Method for manufacturing modular structure for construction
The method improves modular structure manufacturing by separately producing ceiling, floor, and wall assemblies using 3D jigs for precise alignment and assembly, addressing inefficiencies and defects in existing methods, thereby enhancing productivity and quality.
Patent Information
- Application Number
- AU2024292663
- Authority / Receiving Office
- AU · AU
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-07-14
- Filing Date
- 2024-06-24
- Publication Date
- 2026-11-19
AI Technical Summary
Existing methods for manufacturing modular structures for construction are inefficient, requiring sequential completion by workers at one place, leading to long production times and potential structural defects due to deformation and alignment errors, which hinder mass production and quality control.
A method involving separate manufacturing of ceiling, floor, and wall assemblies using 3D jigs for precise alignment and assembly, followed by finishing operations, ensuring accurate size and shape without errors.
This approach significantly enhances productivity and quality by allowing simultaneous manufacturing of modular structure components, reducing defects and enabling rapid, accurate assembly into finished products.
Smart Images

Figure 00000001_0000 
Figure 00000038_0000 
Figure 00000039_0000
Abstract
Description
Title of the Invention: METHOD FOR MANUFACTURING MODULAR STRUCTURE FOR CONSTRUCTION technical field
[0001] The present invention relates to a method for manufacturing a modular structure for construction, which is a manufacturing production method in which each part is partially manufactured in advance in an assembly form during the manufacturing of the modular structure for construction, and then the parts are assembled and finished to complete the entire manufacturing process. background
[0002] Unlike typical construction methods, in a construction method using modular structures for construction, an interior and exterior, each of which is manufactured in a single unit of a modular structure for construction in a factory and then transported to a site so that one or more modular structures are stacked and assembled to complete a building. The modular structures manufactured in the factory include not only a frame including pillars and beams but also interior walls, doors, windows, as well as various machinery and electrical equipment that make up bathrooms and kitchens.
[0003] Thus, the construction method using the modular structures may significantly shorten a construction period and ensure certain quality to minimize problems of poor construction and also reduce costs if a mass production system is in place. In addition, since operations such as cutting are not required during manufacture of members 2024292663 07 Oct 2026 constituting the modular structures. Thus, the construction method may be an environment-friendly construction method which is little loss and facilitates addition and reconstruction of buildings, as well as the reuse and recycling of buildings after being used.
[0004] Typically, each of the modular structures for construction has a hexahedral shape in the form of rectangular box and includes pillars that form frames at four vertical corners, a ceiling beam connecting upper portion of the pillar, and a floor beam connecting to lower portions of the pillars. The beam including the pillar, the ceiling beam, the floor beam may be generally made of steel material such as a steel frame, but may also be made of various materials such as non-ferrous metals like aluminum, wood, or plastics. The number of pillars and beams may be four or more depending on a size or internal design of the modular structure.
[0005] In the existing method for manufacturing the modular structures for construction, a single modular structure has been sequentially completed by workers engaged in different processes at one place within the factory. That is, the process was performed only at one place from beginning to end, and it takes a long time to complete the final product due to the method being difficult for a plurality of processes to be performed simultaneously. In addition, since the productivity of the existing manufacturing method was determined by the capabilities of the workers assigned to each process, this method has been unsuitable for the mass production required in the manufacturing industry for ensuring the productivity.
[0006] In the production of the existing modular structures 2024292663 07 Oct 2026 for construction, verticality and levelness are measured using a plumb bob and a leveler in the factory, and thus, the pillars, the ceiling beam, and the floor beam are welded and fixed manually. In addition, to absorb deformation during the welding of the frame, a temporary support bar (support) has been used without need for an additional fixing device. When manufacturing the modular structure in this manner, deformation and construction errors occur significantly during the welding of the pillars, the ceiling beams, and the floor beams. When the plurality of modular structures with errors are connected to each other on site during the construction, the entire building may not be constructed according to the design to lead to structural defects, and also, as used continuously, serious defects may occur in terms of insulation, airtightness, sound insulation, or waterproofing. disclosure of the invention
[0007] An embodiment of the present invention provides a method for manufacturing a modular structure of construction, which significantly improves productivity by separately and simultaneously manufacturing parts corresponding to a floor, a wall, a ceiling, and a pod in the form of assemblies through separate processes during the manufacturing of the modular structure for construction and then assembling each assembly into a single finished product to perform a finishing operation.
[0008] In addition, an embodiment of the present invention provides a method for manufacturing a modular structure for construction with an accurate size and shape by using a 3D jig to horizontally or vertically align each assembly 2024292663 07 Oct 2026 produced for each process and firmly fix the assemblies at accurate positions when assembling the assemblies during the manufacturing of the modular structure for construction.
[0009] The present invention is not limited to the aforesaid, other embodiments not described herein will be clearly understood by those skilled in the art from descriptions below.
[0010] A method for manufacturing a modular structure for construction according to an embodiment of the present invention includes: a step (S11) of manufacturing a ceiling assembly including a ceiling steel frame, in which a plurality of ceiling beams and nodes are bound to each other, and a ceiling stud panel configured to define a ceiling surface; a step (S12) of manufacturing a floor assembly including a floor steel frame, in which a plurality of floor beams and nodes are bound to each other, and a floor stud panel configured to define a floor surface; a step (S13) of manufacturing a wall assembly including a long-side wall assembly configured to a long-side wall and a short-side wall assembly configured to define a short-side wall; a step (S14) of manufacturing a pod configured to a bathroom; a step (S2) of assembling an assembly including the ceiling assembly, the floor assembly, the wall assembly, and the pod; and performing a finishing work by sealing a joint outside the modular structure with a sealant, installing a partition wall, and installing interior and exterior finishing materials, wherein, in the step (S2) of assembling the assembly comprising the ceiling assembly, the floor assembly, the wall assembly, and the pod, the ceiling assembly, the floor assembly, the wall assembly, and the pod may be firmly 2024292663 07 Oct 2026 gripped using a 3D jig so as to be assembled according to desired positions, levelness, and verticality, wherein the 3D jig may include: a base comprising a first base rail and a second base rail, which are aligned in parallel to each other; and a post comprising one or more clamps for gripping the ceiling assembly, the floor assembly, the wall assembly, and the pod, wherein the post is disposed on an upper portion of the first base rail or the second base rail and has a changeable position on the first base rail or the second base rail.
