Construction climbing system
MYPI2026000745A0Pending Publication Date: 2026-08-11SUNJIN RCS CO LTD
0 Cites 0 Cited by
Patent Information
- Application Number
- MYPI2026000745
- Authority / Receiving Office
- MY · MY
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-02-11
- Filing Date
- 2026-02-06
- Publication Date
- 2026-08-11
Abstract
In a construction climbing system, first through-holes are formed in connection members through which a waler connected to a gang-form is connected to a rail, anti-separation holes are formed in a shoe body of a climbing shoe fixed to an outer wall of a structure, and a first fastener is inserted into the first through-holes and the anti-separation holes to fasten the connection members to the climbing shoe, thereby preventing separation of a gang-form cage.
Need to check novelty before this filing date? Find Prior Art