Method for constructing a pipe rack module
Patent Information
- Application Number
- KR1020260017151
- Authority / Receiving Office
- KR · KR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2026-01-28
- Publication Date
- 2026-09-16
- Estimated Expiration
- 2046-01-28
Smart Images

Figure 112026012006203-PAT00001_ABST
Abstract
Description
Technology Field
[0001] The present invention relates to a method for constructing a pipe rack module. Background Technology
[0002] Conventional pipe rack modules utilized a method in which multiple components, such as steel members, pipes, and brackets, were brought into the building as individual single units and assembled sequentially on-site. However, this method presented a problem where multiple processes had to be carried out simultaneously in a confined workspace inside the building, requiring the deployment of multiple workers at the same time. Furthermore, since the use of large transport or lifting equipment was restricted inside the building, construction was performed primarily using small equipment, leading to increased construction time and reduced overall work efficiency.
[0003] To address these issues, a method in which pipe rack modules are pre-assembled outside a building and then transported inside for installation has recently been utilized. However, in conventional prefabrication methods, it was often difficult to transport and position externally assembled pipe rack modules directly at the installation site. In particular, due to the size and weight of the pipe rack modules, controlling their orientation and adjusting their height became complex during the transport process from the external space to the internal installation site. Furthermore, there was a limitation in that complex additional assembly or reinforcement work was required to precisely position and secure the pipe rack modules at the installation site.
[0004] Therefore, there was a need for a pipe rack module construction method that can improve the efficiency of the placement process by assembling pipe rack modules in an external space, transporting them from the external space to an internal space, and then arranging the pipe rack modules in stages within the internal space by distinguishing between a temporary installation space and an installation space. The problem to be solved
[0005] Embodiments of the present invention aim to provide a pipe rack module construction method that enables easy transport of a pipe rack module to a final installation space by assembling the pipe rack module in an external space and then transporting it to an internal space, and then transporting it step-by-step within the internal space by distinguishing between a temporary installation space and an installation space.
[0006] In addition, embodiments of the present invention aim to provide a pipe rack module construction method that can improve the efficiency of the overall layout process by minimizing repetitive position adjustment and retransport work that occurs near the installation space, by allowing the pipe rack module and the installation module to be transported to the installation space in a combined state from the temporary installation space.
[0007] In addition, embodiments of the present invention aim to provide a pipe rack module construction method that can reduce construction time and manpower by simplifying the process of transporting the pipe rack module to the installation space, thereby reducing the burden of posture control during transport and facilitating the use of the transport device.
[0008] In addition, embodiments of the present invention aim to provide a pipe rack module construction method that improves the stability of transport by combining installation modules during the process of transporting the pipe rack module to the installation space, and improves the flexibility of installation by separating the installation modules in the installation space. means of solving the problem
[0009] One embodiment of the present invention is conceived based on the background described above and aims to provide a pipe rack module construction method comprising: an external construction step in which a pipe rack module is assembled in an external space; a transfer step in which the pipe rack module is transferred from the external space to an internal space through a transfer module; and an internal construction step in which the pipe rack module and the installation module are connected in a temporary installation space of the internal space, the installation module is separated from the pipe rack module in the installation space of the internal space, and the pipe rack module is placed in the installation space.
[0010] In addition, the present invention provides a pipe rack module construction method in which, during the external construction stage, a first pipe rack and a second pipe rack are arranged so as to be offset from each other, one or more of the first pipe rack and the second pipe rack are connected to a connecting part of a first platform, and a third pipe rack is connected to the first pipe rack so as to be parallel to the second pipe rack.
[0011] In addition, the present invention provides a pipe rack module construction method in which, during the external construction stage, a second platform is positioned above the first platform, and the second platform is positioned in the space formed between the plurality of pipe racks such that a plurality of deck sections are horizontal to the ground.
[0012] In addition, the present invention provides a pipe rack module construction method in which, during the external construction stage, external piping is arranged on the upper side of the second platform, and a mounting module is arranged to connect pipe racks arranged parallel to each other among the plurality of pipe racks.
[0013] In addition, the above transfer step includes an outdoor transfer step for transferring the pipe rack module from the outdoor space toward the indoor space, wherein in the outdoor transfer step, the pipe rack module is transferred to be brought closer to the indoor space in a horizontal direction by a first transfer device and transferred to the height of the indoor space by a second transfer device, thereby providing a method for constructing a pipe rack module.
[0014] In addition, the above transfer step further includes an indoor transfer step for transferring the installation module from the external space to a temporary installation space in the internal space, and the above internal construction step is to provide a pipe rack module construction method performed in the temporary installation space.
[0015] In addition, the above internal construction step includes a support module connection step for connecting the pipe rack module and the support module, wherein in the support module connection step, a support portion of the support module is connected to the lower part of the pipe rack module, and a connecting portion of the support module connects the pipe rack module and the support portion to both outer sides of the pipe rack module. The present invention provides a pipe rack module construction method.
[0016] In addition, the above internal construction step includes an installation module connection step that connects the pipe rack module and the installation module, wherein in the installation module connection step, the carrier beam of the installation module connects between a plurality of second pipe racks, and the support rack of the installation module is connected at the bottom of the plurality of pipe racks, thereby providing a pipe rack module construction method.
[0017] In addition, the above internal construction step further includes a pipe rack transfer step for transferring the pipe rack module and the installation module from the temporary installation space to the installation space, and the pipe rack module and the installation module are transferred by a third transfer device, thereby providing a pipe rack module construction method.
