Construction methods for the joint structure of steel-concrete composite columns and steel beams

TW202635985APending Publication Date: 2026-09-01JFE CIVIL ENG & CONSTR +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
TW114149036
Authority / Receiving Office
TW · TW
Patent Type
Applications
Current Assignee / Owner
Priority Date
2025-02-19
Filing Date
2025-12-15
Publication Date
2026-09-01

Smart Images

  • Figure TWG2TA001074887_001
    Figure TWG2TA001074887_001
  • Figure TWG2TA001074887_002
    Figure TWG2TA001074887_002
  • Figure TWG2TA001074887_003
    Figure TWG2TA001074887_003
Patent Text Reader

Abstract

The inner steel pipe (4a) of the lower level and the inner steel pipe (4b) of the upper level are erected coaxially. The steel structure beam (3) is joined to the joining steel pipe of the lower level. The first outer steel pipe (10) and the second outer steel pipe (11) of the integral structure of the upper level are overlapped and inserted, and temporarily placed on the outer periphery of the inner steel pipe of the upper level. Next, the steel structure beam is joined to the joining steel pipe (9b) of the upper level. The first outer steel pipe is raised to the lower part of the steel structure beam of the upper level and placed on the outer periphery of the upper part of the inner steel pipe of the upper level. The second outer steel pipe is lowered from the first outer steel pipe in a sleeve shape to the upper part of the steel structure beam of the lower level and placed on the outer periphery of the lower part of the inner steel pipe. Next, the outer sleeve member (17) is used to surround the outer periphery of the joining steel pipe, and concrete (6) is filled into the interconnected annular space and the outer periphery space.