Beacon simulation system and method

The method and system address beacon loss and accuracy issues in simulation by triggering beacons based on simultaneous upstream and downstream changes, ensuring accurate positioning and reducing resource consumption.

BR112021023474B1Active Publication Date: 2026-11-17BYD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
BR112021023474
Authority / Receiving Office
BR · BR
Patent Type
Patents
Current Assignee / Owner
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing beacon simulation techniques suffer from beacon loss, insufficient accuracy, and delay issues due to discrete train displacement modeling, which increases resource consumption and errors with higher update frequencies.

Method used

A method and system that determines the possibility of upstream and downstream beacons changing simultaneously based on the train's direction, triggering the appropriate beacon to send information to the train, ensuring accurate positioning even when displacements fall outside traditional firing windows.

Benefits of technology

Prevents beacon loss and improves accuracy by dynamically updating beacon information based on the train's direction, reducing resource consumption and enhancing simulation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000047_0000
    Figure 00000047_0000
  • Figure 00000047_0001
    Figure 00000047_0001
  • Figure 00000048_0000
    Figure 00000048_0000
Patent Text Reader

Abstract

This application provides a method and system for simulating a beacon.The method includes: determining the possibility of an upstream and a downstream beacon of a train having changed, where the upstream beacon is a beacon closer to the train along a first direction, and the downstream beacon is a beacon closer to the train along a second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, triggering, via a train beacon transit module (btm), a changed downstream beacon, and sending beacon information to the train via the changed downstream beacon; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, triggering, via the train's btm, a changed upstream beacon, and sending beacon information to the train via the changed upstream beacon.After the train moves past a beacon, the upstream and downstream beacons of the train have changed. Therefore, there is no loss of goal in the present request.
Need to check novelty before this filing date? Find Prior Art

Description

1 / 40 Descriptive Report of Invention Patent for "METHOD AND SYSTEM FOR SIMULATING A BEACON" CROSS-REFERENCE TO RELATED REQUESTS

[0001] The request is based on and claims priority over the Request of Patent No. CN 201910441226.8, filed with the State Intellectual Property Office of the People's Republic of China on May 24, 2019. The full content of the above-referenced applications is incorporated herein by reference. FIELD

[0002] This application relates to the field of simulation technologies and, in particular, to a beacon simulation method and system. BACKGROUND

[0003] A beacon is an important component of a train control system and is configured to provide a positioning function for a train's path. Positioning accuracy and precision are important factors affecting train updating and automatic operation. Therefore, accurate beacon simulation can enhance beacon positioning accuracy and precision, which can facilitate train control system testing and development to improve work efficiency and reduce costs, and also facilitate train updating and automatic operation.

[0004] It should be noted that a real train displacement is continuous, but in the beacon simulation the train displacement is distinct. The beacon simulation can only make the displacement prone to being continuous by increasing the update frequency of the train displacement. However, when the update frequency is higher, more resources are consumed.

[0005] The inventor notes that, as shown in Figure 1, a firing window of a beacon in an existing beacon simulation technique is (Sbtm-d, Sbtm+d). Sbtm is a beacon position and d is a size. Petition 870210108006, dated 11 / 22 / 2021, page 45 / 151 2 / 40 of the beacon firing window. When a simulated train moves within the beacon firing window, the beacon is fired and sends beacon information to a train beacon transit module (BTM). Beacon loss can occur in this solution. For example, when the train is moving excessively fast, due to the fact that the train's movement is distinct, it is possible that neither of the movements in two train updates is within a beacon firing window. In this case, the beacon at that position is not fired, and the train may lose the beacon's position at that location. SUMMARY

[0006] The present application is intended to solve one of the technical problems in the related technique to some extent.

[0007] For this reason, a first objective of the present application is to provide a beacon simulation method.

[0008] A second objective of the present application is to provide another method of beacon simulation.

[0009] A third objective of the present application is to provide a beacon simulation system.