[0018] In addition, the present invention provides a method for constructing a pipe rack module in which the height at which the pipe rack module is placed in the support module connection step is greater than the height at which the pipe rack module is placed in the installation module connection step. Effects of the invention
[0019] Embodiments of the present invention have the effect of easily transporting pipe rack modules to the final installation space by assembling the pipe rack modules in an external space and then transporting them to an internal space, and then transporting them in stages by distinguishing between a temporary installation space and an installation space within the internal space.
[0020] In addition, the embodiments of the present invention allow the pipe rack module and the installation module to be transported to the installation space in a combined state from the temporary installation space, thereby minimizing repetitive position adjustment and re-transport operations that occur near the installation space, and thus have the effect of improving the efficiency of the overall placement process.
[0021] In addition, the embodiments of the present invention simplify the process of transporting pipe rack modules to the installation space, thereby reducing the burden of posture control during transport and facilitating the use of the transport device, which has the effect of reducing construction time and manpower.
[0022] In addition, the embodiments of the present invention have the effect of improving the stability of transport by combining the installation module during the process of transporting the pipe rack module to the installation space, and improving the flexibility of installation by separating the installation module at the installation space. Brief explanation of the drawing
[0023] FIG. 1 is a flowchart of a pipe rack module construction method in the first embodiment of the present invention. Figure 2 is a conceptual diagram of a pipe rack module construction method in an external space. Figure 3 is a conceptual diagram of the pipe rack module construction method in the interior space. Figure 4 is a drawing showing the installation of the first pipe rack during the external construction stage of Figure 1. Figure 5 is a drawing showing the installation of the second pipe rack in Figure 4. Figure 6 is a drawing showing the installation of the second pipe rack in Figure 5. Figure 7 is a drawing showing the installation of the third pipe rack in Figure 6. Figure 8 is a drawing showing the installation of the second platform in Figure 7. Figure 9 is a drawing showing the piping arrangement in Figure 8. FIG. 10 is a drawing in which the second mounting part is installed in FIG. 9. Figure 11 is a drawing showing the installation of the third platform in Figure 10. Figure 12 is a drawing showing the piping arrangement in Figure 11. FIG. 13 is a drawing in which the third mounting part is arranged in FIG. 12. Figure 14 is a drawing showing the piping arrangement in Figure 13. Fig. 15 is a drawing of the completed exterior construction stage of Fig. 1. Fig. 16 is a drawing of the outdoor transfer stage of Fig. 1. FIG. 17 is a drawing of the support module connection step of FIG. 1. Fig. 18 is a front view of Fig. 17. Fig. 19 is a drawing of the support module of Fig. 17 in a raised state. FIG. 20 is a drawing of the installation module connection step of FIG. 1. FIG. 21 is a drawing in which the installation module in FIG. 20 is connected to the pipe rack module. FIG. 22 is a drawing of the support module of FIG. 20 in a lowered state. Fig. 23 is a drawing of the pyrack transfer step of Fig. 1. Figure 24 is a drawing of a pipe rack construction assembly in an installation space. Fig. 25 is a front view of Fig. 24. Specific details for implementing the invention
[0024] Hereinafter, specific embodiments for implementing the technical concept of the present invention will be described in detail with reference to the drawings.
[0025] In addition, in describing the present invention, if it is determined that a detailed description of related known components or functions may obscure the essence of the invention, such detailed description is omitted.
[0026] Furthermore, when it is mentioned that one component is 'connected,' 'supported,' 'supplied,' or 'transmitted' to another component, it should be understood that while the connection, support, supply, or transmission may be direct to that other component, there may also be other components present in between.
[0027] The terms used in this specification are used merely to describe specific embodiments and are not intended to limit the invention. Singular expressions include plural expressions unless the context clearly indicates otherwise.
[0028] Furthermore, it should be noted in advance that expressions such as "upper side," "lower side," and "side" in this specification are described based on the drawings, and may be expressed differently if the orientation of the object changes. For the same reason, some components in the attached drawings may be exaggerated, omitted, or schematically depicted, and the size of each component does not entirely reflect its actual size.
[0029] Additionally, terms including ordinal numbers, such as first, second, etc., may be used to describe various components, but such components are not limited by such terms. These terms are used solely for the purpose of distinguishing one component from another.
[0030] The meaning of "comprising" as used in the specification is to specify certain characteristics, regions, integers, steps, actions, elements, and / or components, and does not exclude the existence or addition of other specific characteristics, regions, integers, steps, actions, elements, components, and / or groups.
[0031] Referring to FIGS. 1 to 3, the pipe rack construction assembly (1) can be assembled in an external space and placed in an installation space. The pipe rack construction assembly (1) can be manufactured by the pipe rack module construction method (S1) described later. The pipe rack construction assembly (1) can be assembled by performing a process with the external space and the internal space separated. Such a pipe rack construction assembly (1) may include a pipe rack module (10), a transfer module (20), a support module (30), and an installation module (40).
[0032] The first direction can be defined as a direction horizontal to the path along which the first transfer device (21), described later, moves. Additionally, the second direction can be defined as a direction perpendicular to the first direction and perpendicular to the platform part (200), described later. For example, the second direction can be defined as a direction perpendicular to the ground. The third direction can be defined as a direction perpendicular to the first direction and the second direction. For example, the third direction can be defined as the width direction of the pipe rack module (10).
[0033] The interior space may be defined as a space that is enclosed, at least in part, by walls, ceilings, or other structures. For example, the interior space may be the interior of a building, but is not limited thereto. The exterior space may be defined as a space other than the interior space. For example, the exterior space may be the exterior of a building, but is not limited thereto. The temporary installation space is formed within the interior space and may be defined as a space that is interconnected before the pipe rack module (10) and the installation module (40) are placed in the installation space. The installation space is formed within the interior space and may be defined as a space where the pipe rack module (10) and the installation module (40) are finally placed.
