Method performed by user equipment and user equipment

By transmitting downlink control signaling on multiple beam pair links with different spatial filtering configurations, the solution addresses beam pair link failures, ensuring robust and continuous communication with user equipment, even under blocking conditions.

BR112019008989B1Active Publication Date: 2026-11-17TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
BR112019008989
Authority / Receiving Office
BR · BR
Patent Type
Patents
Current Assignee / Owner
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The challenge in maintaining communication links with user equipment (UE) under narrow-beam operating conditions, particularly when blocking objects interfere with the beam, leading to beam pair link failures that affect the reception of downlink control signaling, such as PDCCH, resulting in dropped calls and poor user experience.

Method used

Transmitting downlink control signaling on multiple beam pair links using different spatial transmission filtering configurations, with one active and one monitored link, and implementing a longer duty cycle for the monitored link to ensure robust communication even in the presence of blocking objects.

Benefits of technology

Enhances the robustness of communication links by providing redundancy and ensuring continuous reception of control signaling, reducing the likelihood of beam pair link failures and maintaining a stable connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000047_0000
    Figure 00000047_0000
  • Figure 00000048_0000
    Figure 00000048_0000
  • Figure 00000049_0000
    Figure 00000049_0000
Patent Text Reader

Abstract

Methods implemented by a user device and by one or more transmission points, user device, and transmission point. One way to increase robustness against beam pair link failure is by transmitting downlink (DL) control signaling (e.g., PDCC) on more than one beam. That is, one way to mitigate BPLF is for the user to receive DL control signaling both through a first BPL (e.g., the active BPL) and through a second BPL (e.g., the monitored BPL), but with a higher duty cycle for the second BPL compared to the first BPL. For example, control signaling can be scheduled at each interval on the first BPL and scheduled at every nth interval on the second BPL. In this way, in the event that the first BPL is blocked and the user cannot decode the control signaling on the first BPL, the user can receive the control signaling transmitted on the second BPL.
Need to check novelty before this filing date? Find Prior Art

Description

43 METHOD PERFORMED BY A USER'S EQUIPMENT AND USER'S EQUIPMENT Technical Field

[001] Modalities for transmitting control information to an UE using more than one (i.e., a plurality of) beam pair links (BPLs) are described. Fundamentals of the Invention 1.0 Introduction

[002] The 3rd Generation Partnership Project (3GPP) began work on developing and designing the next-generation mobile communications system (also known as the 5G mobile communications system or simply “5G” for short). 5G will encompass an evolution of today’s 4G networks and the addition of a new globally standardized radio access technology known as “New Radio” (NR). The wide variety of requirements for NR implies that frequency bands at many different carrier frequencies will be needed. For example, lower bands will be required to achieve sufficient coverage, and higher bands (e.g., mmW, such as near and above 30 GHz) will be needed to achieve the required capacity. At higher frequencies, propagation properties are more challenging, and high-order beamforming at the base station (e.g., eNB or gNB) will be required to achieve sufficient link budget. For example, narrow-beam transmit and receive schemes may be necessary at higher frequencies to compensate for high propagation loss.For a given communication link, one beam can be applied at the transmission point, TRP, (i.e., a transmit beam (TX)) and one beam can be applied at the user equipment (UE) (i.e., a receive beam (RX)), which is collectively referred to as a “beam pair link” (BPL) or simply “link” for short. Petition 870240098976, dated 11 / 21 / 2024, p. 9 / 111 / 43

[003] The NR will have a beam-centric design, meaning that the traditional cell concept is relaxed, and user equipment (UEs) (i.e., fixed or mobile wireless communication devices) will, in many cases, be connected to and perform “transfer” between narrow beams instead of cells. Therefore, 3GPP agreed to study concepts to address mobility between beams (both within and between transmission points (TRPs)). As used here, a TRP is a base station or a component of a base station. At higher frequencies, where high-gain beamforming will be required, each beam will only be used in a small area (i.e., the beam coverage area), and the link budget outside the coverage area will deteriorate rapidly. Therefore, a frequent and fast beam switching method is necessary to maintain high performance. 1.1 Beam Formation

[004] Beamforming involves transmitting the same signal from multiple antenna elements of an antenna array with an amplitude and / or phase shift applied to the signal for each of the antenna elements. These amplitude / phase shifts are commonly denoted as antenna weights, and the collection of antenna weights for each antenna is a precoding vector. Such antenna weights and precoding vectors are examples of a spatial transmission filtering configuration.

[005] Different spatial transmission filtering configurations (e.g., different precoding vectors) result in a beamforming of the transmitted signal, and the weights can be controlled so that the signals are coherently combined in a certain direction of the angle viewed from the antenna array, in which case a transmission (TX) beam is said to be formed in this direction. Therefore, in some contexts, when referring to a TX beam, one is referring to a configuration of Petition 870240098976, dated 11 / 21 / 2024, p. 10 / 111 / 43 particular transmission spatial filtering (also known as “beamforming weights” or “beam parameters”), and when referring to an RX beam, it is referring to a particular reception spatial filtering configuration. If the antennas in the array are placed in two dimensions, i.e., in a plane, then the beam can be directed in both azimuth and elevation directions relative to the plane perpendicular to the antenna array. 1.2 Reference Signals, Antenna Ports and Quasi-Collateral (QCL)

[006] In LTE, the reference signals (RSs) used for channel estimation are equivalently denoted as antenna ports. Therefore, an UE can estimate the channel from an antenna port by using the associated RS. One can then associate a certain data or control transmission with an antenna port, which is equivalent to saying that the UE must use the RS for this antenna port to estimate the channel used to demodulate the associated control or data channel. One can also say that the data or control channel is transmitted using this antenna port.

[007] In LTE, the concept of quasi-colocalization was introduced in order to improve channel estimation performance during the demodulation of control or data channels. The concept is based on the fact that the UE can estimate long-term channel properties from a reference signal in order to tune its channel estimation algorithm. For example, the average channel delay dispersion can be estimated using one antenna port and used during the demodulation of a transmitted data channel using another antenna port. If this is allowed, it is specified that the first and second antenna ports are quasi-colocalized (QCL) with respect to the average channel delay dispersion.

[008] Therefore, in the way used in LTE specifications, two antenna ports are “almost colocalized” if the large-scale properties of Petition 870240098976, dated 11 / 21 / 2024, p. 11 / 111 / 43 channel of the channel through which a symbol on one antenna port is conducted can be inferred from the channel through which a symbol on the other antenna port is conducted. The large-scale properties of the channel preferably include one or more of delay dispersion, Doppler dispersion, Doppler shift, average gain, and average delay.

[009] Furthermore, or alternatively, the large-scale channel properties may include one or more received power for each port, received synchronization (i.e., synchronization of a first significant channel tap), a number of significant channel taps, and frequency offset. By performing channel estimation algorithm tuning based on the RSs corresponding to the quasi-co-located antenna ports, the quality of the channel estimation is substantially improved.

[0010] In NR, it was agreed to introduce QCL for channel spatial properties on top of these QCL parameters used for LTE. By supplementing the existing QCL structure with new QCL parameters that depend on channel spatial properties, a UE can be allowed to perform spatial processing across different signal types without violating the rule that does not allow a UE to use measurements from a reference signal to assist in the reception or processing of another signal unless explicitly specified.

[0011] Examples of such spatial processing are analog receiver beamforming and channel estimation using spatial processing gain to improve channel estimation.

[0012] Consider the communication between two nodes in a network, a TX node and an RX node. A TX node transmits a first set of reference signals (RS) from one or multiple transmit antenna ports. An RX node receives the transmitted reference signals using one or multiple receive antenna ports and determines or estimates, based on the Petition 870240098976, dated 11 / 21 / 2024, page 12 / 111 / 43 first received set of transmitted RSs, one or more parameters that capture a spatial property of the channel. The RX node determines an indication that a second set of RSs transmitted from one or multiple transmit antenna ports are nearly colocalized (QCL) with the first RS, where QCL is given relative to one or more parameters that capture a spatial property of the channel. The TX node transmits the second set of transmitted RSs from one or multiple transmit antenna ports. The RX node uses one or more of the determined parameters that capture a spatial property of the channel that is based on the first set of RSs, to assist in receiving the second set of RSs.

[0013] In other words, the RX node, typically a UE, can use the same RX beamforming weights to receive the second signals and associated RS (such as a control or data transmission DMRS) as the RX beamforming weights it used when receiving a first signal (e.g., a measurement signal, e.g., CSI-RS) if the second RS is QCL with the first RS with respect to spatial parameters.