[0010] To achieve the aforementioned objectives, an embodiment of a first aspect of the present application provides a beacon simulation method, applied to a beacon simulation module, and which includes the following steps:

[0011] determining the possibility of an upstream beacon and a downstream beacon of a train having changed, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction;

[0012] when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, trigger, via a train BTM, a changed downstream beacon, and send, via the changed downstream beacon, beacon information to the train, for Petition 870210108006, dated 11 / 22 / 2021, p. 46 / 151 3 / 40 to enable the train to control its course according to the beacon information; and

[0013] when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, trigger, via the train's BTM, a changed upstream beacon, and send, via the changed upstream beacon, beacon information to the train, to enable the train to control the train's route according to the beacon information.

[0014] In the beacon simulation method provided in the embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train.After a train passes a marker, the markers closest to the train along the first and second directions change permanently. Therefore, when both the upstream and downstream markers of the train have changed simultaneously, it can be determined that the train has passed a marker. Additionally, because a marker triggered when the train passes must be consistent with the train's direction of travel, a marker triggered by the train can also be specifically determined from the changed upstream marker and downstream marker according to the train's direction of travel. Because... Petition 870210108006, dated 11 / 22 / 2021, p. 47 / 151 4 / 40 distances between the train and the upstream and downstream beacons are updated in real time, even if neither of the displacements in two train updates is within a beacon triggering window, a beacon triggered in a displacement update can still be determined according to changes in the upstream and downstream beacons and the train's direction of travel. Therefore, there is no beacon loss in the present application.

[0015] To achieve the aforementioned objective, an embodiment of a second aspect of the present application provides another beacon simulation method, applied to a train simulation module, and which includes the following steps:

[0016] determine, by means of a beacon simulation module, the possibility of an upstream beacon and a downstream beacon of a train having changed, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction and the first direction is opposite to the second direction;

[0017] when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, determine, by the beacon simulation module, that a changed downstream beacon is triggered, and send, by the changed downstream beacon, beacon information to the train, to enable the train to control the train's path according to the beacon information;

[0018] when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, determine, by the beacon simulation module, that a changed upstream beacon is triggered, and send beacon information to the train via the changed upstream beacon, to enable the train to control its route according to the beacon information; and

[0019] receive, by the train, the beacon information, and control the train's route according to the beacon information. Petition 870210108006, dated 11 / 22 / 2021, page 48 / 151 5 / 40

[0020] In the beacon simulation method provided in the embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train.After a train passes a marker, the markers closest to the train along the first and second directions change permanently. Therefore, when both the upstream and downstream markers of the train have changed simultaneously, it can be determined that the train has passed a marker. Additionally, because a marker triggered when the train passes must be consistent with the train's direction of travel, a marker triggered by the train can also be specifically determined from the changed upstream marker and downstream marker according to the train's direction of travel.Because the distances between the train and the upstream and downstream beacons are updated in real time, even if neither of the displacements in two train updates falls within a beacon's firing window, a beacon triggered in a displacement update can still be determined based on changes in the upstream and downstream beacons and the train's direction of travel. Therefore, there is no beacon loss in the present application.

[0021] To achieve the aforementioned objective, a embodiment of a third aspect of the present application provides a beacon simulation system, Petition 870210108006, dated 11 / 22 / 2021, page 49 / 151 6 / 40 which includes:

[0022] a beacon simulation module and a train simulation module, wherein the train simulation module includes a train, wherein

[0023] the beacon simulation module is configured to: determine the possibility of an upstream beacon and a downstream beacon of the train having changed, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction and the first direction is opposite to the second direction, wherein, when a train travel direction is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train, to enable the train to control the train's travel according to the beacon information;and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train, to enable the train to control its course according to the beacon information; and;

[0024] The train is configured to: receive beacon information, and control the train's path according to the beacon information.