[0034] Referring further to FIGS. 4 through 7, the pipe rack module (10) can be assembled in an external space and transported to an internal space. In other words, the pipe rack module (10) can be transported to an internal space in a state assembled in an external space as a whole module unit, rather than as individual component units. The pipe rack module (10) can support pipes (2). In other words, pipes (2) can be placed in the pipe rack module (10) and transported from the external space to the internal space. As an example, pipes (2) can be stacked in the pipe rack module (10) until they are introduced into the internal space. In other words, pipes (2) can no longer be stacked after the pipe rack module (10) is introduced into the internal space. As another example, pipes (2) can be stacked in the pipe rack module (10) until they are raised by the support module (30) in a temporary installation space. In other words, after the pipe rack module (10) is raised from the temporary installation space, the pipes (2) may no longer be stacked. For example, the pipe rack module (10) may be a steel structure including an H-beam structure. Such a pipe rack module (10) may include a pipe rack unit (100), a platform part (200), and a mounting module (300).
[0035] The pipe rack unit (100) may be formed to support a structure. For example, the pipe rack unit (100) may support piping (2), equipment, or a platform (200) placed on top. The pipe rack unit (100) may be formed by connecting a plurality of steel members to each other. For example, the pipe rack unit (100) may be integrally joined by fastening a plurality of steel members with bolts and nuts. The pipe rack unit (100) may be formed in the shape of a rectangular frame overall. Such a pipe rack unit (100) may be provided as a plurality of pipe racks.
[0036] Among the plurality of pipe racks (110, 120, 130), adjacent pipe racks can be configured to be connected to each other. In other words, among the plurality of pipe racks (110, 120, 130), pipe racks arranged adjacent to each other can be configured to be interconnected. For example, the plurality of pipe racks (110, 120, 130) can be formed of steel. Additionally, the plurality of pipe racks (110, 120, 130) can be connected to each other through fastening means such as bolts and nuts. A deck section (200a), which will be described later, can be placed in the space formed between the plurality of pipe racks (110, 120, 130). The plurality of pipe racks (110, 120, 130) may include a first pipe rack (110), a second pipe rack (120), and a third pipe rack (130).
[0037] The first pipe rack (110) can be connected to the platform (200) in an external space. As an example, the first pipe rack (110) can be connected to the first platform (210) described later in an external space. As a more detailed example, the first pipe rack (110) can be assembled and connected to the connecting part (210a) described later in an external space.
[0038] The first pipe rack (110) may be formed to extend in a direction horizontal to the third direction in the external space. Both ends of the first pipe rack (110) may be connected to the connecting portion (210a). In one example, the other end of the first pipe rack (110) in the second direction may be connected to the connecting portion (210a). In another example, both ends of the first pipe rack (110) in the third direction may be connected to the connecting portion (210a).
[0039] In the third direction of the first pipe rack (110), the two corners can be connected to the second pipe rack (120). Additionally, a third pipe rack (130) can be arranged between a plurality of second pipe racks (120) arranged in the third direction of the first pipe rack (110). In other words, the first pipe rack (110), the second pipe rack (120), and the third pipe rack (130) can be formed into a grid-like structure connected to each other.
[0040] The second pipe rack (120) may be formed to extend in a direction perpendicular to the first pipe rack (110) in an external space. For example, the other edge in the first direction of the second pipe rack (120) may be connected to the first pipe rack (110). In other words, the other edge in the first direction of the second pipe rack (120) may be connected to one edge of the first pipe rack (110) in the third direction.
[0041] The second pipe rack (120) can be connected to the first platform (210) in an external space. One end of the second pipe rack (120) in a first direction can be connected to the platform section (200) in an external space. As an example, one end of the second pipe rack (120) in a first direction can be connected to the first platform (210) in an external space. As a more detailed example, one end of the second pipe rack (120) in a first direction can be connected to the connecting section (210a) in an external space. Such second pipe racks (120) may be provided in multiple numbers.
[0042] Multiple second pipe racks (120) may be connected to both corners in the third direction of the first pipe rack (110). In other words, multiple second pipe racks (120) may be spaced apart along the third direction of the first pipe rack (110). Multiple second pipe racks (120) may be arranged parallel to each other. A third pipe rack (130) may be placed in the space formed between the multiple second pipe racks (120). A mounting module (300) may be placed in the spaced-apart space between the multiple second pipe racks (120).
[0043] The third pipe rack (130) can be formed to extend in a direction parallel to the direction in which the second pipe rack (120) extends in the external space. In other words, the third pipe rack (130) can be formed in a direction horizontal to the second pipe rack (120) in the external space.
[0044] A third pipe rack (130) may be positioned between multiple second pipe racks (120). For example, the third pipe rack (130) may be positioned spaced apart from multiple second pipe racks (120). In other words, the third pipe rack (130) may be positioned to span the space between adjacent second pipe racks (120). Additionally, the third pipe rack (130) may be connected to the first pipe rack (110). For example, the other edge in the first direction of the third pipe rack (130) may be connected to the first pipe rack (110). Multiple such third pipe racks (130) may be provided.
[0045] Multiple third pipe racks (130) may be connected to one side in the first direction of the first pipe rack (110). Additionally, multiple third pipe racks (130) may be spaced apart from each other. Additionally, multiple third pipe racks (130) may be arranged parallel to each other. The spacing between multiple third pipe racks (130) may be arranged to be equal to the spacing between the third pipe rack (130) and the second pipe rack (120). A mounting module (300) may be placed in the space between multiple third pipe racks (130).
[0046] Referring further to FIGS. 8 through 15, the platform portion (200) can support one or more of the pipe rack unit (100) or the pipe (2). The platform portion (200) can be assembled with the pipe rack unit (100) and the mounting module (300) in an external space. A plurality of deck portions (200a) may be provided on the platform portion (200).