[0011] In the foregoing embodiment, the step (S11) of manufacturing the ceiling assembly may include: a step (S111) of manufacturing the ceiling steel frame by binding the plurality of ceiling beams and nodes; a step (S112) of installing the ceiling stud panel on one surface of the ceiling steel frame; a step (S113) of a ceiling insulation material on a top surface of the installed ceiling stud panel; a step (S114) of installing a ceiling fireproof board on a top surface of the installed ceiling insulation material; a step (S115) of installing a mechanical, electrical, and plumbing (MEP) within a ceiling, which includes mechanical equipment, electrical equipment, or fire extinguishing equipment, on a top surface of the installed ceiling fireproof board; a step (S116) of installing a fulltread bolt, a hanger bolt, or a hanger on a wing portion of the ceiling stud panel; and a step (S117) of installing a ceiling frame by coupling a lightweight steel frame M-bar, a carrying channel, and a channel clip so as to be mounted on the full-tread bolt, the hanger bolt, or the hanger.
[0012] In the foregoing embodiment, the step (S12) of 2024292663 07 Oct 2026 manufacturing the floor assembly may include: a step (S121) of manufacturing the floor steel frame by binding the plurality of floor beams and nodes; a step (S122) of installing the floor stud panel on one surface of the floor steel frame; a step (S123) of filling lightweight foamed concrete into the installed floor stud panel; and a step (S124) of installing a CRC board on top surfaces of the floor stud panel and the lightweight foamed concrete.
[0013] In the foregoing embodiment, the step (S13) of manufacturing the wall assembly may include: a step (S131) of manufacturing the long-side wall assembly; and a step (S132) of manufacturing the short-side wall assembly, wherein the long-side wall assembly and the short-side wall assembly may include a wall stud panel, an insulation material, a fireproof board, and a window.
[0014] In the foregoing embodiment, the step (S2) of performing the assembly may include: a step (S21) of installing the manufactured floor assembly; a step (S22) of installing the pod on the installed floor assembly; a step (S23) of installing a plurality of pillars on the floor assembly; a step (S24) of installing the ceiling assembly on an upper portion of each of the pod and the pillars; a step (S25) of installing the wall assembly on a side surface of the pillar; and a step (S26) of sealing the joint exposed to the outside of the modular structure with the sealant.
[0015] In the foregoing embodiment, the method may further include: a step (S133) of installing a window by welding a window frame having a hollow structure to the wall stud panel or directly coupling the window frame to the wall stud panel using direct connection screws or bolts so as to be coupled 2024292663 07 Oct 2026 to the window frame; a step (S134) of installing a fire door comprising a pin hinge, a flush ring, a flush bolt, or a door closer; and a step (S135) of installing an entrance door comprising a butt hinge, a door lock, or a door stopper.
[0016] In the foregoing embodiment, the step (S3) of performing the finishing work may include: a ceiling construction step (S31) of installing residual MEPs on an inner ceiling of the modular structure and installing a ceiling gypsum board; an inner wall construction step (S32) of installing the partition wall inside the modular structure; a wall finishing step of using a wall finishing material inside the modular structure; a ceiling finishing step (S34) of using a ceiling finishing material inside the modular structure; a floor finishing step (S35) of using a floor finishing material inside the modular structure; and an exterior finishing step (S36) of installing an exterior finishing material outside the modular structure. advantageous effects
[0017] In the method for manufacturing the modular structure for construction according to an embodiment of the present invention, the parts corresponding to the floor, the wall, the ceiling, and the pod may be separately and simultaneously manufactured in the form of the assemblies through the separate processes during the manufacturing of the modular structure for construction to assembly each assembly into the single finished product and perform the finishing operation, thereby significantly improving the productivity.
[0018] In the method for manufacturing the modular structure for construction according to an embodiment of the present 2024292663 07 Oct 2026 invention, when assembling the floor assembly, the wall assembly, the ceiling assembly, and the pod, which are produced through the separate processes, the 3D jig may be used to horizontally or vertically align each assembly at the accurate position and firmly fix the each assembly, thereby enabling the production of the modular structure having the accurate size and shape without any errors. brief description of the drawings
[0019] In order that the invention may be more clearly ascertained, embodiments will be described by way of example with reference to the accompanying drawings in which:
[0020] FIG. 1 is a schematic flowchart illustrating each step in a method for manufacturing a modular structure for construction according to an embodiment of the present invention.
[0021] FIG. 2 is a schematic view illustrating a detailed configuration in a step (S11) of manufacturing a ceiling assembly according to an embodiment of the present invention.
[0022] FIG. 3 is a schematic view illustrating a detailed configuration in a step (S12) of manufacturing a floor assembly according to an embodiment of the present invention.
[0023] FIG. 4 is a schematic view illustrating a detailed configuration in a step (S13) of manufacturing a ceiling assembly according to an embodiment of the present invention.