[0025] In the beacon simulation system provided in embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both Petition 870210108006, dated 11 / 22 / 2021, page 50 / 151 7 / 40 When both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train. After the train passes a beacon, the beacons closest to the train along the first and second directions change permanently. Therefore, when both the upstream and downstream beacons of the train have changed simultaneously, it can be determined that the train has passed a beacon. Additionally, because a beacon triggered when the train passes must be consistent with the train's direction of travel, a beacon triggered by the train can also be specifically determined from the changed upstream beacon and downstream beacon according to the train's direction of travel.Because the distances between the train and the upstream and downstream beacons are updated in real time, even if neither of the displacements in two train updates falls within a beacon's firing window, a beacon triggered in a displacement update can still be determined based on changes in the upstream and downstream beacons and the train's direction of travel. Therefore, there is no beacon loss in the present application.

[0026] Additional aspects and advantages of the present application will be given in part in the following descriptions, will become evident in part from the following descriptions, or will be learned from the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] These and other aspects and advantages of embodiments of the present application will become evident and more readily verifiable from the descriptions below made with reference to the drawings.

[0028] Figure 1 is a schematic diagram of a beacon firing in an existing beacon simulation technique;

[0029] Figure 2 is a schematic flowchart of a beacon simulation method according to an embodiment of the present application; Petition 870210108006, dated 11 / 22 / 2021, page 51 / 151 8 / 40

[0030] Figure 3 is a schematic diagram of a beacon firing according to an embodiment of the present application;

[0031] Figure 4 is a schematic diagram of firing another beacon according to an embodiment of the present application;

[0032] Figure 5 is a schematic diagram of the firing of yet another beacon according to an embodiment of the present application;

[0033] Figure 6 is a schematic flowchart of another beacon simulation method according to an embodiment of the present application;

[0034] Figure 7 is a schematic flowchart of yet another beacon simulation method according to an embodiment of the present application;

[0035] Figure 8 is a schematic flowchart of yet another beacon simulation method according to an embodiment of the present application; and

[0036] Figure 9 is a schematic structural diagram of a beacon simulation system according to an embodiment of the present application. DETAILED DESCRIPTION

[0037] Embodiments of the present application are described in detail below and examples of the embodiments are shown in the accompanying drawings, in which the same elements or similar elements or elements having the same or similar functions are indicated by the same numerical references or similar numerical references throughout the description. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to explain this application and cannot be interpreted as a limitation to the present application.

[0038] To facilitate understanding of the present application, an existing beacon simulation technique and its disadvantages are first described in general before the present solution is described. A real train displacement is continuous, but in the beacon simulation technique the train displacement is discrete. The time between two adjacent updates of the train displacement is a period. Beacon simulation can only make the displacement prone to being continuous by increasing the frequency of Petition 870210108006, dated 11 / 22 / 2021, page 52 / 151 9 / 40 train displacement update. However, when the update frequency is higher, more resources are consumed.

[0039] As shown in Figure 1, a beacon firing window in an existing beacon simulation technique is (Sbtm-d, Sbtm+d). Sbtm is a beacon position and ed is a beacon window size. When a train moves within the beacon firing window, the beacon is fired and the beacon sends beacon information to a train BTM. The solution has the following disadvantages: First, beacon loss can occur. For example, as shown in Figure 1, when the train is moving excessively fast, due to the fact that the train displacement is distinct, it is possible that neither of the displacements in two train updates is within a beacon window. In this case, the beacon at that position is not fired, and the train may miss the beacon position at that location. Second, the accuracy of beacon firing is insufficient. There is an error of d, and the value of d is related to a train speed.When the train speed is faster, the value of d that needs to be set is higher. In this case, a beacon firing error is greater. Third, there is a delay problem in a software simulation system. Even if a beacon is precisely fired, it still takes a period of time to transfer the information to an on-board vehicle controller (VOBC). The train displacement that occurs within this time period is also an error belonging to the beacon, and the error increases as the train speed increases.

[0040] A beacon simulation method and system provided in an embodiment of the present application are described below with reference to the accompanying drawings. In the embodiment, the beacon simulation system includes a beacon simulation module, a train simulation module, and a route simulation module. The beacon simulation module includes a beacon and a beacon management unit. The train simulation module includes a train. The train includes a train body, a VOBC, and a BTM. The module of Petition 870210108006, dated 11 / 22 / 2021, page 53 / 151 The 10 / 40 route simulation includes a route and a route management unit.