[0047] The deck section (200a) can be placed within the space formed by the pipe rack unit (100) and the mounting module (300). In other words, the deck section (200a) can be supported by the pipe rack unit (100) and the mounting module (300). The deck section (200a) can be placed in an opening or internal space formed by the arrangement of the pipe rack unit (100) and the mounting module (300), either inserted or placed on top of it.
[0048] The outer edge of the deck section (200a) may be positioned to be surrounded by the pipe rack unit (100) and the mounting module (300). The length of the third direction edge of the deck section (200a) may be shorter than the length of the first direction edge. In one example, the third direction edge of the deck section (200a) may be positioned to be surrounded by the mounting module (300). In another example, the first direction edge of the deck section (200a) may be positioned to be surrounded by the pipe rack unit (100). For example, the deck section (200a) may be formed as either a plate-like structure or a mesh structure made of metal, but is not limited thereto.
[0049] This platform section (200) may include a first platform (210), a second platform (220), and a third platform (230).
[0050] The first platform (210) can support the pipe rack unit (100). In one example, the first platform (210) can support one or more of the first pipe rack (110) and the second pipe rack (120). In a more detailed example, the second pipe rack (120) may be placed at the first direction edge of the first platform (210). The first direction length of the first platform (210) may be longer than the third direction length. Multiple such first platforms (210) may be provided. A connection part (210a) may be provided on such first platforms (210).
[0051] The pipe rack unit (100) can be detachably connected to the connecting portion (210a). In other words, the pipe rack unit (100) can be configured to be connected to and then detached from the connecting portion (210a). The connecting portion (210a) can be connected to the lower end of the pipe rack unit (100) at the top.
[0052] The connecting portion (210a) may be formed to extend from the first platform (210) in a second direction. The connecting portion (210a) may be formed at both ends of the first direction corner of the first platform (210). In one example, both ends of the first pipe rack (110) may be connected to the connecting portion (210a) formed on a plurality of first platforms (210). In another example, among the plurality of connecting portions (210a) formed on the first platform (210), one end in the first direction may be connected to the second pipe rack (120), and the other end may be connected to the first pipe rack (110).
[0053] The second platform (220) may be placed in the space formed between the first mounting part (310) and the pipe rack unit (100), which will be described later. The second platform (220) may be placed above the first platform (210). Additionally, the second platform (220) may be placed below the third platform (230). The second platform (220) may support a plurality of pipes (2). The second platform (220) may be formed by arranging a plurality of deck parts (200a).
[0054] The third platform (230) may be placed in the space formed between the second mounting part (320) and the pipe rack unit (100), which will be described later. The third platform (230) may be placed above the second platform (210). The third platform (230) may support a plurality of pipes (2). The third platform (230) may be formed by arranging a plurality of deck parts (200a).
[0055] The mounting module (300) may be configured to support between a plurality of pipe rack units (100). In other words, the mounting module (300) may be placed in the space formed between adjacent pipe rack units (100). For example, both ends of the mounting module (300) may be connected to adjacent pipe rack units (100). Additionally, the mounting module (300) may be configured to support a platform unit (200). Such a mounting module (300) may include a first mounting unit (310), a second mounting unit (320), and a third mounting unit (330).
[0056] Referring again to FIG. 8, the first mounting member (310) can support between a plurality of pipe racks (110, 120, 130). In other words, both ends of the first mounting member (310) can be configured to connect between the plurality of pipe racks (110, 120, 130). The first mounting member (310) can be configured to be positioned between the second pipe rack (120) and the third pipe rack (130). In other words, in the third direction, one end of the first mounting member (310) can be connected to the second pipe rack (120), and the other end can be connected to the third pipe rack (130). The first mounting member (310) can be configured to extend in the third direction. A deck member (200a) can be positioned on the upper part of the first mounting member (310).
[0057] Referring again to FIGS. 9 to 11, the second mounting member (320) can support between a plurality of pipe racks (110, 120, 130). In other words, both ends of the second mounting member (320) can be configured to connect between the plurality of pipe racks (110, 120, 130). The second mounting member (320) can be configured to be positioned between the second pipe rack (120) and the third pipe rack (130). In other words, in the third direction, one end of the second mounting member (320) can be connected to the second pipe rack (120), and the other end can be connected to the third pipe rack (130). The second mounting member (320) can be configured to extend in the third direction. A deck member (200a) can be positioned on the upper part of the second mounting member (320).
[0058] Referring again to FIGS. 12 through 15, the third mounting member (330) can support between a plurality of pipe racks (110, 120, 130). In other words, both ends of the third mounting member (330) can be configured to connect between a plurality of pipe racks (110, 120, 130). As an example, the third mounting member (330) can be positioned to connect a space formed inside the second pipe rack (120). In other words, the third mounting member (330) can be configured to be positioned at the uppermost part of the second pipe rack (120). As another example, the third mounting member (330) can be positioned to connect a space formed inside the third pipe rack (130). In other words, the third mounting member (330) can be configured to be positioned at the uppermost part of the third pipe rack (130). The third mounting member (330) can support the pipe (2). In other words, a pipe (2) can be placed on the upper part of the third mounting part (330).
[0059] The transfer module (20) can transfer the pipe rack module (10). The transfer module (20) can transfer the pipe rack module (10) from an external space to an internal space. Additionally, the transfer module (20) can transfer one or more of the pipe rack module (10), support module (30), and installation module (40) from a temporary installation space to an installation space. This transfer module (20) may include a first transfer device (21), a second transfer device (22), and a third transfer device (23).