[0024] FIG. 5 is a schematic view illustrating a detailed configuration in a step (S2) of assembling an assembly including a ceiling assembly, a floor assembly, a wall assembly, and a pod according to an embodiment of the present invention. 2024292663 07 Oct 2026
[0025] FIG. 6 is a schematic view illustrating a detailed configuration in a finishing step (S3) according to an embodiment of the present invention.
[0026] FIG. 7 is a schematic view illustrating a 3D jig for assembling assemblies to implement the method for manufacturing the modular structure for construction according to an embodiment of the present invention.
[0027] FIG. 8 is a schematic view illustrating a post included in the 3D jig according to an embodiment of the present invention.
[0028] FIG. 9 is a schematic view illustrating a locator included in the 3D jig according to an embodiment of the present invention.
[0029] FIG. 10 is a schematic view illustrating an example in which a portion of the modular structure is gripped by the 3D jig according to an embodiment of the present invention.
[0030] FIG. 11 is a schematic view illustrating an example of a safety bar mounded on the post of the 3D jig according to an embodiment of the present invention.
[0031] FIG. 12 is a schematic view illustrating a worktable of the 3D jig according to an embodiment of the present invention. detailed description of embodiments the invention
[0032] Advantages and / or features of the present invention, and implementation methods thereof will be clarified through following embodiments described with reference to the accompanying drawings. The present invention may, however, be embodied in different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be 2024292663 07 Oct 2026 thorough and complete, and will fully convey the scope of the present invention to those skilled in the art. Further, the present invention is only defined by scopes of claims. Like reference numerals refer to like elements throughout.
[0033]
[0034] Hereinafter, embodiments of the present invention will be described in more detail with reference to the accompanying drawings.
[0035]
[0036] FIG. 1 is a schematic flowchart illustrating each step in a method for manufacturing a modular structure for construction according to an embodiment of the present invention.
[0037] Referring to FIG. 1, a method for manufacturing a modular structure for construction according to an embodiment of the present invention may include a step (S11) of manufacturing a ceiling assembly, a step (S12) of manufacturing a floor assembly, a step (S13) of manufacturing a wall assembly, a step (S14) of manufacturing a pod, a step (S2) of assembling the manufactured assemblies, and a finishing step (S3). Although each step of manufacturing the ceiling assembly, the floor assembly, the wall assembly, and the pod is performed in prescribed order according to a sequential relationship, all steps may also be performed simultaneously at different places, or some of the steps may be performed simultaneously in parallel at different places.
[0038]
[0039] FIG. 2 is a schematic view illustrating a detailed configuration in a step (S11) of manufacturing the ceiling assembly a11 according to an embodiment of the present 2024292663 07 Oct 2026 invention.
[0040] In the step (S11) of manufacturing the ceiling assembly according to an embodiment of the present invention, the ceiling assembly a11 includes a ceiling steel frame a14, in which a plurality of ceiling beams a12 and nodes a13 are bound to each other, and a ceiling stud panel a15 forming a ceiling surface.
[0041] Referring to FIG. 2a, the step (S11) of manufacturing the ceiling assembly includes a step (S111) of manufacturing the ceiling steel frame a14 previously using the ceiling beams a12 and the nodes a13. The ceiling beams a12, each of which has a long side and a short sides, form the ceiling steel frame a14 through a binding operation such as bolting, riveting, bonding, or welding using the nodes a13 having suitable sizes. The ceiling steel frame a14 generally has a rectangular shape. However, depending on a design of the modular structure, the ceiling steel frame a14 may have a square shape, some sides thereof may have a circular shape, or the ceiling steel frame a14 may have an asymmetric shape.
[0042] Referring to FIG. 2b, after the step (S111) of manufacturing the ceiling steel frame, a step (S112) of installing a ceiling stud panel a15 on one surface of the ceiling steel frame a14 may be performed. The ceiling stud panel a15 may be installed on the ceiling steel frame or another ceiling stud panel by welding. The ceiling stud panel a15 may be installed by being coupled after being premanufactured in consideration of an interval between the ceiling beams a12 of the ceiling steel frame a14.
[0043] Referring to FIG. 2c, after the step (S112), a step (S113) of installing a ceiling insulation material a16 in an 2024292663 07 Oct 2026 empty space between wing portions of the ceiling stud panel a15 may be performed. As the ceiling insulation material a16, for example, mineral wool or glass wool having a density of 40 K to 80 K may be used.
[0044] Referring to FIG. 2d, after the step (S113), a step (S114) of installing a ceiling fireproof board a17 on a top surface of the installed ceiling insulation material a16 may be performed. As for the ceiling fireproof board a17, a material including gypsum may be used, and the fireproof board having a thickness of 15T to 20T that satisfies a 2-hour fireproof standard may be applied.
[0045] Referring to FIG. 2e, after the step (S114), a step (S115) of installing a mechanical, electrical, and plumbing (MEP) a18 within a ceiling, which includes mechanical equipment, electrical equipment, heating / cooling equipment, ventilation equipment, pipings, or fire extinguishing equipment on a top surface of the installed ceiling fireproof board a17 may be performed. The MEP a18 may be installed to include all or some of its components depending on the design in consideration of connection with other internal and external components.
[0046] Referring to FIG. 2f, a step (S116) of installing a full-tread bolt, a hanger bolt, or a hanger al9 on each of the wing portions of the ceiling stud panel a15 for a process of installing a ceiling frame, which is performed later, may be performed. The full-tread bolt, the hanger bolt, or the hanger a19 may be installed on the wing portion of the ceiling stud panel a15, rather than a portion, at which the ceiling fireproof board a17 is installed, in consideration of a weight of the ceiling frame. A length of the full-tread 2024292663 07 Oct 2026 bolt, the hanger bolt, or the hanger a19 may be appropriately applied according to the design in consideration of a height of the MEP.
