Methods for Hydraulic Fracturing and Start-up Operations in Wells
AO4271AUndetermined Publication Date: 2026-07-31SCHLUMBERGER TECHNOLOGY BV
0 Cites 0 Cited by
Patent Information
- Application Number
- AO4271
- Authority / Receiving Office
- AO · AO
- Current Assignee / Owner
- Filing Date
- 2025-01-27
- Publication Date
- 2026-07-31
Abstract
The properties of a reservoir rock, hydraulic fracturing materials, and a well to be stimulated are determined. One or more preliminary designs for hydraulic fracturing and well production are selected. The data and designs are entered into one or more computer models to calculate well productivity after hydraulic fracturing treatment. A treatment and well drilling initiation project is selected that will provide maximum well productivity, and work continues accordingly.
Need to check novelty before this filing date? Find Prior Art