[0060] Referring further to FIG. 16, the first transfer device (21) can transfer the pipe rack module (10) from the external space. As an example, the first transfer device (21) can transfer it in a horizontal direction from the external space toward the internal space. The pipe rack module (10) can be placed on the upper part of the first transfer device (21). In other words, the pipe rack module (10) can be moved together with the movement of the first transfer device (21). The first transfer device (21) may be a self-propelled transfer device. For example, the first transfer device (21) may be a SPMT (Self-Propelled Modular Transporter), but is not limited thereto.
[0061] The second transfer device (22) can transfer the pipe rack module (10) from the external space. As an example, the second transfer device (22) can transfer it so that it moves vertically from the external space toward the internal space. The second transfer device (22) can transfer the pipe rack module (10) from the ground to a height corresponding to the temporary installation space in the internal space. In other words, the second transfer device (22) can adjust the pipe rack module (10) to the height of the internal space. As an example, the second transfer device (22) can transfer the pipe rack module (10) by lifting it upward. As a more detailed example, the second transfer device (22) may be provided as a crane, but is not limited thereto.
[0062] The third transfer device (23) can transfer one or more of the pipe rack module (10), support module (30), and installation module (40) within the internal space. The third transfer device (23) can transfer the pipe rack module (10) to a temporary installation space. Additionally, the third transfer device (23) can transfer the installation module (40) to a temporary installation space. When the pipe rack module (10) and the installation module (40) are connected, the third transfer device (23) can transfer the combined assembly of the pipe rack module (10) and the installation module (40) from the temporary installation space to the installation space. The third transfer device (23) may be a self-propelled transfer device. For example, the third transfer device (23) may be a SPMT (Self-Propelled Modular Transporter), but is not limited thereto.
[0063] Referring further to FIGS. 17 through 19, the support module (30) can raise or lower the pipe rack module (10). In other words, the support module (30) can raise or lower the pipe rack module (10). The support module (30) can adjust the height of the pipe rack module (10) in an internal space. As an example, the support module (30) can adjust the height of the pipe rack module (10) in a temporary installation space. For example, the support module (30) may be provided as a strand jack type raising / lowering device, but is not limited thereto. The support module (30) may include a support part (31) and a coupling part (32).
[0064] The support member (31) can support the pipe rack module (10). The support member (31) may be positioned at the bottom of the pipe rack module (10) in a second direction. The support member (31) may be configured to transfer the load of the pipe rack module (10) to another support structure. In a third direction, a connecting member (32) may be positioned on both sides of the support member (31). For example, the support member (31) may be a jack beam.
[0065] The connecting part (32) can connect the pipe rack module (10) and the support part (31) to each other. This connecting part (32) can be positioned on both sides of the pipe rack module (10) in a third direction. In other words, the connecting part (32) can be positioned at the lower ends of both sides of the pipe rack module (10) in a third direction. This connecting part (32) may be a strand jack type lifting / lowering device. The connecting part (32) can be configured to raise and lower the pipe rack module (10) in a second direction while fixed to the support part (31). As an example, while the connecting part (32) raises or lowers the pipe rack module (10), the pipe rack module (10) can be raised and lowered together while supported by the support part (31). As a more detailed example, the connecting part (32) can move the pipe rack module (10) in a second direction while the supporting part (31) and the pipe rack module (10) are connected to each other.
[0066] Referring further to FIGS. 20 through 25, the installation module (40) can be connected to the pipe rack module (10). The installation module (40) can be connected to the pipe rack module (10) and placed in an installation space. In other words, when the installation module (40) is placed in the installation space, it can support the pipe rack module (10). Such an installation module (40) may include a carrier beam (41) and a support rack (42).
[0067] The carrier beam (41) can connect multiple pipe racks (110, 120, 130) included in the pipe rack module (10). In one example, the carrier beam (41) can connect multiple second pipe racks (110). In another example, the carrier beam (41) can connect both corners in the third direction of the first pipe rack (110).
[0068] This carrier beam (41) can be configured to be detachable from the pipe rack module (10). For example, the carrier beam (41) can be connected to the pipe rack module (10) in a temporary installation space and can be detached from the pipe rack module (10) in the installation space. In other words, the carrier beam (41) is connected to the pipe rack module (10) until the pipe rack module (10) is transported, and can be detached from the pipe rack module (10) after installation is finished.
[0069] The support rack (42) can be configured to extend from the lower part of the pipe rack module (10). In other words, the upper part of the support rack (42) can be connected to the lower part of the pipe rack module (10). The support rack (42) can be positioned to protrude in a second direction from the pipe rack module (10) while the pipe rack module (10) is placed in the installation space. The support rack (42) can support the pipe rack module (10) in the installation space.
[0070] Hereinafter, a pipe rack module construction method (S1) for constructing a pipe rack construction assembly (1) according to one embodiment of the present invention will be described.
[0071] Referring again to FIGS. 1 to 3, the pipe rack module construction method (S1) according to the first embodiment of the present invention can place a pipe rack module (10) assembled in an external space into an installation space in an internal space. In other words, the pipe rack module construction method (S1) can transport a pipe rack module (10) assembled in an external space to an internal space of a different height, assemble it in a temporary installation space in the internal space, and then transport it to a final installation space. For example, according to the pipe rack module construction method (S1), a pipe rack module (10) assembled in an external space can be transported to an indoor space of a high-rise building. Additionally, according to the pipe rack module construction method (S1), a pipe rack module (10) transported to an indoor space can be transported to an installation location in the indoor space. Such a pipe rack module construction method (S1) may include an external construction step (S100), a transport step (S200), and an internal construction step (S300).