[0047] Referring to FIG. 2g, after the step (S116), a step (S117) of installing the ceiling frame a20 by reversing the ceiling steel frame a14 up and down so that the ceiling frame a20 is mounted, i.e., hung on the hanger a19 may be performed. The ceiling frame a20 may be installed by coupling a lightweight steel frame M-bar, a carrying channel, and a channel clip. In addition, considering factors such as weights and costs of materials, the ceiling frame a20 may be installed using various materials such as steel or aluminum.
[0048] FIG. 2h is a perspective view of the ceiling assembly a11 completed through the steps (S111 to S117) when viewed from above.
[0049]
[0050] FIG. 3 is a schematic view illustrating a detailed configuration in the step (S12) of manufacturing a floor assembly a21 according to an embodiment of the present invention.
[0051] In the step (S12) for manufacturing the floor assembly according to an embodiment of the present invention, the floor assembly a21 including a floor steel frame a24, in which the plurality of floor beams a22 and nodes a23 are bound to each other, and a floor stud panel a25 that forms a floor surface may be manufactured.
[0052] Referring to FIG. 3a, the step (S12) of manufacturing the floor assembly includes a step (S121) of manufacturing the floor steel frame a24 previously using floor beams a22 and nodes a23. The floor beams a22, each of which has a long 2024292663 07 Oct 2026 side and a short sides, form the floor steel frame a24 through a binding operation such as bolting, riveting, bonding, or welding using the nodes a23 having suitable sizes. The floor steel frame a24 generally has a rectangular shape. However, depending on a design of the modular structure, the ceiling steel frame a14 may have a square shape, some sides thereof may have a circular shape, or the ceiling steel frame a14 may have an asymmetric shape. Referring to a left edge of FIG. 3a, a beam for firmly supporting a portion at which the pod to be installed later is seated may be provided on the floor steel frame a24.
[0053] Referring to FIG. 3b, after the step (S121) of manufacturing the floor steel frame, a step (S122) of installing a floor stud panel a25 on one surface of the floor steel frame a24 may be performed. The floor stud panel a25 may be installed on another floor stud panel or floor steel frame through welding. The floor stud panel a25 may be installed in a form that is pre-manufactured and then coupled in consideration of an interval between the beams of the floor steel frame a24. Referring to an enlarged view of an upper portion in FIG. 3b, a frame for mounting the pod may be provided on the beam for the pod that is previously provided in the floor steel frame, and a connection pin for fixing the pod at an accurate position may be provided.
[0054] Referring to FIG. 3c, after the step (S122) of installing the floor stud panel, a step (S123) of filling lightweight foamed concrete a26 into an inner space between the wing portions of the floor stud panel a25 may be performed. As being filled with the lightweight foamed concrete a26, not only may thermal insulation and sound 2024292663 07 Oct 2026 insulation effects be maintained, but also structural support effects due to the weight may be maintained. After curing the lightweight foamed concrete a26, a buffer material may be constructed.
[0055] Referring to FIG. 3d, a step (S124) of installing a cellulose fiber reinforced cement board (CRC board, a27) on a top surface of the floor stud panel a25 filled with the lightweight foam concrete a26 may be performed. The CRC board a27 is a high-strength, high-density building material produced by mixing Portland cement, silica, and cellulose fibers with water, compressing the mixture at a high pressure of 10,000 tons, and undergoing an autoclave curing process using fiber-reinforced cement. The CRC board a27 may be applied as the flooring material to achieve excellent weather resistance, water resistance, sound insulation, nonflammability, as well as sufficient mechanical strength and environmental friendliness.
[0056] FIG. 3e is a perspective view of the floor assembly a21 completed through the steps (S121 to S124) when viewed from above.
[0057]
[0058] FIG. 4 is a schematic view illustrating a detailed configuration in a step (S13) of manufacturing the ceiling assembly according to an embodiment of the present invention.
[0059] The method for manufacturing the modular structure for construction according to an embodiment of the present invention may include a step (S13) of manufacturing a wall assembly a31 comprising a long-side wall assembly forming a long-side wall and a short-side wall assembly forming a short-side wall. In detail, the step (S13) of manufacturing 2024292663 07 Oct 2026 the wall assembly a31 may include a step (S131) of manufacturing the long-side wall assembly and a step (S132) of manufacturing the short-side wall assembly. The step (S131) of manufacturing the long-side wall assembly and the step (S132) of manufacturing the short-side wall assembly may be performed sequentially, but may also be performed in parallel simultaneously. The long-side wall assembly and the short-side wall assembly may be manufactured by including a wall stud panel a35, an insulation material a36, a fireproof board a37, and a window a33.
[0060] The step (S13) of manufacturing the wall assembly may further include a window installation step (S133), a fire door installation step (S134), and an entrance door installation step (S135).
[0061] Referring to FIGS. 4a to 4e, a window frame a32 that surrounds and supports the window is manufactured by coupling metal square pipes, each of which has a hollow structure. The coupling may be achieved using welding, direct connection threaded screws, or direct connection screws. The long-side wall assembly or the short-side wall assembly is manufactured by welding the wall stud panel a35 to an outer periphery of the window frame a32. The window frame a32 is seated inside the manufactured window frame a32 to complete the installation (S133).
[0062] After the step (S133), a fire door including a pin hinge, a flush ring, a flush bolt, or a door closer may be installed (S134), or an entrance door including a butt hinge, a door lock, or a door stopper may be installed (S135).
