Full-process construction method for zero-carbon service areas based on wind-solar synergy
ZA202511059BActive Publication Date: 2026-08-26SHAANXI PROVINCIAL TRANSPORT PLANNING DESIGN & RESEARCH INSTITUTE CO LTD +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- ZA202511059
- Authority / Receiving Office
- ZA · ZA
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2025-09-29
- Filing Date
- 2025-12-22
- Publication Date
- 2026-08-26
- Estimated Expiration
- 2045-12-22
Smart Images

Figure 00000020_0000
Abstract
The present invention discloses a full-process construction method for a zero-carbon service area based on wind-solar synergy, comprising the following steps: Step 1: Construct an index system of wind-solar resources and development conditions through multi-source data collection, evaluate the wind-solar synergistic development potential around the service area using quantitative methods, and select the optimal layout points; Step 2: Combine the energy consumption demand of the service area to carry out collaborative configuration and scheme selection of the wind-solar-storage system; Step 3: Establish a life cycle carbon benefit evaluation model to quantify the carbon emission reduction performance of the system from construction to retirement and determine the optimal construction scheme. By building a multi-dimensional resource assessment system, optimizing the wind-solar-storage configuration logic, and establishing a life cycle carbon benefit evaluation framework, the efficient utilization of new energy and the precise realization of carbon emission reduction targets in the service area are achieved.
Need to check novelty before this filing date? Find Prior Art