[0041] Figure 2 is a schematic flowchart of a beacon simulation method according to an embodiment of the present application. The method is implemented by a beacon simulation module. As shown in Figure 2, the beacon simulation method includes the following steps.

[0042] S101: Determine the possibility of an upstream and a downstream train marker having changed, wherein the upstream marker is a marker closer to the train along a first direction, the downstream marker is a marker closer to the train along a second direction, and the first direction is opposite to the second direction.

[0043] In this embodiment, the first and second directions in which the train travels are opposite. For example, as shown in Figure 1, Figure 3, Figure 4, and Figure 5, the first direction may be an upstream direction, and the second direction may be a downstream direction. The upstream direction is from left to right, and the downstream direction is from left to right. In the embodiment of the present application, if the train travels along the first direction, one direction of travel of the train is the upstream direction, specifically, a direction from left to right. If the train travels along the second direction, the direction of travel of the train is the downstream direction, specifically, a direction from left to right. A marker closest to the train in the upstream direction is the upstream marker of the train. The second direction is the downstream direction. A marker closest to the train in the downstream direction is the downstream marker of the train.The beacon management unit of the beacon simulation module acquires a train position from a route simulation module, and acquires the upstream and downstream beacons according to the train's position. The beacon management unit manages all beacons on a route. For example, the beacon management unit knows the position of any beacon on the route, i.e., a beacon position, and acquires the upstream and downstream beacons according to that position. Petition 870210108006, dated 11 / 22 / 2021, page 54 / 151 11 / 40 a BTM of the train. The route simulation module acquires a train displacement from a train simulation module, where the train displacement is represented by a track section and a number of deviations on a route, to convert the train displacement into the train's position on the route, i.e., the train's position, to facilitate the search for a beacon and other trackside device on the route. When the train moves, the train's position changes. When the train moves between two adjacent beacons, the upstream beacon and the downstream beacon do not change. After the train passes a beacon, the beacon is triggered, and the upstream beacon and the downstream beacon have changed. There is no beacon loss. Additionally, due to the fact that upstream and downstream beacon changes occur instantaneously, the frequency of train displacement updates determines the accuracy of beacon triggering.Compared to the related technique, the accuracy of firing a beacon is greater.

[0044] S102: When a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a BTM on the train triggers a changed downstream beacon, and the changed downstream beacon sends beacon information to the train, to enable the train to control the train's path according to the beacon information.

[0045] S103: When the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, the train's BTM triggers a changed upstream beacon, and the changed upstream beacon sends beacon information to the train, to enable the train to control the train's path according to the beacon information.

[0046] In this mode, after the train passes a marker, the marker is triggered, and both the marker upstream of the train and the marker downstream of the train have changed simultaneously. The triggered marker can be determined according to the direction of travel of the train. If the direction of travel of the train Petition 870210108006, dated 11 / 22 / 2021, pp. 55 / 151 12 / 40 For the upstream direction, the triggered beacon is a changed downstream beacon or the upstream beacon before the change occurs. The changed downstream beacon sends beacon information from the downstream beacon to the train, which may include: sending, via the changed downstream beacon, beacon information from the downstream beacon to the train's BTM. If the train's direction of travel is downstream, the triggered beacon is a changed upstream beacon or the downstream beacon before the change occurs. The changed upstream beacon is triggered, and the changed upstream beacon sends beacon information from the upstream beacon to the train, which may include: sending, via the changed upstream beacon, beacon information from the upstream beacon to the train's BTM, and controlling, via the train, the train's path according to the beacon information. After the train passes a marker, the markers closest to the train along the first and second directions change permanently.Therefore, when both the upstream and downstream beacons of the train have changed simultaneously, it can be determined that the train has overshot a beacon. Additionally, because a beacon triggered when the train overshoots must be consistent with the train's direction of travel, a beacon triggered by the train can also be specifically determined from the changed upstream beacon and downstream beacon according to the train's direction of travel. Because the distances between the train and the upstream and downstream beacons are updated in real time, even if neither of the displacements in two train updates falls within a beacon's triggering window, a beacon triggered in a displacement update can still be determined based on changes in the upstream and downstream beacons and the train's direction of travel. Therefore, there is no beacon loss in the present application.Beacon information can be used to control the train's path. For example, beacon information might include the beacon's position, and the train could calibrate its displacement according to the beacon information. However, this method is not limited to that. In another example, when the beacon is... Petition 870210108006, dated 11 / 22 / 2021, page 56 / 151 13 / 40 A passive beacon, the beacon information includes the beacon's position, a route gradient, a permissible route speed, and similar information. When the beacon is an active beacon, the beacon information includes the beacon's position, a route gradient, a permissible route speed, a temporary speed limit, and similar information. The train can control the train's path according to this beacon information.