[0063] Referring to FIG. 4f, after the step (S132), a step (S136) of installing an insulation material a36 and a step 2024292663 07 Oct 2026 (S137) of installing a fireproof board a37 may be performed. As the insulation material a36, mineral wool having a thickness of 100 T may be used, and as the fireproof board a37, various materials having a thickness of 19 T may be used.
[0064]
[0065] The method for manufacturing the modular structure for construction according to an embodiment of the present invention may include a step (S14) of manufacturing a pod a41 forming a bathroom. The pod a41 is a type of system structure in which convenience facilities such as the bathroom are integrally manufactured and applied to the building. The pod a41 may be manufactured by including electrical, mechanical, and piping equipment, excluding components such as baths, toilets, or washbasins that will ultimately be installed in the bathroom.
[0066]
[0067] FIG. 5 is a schematic view illustrating a detailed configuration in the step (S2) of assembling the assembly including the ceiling assembly a11, the floor assembly a21, the wall assembly a31, and the pod a41 according to an embodiment of the present invention.
[0068] Each of the pre-manufactured ceiling assembly a11, floor assembly a21, wall assembly a31, and pod a41 is transported to one place within the factory to undergo an assembly process. The step (S2) of assembling the assembly, which is illustrated in FIG. 5 may be accurately and easily performed using a 3D jig for manufacturing the modular structure, which will be described later.
[0069] Referring to FIG. 5a, the step (S2) of assembling the assembly includes a step (S21) of installing the previously 2024292663 07 Oct 2026 manufactured floor assembly a21. Since the floor assembly a21 serves to support the entire modular structure, the floor assembly a21 has to be installed to achieve an accurate levelness.
[0070] Referring to FIG. 5b, after the step (S21), a step (S22) of installing the pod a41 on the floor assembly a21 is performed. Referring to FIG. 5c, the pod is coupled to be installed on the previously prepared seating portion. When using connection pins, the pod may be installed more securely at a more precise position.
[0071] Referring to FIG. 5d, a step (S23) of installing a plurality of pillars a42 on corners or edges of the floor assembly a21 is performed. Thereafter, a step (S24) of installing the ceiling assembly a11 on upper portions of the pod a41 and the pillars a42 is performed. The pillars a42 may be coupled to the beams or nodes of the floor assembly a21 and the ceiling assembly a11 by welding. A sealing treatment using a sealant may be performed on the joint between the upper portion of the pod a41 and the ceiling assembly a11 to maintain airtightness.
[0072] Thereafter, as illustrated in FIG. 5e, a step (S25) of installing the wall assembly a31 including the long-side wall assembly and the short-side wall assembly is performed. Thereafter, referring to FIG. 5f, a step (S26) of sealing the joint exposed to the outside of the modular structure with the sealant is performed. The exposed joint may exist between the ceiling stud panels, between the wall stud panels, and between the ceiling stud panel and the wall stud panel.
[0073]
[0074] FIG. 6 is a schematic view illustrating a detailed 2024292663 07 Oct 2026 configuration in the finishing step (S3) according to an embodiment of the present invention.
[0075] Referring to FIGS. 6a and 6b, the finishing step (S3) includes a ceiling construction step (S31) in which a residual MEP is installed on an inner ceiling of the modular structure, and a ceiling gypsum board a51 is installed. Referring to FIG. 6a, although the MEP has been installed in the previous step (S11) of manufacturing the ceiling assembly, the residual MEP may be additionally installed to connect related equipment in the state of being assembled with other assemblies. Thereafter, as illustrated in FIG. 6b, the ceiling gypsum board a51 may be installed under the MEP equipment exposed to the ceiling.
[0076] After the step (S31), an inner wall construction step (S32) of installing a partition wall a52 inside the modular structure as illustrated in FIG. 6c, a wall finishing step (S33) of finishing a wall using a wall finishing material a53 inside the modular structure as illustrated in FIG. 6d, a ceiling finishing step (S34) of finishing a ceiling using a ceiling finishing material a54 inside the modular structure as illustrated in FIG. 6e, a floor finishing step (S35) of finishing a floor using a floor finishing material a55 inside the modular structure as illustrated in FIG. 6f, and an exterior finishing step (S36) of installing an exterior finishing material a56 outside the modular structure as illustrated in FIG. 6g.
[0077] FIG. 6h is a perspective view of a finally completed unit modular structure through the finishing step (S3) including the steps (S31 to S36) when viewed from above.
[0078] 2024292663 07 Oct 2026
[0079] FIG. 7 is a schematic view illustrating the 3D jig for assembling the assemblies a11, a21, a31, and a41 to implement the method for manufacturing the modular structure for construction according to an embodiment of the present invention. When assembling the floor assembly, the wall assembly, the ceiling assembly, and the pod, which are produced through the separate processes, the 3D jig may be used to horizontally or vertically align each assembly at the accurate position and firmly fix the each assembly, thereby enabling the production of the modular structure having the accurate size and shape without any errors.
[0080] Referring to FIG. 7, the 3D jig for manufacturing the modular structure for construction according to an embodiment of the present invention includes a base 1 disposed on a bottom surface thereof, a post 3 including a clamp 35 disposed on an upper portion of the base 1 to grip a member of the modular structure, and a locator 5 for stably fixing a lower portion of the modular structure to the base 1.
