discharge section 12a, pressure sensor 12b, or temperature sensor 12c is as described above. Regarding the safety operation using the temperature sensor 12c, since the superheated steam generating section 3 is temperature-controlled, whether it operates depends on its set temperature.Function. For example, when the set temperature of the superheated steam is 150°C, the temperature rises as the load loss of the steam flow path increases, resulting in the control input of the temperature control unit 63 sometimes becoming zero. Subsequently, when the temperature of the superheated steam gradually rises, the safety operation of the temperature sensor 12c is activated.
[0063] Furthermore, when the safety device 12 is installed in the first inlet pipe 21b of the steam generation unit 2 or the water supply pipe 13, as shown in FIG10, it is possible to install the above-mentioned discharge part 12a or pressure sensor 12b at or near the first inlet port H of the first inlet pipe 21b of the steam generation unit 2 (e.g., the straight pipe section) or the water supply pipe 13. In addition, the safety operation of each part using the discharge part 12a or pressure sensor 12b is as described above.
[0064] Furthermore, the position of the discharge part 12a in the safety device 12 can be different from the position of the pressure sensor 12b or temperature sensor 12c. For example, it may be configured such that a pressure sensor 12b or a temperature sensor 12c is provided between the steam generation unit 2 or the steam generation unit 2 and the superheated steam generation unit 3, and a discharge unit 12a is provided in the steam generation unit 2 or the water supply pipe 13 to discharge water. Alternatively, it may be configured such that a pressure sensor 12b or a temperature sensor 12c is provided in the superheated steam generation unit 3, and a discharge unit 12a is provided in the steam generation unit 2 or the water supply pipe 13 to discharge water. Furthermore, it may be configured such that a pressure sensor 12b is provided in the water supply pipe 13, and a discharge unit 12a is provided in the steam generation unit 2 or between the steam generation unit 2 and the superheated steam generation unit 3 to discharge steam.
[0065] A third inlet or a third inlet pipe section having the third inlet may also be provided in the connecting pipe section CP of the above embodiment to introduce steam, superheated steam, or other gases other than steam from the outside. For example, steam generated by an external boiler, superheated steam introduced into the heat treatment chamber and then recirculated, or nitrogen are introduced into the third inlet. In this case, a safety device 12 is provided at the third inlet pipe section and the safety device 12 is installed at the connecting pipe section CP.
[0066] The saturated steam generating section 2 and the superheated steam generating section 3 can be electrically heated in addition to induction heating. In this case, an AC power supply or a DC power supply is connected to both ends of the conductor pipes 21 and 31 for fluid flow, and the conductor pipes 21 and 31 are Joule heated by flowing AC current or DC current in the conductor pipes 21 and 31. In this case, the conductor pipes 21 and 31 can be formed in various shapes, such as having multiple straight sections and multiple curved sections connecting two straight sections, in addition to being spiral.
[0067] Furthermore, the present invention is not limited to the above embodiments, and various modifications can be made without departing from its spirit. Explanation of reference numerals:
[0068] 100: Superheated steam generator; 2: Saturated steam generator (7K steam generator); 3: Superheated steam generator; 61: Steam quantity control unit (control unit); 12: Safety device; 12a: Discharge unit; 12b: Pressure sensor; 12c: Temperature sensor; 12d: Safety circuit. 12 CN 122072079 A Instruction Manual Appendix 1 / 5 Page Figure 1 Figure 2 13 CN*122072079 A Instruction Manual Appendix 2 / 5 Page [Europian View] 43 [Front View] Figure 3 2 [Top View] Figure 4 14 CN*122072079 A Instruction Manual Appendix 3 / 5 Page T-type transformer to second heating A degree control 《63 Power meter 7 Temperature detection unit 8 100 6 Superheated water steam Figure 5 6 Figure 6 15 CN 122072079 A Instruction Manual Appendix 4 / 5 Page 100 Figure 7 Water vapor release power supply cut-off warning signal (preparatory alarm) Release unit set pressure threshold pressure (alarm pressure) threshold pressure (caution pressure) time Figure 8 \...— I kn I y 22a 22b 32b 32a 16 CN 122072079 A Instruction Manual, Figures 5 / 5, P1 21b 63— Figure 9 Figure 10 17 Our Ref: 26HKI024-101 Summary of Invention Title: Superheated Water Vapor Generating Device This invention provides a superheated water vapor generating device that prevents damage to the water vapor generating section in a device that controls the amount of water vapor generated according to electrical power, and includes: a water vapor generating section (2), an induction heating spiral-shaped first conductor tube (21) to generate water vapor from water; a superheated water vapor generating section (3), an induction heating spiral-shaped second conductor tube (31) The device generates superheated steam from water vapor; a control unit (61) controls the amount of steam generated by the steam generator based on the electrical power supplied to the steam generator; and a safety device (12) prevents damage to the steam generator or the superheated steam generator