[0047] If both the upstream and downstream goal of the train do not change, no goal is triggered. That is, no goal sends goal information to the train. In one example, both the upstream and downstream beacons of the train do not change, the train moves between two adjacent beacons, and no beacon is triggered.

[0048] In one example, as shown in Figure 3, the upstream direction is from left to right, and the downstream direction is from left to right. The train's direction of travel is from left to right. That is, the direction of travel is the upstream direction. For example, as shown in Figure 3, when the train is at point A, for the upstream shown above the train: B0102, 50 refers to the fact that a beacon B0102 is the upstream beacon, and a distance between the train and the upstream beacon B0102 is 50; The downstream marker shown above the train, B0101, 50, refers to the fact that marker B0101 is the downstream marker, and the distance between the train and the downstream marker B0101 is 50. As the train travels from point A to point B, when the train is at point A, the upstream marker is B0102 and the downstream marker is B0101. After the train passes marker B0102, the train's upstream marker changes to B0103 and the train's downstream marker changes back to B0102.When the train travels between beacon B0101 and beacon B0102, the upstream and downstream beacons remain unchanged. After the train passes beacon B0102, the upstream beacon changes to B0103 and the downstream beacon changes to B0102. Therefore, the beacon simulation module can determine, based on the possibility of both the upstream and downstream beacons changing simultaneously, a. Petition 870210108006, dated 11 / 22 / 2021, page 57 / 151 14 / 40 possibility of the train overshooting the marker or the possibility of the marker being triggered, and the triggered marker is the marker before the change occurs in the train's direction of travel. For example, in this mode, the upstream marker before the change occurs is B0102. That is, B0102 is the triggered marker. The train continues to move to point C. In this case, the train moves between marker B0102 and marker B0103, and the upstream and downstream markers of the train remain unchanged.

[0049] In an example, as shown in Figure 4, the upstream direction is from left to right, and the downstream direction is from left to right. The train's direction of travel is from left to right. That is, the direction of travel is the upstream direction. For example, when the train is at point A, for “upstream” displayed above the train: “B0102, d-1” refers to the fact that beacon B0102 is the upstream beacon, and a distance between the train and the upstream beacon B0102 is d-1; and for “downstream” displayed above the train: B0101, 82 refers to the fact that beacon B0101 is the downstream beacon, and a distance between the train and the downstream beacon B0101 is 82. In the related technique, a beacon window is (Sbtm-d, Sbtm+d). Sbtm is the position of the beacon, ed is the size of the beacon window. When the train moves to point A, the train enters a window of beacon B0102, and beacon B0102 is triggered.However, the distance between point A and the center of beacon B0102 is d-1, and the firing error is d-1. When the present application is used, the train moves to point B. The upstream beacon and the downstream beacon have changed. The train's direction of travel is the upstream direction. The fired beacon is the upstream beacon before the change occurs. That is, beacon B0102 is fired. The distance between point B and the center of beacon B0102 is 1, and the firing error is 1. As can be seen from the Figure, the firing accuracy of the beacon in the present application is significantly improved, and is closer to the actual firing of a beacon, thus ensuring the practicality and reliability of beacon simulation. In the related technique, the firing accuracy of a beacon can be improved by reducing d. Petition 870210108006, dated 11 / 22 / 2021, page 58 / 151 15 / 40, however, this tends to cause loss of focus.