[0014] A QCL parameter related to a spatial property is related to the UE's RX beamforming or the UE's RX reception parameters. Therefore, if the UE uses two different QCL spatial parameters, it may indicate that the UE uses two different RX beamforming weights (or, equivalently, two different ways of combining the signals coming from the UE's RX antennas).

[0015] The spatial parameters can be the angle of arrival, the angular dispersion or the spatial correlation, the spatial correlation matrix on the RX side or on the TX side.

[0016] It was agreed for NR that the information regarding the beamforming / reception procedure on the EU side used for the Petition 870240098976, dated 11 / 21 / 2024, page 13 / 111 / 43 data reception can be indicated via QCL to the UE (from the base station). 1.3 Control channel search space and control signaling

[0017] The information transmitted over the radio link to users can be broadly classified as control information (also known as control messages) or user data. Control information is used to facilitate the proper operation of the system, as well as the proper operation of each UE in the system. Control information may include commands to control functions, such as the power transmitted from a UE, the signaling of resource blocks (RBs) where information should be received by the UE or transmitted from the UE, and similar functions.Examples of control information include a physical downlink control channel (PDCCH) that, for example, carries scheduling information and power control messages, a physical HARQ indicator channel (PHICH) that carries ACK / NACK messages sent in response to a previous uplink transmission, and a physical broadcast channel (PBCH) that carries system information. Also, primary and secondary synchronization signals (PSS / SSS) can be seen as control signals with fixed locations and periodicity in time and frequency, so that UEs initially accessing the network can discover them and synchronize.

[0018] The PBCH in LTE is not scheduled by a PDCCH transmission, but has a fixed location relative to the primary and secondary synchronization signals (PSS / SSS). Therefore, the LTE UE can receive the system information transmitted in BCH before it can read the PDCCH. It should be noted that the payload in BCH (which is referred to as the master information block (MIB)) is not fully utilized, but contains some unallocated “spare” bits that can be used for other purposes. Petition 870240098976, dated 11 / 21 / 2024, p. 14 / 111 / 43 future.

[0019] In LTE Rel-10, all control messages for UEs are demodulated using a cell-specific RS (CRS), therefore they have coverage across the cell width to reach all UEs in the cell without needing knowledge of their position. An exception is the PSS and SSS which are independent and do not need CRS reception before demodulation. The first one to four OFDM symbols, depending on the configuration, in a subframe, are reserved to contain such control information, as shown in Figure 1. Control messages can be categorized into those message types that need to be sent only to one UE (UE-specific control) and those that need to be sent to all UEs or some subset of UE numbering greater than one (common control) in the cell that is covered by the eNB.

[0020] PDCCH-type control messages are demodulated using CRS and transmitted in multiple units called control channel elements (CCEs), where each CCE contains 36 feature elements (REs). A PDCCH can have an aggregation level (AL) of 1, 2, 4, or 8 CCEs to allow for link adaptation of the control message. Furthermore, each CCE is mapped to 9 feature element groups (REGs) consisting of 4 REs each. These REGs are distributed across the entire system bandwidth to provide frequency diversity for a CCE. Therefore, a PDCCH consisting of up to 8 CCEs spans the entire system bandwidth in the first one to four OFDM symbols, depending on the configuration.

[0021] The transmission of the shared data channel in physical downlink (PDSCH) to LTE UEs is using the RE on a pair of RBs that is not used for control messages (i.e., in the data area shown in Figure 1) or RS and can be transmitted using either the UE-specific RS or the CRS as a demodulation reference, Petition 870240098976, dated 11 / 21 / 2024, page 15 / 111 / 43 depending on the PDSCH transmission mode. The use of UE-specific RS in LTE allows a multi-antenna LTE base station (eNB) to optimize transmission by precoding both data and reference signals transmitted from the multiple antennas, so that the received signal strength increases in UE and, consequently, channel estimation performance is improved and the transmission data rate can be increased.

[0022] For NR, it is expected that the specific EU RS will also be used for control channel transmissions. 1.3.1 PDCCH Processing in LTE

[0023] After channel coding, scrambling, modulation, and interleaving of control information, the modulated symbols are mapped to resource elements in the control area. In the aforementioned manner, control channel elements (CCEs) were defined, where each CCE maps to 36 resource elements. By choosing the aggregation level, the link adaptation of the PDCCH is obtained. In total, there are NCCEs available for the entire PDCCH to be transmitted in the subframe, and the number of NCCEs varies from subframe to subframe depending on the number of control symbols and the number of PHICH resources configured.

[0024] Because NCCE varies from subframe to subframe, the terminal will need to blindly determine the position as well as the number of CCEs used for its PDCCH, which can be a computationally intensive decoding task. Therefore, some restrictions on the number of possible blind decodings a terminal needs to traverse were introduced in Rel.8. For example, CCEs are numbered and CCE aggregation levels of size K can only start at CCE numbers uniformly divisible by K, see Figure 2.

[0025] The set of CCEs that a terminal needs to decode Petition 870240098976, dated 11 / 21 / 2024, page 16 / 111 / 43. Blindly searching for a valid PDCCH is called the UE's "search space". This is the set of CCEs in an AL that a terminal must monitor for scheduling assignments or other control information, see the example in Figure 3. In each subframe and in each AL, a terminal will attempt to decode all PDCCHs that can be formed from the CCEs in its search space. If the CRC passes, then the content of the PDCCH is considered valid for the terminal and it further processes the received information. Frequently, two or more terminals will have overlapping search spaces and the network needs to select one of them for scheduling the control channel. When this occurs, the unscheduled terminal must be blocked. The search spaces for a UE vary pseudo-randomly from subframe to subframe to minimize this blocking probability.

[0026] A search space is further divided into a common part and a terminal-specific part. In the common search space, the PDCCH containing information relating to all or a group of terminals is transmitted (radiolocation, system information, etc.). If carrier aggregation is used, a terminal will find the common search space present on the primary component carrier (PCC) only. The common search space is restricted to aggregation levels 4 and 8 to provide sufficient channel code protection for all terminals in the cell (since it is a broadcast channel, link adaptation cannot be used). The first m8 and m4 PDCCHs (first in the sense of having the lowest CCE number) in an AL of 8 or 4, respectively, belong to the common search space. For efficient use of CCEs in the system, the remaining search space is terminal-specific at each aggregation level.

[0027] A CCE consists of 36 QPSK-modulated symbols that map to the 36 REs unique to that CCE. Therefore, knowing the CCE means that the RE is also automatically known. To maximize a. Petition 870240098976, dated 11 / 21 / 2024, p. 17 / 111 / 43 diversity and randomization of interference, interleaving is used before a specific cyclic cell shift and mapping to the REs, see the processing steps in Figure 4. Note that, in most cases, some CCEs are left empty due to the PDCCH site restriction for search spaces and terminal aggregation levels. Empty CCEs are included in the interleaving and mapping process to the RE like any other PDCCH to maintain the search space structure. Empty CCEs are set to zero power and this power can instead be used by non-empty CCEs to further boost PDCCH transmission.

[0028] Furthermore, to enable the use of 4-antenna TX diversity, a group of 4 adjacent QPSK symbols in a CCE is mapped to 4 adjacent REs, denoted as a group of REs (REG). Therefore, CCE interleaving is quadruplex-based (group of 4) and the mapping process has a granularity of 1 REG and a CCE corresponds to 9 REGs (= 36 REs).

[0029] In LTE, each PDCCH is mapped to REs in all OFDM symbols configured for the control area. This is also seen in the mapping in Figure 1 of a CCE belonging to a PDCCH in LTE to the control area that encompasses the entire system bandwidth. Summary of the Invention

[0030] One problem with connecting UEs in a narrow beam is that the signal transmitted in the beam can be easily deteriorated, for example, if an object gets in the way of the signal with the formed beam and blocks it. Due to high penetration loss and weak diffraction properties at high frequencies, a blocking object can lead to a lost connection between the TX beam and the UE, so that the control channel cannot be decoded, which can lead to dropped calls and a poor user experience. Such a scenario will be considered a “pair link failure”. Petition 870240098976, dated 11 / 21 / 2024, page 18 / 111 / 43 of bundles” (BPLF).

[0031] Thus, it is a problem how to maintain a communication link with the UE even under narrow-beam operating conditions and the presence of blocking objects. In particular, it is a problem how to transmit and receive downlink (DL) control signaling (e.g., PDCCH) that carries scheduling assignments or data scheduling grants under such operating conditions.