[0072] Referring again to FIGS. 4 to 6, in the external construction stage (S100), a pipe rack module (10) can be assembled in an external space. In the external construction stage (S100), a pipe rack unit (100) and a platform part (200) can be connected. In the external construction stage (S100), one or more of the first pipe rack (110) and the second pipe rack (120) can be connected to the first platform (210). For example, in the external construction stage (S100), one or more of the first pipe rack (110) and the second pipe rack (120) can be detachably connected to the connection part (210a) of the first platform (210).
[0073] In the external construction stage (S100), the first pipe rack (110) and the second pipe rack (120) can be connected so as to be perpendicular to each other. Additionally, in the external construction stage (S100), the second pipe rack (120) can be connected to both corners in the first direction of the first pipe rack (110).
[0074] Referring again to FIG. 7, in the external construction stage (S100), a third pipe rack (130) can be connected to the first pipe rack (110). For example, in the external construction stage (S100), the third pipe rack (130) can be connected to the first pipe rack (110) in a direction parallel to the second pipe rack (120). Additionally, in the external construction stage (S100), the third pipe rack (130) can be connected to the first pipe rack (110) in a direction perpendicular to the first pipe rack (110).
[0075] Referring again to FIGS. 8 and 9, in the external construction stage (S100), a mounting module (300) may be placed between the second pipe rack (120) and the third pipe rack (130). In other words, in the external construction stage (S100), a first mounting part (310) may be placed between the second pipe rack (120) and the third pipe rack (130). In the external construction stage (S100), the first mounting part (310) may be placed in a direction horizontal to the first pipe rack (110). In other words, in the external construction stage (S100), the first mounting part (310) may be placed in a direction horizontal to the third direction.
[0076] In the external construction stage (S100), a second platform (220) may be placed. In the external construction stage (S100), a deck section (200a) may be placed on top of the pipe rack unit (100) and the mounting module (300). In other words, in the external construction stage (S100), a deck section (200a) may be placed in the space formed between the plurality of pipe racks (110, 120, 130) and the first mounting section (310).
[0077] Referring again to FIG. 10, in the external construction stage (S100), a mounting module (300) may be placed between the second pipe rack (120) and the third pipe rack (130). In other words, in the external construction stage (S100), a second mounting part (320) may be placed between the second pipe rack (120) and the third pipe rack (130). In the external construction stage (S100), the second mounting part (320) may be placed in a direction horizontal to the first pipe rack (110). In other words, in the external construction stage (S100), the second mounting part (320) may be placed in a direction horizontal to the third direction.
[0078] Referring again to FIGS. 11 and 12, in the external construction step (S100), parts of the second pipe rack (120) and the third pipe rack (130) may be removed. For example, in the external construction step (S100), steel structures of the second pipe rack (120) and the third pipe rack (130) placed on both sides in the first direction of the second mounting part (320) may be removed. In other words, in the external construction step (S100), the space between the second pipe rack (120) and the third pipe rack (130) may be opened.
[0079] In the external construction stage (S100), a third platform (230) may be placed. In the external construction stage (S100), a deck section (200a) may be placed on top of the pipe rack unit (100) and the mounting module (300). In other words, in the external construction stage (S100), a deck section (200a) may be placed in the space formed between the plurality of pipe racks (110, 120, 130) and the first mounting section (310).
[0080] Referring again to FIGS. 13 to 15, in the external construction stage (S100), a third mounting member (330) may be placed in the portion of the second pipe rack (120) where the steel structure has been removed. Additionally, in the external construction stage (S100), a third mounting member (330) may be placed in the portion of the third pipe rack (130) where the steel structure has been removed. In the external construction stage (S100), the third mounting member (330) may be placed in a direction horizontal to the second pipe rack (120) and the third pipe rack (130). In other words, in the external construction stage (S100), the third mounting member (330) may be placed in a direction perpendicular to the first direction.
[0081] In the external construction stage (S100), the pipe (2) may be supported on the pipe rack module (10). In the external construction stage (S100), the pipe (2) may be placed on the upper part of the platform section (200). As an example, in the external construction stage (S100), the pipe (2) may be placed on one or more of the second platform (220) and the third platform (230). As a more detailed example, in the external construction stage (S100), the pipe (2) may be placed on the upper side of the deck section (200a).
[0082] In the external construction stage (S100), a pipe (2) may be placed on the upper side of a plurality of pipe racks (110, 120, 130). In other words, in the external construction stage (S100), the pipe (2) may be supported in the space formed by the plurality of pipe racks (110, 120, 130). Additionally, in the external construction stage (S100), the pipe (2) may be placed on the upper side of a mounting module (300). In other words, in the external construction stage (S100), the pipe (2) may be supported in the space formed by the plurality of mounting modules (300) and the plurality of pipe racks (110, 120, 130).
[0083] After the external construction phase (S100) is finished, pipes (2) may no longer be stacked on the pipe rack module (10). In other words, when the pipe rack module (10) is moved into the internal space after the external construction phase (S100) is finished, pipes (2) may no longer be stacked on the pipe rack module (10).
[0084] Referring again to FIG. 16, in the transfer step (S200), a pipe rack module (10) assembled in an external space can be transferred from the external space to an internal space. Additionally, in the transfer step (S200), a pipe rack module (10) can be transferred from a temporary installation space to an installation space within the internal space. This transfer step (S200) may include an outdoor transfer step (S210) and an indoor transfer step (S220).
[0085] In the outdoor transfer step (S210), the pipe rack module (10) can be transferred from the external space toward the internal space. In the outdoor transfer step (S210), the pipe rack module (10) can be transferred by the first transfer device (21) so as to be moved closer in a horizontal direction from the external space toward the internal space. In other words, in the outdoor transfer step (S210), the first transfer device (21) can transfer the pipe rack module (10) in a horizontal direction from the external space to an adjacent position in the internal space.