[0050] In one example, as shown in Figure 5, the upstream direction is from left to right, and the downstream direction is from left to right. The train's route direction is from left to right. That is, the direction of travel is the upstream direction. For example, as shown in Figure 5, when the train is at point A, for the upstream shown above the train: “B0102, d+1” refers to the fact that beacon B0102 is the upstream beacon, and the distance between the train and the upstream beacon B0102 is d+1; And for “downstream” displayed above the train: “B0101, 80” refers to the fact that beacon B0101 is the downstream beacon, and the distance between the train and the downstream beacon B0101 is 80. When the train is traveling at high speed, the travel interval of each period is relatively large. For example, within an nth period, the train travels to point A, and within an (n+1)th period, the train travels to point B.In the related technique, due to the fact that the train did not move to the window of beacon B0102, i.e., the train did not trigger beacon B0102, a beacon loss is caused. In the present application, from the nth period to the (n+1)th period, the upstream and downstream beacons of the train changed. Due to the fact that the train's direction of travel is upstream, the triggered beacon is the upstream beacon before the change occurred. That is, the train triggers beacon B0102. As can be seen, no beacon is lost in the present application.

[0051] In addition, the method includes: acquiring a train position, determining the upstream and downstream beacons of the train according to the train position, and calculating a first distance between the upstream beacon of the train and the train and a second distance between the downstream beacon of the train and the train.

[0052] In this mode, the beacon simulation module acquires a train position from the route simulation module, searches for the nearest beacon along the first direction according to the train position, where the beacon is the upstream beacon of the train, and calculates the first distance between the upstream beacon of the train and the train; searches for the nearest beacon Petition 870210108006, dated 11 / 22 / 2021, page 59 / 151 16 / 40 along the second direction according to the train's position, where the beacon is the downstream beacon of the train, and calculates the second distance between the downstream beacon of the train and the train, to facilitate development and testing and, at the same time, facilitate the examination of the possibility of a beacon firing being correct, thus improving the work efficiency of a developer and tester. Furthermore, the first distance between the train and the upstream beacon and the second distance between the train and the downstream beacon are stored and displayed, and the train, an upstream beacon name, and a downstream beacon name are displayed. In an example, the first distance between the train and the upstream beacon and the second distance between the train and the downstream beacon can be displayed on a station map, and the train, the upstream beacon name, and the downstream beacon name are displayed.The train's displacement, position, and similar aspects can be intuitively and quickly determined based on changes in the first and second distances, facilitating development and testing. Additionally, the distance between the triggered beacon and the train gradually increases before the change occurs, and the distance between the triggered beacon and the train gradually increases after the change occurs. For example, when the train's direction of travel is the first direction, before the train triggers the beacon, the beacon is the upstream beacon, and the first distance between the train and the upstream beacon gradually decreases. After the change occurs, the beacon is the downstream beacon, and the second distance between the train and the downstream beacon gradually increases.Therefore, the first distance between the train and the upstream beacon and the second distance between the train and the downstream beacon are displayed to facilitate the examination of whether the beacon firing is correct, thus improving the work efficiency of a developer and tester.

[0053] In addition, the method includes: acquiring a third distance between the train's BTM and a locomotive according to a train ID; calculating a BTM position according to the train's position, the train's direction of travel, and the third distance; determining the upstream and downstream beacons. Petition 870210108006, dated 11 / 22 / 2021, page 60 / 151 17 / 40 of the train according to the BTM position; and calculate a distance between the BTM and the upstream beacon as the first distance and a distance between the BTM and the downstream beacon as the second distance.

