A method for cooperatively weakening high- and low-level hard roofs based on non-continuous fracturing
AU2026205240B1Pending Publication Date: 2026-08-20ANHUI UNIV OF SCI & TECH
Patent Information
- Application Number
- AU2026205240
- Authority / Receiving Office
- AU · AU
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2025-09-29
- Filing Date
- 2026-01-29
- Publication Date
- 2026-08-20
Smart Images

Figure 00000030_0000 
Figure 00000031_0000 
Figure 00000032_0000
Abstract
Provided is a collaborative weakening method of high and low positions for hard rock layer roof based on discontinuous fracturing, which includes obtaining rock stratum parameters of a benchmark area and rock stratum parameters of a current area; dividing a roadway into multiple independent sections based on the rock stratum parameters of the benchmark area and rock stratum parameters of the current area; drilling several sets of fracturing boreholes in each independent section, each set of fracturing boreholes consisting of a high-position deep hole and a low-position shallow hole; arranging the high-position deep hole and low-position shallow hole alternately along a tunnel axis according to the weakened unit length and rock bridge unit length; when detonating the fracturing boreholes, a detonation time of the high- position deep hole is delayed compared to a detonation time of the low-position shallow hole. ABSTRACTABSTRACTABSTRACT
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Graded roof-cutting gob-side entry retaining method
CN112459786A
Advanced roof cutting pressure relief and surrounding rock control method for hard roof of gob-side roadway
CN113417638A