[0032] One way to overcome this problem is to increase robustness against beam pair link failure by transmitting DL control signaling (e.g., PDCCH) on more than one beam (i.e., transmitting DL control signaling using more than one transmission spatial filtering configuration). That is, one way to mitigate BPLF is for the UE to receive DL control signaling both through a first BPL (sometimes called the “active link”) and through a second BPL (sometimes called the monitored link), but with a higher duty cycle for the second BPL compared to the first BPL. For example, control signaling could be scheduled at every interval on the first link and scheduled at every N-th interval on the second link.In this way, if the first BPL is blocked and the UE cannot decode the control signaling on the first BPL (that is, the control signaling transmitted using a first spatial transmission configuration), the UE can receive the control signaling transmitted on the second link (that is, the control signaling transmitted using a second spatial transmission configuration).

[0033] Preferably, the transmission of control signals in more than one BPL is carried out in an efficient manner. Additionally, the UEs should be configured to monitor the BPLs in a robust and efficient way. A main advantage of doing this is that the connection, particularly the PDCCH transmission and reception at high frequencies, will be Petition 870240098976, dated 11 / 21 / 2024, page 19 / 111 / 43, is more robust in relation to BPLFs.

[0034] The transmission of control signals on more than one beam can be achieved, in one mode, by associating each candidate control channel in the control channel search space with a spatial QCL parameter. In other words, two candidate control channels can be received with different RX beams from the UE and thus two different TX beams, respectively, if the two candidates have different QCL parameters with respect to spatial properties. This provides robustness against beam pair link failure, since an active and monitored BPL can be used to schedule data messages to or from the UE.

[0035] Therefore, in addition to the TRP transmitting the PDCCH to an UE using a first BPL (e.g., active BPL) and thus using a first TX beam (e.g., using a first precoding vector), for the UE, the TRP transmits the PDCCH to the UE using a second BPL (e.g., monitored BPL) and thus using a second TX beam (e.g., using a second precoding vector), to achieve diversity. In some modes, a longer duty cycle is used for the PDCCH transmitted using the second BPL, compared to the first BPL. The relationship between the spatial QCL parameter and the candidate PDCCH to use during the attempt to decode the PDCCH may be different for different candidate PDCCHs in the search space in a different subframe or subframes (or other defined time periods).Alternatively, the association between a candidate PDCCH and the TX beam used, and thus the RX beam to be used during the attempt to decode the PDCCH, may be different for different candidate PDCCHs in the search space for the UE, either in one subframe or in different subframes (or, equivalently, in other defined time periods). Petition 870240098976, dated 11 / 21 / 2024, page 20 / 111 / 43

[0036] In this way, in one aspect, a method implemented by a TRP to communicate with a UE is provided. The method includes: using a first beam pair link, BPL, to communicate with the UE, wherein the first BPL comprises a first transmit spatial filtering configuration and a first receive spatial filtering configuration corresponding to the first transmit spatial filtering configuration, transmitting the control information to the UE using the first BPL, and providing the UE with scheduling information indicating an interval at which the TRP may transmit the control information to the UE using a second BPL, wherein the second BPL comprises a second transmit spatial filtering configuration.

[0037] In some embodiments, the method additionally includes: the TRP detecting that the first BPL has experienced a beam pair link failure, BPLF, and, as a result of detecting that the first BPL has experienced a BPLF, the TRP transmitting the control information to the UE at the indicated interval using the second BPL.

[0038] In some embodiments, the control information transmitted to the UE in the indicated range using the second BPL informs the UE that the second BPL is now an active BPL for the UE. In some embodiments, the UE is configured in such a way that the UE will look for a control area in the indicated range for the control information transmitted by the TRP using the second BPL.

[0039] In some embodiments, the step of transmitting control information to the UE using the first BPL comprises transmitting control information to the UE using the first BPL in no more than M of N consecutive intervals, wherein N is greater than 1 and M is less than or equal to N, and the indicated interval is one of the N consecutive intervals. In some embodiments, the scheduling information indicates L intervals in which the TRP may transmit control information to the Petition 870240098976, dated 11 / 21 / 2024, p. 21 / 111 / 43 UE using the second BPL, where L is greater than or equal to 1 and L is less than M, and each of the L intervals is one of the N consecutive intervals. In some embodiments, M = N-1 and L = 1. In some embodiments, in one of the N consecutive intervals, the TRP transmits the control information to the UE using the second BPL, but does not transmit the control information to the UE using the first BPL. In some embodiments, M = N and L = 1.

[0040] In another aspect, there is a method performed by one or more TRPs communicating with an UE. The method includes: defining a first search space and a second search space, wherein a first broadcast spatial filtering configuration is associated with the first search space and a second broadcast spatial filtering configuration is associated with the second search space, for a transmission of a candidate control channel to the UE, selecting the first or second search spaces, and transmitting the candidate control channel on control channel resources belonging to the selected search space using the broadcast spatial filtering configuration associated with the selected search space.

[0041] In some embodiments, the first transmission spatial filtering configuration is related to a first BPL and the second transmission spatial filtering configuration is related to a second BPL. In some embodiments, the selection is based on the information that the first BPL experienced a beam pair link failure (BPLF).

[0042] In some embodiments, the first search space is a first part of a control area, and the second search space is a second part of the control area. In some embodiments, the first part of the control area and the second part of the control area overlap in time at least partially, or the first part of the control area does not. Petition 870240098976, dated 11 / 21 / 2024, page 22 / 111 / 43 overlaps in time with the second part of the control area.

[0043] In some embodiments, the first search space is a first area of ​​control, and the second search space is a second area of ​​control. In some embodiments, the first area of ​​control and the second area of ​​control overlap in time at least partially, or the first area of ​​control does not overlap in time with the second area of ​​control.

[0044] In another aspect, a TRP is provided that is configured to perform any of the TRP methods described in this description. For example, in some embodiments, the TRP includes a transmitter, a receiver, a memory, and a data processing system comprising one or more processors, wherein the TRP is configured to perform any of the TRP methods described in this description.

[0045] In another aspect, a method is provided for an UE communicating with one or more TRPs, wherein the TRPs are configured to transmit information to the UE using a first beam pair link, BPL, comprising a first transmit spatial filtering configuration and a first receive spatial filtering configuration corresponding to the first transmit spatial filtering configuration.The method involves the UE using the first reception spatial filtering configuration corresponding to the first transmission spatial filtering configuration to obtain the control information transmitted to the UE using the first BPL, and the UE obtaining the scheduling information indicating an interval in which one of the TRPs can transmit the control information to the UE using a second BPL comprising a second transmission spatial filtering configuration and a second reception spatial filtering configuration corresponding to the second transmission spatial filtering configuration.

[0046] In some modes, a TRP transmits in the interval a Petition 870240098976, dated 11 / 21 / 2024, page 23 / 111 / 43 control information for the UE using the second BPL in the event that the TRP detects that the first BPL experienced a beam pair link failure.

[0047] In some modes, as a result of receiving the scheduling information, the UE uses the second reception spatial filtering configuration corresponding to the second transmission spatial filtering configuration to search for the indicated interval for the control information transmitted to the UE and, as a result of the search, the UE obtains the control information transmitted to the UE, and the control information obtained informs the UE that the second BPL is now an active BPL for the UE.

[0048] In some embodiments, the indicated interval is an interval in which a TRP does not transmit control information to the UE using the first BPL.

[0049] In another aspect, there is another method performed by the UE. The method includes: the UE using a first parameter corresponding to a first BPL to search a first search space for the control information transmitted by a TRP to the UE using the first BPL, and the UE using a second parameter corresponding to a second BPL to search a second search space for the control information transmitted by a TRP to the UE using the second BPL. The first BPL comprises a first transmit spatial filtering configuration and a first receive spatial filtering configuration corresponding to the first transmit spatial filtering configuration. The second BPL comprises a second transmit spatial filtering configuration and a second receive spatial filtering configuration corresponding to the second transmit spatial filtering configuration.In some modes, the UE uses the second parameter corresponding to the second BPL to search the second search space for control information when the UE is unable to find the control information transmitted using the . Petition 870240098976, dated 11 / 21 / 2024, page 24 / 111 / 43 first BPL.

[0050] In another aspect, there is another method performed by the UE. The method involves: the UE using a first QCL parameter to receive a candidate control channel transmitted in a first search space, and the UE using a second QCL parameter to receive a candidate control channel transmitted in a second search space. In some embodiments, the first search space is a first part of a control area, and the second search space is a second part of the control area. In some embodiments, the first part of the control area and the second part of the control area overlap in time at least partially, or the first part of the control area does not overlap in time with the second part of the control area.