[0081] The base 1 is disposed on the floor of the factory for manufacturing the modular structures so as to be parallel to the horizontal plane. The base 1 may be provided as a single plate or may be provided as a plurality of plates having different thicknesses. In this case, the plates have to be connected to each other to integrally support an upper working load and be disposed to be parallel to the horizontal plane. A first base rail 13a and a second base rail 13b, which are arranged in a first direction a and aligned with each other in parallel are disposed on an upper portion of the base 1. Each of side surfaces of the box-shaped modular structure is constituted by two long sides and two short 2024292663 07 Oct 2026 sides. The first direction a may coincide with the direction of the short side, but it is preferable that it is set to be coincide with a direction of the long side for the convenience of disposing the post 3 and for the stable gripping and fixing of the modular structure. Each of the first base rail 13a and the second base rail 13b may be provided as a single rail, but for the stable fixation and smooth movement of the post 3, each of the first base rail 13a and the second base rail 13b may also be provided as two or more rails. In the case in which each of the first base rail 13a and the second base rail 13b is provided as a plurality of rails, the rails may be disposed side by side in the first direction a. The first base rail 13a and the second base rail 13b may be made of high-strength materials such as steel and may be configured to support rolling means such as rollers provided on the bottom surface of the post 3. The first base rail 13a and the second base rail 13b may be provided as grooves defined in a portion of the top surface of the base 1 in the first direction a and may also be provided so that the rolling means such as the roller provided on the bottom surface of the post 3 move within the grooves. In addition, the first base rail 13a and the second base rail 13b may be provided in the form of linear motion guides or may be provided so that the post 3 is able to slid and move on the upper portions of the first base rail 13a and the second base rail 13b in the first direction a without need for a separate rotating means such as the roller, by slip caused by a lubricant.
[0082] The post 3 may be disposed on the first base rail 13a or the second base rail 13b on the upper portion of the base 2024292663 07 Oct 2026 1. Although one post 3 is disposed on each of the first base rail 13a and the second base rail 13b, two or more posts 3 may be disposed for the stable fixation of the modular structure. The number of posts 3 to be disposed on each rail may be appropriately set according to a length of the long side, the number of pillars, the type of work, etc. The post 3 may move on the first base rail 13a or the second base rail 13b through a motor or the like that directly applies rotational force to wheels or the like, which are provided at a lower portion thereof. In addition, the post 3 may move on the first base rail 13a or the second base rail 13b by a hydraulic or compressed air operation or pushing or pulling force generated by rotation of an external motor. The post 3 may be fixed to the base 1 through a separate fixing means for a stable operation after the movement. The separate fixing means may be a fastening bolt or a fixing pin.
[0083] The locator 5 may be configured to stably fix the lower portion of the modular structure, i.e., the floor assembly, to the base 1. The locator 5 may be configured to be detachably attached to the base 1 so as to change its position for stably fixing the modular structures having various sizes, or so as to change or reinforce the supported portion of the modular structure during the operation. The locator 5 may be fastened to the base 1 using bolts or pins or may be fixed using a clamp. In this case, a plurality of holes may be defined in the base 1, and the locator 5 may be attached to the base 1 using the bolts or the like through the defined holes. In addition, since horizontal sliding of the locator 5 is restricted due to the weight of the modular structure, the locator 5 may be placed on the base 1 in the 2024292663 07 Oct 2026 form of a pedestal without an additional fixing member, and the modular structure may be mounted on an upper portion of the locator 5. In this case as well, a portion of the pedestal may be fixed to the hole or the like of the base 1 through the pin or the like.
[0084]
[0085] FIG. 8 is a schematic view illustrating the post included in the 3D jig according to an embodiment of the present invention.
[0086] Referring to FIG. 8, the post 3 may be divided into a post upper portion 31 and a post lower portion 33. A post LM guide 37, which allows for a position change of the post upper portion 31 disposed thereon may be disposed on a top surface of the post lower portion 33. The post LM guide 37 may be disposed in a direction that is unrelated to the above-described first direction a. However, considering that the first base rail 13a or the second base rail 13b should be disposed in parallel with the long side and more firmly grip the modular structures, i.e., the pillars or the assemblies, the post LM guide 37 may also be disposed in a second direction b perpendicular to the first direction a, which is parallel to a cross-section of the modular structure. Since the post upper portion 31 is changed in position according to sizes in the two directions, i.e., a length of the short side of the modular structure through the post upper portion 31, the assemblies or the pillars may be more firmly gripped.
[0087] The post 3 may include one or a plurality of post LM guides 37 for the stable position change of the post upper portion 31. The post LM guide 37 may be provided as a rail made of a high-strength material such as steel, and may be 2024292663 07 Oct 2026 configured to support the rolling means such as the roller disposed on a bottom surface of the post upper portion 31. The post LM guide 37 may be provided in the form of a groove in the top surface of the post lower portion 33 in the second direction b and may also be provided so that the rolling means such as the roller disposed on the bottom surface of the post upper portion 31 moves within the groove. In addition, the post LM guide 37 may be provided in the form of a linear motion guide, and the bottom surface of the post upper portion 31 may be slid and move on the top surface of the post lower portion 33 in the second direction b due to slip caused by the lubricant, without need for a separate rotating means such as the roller.
[0088] The post upper portion 31 may be changed in its position on the top surface of the post lower portion 33 by the motor or the like that directly applies the rotational force to the wheels or the like, which is disposed on the bottom surface thereof. In addition, the post upper portion 31 may be changed in its position on the top surface of the post lower portion 33 by the hydraulic or compressed air or by being pushed or pulled by the rotation of the external motor. The post upper portion 31 may be fixed to the post lower portion through a separate fixing means for the stable operation after the position is changed. A separate fixing means may be a bolt or pin for fastening.
