Smart skid support structure system for modular battery energy storage systems (BESS) and modular bess
TW202636519APending Publication Date: 2026-09-01FLUENCE ENERGY LLC
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- TW114151866
- Authority / Receiving Office
- TW · TW
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2024-12-30
- Filing Date
- 2025-12-30
- Publication Date
- 2026-09-01
Smart Images

Figure TWG2TA001075070_001 
Figure TWG2TA001075070_002 
Figure TWG2TA001075070_003
Abstract
A smart skid support structure system includes a smart skid frame having at least one electrical connection access arranged within at least one of a pair of opposing ends, a top surface having a plurality of location features and a connection port arranged in the top surface, a bottom surface, a pair of opposing sides, a pair of opposing ends, a plurality of bays arranged within the smart skid frame, and a system cabling arranged within the smart skid frame. The smart skid support structure system further includes a plurality of electrical components arranged within the smart skid frame with at least one of the plurality of electrical components being arranged within at least one of the plurality of bays and at least one pod is configured for attachment to the smart skid support structure system.
Need to check novelty before this filing date? Find Prior Art