[0051] In some embodiments, the first search space is a first area of ​​control, and the second search space is a second area of ​​control. In some embodiments, the first area of ​​control and the second area of ​​control overlap in time at least partially, or the first area of ​​control does not overlap in time with the second area of ​​control.

[0052] In some embodiments, the method also includes the UE receiving the configuration information using a top-layer message, where the configuration information configures the first and second lookup spaces.

[0053] In another aspect, a UE is provided that is configured to perform any of the UE methods described in this description. For example, in some embodiments, the UE includes a transmitter, a receiver, a memory, and a data processing system comprising one or more processors, wherein the UE is configured to perform any of the UE methods described in this description.

[0054] In another aspect, a method is provided that is carried out by a Petition 870240098976, dated 11 / 21 / 2024, page 25 / 111 / 43, describes a system comprising a first TRP to communicate with an UE and a second TRP to communicate with the UE. The method includes: the first TRP using a first beam pair link (BPL) to communicate with the UE, the second TRP using a second BPL to communicate with the UE, the first TRP transmitting control information to the UE using the first BPL, and providing the UE with scheduling information indicating an interval within which the second TRP can transmit control information to the UE using the second BPL.

[0055] In some embodiments, the method also includes: detecting that the first BPL has experienced a beam pair link failure (BPLF), as a result of detecting that the first BPL has experienced a BPLF, the second TRP transmits the control information to the UE in the indicated interval using the second BPL. In some embodiments, the control information transmitted to the UE in the indicated interval using the second BPL informs the UE that the second BPL is now an active BPL for the UE. In some embodiments, the UE is configured in such a way that the UE will fetch a control area of ​​the indicated interval for the control information transmitted by the second TRP using the second BPL.

[0056] In some embodiments, the step of transmitting control information to the UE using the first BPL comprises transmitting control information to the UE using the first BPL in no more than M of N consecutive intervals, wherein N is greater than 1 and M is less than or equal to N, and the indicated interval is one of the N consecutive intervals. In some embodiments, the scheduling information indicates L intervals in which the second TRP may transmit control information to the UE using the second BPL, wherein L is greater than or equal to 1 and L is less than M, and each of the L intervals is one of the N consecutive intervals. In some embodiments, M = N-1 and L = 1. In some embodiments, in one of the N consecutive intervals, the second TRP transmits Petition 870240098976, dated 11 / 21 / 2024, page 26 / 111 / 43, the control information for the EU is transmitted using the second BPL, but the first TRP does not transmit the control information to the EU using the first BPL. In some embodiments, M = N and L = 1.

[0057] In another aspect, another method is provided for by one or more TRPs. The method includes: a TRP using a first transmission spatial filtering configuration to transmit a PDCCH control message in a first search space, and a TRP using a second transmission spatial filtering configuration to transmit a PDCCH control message in a second search space. In some embodiments, the first search space is a first part of a control area, and the second search space is a second part of the control area, or the first search space is a first control area, and the second search space is a second control area.

[0058] In another aspect, another method is provided for one or more TRPs. The method includes: a TRP using a first transmission spatial filtering configuration to transmit a PDCCH control message in a first set of one or more symbols from a range, a TRP using a second transmission spatial filtering configuration to transmit a PDCCH control message in a second set of one or more symbols from the range.

[0059] In another aspect, another method implemented by an UE is provided. The method includes: the UE using a first spatial receive filtering configuration to search for a PDCCH control message in a first search space, and the UE using a second spatial receive filtering configuration to search for a PDCCH control message in a second search space. In some embodiments, the first search space is a first part of a control area, and the second search space is a second part of the control area, or the first search space is a first control area, and the second space Petition 870240098976, dated 11 / 21 / 2024, page 27 / 111 / 43, regarding the search, is a second area of ​​control.

[0060] In another aspect, another method implemented by an UE is provided. The method includes: the UE using a first reception spatial filtering configuration to search for a PDCCH control message in a first set of one or more symbols, and the UE using a second reception spatial filtering configuration to search for a PDCCH control message in a second set of one or more symbols.

[0061] In another aspect, there is a method that includes performing at least one of: configuring an UE to monitor a PDCCH on M beam pair links simultaneously, where M is greater than 1, and configuring the UE to monitor the PDCCH on different beam pair links in different OFDM PDCCH symbols. Brief Description of the Drawings

[0062] The attached drawings, which are incorporated herein and form part of the specification, illustrate various embodiments.

[0063] Figure 1 illustrates an exemplary subframe.

[0064] Figure 2 illustrates the aggregation of CCE.

[0065] Figure 3 illustrates an example search space.

[0066] Figure 4 is a flowchart that illustrates the processing steps.

[0067] Figures 5A, 5B and 5C illustrate the use of active and monitored BPLs for communications between a TRP and an UE.

[0068] Figure 6 is a flowchart that illustrates a process according to a modality.

[0069] Figure 7 is a flowchart that illustrates a process according to a modality.

[0070] Figure 8 is a flowchart that illustrates a process according to a modality. Petition 870240098976, dated 11 / 21 / 2024, page 28 / 111 / 43

[0071] Figure 9 is a flowchart that illustrates a process according to a modality.

[0072] Figure 10 is a flowchart that illustrates a process according to a modality.

[0073] Figure 11 is a flowchart that illustrates a process according to a modality.

[0074] Figure 13 is a block diagram of a UE according to some embodiments.

[0075] Figure 14 is a TRP block diagram according to some modalities.

[0076] Figure 15 illustrates the use of first and second BPLs for communications between two TRPs and one UE. Detailed Description

[0077] One way to mitigate the BPLF problem is to use a second transmit (TX) beam (e.g., monitored (also known as backup)) (e.g., using, among other things, a second precoding vector) that can be used in case the first BPL (e.g., active) experiences a BPLF (e.g., being blocked). Therefore, at least two TX beams (e.g., at least two precoding vectors) are used to communicate with an UE. In the case of the UE performing receive beamforming (RX) using analog beamformers, the UE can only tune its RX beam to one TX beam at a time. Similarly, if the TRP uses analog beamforming, only one beam can be transmitted at a time. Therefore, there is a need to align the TX beam (i.e., the transmit spatial filtering configuration) with the correct RX beam (i.e., the receive spatial filtering configuration) at a given time.For each TX beam, there is a corresponding "ideal" UE RX beam (e.g., ideal reception spatial filtering configuration, which may include the...). Petition 870240098976, dated 11 / 21 / 2024, p. 29 / 111 / 43 phase and / or amplitude adjustment parameters for each signal received through multiple receiving antennas, parameters that are applied to the signals before the combination or summation of the signals).

[0078] A first transmit spatial filtering configuration (i.e., the TX beam) and its corresponding receive spatial filtering configuration (i.e., the RX beam) in the UE can be viewed as a first beam pair link (BPL), which is used for control and possibly also data transmission. Furthermore, a secondary TX beam (i.e., one or more secondary TX beams) and the corresponding RX beams can be used as the secondary (e.g., monitored) BPLs.

[0079] Beam management refers to the maintenance of a beam pair link, for example, by firing the UE to make measurements and reporting the measurement results. The purpose of the second BPL (hereinafter, “monitored BPL”) is 1) to discover new BPLs that are better than the first BPL (hereinafter, “active BPL”), and 2) to have a monitored BPL in case the active BPL experiences a BPLF. Since most communication occurs using the active BPL (i.e., the active TX beam and the active RX beam), the secondary BPLs can be viewed as being “backup” or “monitored” BPLs.

[0080] An example of this is illustrated in Figures 5A, 5B, and 5C. Figure 5A shows a TRP 550 (e.g., a base station) using an active BPL for UE 501 to transmit control information (e.g., PDCCH) and user data to the UE, and additionally using a monitored (backup) BPL for the UE. Although Figures 5A, 5B, and 5C illustrate a single TRP communicating with the UE, in other embodiments, two or more TRPs may be communicating with the TRP, where one of the TRPs uses the active BPL to communicate with the UE and another of the TRPs uses the monitored BPL to communicate with the UE (see, for example, the Petition 870240098976, dated 11 / 21 / 2024, page 30 / 111 / 43 figure 15).

