Connector splicing and soldering system

TWM688515UActive Publication Date: 2026-10-11光隆摩擦焊股份有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
TW115205762
Authority / Receiving Office
TW · TW
Patent Type
Utility models
Current Assignee / Owner
Filing Date
2026-06-23
Publication Date
2026-10-11
Estimated Expiration
2036-06-22

Smart Images

  • Figure TWG2TB001916106_001
    Figure TWG2TB001916106_001
  • Figure TWG2TB001916106_002
    Figure TWG2TB001916106_002
Patent Text Reader

Abstract

A splice welding line system includes a cutting module for cutting a raw steel bar into at least one steel bar to be processed; a conveying module connected to the lower end of the cutting module, the conveying module having at least a half-finished product area; a material preparation conveying section connected to the conveying module, the material preparation conveying section sequentially including a first material bed and a second material bed, the material preparation conveying section receiving the steel bars to be processed; a first welding machine connected to one side of the first material bed; a second welding machine connected to one side of the second material bed; and a control module electrically connected to the cutting module, the conveying module, the material preparation conveying section, the first welding machine, and the second welding machine. This invention allows for continuous production of both cutting and friction welding capacity, eliminating the time required for manual re-lifting of capping operations.
Need to check novelty before this filing date? Find Prior Art

Claims

1. A connector cutting and welding line system, comprising: a cutting module for cutting a raw steel bar into at least one steel bar to be processed; a conveying module connected to the lower end of the cutting module for transporting the steel bar to be processed, the conveying module having at least a half-finished product area; a material preparation conveying section connected to the conveying module, the material preparation conveying section sequentially including a first material bed and a second material bed, the material preparation conveying section receiving the steel bar to be processed; a first welding machine connected to one side of the first material bed for friction welding a first connector to one end of the steel bar to be processed into a half-finished product; a second welding machine connected to one side of the second material bed for receiving the half-finished product and friction welding a second connector to the other end of the half-finished product into a finished product; and a control module electrically connected to the cutting module, the conveying module, the material preparation conveying section, the first welding machine and the second welding machine.

2. The connector cutting and welding connection system as described in claim 1, wherein a cooling bed is provided between the first bed and the second bed, the cooling bed cooling the semi-finished product during transport.

3. The connector cutting and welding connection system as described in claim 1, wherein the conveying module is a conveyor belt.

4. The connector cutting and welding connection system as described in claim 1, wherein the material preparation conveying section is connected to the end of the conveying module, and the semi-finished product area is located in the middle section of the conveying module.

5. The connector cutting and soldering system as described in claim 2, wherein the cooling bed cools the semi-finished product by air cooling.

6. The connector cutting and soldering system as described in claim 2, wherein the first connector is fitted with an end cap on the cooling bed.

7. The connector cutting and welding connection system as described in claim 1, wherein the material preparation conveying section further has a buffer zone between the first material bed and the conveying module.

8. The connector cutting and welding system as described in claim 1, wherein the height of the conveying module is lower than that of the cutting module.

9. The connector cutting and welding system as described in claim 1, wherein the semi-finished product area accommodates the reinforcing bars of different lengths to be processed.

10. The connector cutting and welding connection system as described in claim 1, wherein the first welding machine and the second welding machine are respectively located on opposite sides of the material conveying section.