[0086] Additionally, in the outdoor transfer step (S210), the pipe rack module (10) can be transferred by the second transfer device (22) so as to be moved vertically from the external space toward the internal space. In other words, in the outdoor transfer step (S210), the pipe rack module (10) can be transferred by the second transfer device (22) from a reference height in the external space to a height corresponding to the installation height in the internal space.
[0087] In the indoor transfer step (S220), one or more of the pipe rack module (10), support module (30), and installation module (40) can be transferred within the indoor space. In the indoor transfer step (S220), the pipe rack module (10) that entered the indoor space through the outdoor transfer step (S210) can be transferred to a temporary installation space. In other words, in the indoor transfer step (S220), the pipe rack module (10) can be transferred to a temporary installation space where the support module (30) is placed.
[0088] These outdoor transfer steps (S210) and indoor transfer steps (S220) can be performed continuously, and some steps may be repeated or the order changed as needed.
[0089] Referring again to FIGS. 17 to 19, in the internal construction step (S300), the pipe rack module (10) and the installation module (40) are connected in the temporary installation space of the internal space, and then the installation module (40) is separated from the pipe rack module (10) in the installation space of the internal space, and the pipe rack module (10) can be placed in the installation space. This internal construction step (S300) may include a support module connection step (S310), an installation module connection step (S320), and a pipe rack transfer step (S330).
[0090] In the support module connection step (S310), the pipe rack module (10) can be connected to the support module (30) in the temporary installation space. In the support module connection step (S310), a support member (31) can be placed at the bottom of the pipe rack module (10). In other words, in the support module connection step (S310), the pipe rack module (10) can be supported by the support member (31).
[0091] Additionally, in the support module connection step (S310), the support member (31) and the pipe rack module (10) can be connected by the connecting member (32). In the support module connection step (S310), the connecting member (32) can be connected from the side of the support member (31) and the pipe rack module (10).
[0092] In the support module connection step (S310), the support member (31) and the pipe rack module (10) can be raised by the connecting member (32). In other words, in the support module connection step (S310), the pipe rack module (10) can be raised in a second direction while the support member (31) and the pipe rack module (10) are connected to each other.
[0093] After the pipe rack module (10) is raised in the support module connection step (S310), pipes (2) may no longer be stacked on the pipe rack module (10). In other words, pipes (2) may be stacked on the pipe rack module (10) until the pipe rack module (10) is raised in the support module connection step (S310).
[0094] Referring again to FIGS. 20 to 22, in the installation module connection step (S320), the pipe rack module (10) and the installation module (40) can be connected. In the installation module connection step (S320), the carrier beam (41) and the support rack (42) can be connected. As an example, in the installation module connection step (S320), the carrier beam (41) and the support rack (42) can be connected by a fastening member. As a more detailed example, in the installation module connection step (S320), the carrier beam (41) and the support rack (42) can be connected by a bolt and a nut.
[0095] In the installation module connection step (S320), the connected carrier beam (41) and support rack (42) can be transported to a temporary installation space by the third transfer device (23). In other words, in the installation module connection step (S320), the connected carrier beam (41) and support rack (42) can be transported toward the pipe rack module (10).
[0096] In the installation module connection step (S320), the pipe rack module (10), the carrier beam (41), and the support rack (42) can be connected in the temporary installation space. In the installation module connection step (S320), the lower end portion of the pipe rack module (10) in the second direction and the support rack (42) can be connected.
[0097] In the installation module connection step (S320), the pipe rack module (10), the carrier beam (41), and the support rack (42) can be lowered by the support module (30). In other words, in the installation module connection step (S320), the support member (31), the pipe rack module (10), the carrier beam (41), and the support rack (42) can be lowered in a second direction while connected to each other.
[0098] In the installation module connection step (S320), after the pipe rack module (10) is supported by the installation module (40), the support module (30) can be separated from the pipe rack module (10). In other words, in the installation module connection step (S320), the support part (31) and the coupling part (32) can be released from the pipe rack module (10).
[0099] Referring again to FIGS. 23 to 25, in the pipe rack transfer step (S330), the pipe rack module (10) and the installation module (40) can be transferred to the installation space. In other words, in the pipe rack transfer step (S330), the pipe rack module (10) and the installation module (40) can be transferred to the installation space by the third transfer device (23) while connected.
[0100] In the pipe rack transfer step (S330), the carrier beam (41) can be separated when the pipe rack module (10) and the installation module (40) are placed in the installation space. In other words, in the pipe rack transfer step (S330), the carrier beam (41) can be separated after the pipe rack module (10), the carrier beam (41), and the support rack (42) are placed in the installation space. In the pipe rack transfer step (S330), the pipe rack module (10) can be maintained in a state where it is supported by the support rack (42) in the installation space.
[0101] Hereinafter, the operation and effects of the pipe rack construction assembly (1) and the construction method (S1) for constructing the same according to the first embodiment of the present invention will be described.
[0102] The pipe rack module (10) can be transported from the external space to the internal space in an assembled state as a whole module unit, rather than as individual member units. Accordingly, since there is no need to bring in and assemble multiple steel members and brackets individually in the internal space, the construction process can be simplified even in a confined work environment.
[0103] In addition, since multiple pipe racks (110, 120, 130) are formed as an integrated structure connected to each other, the pipe rack module (10) can distribute and support the load, thereby improving structural stability. Through this, the structure can be maintained stably even when the pipe rack module (10) is transferred from an external space to an internal space.
[0104] In addition, the internal space is divided into a temporary installation space and an installation space, and the pipe rack module (10) is transported step by step so that additional assembly work can be performed in the temporary installation space for the pipe rack module (10) that has flowed from the external space into the internal space, thereby reducing the burden of work in the installation space.