[0081] The active BPL comprises the active transmit (TX) beam 502 and the corresponding active RX beam 506, and the monitored BPL comprises the monitored TX beam 504 and the corresponding monitored RX beam 508. The UE is decoding the candidate PDCCHs in the search space using the RX beam 506 corresponding to the active TX beam 502 (i.e., the base station is transmitting its PDCCH to the UE using the active TX beam). The PDCCH is used throughout to indicate that the control channel carries the scheduling information. Another term may be NR-PDCCH.

[0082] In Figure 5B, an object 590 is shown blocking the active BPL, thus causing the UE to detect a BPLF relative to the active BPL (i.e., the active TX beam / active RX beam pair). A problem arises where the TRP cannot switch the PDCCH transmission to the monitored BPL, since the UE is still monitoring the RX beam of UE 506 corresponding to the active TX beam 502 as the UE is unaware of the blocking. Furthermore, the TRP may also be unaware of the blocking situation.

[0083] To restore the connection between the TRP and the UE, the TRP can use the monitored BPL as the active BPL for the UE, as illustrated in Figure 5C. However, to efficiently perform this beam switching, the TRP must first signal the UE that it will start using the monitored BPL as the active BPL; otherwise, the UE will not know which UE RX beam to use during reception (i.e., RX beam 506 or RX beam 508). This is problematic because the active BPL, which is used for control signaling, is blocked and has poor or non-existent channel quality. If the blocking occurs slowly, there may be time to perform this signaling before the signal degrades too much.

[0084] There is a risk that the blocking will occur so quickly that the TRP will not have time to signal a “switch of Petition 870240098976, dated 11 / 21 / 2024, page 31 / 111 / 43 beam” (also known as “BPL switching”) to the UE, and in this case, the UE will continue searching, unsuccessfully, for the PDCCH using the RX 506 beam corresponding to the TX 502 beam which is now blocked. The modalities described here overcome this problem.

[0085] In one embodiment, the TRP transmits the PDCCH (or other control information) to the UE using both an active BPL and a monitored BPL, thereby improving diversity and thus improving robustness. In some embodiments, the time or resource fraction for which the monitored BPL is used for PDCCH transmission and reception is controlled, for example, by upper-layer signaling, such as RRC signaling.

[0086] Typically, the PDCCH will be transmitted less frequently using the monitored BPL compared to the active BPL. For example, in one embodiment, the PDCCH is time-multiplexed between the active and monitored BPLs, such that on every Nth subframe (e.g., N is configured by the network), the TRP transmits the PDCCH to the UE using the monitored BPL for the UE, instead of the active BPL for the UE. In another embodiment, the PDCCH is always transmitted to the UE using the active BPL for the UE, but on every Nth subframe (e.g., N is configured by the network), the PDCCH is also transmitted to the UE using the monitored BPL for the UE.

[0087] On the UE side, the corresponding modalities hold true if the UE uses UE RX beamforming: 1) the PDCCH search space is time-multiplexed between the active and monitored BPLs, such that, in every Nth subframe, the UE receives the PDCCH search space using the monitored BPL instead of the active BPL; and 2) the PDCCH search space is always monitored using the active BPL, but, in every Nth subframe, the PDCCH is also monitored using the monitored BPL. Petition 870240098976, dated 11 / 21 / 2024, page 32 / 111 / 43

[0088] In the first embodiment, the transmission of the PDCCH to the UE data is time-multiplexed between the active BPL and the monitored BPL, but preferably with a longer duty cycle for the monitored BPL. Therefore, the UE must use the RX beam corresponding to the monitored BPL (i.e., the RX beam of the monitored beam pair link) whenever the network is using the monitored BPL for PDCCH transmission. Then, the network and the UE are synchronized with respect to when to use the first or second beam pair links (i.e., active and monitored) for PDCCH transmission and reception.

[0089] For example, PDCCH is transmitted nine times in a row using the active BPL and the tenth time using the monitored BPL.

[0090] In one embodiment, this can be achieved by associating a candidate PDCCH with a certain spatial correlation or angle-of-arrival parameter in the quasi-colocation structure in a given subframe. Therefore, during the reception of a candidate PDCCH, the UE also knows the QCL parameter for this PDCCH, so it knows which RX beam to use for its reception. The PDCCH thus becomes spatially QCL with a beam management process, with a given identity, or a link identifier (such as active / monitored or link [beam pair] 1, link 2, etc.) or an RS or another signal. Therefore, the PDCCH can alternatively become spatially QCL with the identity or feature of a previously transmitted CSI measurement reference signal.Alternatively, the PDCCH can be spatially QCL with a measurement signal used for mobility or synchronization, such as mobility RS, beam RS, primary or secondary synchronization signals (PSS, SSS).

[0091] The TRP signals to the UE which signal, RS, or previous process is QCL relative to the spatial parameter with the demodulation RS used for PDCCH reception. This signaling can be explicit or implicit. Petition 870240098976, dated 11 / 21 / 2024, page 33 / 111 / 43 (including given by a rule in the standard specification).

[0092] Therefore, the candidate PDCCHs are QCL with at least two different spatial QCL definitions and the UE can adjust its receiving beam depending on the QCL definition. The active BPL has one spatial QCL definition (a first RX beam) and the monitored BPL has a different spatial QCL definition (a second RX beam). In the first mode, the transmission from the PDCCH to the UE data from the TRP is time-multiplexed between the active BPL and the monitored BPL, and the UE uses the spatial QCL definitions in this way, but with a potentially longer duty cycle for the monitored BPL.

[0093] The relationship between the spatial QCL parameter and the candidate PDCCH can be subframe-wise. Therefore, the spatial QCL parameter to use to receive the PDCCH is dependent on at least one time index, such as a subframe.

[0094] More generally, a subset of (or all of) the PDCCH search space candidates in a given subframe are located in the monitored BPL with a longer duty cycle. In this case, the relationship between the spatial QCL parameter and the candidate PDCCH may be different for different candidates. Thus, the TRP may transmit the candidate PDCCH on different TX beams, and the UE uses different RX beams from the UE to receive and attempt to decode the candidate. Which RX beam to use is given by the spatial QCL parameter associated with the candidate PDCCH.

[0095] The UE will know the time schedule and therefore monitors the correct UE RX beam at the right times. Figure 6 illustrates a method according to a modality. In step 602, the TRP defines the first and second BPLs (e.g., active and monitored) (beam tracking processes) and signals this to the UE. Each beam tracking process can be associated with a spatial QCL parameter. Alternatively, each tracking process is associated with an index of a measurement of Petition 870240098976, dated 11 / 21 / 2024, page 34 / 111 / 43 If a previous CSI-RS or a mobility RX (MRS) transmission occurs, then the UE knows that the network will use the same beam for the PDCCH that is previously used for a CSI-RS or MRS transmission. The TRP also defines a time schedule for time-multiplexing of PDCCH transmissions between the first and second BPLs (e.g., active and monitored) and signals this information to the UE (step 604). In step 606, the TRP transmits the PDCCH using the first and second BPLs (e.g., active and monitored) according to the time schedule. And, in step 608, the UE receives the PDCCH using the UE's RX beam that corresponds to the first and second BPLs. In the case where the PDCCH from the second BPL is detected, but not the PDCCH from the first BPL, the TRP must switch in such a way that the second BPL becomes the new active BPL. This can, for example, be included in the PDCCH signal transmitted using the monitored BPL.

[0096] In the second mode, the PDCCH for a given UE is transmitted normally (e.g., at each subframe) using the first BPL and, furthermore, the PDCCH is transmitted at every Nth subframe using the second BPL (the PDCCH of the two links can be transmitted in different OFDM symbols when scheduled in the same subframe or interval, so that it is possible for the UE to switch to the RX beam of the UE corresponding to the right link).

[0097] Therefore, if, for example, the PDCCH for the active BPL is scheduled on the first OFDM symbol and the PDCCH for the monitored BPL is scheduled on the second OFDM symbol, the UE will use the first RX beam when attempting to decode the candidate PDCCHs on the first OFDM symbol and the second RX beam when attempting to decode the candidate PDCCHs on the second OFDM symbol. Stated differently, the UE will use the first spatial QCL parameter when attempting to decode the candidate PDCCHs on the first OFDM symbol and the second parameter Petition 870240098976, dated 11 / 21 / 2024, page 35 / 111 / 43 of spatial QCL during the attempt to decode candidate PDCCHs in the second OFDM symbol. The UE will always attempt to decode candidate PDCCHs from the active BPL and, in an alternative mode, if decoding is successful, the UE will not attempt to decode candidate PDCCHs originating from the monitored BPL.