[0089] The post 3 may include a clamp 35 for gripping the member such as the assembly of the modular structure or the pillars on the post upper portion 31. The post 3 may include one clamp, but may also include a plurality of clamps to grip several portions of the members, such as simultaneously 2024292663 07 Oct 2026 gripping the upper and lower portions of the pillar or simultaneously gripping the pillar with the ceiling assembly or the wall assembly. The clamp 35 may individually grip the members, but different clamps included in different posts 3 may also push or pull the members disposed therebetween to be stably fixed. In addition, the clamp 35 may also support or sustain the member from below. The clamp 35 may grip, release, push, or pull the member by the hydraulic pressure or compressed air. The clamp 35 may move in a vertical direction, i.e., in a third direction c perpendicular to the first direction a and the second direction b, from the post upper portion 31. That is, the clamp 35 may include a clamp LM guide 39, which enables height adjustment in the third direction c. Thus, a height of the clamp 35 may be adjusted in response to the size of the modular structure in the third direction c, i.e., various heights to more stably grip, push or pull the pillar, the ceiling assembly, or the wall assembly. The clamp LM guide 39 may operate by a hydraulic or compressed air driving means. In addition, the clamp 35 may be provided to be detachable so as to be directly fastened at various heights on the post 3 using the bolts or pins. Since the members of the modular structure are more firmly supported through the free horizontal movement of the post 3 and the free vertical movement of the clamp 35, deformation that may occur during the welding of the frame may be absorbed to allow for precise production according to designed dimensions.
[0090]
[0091] FIG. 9 is a schematic view illustrating the locator included in the 3D jig according to an embodiment of the 2024292663 07 Oct 2026 present invention.
[0092] Referring to FIG. 9, the locator 5 may include a fixing pin 51 and a pin fixing block 53. As described above, the locator 5 may include a pedestal-type configuration that is placed on the base 1 without a separate fixing means instead of the pin fixing block 53. The locator 5 may be fixed in position on the upper portion of the base 1 through the pin fixing block 53 or the pedestal. The fixing pin 51 is disposed on the upper portion of the locator 5. A circular coupling hole may be defined in a floor part of the modular structure, i.e., in the floor assembly or the floor portion of the pillar. When the modular structure is mounted on the upper portion of the locator 5, the fixing pin 51 may be seated inside the coupling hole to finally firmly fix the floor of the modular structure to the base 1. Since the length of the long side or short side of the modular structure varies, and the modular structure is asymmetric, or a portion thereof is omitted, the locator 5 may freely move to any position on the base 1 to allow the modular structure to be fixed to the base 1 in an optimal state.
[0093]
[0094] FIG. 10 is a schematic view illustrating an example in which a portion of the modular structure is gripped by the 3D jig according to an embodiment of the present invention.
[0095] Referring to FIG. 10, a modular structure having a rectangular parallelepiped shape shown as an example is configured so that assemblies include six pillars, seven floor beams, and seven ceiling beams. The locator 5 may support coupled portions of the floor beams and the pillars that constitute the floor assembly to firmly fix the floor 2024292663 07 Oct 2026 beams and the pillars to the base 1, and each pillar may be gripped by the clamp 35 of the post 3 and thus to be firmly fixed. As a result of manufacturing the modular structure exemplified using an actual 3D jig, it was confirmed that a manufacturing error is within 0.5 mm.
[0096]
[0097] FIG. 11 is a schematic view illustrating an example of a safety bar mounded on the post of the 3D jig according to an embodiment of the present invention.
[0098] Referring to FIG. 11, a safety bar 7a may be configured to prevent access to the upper portion of the operating post 31 or to ensure safety of a worker boarded on the post upper portion 31 during the change in position of the post upper portion 31. Although the fence-shaped safety bar 7a is exemplified, it may also be implemented as a safety bar in the form of a cover or a net.
[0099]
[00100] FIG. 12 is a schematic view illustrating a worktable of the 3D jig according to an embodiment of the present invention.
[00101] Referring to FIG. 12, a worktable 7 may be configured for the safety and convenience of the worker when performing operations such as welding or coupling for the assemblies gripped or supported by the clamp 35 or the members such as the pillars. Particularly, when performing high-altitude work such as the welding or coupling of the ceiling assembly and the pillar, the worker may be boarded on the worktable 7 to perform the work safely and conveniently. For easy and safe boarding by the worker, the worktable 7 may include a step or a safety bar 7b. The worktable 7 may move to a 2024292663 07 Oct 2026 position corresponding to the position of the post 3. That is, when the post 3 moves in the first direction a, its position may be changed to perform the operations on the members gripped on the post 3. In addition, regardless of the position change of the post 3, it is also possible to change the position of the worktable to a position that facilitates the work on various portions of the members when the work on the portions is required. The position change of the worktable 7 may be applied the above-described method for changing the position of the post 3 on the base 1 through the first base rail 13a or the second base rail 13b. In addition, the worktable 7 may be disposed independently of the base by being separated from the top surface of the base, and in this case, the worktable 7 may move by the wheels, the rollers, or the rails at the floor portion thereof.
[00102]
[00103] As described above, according to embodiments of the present invention, the method for manufacturing the modular structure of construction, which significantly improves the productivity by separately and simultaneously manufacturing the parts corresponding to the floor, the wall, the ceiling, and the pod in the form of the assemblies through the separate processes during the manufacturing of the modular structure for construction and then assembling each assembly into the single finished product to perform the finishing operation.
[00104] The modular structure having various specifications may be manufactured through the embodiment of the present invention. In addition, the manufacturing method may be applied to the 3D assembly process, which was the biggest 2024292663 07 Oct 2026 problem in producing the modular structure in the factory to easily establish production lines. As a result, the production of the modular structure may be achieved with high precision, while significantly improving the productivity.
[00105]
[00106] Although the preferred embodiment is described above, it will be understood by those skilled in the art that various changes form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. Therefore, the scope of this invention is defined not by the detailed description of the invention but by the appended claims, and all differences within the scope will be construed as being included in the present invention.
