Binding Treatment Method for Dangerous Rock Masses

IES87784B2Active Publication Date: 2026-11-04CHINA WEST NORMAL UNIVERSITY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
IES20240696
Authority / Receiving Office
IE · IE
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-11-18
Publication Date
2026-11-04
Estimated Expiration
2034-11-18

Smart Images

  • Figure 00000011_0000
    Figure 00000011_0000
  • Figure 00000012_0000
    Figure 00000012_0000
  • Figure 00000013_0000
    Figure 00000013_0000
Patent Text Reader

Abstract

The present invention discloses a binding treatment method for dangerous rock masses. The method relates to the field of geological disaster prevention and control technology and includes the following steps: Step 1: Arrange positions of anchor cables and anchor bolts. Step 2: Prepare materials for anchor cables and anchor bolts. Step 3: Erect scaffolding, drill holes manually with an air gun, insert and tighten the anchor bolts, and reserve anchor heads for locking the anchor cables. Step 4: install the anchor cables, lock them at the anchor head positions and apply mechanical tension to place them in a loaded state. After the binding treatment is applied, the dangerous rock mass (or belt) will not have the potential for overturning destruction. The rock mass in sections where the controlling structural surface is not penetrated will transition from a tensile-shear stress state to a compressive-shear stress state. Since the tensile-shear strength of the rock mass is approximately 1 / 3 of its compressive-shear strength, it is clear that the safety of the dangerous rock mass (or belt) can be improved by more than several times after the binding treatment is implemented.
Need to check novelty before this filing date? Find Prior Art