[0098] If the active BPL becomes blocked in such a way that the corresponding PDCCH cannot be decoded by the UE, the UE can wait until the PDCCH is transmitted using the monitored BPL and, optimistically, decode the PDCCH in this way. In one embodiment, the PDCCH from the monitored BPL contains a command that switches the active BPL to the monitored BPL directly. In this case, the UE must start monitoring the candidate search spaces associated with the monitored BPL directly, i.e., using the UE's RX beam corresponding to the monitored BPL.

[0099] As described above, the PDCCH from the active and monitored BPLs that are in the same subframe must be scheduled on different OFDM symbols in the same interval or subframe. The OFDM symbols containing the two PDCCHs can either be consecutive or have a time duration between them. A benefit of having a time duration between the two PDCCHs is that the UE then has time to assess whether the PDCCH from the active BPL is properly decoded before the PDCCH from the monitored BPL is received. Therefore, if the PDCCH corresponding to the active BPL is properly decoded, the UE does not need to change the UE's RX beam corresponding to the monitored BPL (i.e., the RX beam of the monitored beam pair link) to the OFDM symbol containing the PDCCH for the monitored BPL.In this way, it is also possible to schedule the data for the active BPL on this OFDM symbol in some cases (depending on the antenna implementation in the TRP, the antenna implementation in the UE, the scenario, etc.). Petition 870240098976, dated 11 / 21 / 2024, page 36 / 111 / 43

[00100] The PDCCH transmitted using the monitored BPL (e.g., the second spatial QCL parameter) can be transmitted in each subframe or with a longer duty cycle, compared to the PDCCH that uses the active BPL (first spatial QCL parameter). In some modes, for subframes where no PDCCH is transmitted using the monitored BPL, only the first OFDM symbol is used for the PDCCH (but in other modes, more than one OFDM symbol can be used for the PDCCH), and the data can be scheduled for this second OFDM symbol instead (by virtue of the start of the data symbols being indicated in the DCI message).

[00101] In one embodiment, the duty cycle for PDCCH transmissions in the monitored BPL is configurable using TRP upper-layer signaling for the UE, such as RRC signaling, depending on the environment (e.g., how common the blocking is), and can be either UE-specific or broadcast. It would also be possible to disable it completely.

[00102] Figure 7 is a flowchart that illustrates a 700 process, according to some modalities, that is carried out by the TRP (which may have an initial coverage area).

[00103] Process 700 can start with step 702 in which the TRP uses a first BPL as an active BPL for the UE, where the first BPL comprises a first TX beam and a first RX beam corresponding to the first TX beam (the first BPL may have a second coverage area in the first coverage area).

[00104] In step 704, the TRP uses a second BPL as a monitored BPL for the UE, wherein the second BPL comprises a second TX beam and a second RX beam corresponding to the second TX beam (the second BPL may have a third coverage area that is within the first coverage area and which is different from the second coverage area of ​​the first BPL). Petition 870240098976, dated 11 / 21 / 2024, page 37 / 111 / 43

[00105] In step 706, while the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL, the TRP transmits the control information (e.g., the PDCCH) to the UE using the first BPL (i.e., using the first TX beam).

[00106] In step 708, the TRP provides the UE with scheduling information indicating a subframe in which the TRP can transmit control information (e.g., PDCCH) to the UE using the second BPL (i.e., using the second TX beam).

[00107] In some embodiments, process 700 additionally includes the TRP detecting that the first BPL has experienced a beam pair link failure (BPLF); and, as a result of detecting that the first BPL has experienced a BPLF, the TRP transmitting the control information to the UE in the indicated subframe using the second BPL.

[00108] In some embodiments, the control information transmitted to the UE in the indicated subframe using the second BPL informs the UE that the second BPL is now an active BPL for the UE. In some embodiments, the UE is configured in such a way that the UE will look for a control area of ​​the indicated subframe for the control information transmitted by the TRP using the second BPL.

[00109] In some embodiments, the step of transmitting control information to the UE using the first BPL while the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL comprises transmitting control information to the UE using the first BPL in no more than M of N consecutive subframes, wherein N is greater than 1 and M is less than or equal to N (in some embodiments, M = N), and the indicated subframe is one of the N consecutive subframes.

[00110] In some modalities, scheduling information Petition 870240098976, dated 11 / 21 / 2024, page 38 / 111 / 43 indicates L subframes (in some embodiments, L = 1) in which the TRP can transmit control information to the UE using the second BPL, where L is greater than or equal to 1 and L is less than M, and each of the L subframes is one of the N consecutive subframes. In some embodiments, M = N-1 and L = 1. In some embodiments, in one of the N consecutive subframes, the TRP transmits control information to the UE using the second BPL, but does not transmit control information to the UE using the first BPL.

[00111] Figure 8 is a flowchart illustrating an 800 process, according to some modalities, which is performed by one or more transmission points (TRPs) communicating with a user equipment (UE) where the UE is monitoring a control channel search space for control channel message candidates (e.g., PDCCH).

[00112] The 800 process can begin with step 802, which consists of dividing the resources for the control channel search space for the UE into two parts, a first part and a second part, where the first part is associated with a first QCL parameter and the second part is associated with a second QCL parameter. In step 804, for a candidate control channel transmission to the UE, the selection of the first or second part is performed. In step 806, the candidate control channel is transmitted in control channel resources belonging to the selected part using the QCL parameter associated with the selected part. In some embodiments, the first QCL parameter is related to an active BPL and the second QCL parameter is related to a monitored BPL, and the selection is based on the information that the active BPL experienced a BPLF (e.g., the active BPL has low or no reception quality).

[00113] Figure 9 is a flowchart illustrating a 900 process, according to some modalities, that is carried out by a communicating UE. Petition 870240098976, dated 11 / 21 / 2024, p. 39 / 111 / 43 with one or more transmission points (TRPs), where the TRPs are configured to transmit the information to the UE using a first BPL comprising a first TX beam and a first RX beam corresponding to the first TX beam (the first BPL may have a second coverage area within the first coverage area).

[00114] Process 900 can begin at step 902 where the UE uses the first RX beam corresponding to the first TX beam to obtain the control information (e.g., PDCCH) transmitted by a TRP to the UE using the first BPL. At step 904, the UE obtains the scheduling information indicating a subframe in which a TRP can transmit the control information (e.g., the PDCCH) to the UE using a second BPL comprising a second TX beam and a second RX beam corresponding to the second TX beam (the second BPL may have a third coverage area that lies within the first coverage area but is different from the second coverage area of ​​the first BPL). At step 906, the UE, upon receiving the scheduling information, uses the second RX beam corresponding to the second TX beam to fetch the indicated subframe for the control information transmitted by a TRP to the UE using the second BPL.In some embodiments, a TRP transmits control information to the UE in the subframe using the second BPL in the event that the TRP detects that the first BPL has experienced a beam pair link failure (BPLF). In some embodiments, as a result of the search, the UE obtains the control information transmitted to the UE using the second BPL, and the control information obtained informs the UE that the second BPL is now an active BPL for the UE. In some embodiments, the indicated subframe is a subframe in which a TRP does not transmit control information to the UE using the first BPL.

[00115] Figure 10 is a flowchart illustrating a process 1000, according to some modalities, which is carried out by a communicating UE. Petition 870240098976, dated 11 / 21 / 2024, page 40 / 111 / 43 with one or more transmission points (TRPs), where the TRPs are configured to transmit information to the UE using the first BPL. Process 1000 can begin at step 1002 in which the UE uses a first parameter corresponding to the first BPL to look up a control area of ​​a subframe for the control information (e.g., PDCCH) transmitted by a TRP to the UE using the first BPL. At step 1004, when the UE is unable to find the control information transmitted to the UE using the first BPL, the UE uses a second parameter corresponding to the second BPL to look up the control area of ​​the subframe for the control information (e.g., PDCCH) transmitted by a TRP to the UE using the second BPL.

[00116] Figure 11 is a flowchart illustrating a process 1100, according to some embodiments, which is performed by a UE communicating with one or more transmission points (TRPs), wherein the UE is monitoring a control channel seek space of candidate messages from the control channel (e.g., PDCCH), wherein the control channel seek space of candidate messages from the control channel is divided into at least two parts, a first part and a second part. The process 1100 may begin at step 1102 wherein the UE uses a first QCL parameter during the reception of a candidate control channel from the first part of the seek space. At step 1104, the UE uses a second QCL parameter during the reception of a candidate control channel from the second part of the seek space. In some embodiments, the candidate seek spaces of the two parts are received in two different OFDM symbols in a subframe.In some embodiments, the candidate search spaces of the two parties are received in two different subframes. In some embodiments, the 1100 process additionally includes the UE receiving configuration information using a higher-layer message (e.g., a layer 3 message, such as the control message). Petition 870240098976, dated 11 / 21 / 2024, page 41 / 111 / 43 radio resource (RRC)), in which the configuration information configures the division of the search space.