based on the pressure or temperature of the steam in the steam generator. The first guide tube has a first spiral wound section (21a) and the second guide tube has a second spiral wound section (31a). The safety device is provided in the first spiral wound section or a connecting section connecting the first spiral wound section and the second spiral wound section.in which the amount of generated steam is controlled according to the amount of electrical power, the superheated steam generator having: a steam generation unit (2) that generates steam from water by inductively heating a first conductor pipe (21) having a spiral shape; a superheated steam generation unit (3) that generates superheated steam from the steam by inductively heating a second conductor pipe (31) having a spiral shape; a control unit (61) that controls an amount of steam generated by the steam generation unit according to an amount of electric power supplied to the steam generation unit; and a safety device (12) that prevents damage to the steam generation unit or the superheated steam generation unit based on a pressure or a temperature of the steam in the steam generation unit, wherein the first conductor pipe has a first winding pipe portion (21 a) wound into a spiral shape, the second conductor pipe has a second winding pipe portion (31 a) wound into a spiral shape, andthe safety device is provided at the first winding portion or at a communication pipe part communicably connecting the first winding pipe portion and the second winding pipe portion. Abstract
Claims
1. A superheated steam generating device, wherein, have: The steam generation section uses induction heating of the spiral-shaped first conductor tube to generate steam from water. The superheated steam generation unit induction heats the spiral-shaped second conductor tube to generate superheated steam from the water vapor; The control unit controls the amount of water vapor generated by the water vapor generating unit based on the electrical power supplied to the water vapor generating unit; as well as Safety devices prevent damage to the steam generating unit or the superheated steam generating unit based on the pressure or temperature of the steam in the steam generating unit. The first conductor tube has a first wound tube portion wound into a spiral shape. The second conductor tube has a second wound tube portion wound into a spiral shape. The safety device is disposed in the first winding tube section or in a connecting tube section that connects the first winding tube section and the second winding tube section.
2. The superheated steam generating device according to claim 1, wherein, The first conductor tube has a first outlet section, and the first outlet section has a first outlet for discharging water vapor. The second conductor tube has a second inlet section, which has a second inlet for introducing water vapor. The connecting tube section includes at least the first outlet tube section and the second inlet tube section.
3. The superheated steam generating device according to claim 1 or 2, wherein, The safety device has a discharge section, which is disposed in the first winding tube section or a connecting tube section connecting the first winding tube section and the second winding tube section, and discharges the water vapor to the outside.
4. The superheated steam generating device according to claim 1, wherein, The safety device has the following features: A pressure sensor is disposed in the first winding tube section or in a connecting tube section that connects the first winding tube section and the second winding tube section to detect the pressure of the water vapor; as well as The safety circuit outputs an alarm signal based on the pressure detected by the pressure sensor.
5. The superheated steam generating device according to claim 1, wherein, The safety device has the following features: A temperature sensor is disposed in the first winding tube section or in a connecting tube section that connects the first winding tube section and the second winding tube section to detect the temperature of the water vapor; as well as The safety circuit outputs an alarm signal based on the temperature detected by the temperature sensor.
6. The superheated steam generating device according to claim 1, wherein, The safety device has the following features: A pressure sensor is disposed in the first winding tube section or in a connecting tube section that connects the first winding tube section and the second winding tube section to detect the pressure of the water vapor; A temperature sensor is disposed in the first winding tube section or in a connecting tube section that connects the first winding tube section and the second winding tube section to detect the temperature of the water vapor; as well as The safety circuit outputs an alarm signal based on the pressure detected by the pressure sensor and the temperature detected by the temperature sensor.
7. The superheated steam generating apparatus according to any one of claims 4 to 6, wherein, The safety circuit outputs an attention signal in the stage before outputting the alarm signal.
8. The superheated steam generating device according to claim 1, wherein, The safety device is also provided on the second winding tube section or the second outlet tube section having a second outlet for discharging superheated steam, to prevent damage to the steam generating section or the superheated steam generating section based on the pressure or temperature of the superheated steam.