[0054] The train's position can be the locomotive's position, the train's BTM position, or similar. However, this mode is not limited to this. In this mode, the train's position is the locomotive's position. The beacon is, in fact, triggered by the train's BTM, and therefore the position of the train's BTM needs to be calculated. The BTM is mounted at a particular distance from the locomotive. Different trains have different distances between the locomotive and the BTM. The third distance between the train's BTM and the locomotive is acquired according to the train ID. The locomotive is the final portion of the train in the direction of travel.The beacon simulation module acquires the train's position from the route simulation module, calculates the BTM's position based on the train's position, the train's direction of travel, and a third distance, searches for the nearest beacon along the first direction based on the BTM's position (where the beacon is the upstream beacon of the train), and calculates the first distance between the upstream beacon of the train and the BTM. It then searches for the nearest beacon along the second direction based on the BTM's position (where the nearest beacon is the downstream beacon of the train), and calculates the second distance between the downstream beacon of the train and the BTM. The first distance between the BTM and the upstream beacon and the second distance between the BTM and the downstream beacon are stored and displayed, along with the train, the name of the upstream beacon, and the name of the downstream beacon.In one example, the first distance between the BTM and the upstream beacon and the second distance between the BTM and the downstream beacon can be displayed on a station map, and the train, the name of the upstream beacon, and the name of the downstream beacon are displayed to facilitate development and testing and at the same time, facilitate the examination of the possibility of a beacon firing being correct, thus improving the work efficiency of a developer and tester.

[0055] In one example, Figure 3 is a schematic diagram of Petition 870210108006, dated 11 / 22 / 2021, page 61 / 151 18 / 40 shot from a beacon according to this request. The upstream direction is from left to right, and the downstream direction is from left to right. The train's route direction is from left to right. That is, the direction of travel is the upstream direction. As the train moves from point A to point B, when the train is at point A, the upstream goal is B0102, and the downstream goal is B0101. After the train's BTM passes beacon B0102, the train's upstream beacon changes to B0103, and the train's downstream beacon changes to B0102. When the train moves between goal B0101 and goal B0102, the train's BTM is located between goal B0101 and goal B0102, and the train's upstream goal and downstream goal remain unchanged. After the train's BTM surpasses target B0102, the train's upstream and downstream targets change accordingly.Therefore, the beacon simulation module can determine, based on the possibility of both the upstream and downstream beacons of the train changing simultaneously, whether the train overshoots the beacon or whether the beacon is triggered, and the triggered beacon is the beacon before the change occurs in the train's direction of travel. For example, in this mode, the upstream beacon before the change occurs is B0102, that is, B0102 is the triggered beacon. The train continues to move to point C. In this case, the train moves between beacon B0102 and beacon B0103, and the upstream and downstream beacons of the train remain unchanged. The distances between the train's BTM and the upstream and downstream beacons are updated in real time. In the present application, a distance between the train's BTM and a beacon can be dynamically displayed.The distance between the train's BTM (Bus Rapid Transit) and a beacon can be dynamically displayed on a station map to facilitate development and testing.

[0056] In addition, the method includes: displaying the upstream beacon of the train and the downstream beacon of the train; and displaying the first distance between the upstream beacon of the train and the train and the second distance between the downstream beacon of the train and the train.

[0057] In this mode, after the first distance between the beacon Petition 870210108006, dated 11 / 22 / 2021, page 62 / 151 The first distance between the train and the upstream beacon and the train, and the second distance between the downstream beacon and the train, are calculated. The first distance between the upstream beacon and the train, and the second distance between the downstream beacon and the train are updated in real time. The first distance between the train and the upstream beacon and the second distance between the train and the downstream beacon are stored and displayed, along with the train, the upstream beacon name, and the downstream beacon name. In one example, the first distance between the train and the upstream beacon and the second distance between the train and the downstream beacon can be displayed on a station map, and the train, the upstream beacon name, and the downstream beacon name are shown to facilitate development and testing, while also making it easier to check if a beacon firing is correct, thus improving the work efficiency of a developer and tester.If both the upstream and downstream beacons of the train have not changed simultaneously, the distances between the train and the upstream and downstream beacons can be updated separately. If both the upstream and downstream beacons of the train have changed simultaneously, the distances between the train and the upstream and downstream beacons are updated separately, and the triggered beacon sends beacon information to the train, which may include: sending beacon information to the train's BTM via the triggered beacon, receiving beacon information via the BTM, and sending beacon information to a train VOBC.