[0105] In addition, by transporting the pipe rack module (10) and the installation module (40) to the installation space while combined in the temporary installation space, the need for repeated fine position adjustments or re-transportation work near the installation space can be minimized. Through this, the installation precision of the pipe rack module (10) can be improved, and the reliability of the entire construction process can be enhanced.
[0106] In addition, by using the installation module (40) to maintain a supported and coupled state during the process of transporting the pipe rack module (10) to the installation space, the structural stability of the pipe rack module (10) during transport is improved, thereby reducing the risk of shaking or collision that may occur during transport.
[0107] In addition, since the installation module (40) can be separated from the pipe rack module (10) in the installation space, the pipe rack module (10) can be placed without structural interference during the final installation stage. Accordingly, it is possible to flexibly respond to various placement conditions depending on the installation environment, and responsiveness can be improved even during maintenance or equipment changes.
[0108] Although the embodiments of the present invention have been described above as specific embodiments, they are merely examples and the present invention is not limited thereto, but should be interpreted as having the broadest scope in accordance with the technical concept disclosed in this specification. Those skilled in the art may implement patterns of shapes not specified by combining or substituting the disclosed embodiments, and this also does not deviate from the scope of the present invention. Furthermore, those skilled in the art may easily modify or alter the disclosed embodiments based on this specification, and it is evident that such modifications or alterations also fall within the scope of the rights of the present invention. Explanation of the symbols
[0109] S1: Pipe Rack Module Installation Method S100: External construction phase S200: For transfer phase S210: Outdoor transfer stage S220: Indoor transfer stage S300: Internal construction phase S310: Support module connection phase S320: Installation module connection step S330: Pipe rack transfer step 1: Pipe rack assembly 2: Piping 3: Pillar 10: Pipe rack module 20: Transfer module 21: 1st transfer device 22: 2nd transfer device 23: Third transfer device 30: Support module 31: Support member 32: Joint 40: Installation Module 41: Carrier Beam 42: Support rack clamp module 100: Pipe rack 110: 1st pipe rack 120: 2nd Pipe Rack 130: 3rd Pipe Rack 200: Platform section 200a: Deck section 210: Platform 1 210a: Connection 220: Platform 2 230: Platform 3 300: Mounting module 310: First mounting part 320: 2nd mounting part 330: 3rd mounting part
Claims
Claim 1 A pipe rack module construction method comprising: an external construction step in which a pipe rack module is assembled in an external space; a transfer step in which the pipe rack module is transferred from the external space to an internal space through a transfer module; and an internal construction step in which the pipe rack module and the installation module are connected in a temporary installation space of the internal space, the installation module is separated from the pipe rack module in the installation space of the internal space, and the pipe rack module is placed in the installation space, wherein the internal construction step includes a support module connection step in which the pipe rack module and the support module are connected, and in the support module connection step, the support portion of the support module is connected to the lower part of the pipe rack module, and the connecting portion of the support module connects the pipe rack module and the support portion on both outer sides of the pipe rack module. Claim 2 A pipe rack module construction method according to claim 1, wherein in the external construction step, a first pipe rack and a second pipe rack are arranged so as to be offset from each other, one or more of the first pipe rack and the second pipe rack are connected to a connecting part of a first platform, and a third pipe rack is connected to the first pipe rack so as to be parallel to the second pipe rack. Claim 3 A pipe rack module construction method according to claim 2, wherein in the external construction step, a second platform is positioned above the first platform, and the second platform is positioned in the space formed between the plurality of pipe racks such that a plurality of deck sections are horizontal to the ground. Claim 4 A pipe rack module construction method according to claim 3, wherein in the external construction step, an external pipe is placed on the upper side of the second platform, and a mounting module is placed to connect pipe racks arranged parallel to each other among the plurality of pipe racks. Claim 5 A method for constructing a pipe rack module according to claim 1, wherein the transfer step comprises an outdoor transfer step for transferring the pipe rack module from the outer space toward the inner space, wherein in the outdoor transfer step, the module is transferred to be brought closer to the inner space in a horizontal direction by a first transfer device and transferred to the height of the inner space by a second transfer device. Claim 6 A pipe rack module construction method comprising: an external construction step in which a pipe rack module is assembled in an external space; a transfer step in which the pipe rack module is transferred from the external space to an internal space through a transfer module; and an internal construction step in which the pipe rack module and the installation module are connected in a temporary installation space of the internal space, the installation module is separated from the pipe rack module in the installation space of the internal space, and the pipe rack module is placed in the installation space, wherein the transfer step comprises: an outdoor transfer step in which the pipe rack module is transferred from the external space toward the internal space; and an indoor transfer step in which the installation module is transferred from the external space to a temporary installation space of the internal space, wherein in the outdoor transfer step, the installation module is transferred to be brought closer to the internal space in a horizontal direction by a first transfer device and transferred to the height of the internal space by a second transfer device, and the internal construction step is carried out in the temporary installation space. Claim 7 delete Claim 8 A pipe rack module construction method according to claim 1, wherein the internal construction step includes an installation module connection step connecting the pipe rack module and the installation module, wherein in the installation module connection step, a carrier beam of the installation module connects between a plurality of second pipe racks, and a support rack of the installation module is connected at the bottom of the plurality of pipe racks. Claim 9 In claim 8, the internal construction step further includes a pipe rack transfer step for transferring the pipe rack module and the installation module from the temporary installation space to the installation space, wherein the pipe rack module and the installation module are transferred by a third transfer device, a pipe rack module construction method. Claim 10 A pipe rack module construction method according to claim 9, wherein the height at which the pipe rack module is placed in the support module connection step is greater than the height at which the pipe rack module is placed in the installation module connection step.
Citation Information
Patent Citations
Piping construction method using pre-piping type rack modules
KR1020240032381A