[00107] The present invention may, however, be embodied in different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this invention will be thorough and complete, and will fully convey the scope of the present invention to those skilled in the art. Accordingly, the present invention is only defined by scopes of claims and it is intended that the present invention covers the modifications and variations of this invention provided they come within the scope of the appended claims and their equivalents.
[00108] In the claims which follow and in the preceding description of the invention, except where the context requires otherwise due to express language or necessary implication, the word “comprise” or variations such as “comprises” or “comprising” is used in an inclusive sense, i.e. to specify the presence of the stated features but not 2024292663 07 Oct 2026 to preclude the presence or addition of further features in various embodiments of the invention. It is to be understood that, if any prior art is referred to herein, such reference does not constitute an admission that the prior art forms a part of the common general knowledge in the art, in Australia or any other country.
Claims
1. A method for manufacturing a modular structure for construction, the method comprising:a step (S11) of manufacturing a ceiling assembly comprising a ceiling steel frame, in which a plurality of ceiling beams and nodes are bound to each other, and a ceiling stud panel configured to define a ceiling surface;a step (S12) of manufacturing a floor assembly comprising a floor steel frame, in which a plurality of floor beams and nodes are bound to each other, and a floor stud panel configured to define a floor surface;a step (S13) of manufacturing a wall assembly comprising a long-side wall assembly configured to a long-side wall and a short-side wall assembly configured to define a short-side wall;a step (S14) of manufacturing a pod configured to a bathroom;a step (S2) of assembling an assembly comprising the ceiling assembly, the floor assembly, the wall assembly, and the pod; andperforming a finishing work by sealing a joint outside the modular structure with a sealant, installing a partition wall, and installing interior and exterior finishing materials,wherein, in the step (S2) of assembling the assembly comprising the ceiling assembly, the floor assembly, the wall assembly, and the pod, the ceiling assembly, the floor assembly, the wall assembly, and the pod are firmly gripped using a 3D jig so as to be assembled according to desired2024292663 07 Oct 2026positions, levelness, and verticality,wherein the 3D jig comprises:a base comprising a first base rail and a second base rail, which are aligned in parallel to each other; anda post comprising one or more clamps for gripping the ceiling assembly, the floor assembly, the wall assembly, and the pod, wherein the post is disposed on an upper portion of the first base rail or the second base rail and has a changeable position on the first base rail or the second base rail.
2. The method of claim 1, wherein the step (S11) of manufacturing the ceiling assembly comprises:a step (S111) of manufacturing the ceiling steel frame by binding the plurality of ceiling beams and nodes;a step (S112) of installing the ceiling stud panel on one surface of the ceiling steel frame;a step (S113) of a ceiling insulation material on a top surface of the installed ceiling stud panel;a step (S114) of installing a ceiling fireproof board on a top surface of the installed ceiling insulation material;a step (S115) of installing a mechanical, electrical, and plumbing (MEP) within a ceiling, which comprises mechanical equipment, electrical equipment, or fire extinguishing equipment, on a top surface of the installed ceiling fireproof board;a step (S116) of installing a full-tread bolt, a hanger bolt, or a hanger on a wing portion of the ceiling stud panel; and2024292663 07 Oct 2026a step (S117) of installing a ceiling frame by coupling a lightweight steel frame M-bar, a carrying channel, and a channel clip so as to be mounted on the full-tread bolt, the hanger bolt, or the hanger.
3. The method of claim 1, wherein the step (S12) of manufacturing the floor assembly comprises:a step (S121) of manufacturing the floor steel frame by binding the plurality of floor beams and nodes;a step (S122) of installing the floor stud panel on one surface of the floor steel frame;a step (S123) of filling lightweight foamed concrete into the installed floor stud panel; anda step (S124) of installing a CRC board on top surfaces of the floor stud panel and the lightweight foamed concrete.
4. The method of claim 1, wherein the step (S13) of manufacturing the wall assembly comprises:a step (S131) of manufacturing the long-side wall assembly; anda step (S132) of manufacturing the short-side wall assembly,wherein the long-side wall assembly and the short-side wall assembly comprise a wall stud panel, an insulation material, a fireproof board, and a window.
5. The method of claim 1, wherein the step (S2) of performing the assembly comprises:a step (S21) of installing the manufactured floor assembly;2024292663 07 Oct 2026a step (S22) of installing the pod on the installed floor assembly;a step (S23) of installing a plurality of pillars on the floor assembly;a step (S24) of installing the ceiling assembly on an upper portion of each of the pod and the pillars;a step (S25) of installing the wall assembly on a side surface of the pillar; anda step (S26) of sealing the joint exposed to the outside of the modular structure with the sealant.
6. The method of claim 1, further comprising:a step (S133) of installing a window by welding a window frame having a hollow structure to the wall stud panel or directly coupling the window frame to the wall stud panel using direct connection screws or bolts so as to be coupled to the window frame;a step (S134) of installing a fire door comprising a pin hinge, a flush ring, a flush bolt, or a door closer; anda step (S135) of installing an entrance door comprising a butt hinge, a door lock, or a door stopper.
7. The method of claim 1, wherein the step (S3) of performing the finishing work comprises:a ceiling construction step (S31) of installing residual MEPs on an inner ceiling of the modular structure and installing a ceiling gypsum board;an inner wall construction step (S32) of installing the partition wall inside the modular structure;a wall finishing step of using a wall finishing2024292663 07 Oct 2026material inside the modular structure;a ceiling finishing step (S34) of using a ceiling finishing material inside the modular structure;a floor finishing step (S35) of using a floor finishing material inside the modular structure; andan exterior finishing step (S36) of installing an exterior finishing material outside the modular structure.