[00117] Figure 12 is a flowchart illustrating a 1200 process, according to some embodiments, which is performed by a 1500 system (see Figure 15) comprising a first transmission point (TRP) (e.g., TRP 550 as shown) to communicate with UE 501 and a second TRP 1502 to communicate with UE. The 1200 process can begin at step 1202, where the first TRP uses a first beam pair link (BPL) (denoted as BPL No. 1) as an active BPL to UE. At step 1204, the second TRP uses a second BPL (denoted as BPL No. 2) as a monitored BPL to UE. In step 1206, while the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL, the first TRP transmits the control information (e.g., the PDCCH) to the UE using the first BPL (i.e., using the TX beam of the first BPL's TRP).In step 1208, scheduling information is provided to the UE, where the scheduling information indicates a subframe in which the second TRP 1502 can transmit control information (e.g., PDCCH) to the UE using the second BPL (i.e., using the TX beam of the second BPL's TRP).

[00118] Figure 13 is a block diagram of the UE 501 according to some embodiments. As shown in Figure 13, the UE may comprise: a data processing system (DPS) 1302, which may include one or more processors 1355 (e.g., a general-purpose microprocessor and / or one or more other processors, such as an application-specific integrated circuit (ASIC), field-programmable gate arrays (FPGAs) and the like); a radio transmitter 1305 and a radio receiver 1306 coupled to an antenna 1322 for use in wireless communication with a radio access network (RAN) node (e.g., a TRP); and a local storage unit (also known as a “system of Petition 870240098976, dated 11 / 21 / 2024, page. 42 / 111 / 43 data storage”) 1312, which may include one or more non-volatile storage devices and / or one or more volatile storage devices (e.g., random access memory (RAM)). In embodiments where the UE includes a general-purpose microprocessor, a computer program product (CPP) 1341 may be provided. The CPP 1341 includes a computer-readable medium (CRM) 1342 that stores a computer program (CP) 1343 comprising computer-readable instructions (CRI) 1344. The CRM 1342 may be a non-transient computer-readable medium, such as, but not limited to, a magnetic medium (e.g., a hard disk), an optical medium (e.g., a DVD), memory devices (e.g., random access memory, flash memory, etc.), and the like.In some embodiments, the CRI 1344 of the computer program 1343 is configured in such a way that, when executed by the data processing system 1302, the CRI causes the UE to perform the steps described above (for example, the steps described above in relation to the flowcharts). In other embodiments, the UE can be configured to perform the steps described herein without the need for code. That is, for example, the data processing system 1302 may consist merely of one or more ASICs. Therefore, the features of the embodiments described herein can be implemented in hardware and / or in software.

[00119] Figure 14 is a block diagram of a TRP 550 according to some embodiments. As shown in Figure 14, the TRP may comprise: a data processing system (DPS) 1402, which may include one or more processors 1455 (for example, a general-purpose microprocessor and / or one or more other processors, such as an application-specific integrated circuit (ASIC), field-programmable gate arrays (FPGAs), and the like); a radio transmitter 1405 and a radio receiver 1406 coupled to an antenna 1422 for use in wireless communication. Petition 870240098976, dated 11 / 21 / 2024, page 43 / 111 / 43 wire with a UE; and a local storage unit (also known as a “data storage system”) 1412, which may include one or more non-volatile storage devices and / or one or more volatile storage devices (e.g., random access memory (RAM)). In embodiments where the TRP includes a general-purpose microprocessor, a computer program product (CPP) 1441 may be provided. CPP 1441 includes a computer-readable medium (CRM) 1442 that stores a computer program (CP) 1443 comprising computer-readable instructions (CRI) 1444. The CRM 1442 may be a non-transient computer-readable medium, such as, but not limited to, a magnetic medium (e.g., a hard disk), an optical medium (e.g., a DVD), memory devices (e.g., random access memory, flash memory, etc.), and the like.In some embodiments, the CRI 1444 of the computer program 1443 is configured in such a way that, when executed by the data processing system 1402, the CRI causes the TRP to perform the steps described above (for example, the steps described above in relation to flowcharts). In other embodiments, the TRP can be configured to perform the steps described herein without the need for code. That is, for example, the data processing system 1402 may consist merely of one or more ASICs. Therefore, the features of the embodiments described herein can be implemented in hardware and / or software. Additional Options TRP Modalities

[00120] 1. A method implemented by a transmission point (TRP) to communicate with a user equipment (UE), comprising: using a first beam pair link (BPL) as an active BPL for the UE, wherein the first BPL comprises a first TX beam and a first RX beam corresponding to the first TX beam; using a second BPL as Petition 870240098976, dated 11 / 21 / 2024, page 44 / 111 / 43 a monitored BPL for the UE, wherein the second BPL comprises a second TX beam and a second RX beam corresponding to the second TX beam; while the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL, transmit the control information (e.g., the PDCCH) to the UE using the first BPL; and provide the UE with scheduling information indicating a subframe in which the TRP can transmit the control information (e.g., the PDCCH) to the UE using the second BPL.

[00121] 2. The method of embodiment 1, which further comprises: the TRP detecting that the first BPL has experienced a beam pair link failure (BPLF); and, as a result of detecting that the first BPL has experienced a BPLF, the TRP transmits the control information to the UE in the indicated subframe using the second BPL.

[00122] 3. The method of mode 2, in which the control information transmitted to the UE in the indicated subframe using the second BPL informs the UE that the second BPL is now an active BPL for the UE.

[00123] 4. The method of mode 3, in which the UE is configured in such a way that the UE will look for a control area of ​​the subframe indicated for the control information transmitted by the TRP using the second BPL.

[00124] 5. The method of any of the embodiments 1 to 4, in which the step of transmitting the control information to the UE using the first BPL at the same time that the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL comprises transmitting the control information to the UE using the first BPL in no more than M of N consecutive subframes, wherein N is greater than 1 and M is less than or equal to N, and the indicated subframe is one of the N consecutive subframes.

[00125] 6. The method of modality 5, in which the scheduling information indicates L subframes in which the TRP can transmit the Petition 870240098976, dated 11 / 21 / 2024, page 45 / 111 / 43 control information for the EU using the second BPL, where L is greater than or equal to 1 and L is less than M, and each of the L subframes is one of the N consecutive subframes.

[00126] 7. The method of modality 6, where M = N-1 and L = 1.

[00127] 8. The method of modality 7, in which, in one of the N consecutive subframes, the TRP transmits the control information to the UE using the second BPL, but does not transmit the control information to the UE using the first BPL.

[00128] 9. The method of modality 6, where M = N and L = 1.

[00129] 10. A method performed by one or more transmission points (TRPs) communicating with a user equipment (UE), wherein the UE is monitoring a control channel search space for control channel message candidates (e.g., PDCCH), wherein the method comprises: dividing the resources for the control channel search space to the UE into two parts, a first part and a second part, wherein the first part is associated with a first QCL parameter and a second part is associated with a second QCL parameter; for a transmission of a control channel candidate to the UE, selecting either the first or the second part; and transmitting the control channel candidate on control channel resources belonging to the selected part using the QCL parameter associated with the selected part.

[00130] 11. The modality 10 method, in which the first QCL parameter is related to an active BPL and the second QCL parameter is related to a monitored BPL.

[00131] 12. The method of modality 11, in which the selection is based on the information that the active BPL has experienced a BPLF (for example, the active BPL has low or no reception quality).

[00132] 13. A TRP comprising a transmitter, a receiver, a memory, and a data processing system comprising a Petition 870240098976, dated 11 / 21 / 2024, page 46 / 111 / 43 or more processors, where the TRP is configured to perform the method as defined in any of the modalities 1 to 12. Modalities on the EU Side

[00133] 14. A method implemented by a user equipment (UE) communicating with one or more transmission points (TRPs), wherein the TRPs are configured to transmit information to the UE using a first beam pair link (BPL) comprising a first transmit beam (TX) and a first receive beam (RX) corresponding to the first TX beam, wherein the method comprises: the UE using the first RX beam corresponding to the first TX beam to obtain the control information (e.g., PDCCH) transmitted to the UE using the first BPL; the UE obtaining the scheduling information indicating a subframe in which one of the TRPs may transmit the control information (e.g., the PDCCH) to the UE using a second BPL comprising a second TX beam and a second RX beam corresponding to the second TX beam;As a result of receiving the scheduling information, the UE uses the second RX beam corresponding to the second TX beam to retrieve the subframe indicated for the control information transmitted to the UE using the second BPL.

[00134] 15. The method of mode 14, in which a TRP transmits in the subframe the control information to the UE using the second BPL in the event that the TRP detects that the first BPL has experienced a beam pair link failure (BPLF).

[00135] 16. The method of modalities 14 or 12, in which, as a result of the search, the UE obtains the control information transmitted to the UE using the second BPL, and the control information obtained informs the UE that the second BPL is now an active BPL for the UE.

[00136] 17. The method, as defined in any of the embodiments 14 to 13, wherein the indicated subframe is a subframe in which a TRP does not transmit the control information to the UE using the first Petition 870240098976, dated 11 / 21 / 2024, page 47 / 111 / 43 BPL.

[00137] 18. A method implemented by a user equipment (UE) communicating with one or more transmission points (TRPs), wherein the TRPs are configured to transmit information to the UE using a first beam pair link (BPL) comprising a first transmit beam (TX) and a first receive beam (RX) corresponding to the first TX beam, wherein the method comprises: the UE using a first parameter corresponding to the first BPL to fetch a control area from a subframe for control information (e.g., PDCCH) transmitted by a TRP to the UE using the first BPL;When the UE is unable to find the control information transmitted by the TRP to the UE using the first BPL, the UE uses a second parameter corresponding to a second BPL to search the subframe control area for the control information (e.g., PDCCH) transmitted by a TRP to the UE using the second BPL, wherein the second BPL comprises a second TX beam and a second RX beam corresponding to the second TX beam.

[00138] 19. A method implemented by a user equipment (UE) communicating with one or more transmission points (TRPs), wherein the UE is monitoring a control channel seek space of candidate messages from the control channel (e.g., PDCCH), wherein the control channel seek space of candidate messages from the control channel is divided into at least two parts, a first part and a second part, wherein the method comprises: the UE using a first QCL parameter during reception of a candidate control channel from the first part of the seek space; and the UE using a second QCL parameter during reception of a candidate control channel from the second part of the seek space.

[00139] 20. The modality method 19, in which the search spaces Petition 870240098976, dated 11 / 21 / 2024, page 48 / 111 / 43 candidates from both parties are received in two different OFDM symbols in a sub-frame.

[00140] 21. The method of modality 19, in which the candidate search spaces of the two parties are received in two different subframes.

[00141] 22. The method of any of the embodiments 19 to 21, which further comprises the UE receiving the configuration information using a higher-layer message (for example, a layer 3 message, such as a radio resource control (RRC) message), wherein the configuration information configures the search space division. System Modalities

[00142] 23. A method implemented by a system, comprising a first transmission point (TRP) for communicating with a user equipment (UE) and a second TRP for communicating with the UE, comprising: the first TRP using a first beam pair link (BPL) as an active BPL for the UE; the second TRP using a second BPL as a monitored BPL for the UE; while the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL, the first TRP transmits control information (e.g., the PDCCH) to the UE using the first BPL; and provides the UE with scheduling information indicating a subframe in which the second TRP can transmit control information (e.g., the PDCCH) to the UE using the second BPL.

[00143] 24. The method of embodiment 23, which further comprises: detecting that the first BPL has experienced a beam pair link failure (BPLF); as a result of detecting that the first BPL has experienced a BPLF, the second TRP transmits the control information to the UE in the indicated subframe using the second BPL.

[00144] 25. The method of modality 24, in which the control information transmitted to the EU in the indicated subframe using the second BPL Petition 870240098976, dated 21 / 11 / 2024, page 49 / 111 / 43 informs the EU that the second BPL is now an active BPL for the EU.

[00145] 26. The method of modality 25, in which the UE is configured in such a way that the UE will look for a control area of ​​the indicated subframe for the control information transmitted by the second TRP using the second BPL.

[00146] 27. The method of any of the embodiments 23 to 26, in which the step of transmitting the control information to the UE using the first BPL at the same time that the first BPL is being used as the active BPL and the second BPL is being used as the monitored BPL comprises transmitting the control information to the UE using the first BPL in no more than M of N consecutive subframes, wherein N is greater than 1 and M is less than or equal to N, and the indicated subframe is one of the N consecutive subframes.

[00147] 28. The method of modality 27, in which the scheduling information indicates L subframes in which the second TRP can transmit the control information to the UE using the second BPL, where L is greater than or equal to 1 and L is less than M, and each of the L subframes is one of the N consecutive subframes.

[00148] 29. The method of modality 28, where M = N-1 and L = 1.

[00149] 30. The method of modality 29, in which, in one of the N consecutive subframes, the second TRP transmits the control information to the UE using the second BPL, but the first TRP does not transmit the control information to the UE using the first BPL.

[00150] 31. The method of modality 28, where M = N and L = 1.

[00151] 32. A UE comprising a transmitter, a receiver, a memory, and a data processing system comprising one or more processors, wherein the TRP is configured to perform the method as defined in any of embodiments 14 to 22.

[00152] Although several forms of the present description are here Petition 870240098976, dated 11 / 21 / 2024, pp. 50 / 111 / 43 described (including the appendix), it is understood that they were presented by way of example only, and not as a limitation. Thus, the breadth and scope of this description shall not be limited by any of the above-described exemplary modalities. Furthermore, any combination of the above-described elements in all possible variations thereof is covered by the description, unless otherwise indicated herein or otherwise clearly contradicted by the context.

[00153] Additionally, although the processes described above and illustrated in the drawings are shown as a sequence of steps, this is done solely for illustrative purposes. Therefore, it is contemplated that some steps may be added, some steps may be omitted, the order of the steps may be rearranged, and some steps may be performed in parallel. Petition 870240098976, dated 11 / 21 / 2024, page 51 / 111

Claims

1 / 3 CLAIMS 1. A method implemented by a user equipment, UE (501), communicating with one or more transmission points, TRPs (550), the one or more TRPs comprising a first TRP, the method characterized in that it comprises: the UE receiving a synchronization signal, SS, transmitted by the first TRP; the UE obtaining a first set of one or more spatial reception parameters, RX, to receive a first candidate control channel based on the received synchronization signal, SS; the UE using the first set of one or more spatial RX parameters to receive the first candidate control channel; the UE obtaining a second set of one or more spatial RX parameters to receive a second candidate control channel;and the UE uses the second set of one or more spatial RX parameters to receive the second candidate control channel, wherein the first candidate control channel is transmitted in a first control area, the second candidate control channel is transmitted in a second control area, the first control area is a first portion of a first subframe; and the second control area is a second portion of the first subframe separate from the first portion.

2. Method according to claim 1, characterized in that the first candidate control channel is transmitted in a first control area, the second candidate control channel is transmitted in a second control area, and the first control area and the second control area overlap in time at least partially, or the first control area does not overlap in time with the second control area.

3. User Equipment, UE (501), the UE characterized in that it comprises: a transmitter (1305), a receiver (1306) for receiving a synchronization signal, SS, transmitted by a first transmission point, TRP, a memory (1308), and a data processing system (1302) comprising one or more processors (1355), wherein the UE is configured to perform a method comprising: obtaining a first set of one or more spatial reception parameters, RX, to receive a first candidate control channel based on the received synchronization signal, SS; using the first set of one or more spatial RX parameters to receive the first candidate control channel; obtaining a second set of one or more spatial RX parameters to receive a second candidate control channel; and using the second set of one or more spatial RX parameters to receive the second candidate control channel.

4. User equipment according to claim 3, characterized in that the first candidate control channel is transmitted in a first control area; the second candidate control channel is transmitted in a second control area; Petition 870260068133, dated 09 / 07 / 2026, page 12 / 17 3 / 3 the first control area is a first part of a first subframe that has a data area that is separate from the first control area of ​​the first subframe; the second control area is a part of the first subframe or the second control area is a part of a second subframe.

5. User equipment according to claim 3, characterized in that the first candidate control channel is transmitted in a first control area, the second candidate control channel is transmitted in a second control area, and the first control area and the second control area overlap in time at least partially, or the first control area does not overlap in time with the second control area. Petition 870260068133, dated 09 / 07 / 2026, pp. 13 / 17