[0058] In one mode, the BTM communicates with the VOBC periodically to ensure normal communication between the BTM and the VOBC. If a beacon is triggered, the BTM sends a message that includes the beacon information to the VOBC. If no beacon is triggered, the BTM sends a message that does not include beacon information to the VOBC module.

[0059] Furthermore, after determining the possibility of an upstream and a downstream marker of a train having changed, when both the upstream and downstream markers of the train have changed simultaneously, the position of the train is a first position, a position of Petition 870210108006, dated 11 / 22 / 2021, page 63 / 151 20 / 40 upstream firing point changed or downstream firing point changed is a second position, and the method may include: calculating a fourth distance between the first position and the second position, and sending the fourth distance to a route simulation module, to enable the route simulation module to compensate the train's position according to the fourth distance.

[0060] In this mode, after determining the possibility of an upstream and a downstream beacon of a train having changed, when both the upstream and downstream beacons of the train have changed simultaneously, the train's position is the first position, and the position of the upstream beacon that has been changed or the downstream beacon that has been changed is the second position; and the method includes: calculating the fourth distance between the first and second positions, storing the fourth distance in a compensation variable, and sending the fourth distance to the route simulation module.During the calculation of a beacon firing within an upcoming period, the route simulation module adds the compensation variable when updating the train position, or adds the train position and the compensation variable, which may include: adding the compensation variable and a train deviation amount on the route, and updating a section and the train deviation amount on the route, thus reducing an error caused by inaccurate beacon information transmission, to make beacon firing more likely to be accurate.

[0061] In addition, the include method: after calculating a fourth distance between the first position and the second position, send the fourth distance to a route simulation module, and if a compensation parameter of the route simulation module is “allow”, compensate, by the route simulation module, for the train's position according to the fourth distance.

[0062] In this mode, after determining the possibility of an upstream and a downstream marker of a train having changed, when both the upstream and downstream markers of the train have changed simultaneously, the position of the train is the first position, and the position of the upstream marker that has changed or the downstream marker that has changed is the Petition 870210108006, dated 11 / 22 / 2021, page 64 / 151 21 / 40 second position, the method additionally includes: calculating the fourth distance between the first and second positions, storing the fourth distance in a compensation variable, and sending the fourth distance to the route simulation module. During the calculation of a beacon firing within a given period, if the compensation parameter of the route simulation module is “allow”, the route simulation module adds the compensation variable when updating the train position or adds the train position and the compensation variable, where the compensation parameter is present in the route simulation module, and includes “allow” and “prohibit”, which may include: adding the compensation variable and the amount of train deviation on the route, and updating a section and the amount of train deviation on the route, thus reducing an error caused by inaccurate transmission of beacon information, to make beacon firing more likely to be accurate.If the route simulation module's compensation parameter is "prohibit", the route simulation module does not add the train position and the compensation variable.

[0063] In addition, the method includes: determining the possibility of a fault injection being received; and if the fault injection is received, updating an attribute of a corresponding beacon according to the fault injection, wherein the beacon attribute includes at least one of a requirement to send beacon information, a beacon position, a beacon ID, or a beacon name.

[0064] In one embodiment, the present application supports beacon fault injection. If the beacon simulation module determines that fault injection is received, the beacon attribute can be dynamically changed in software. The beacon attribute includes at least one of a requirement to send beacon information, beacon position, beacon ID, or beacon name. However, this embodiment is not limited to this. The requirement to send beacon information includes the fact that the beacon sends beacon information to the train and the beacon does not send beacon information to the train. If the requirement to send beacon information is the fact that the beacon sends the information Petition 870210108006, dated 11 / 22 / 2021, page 65 / 151 22 / 40 of a beacon to the train: when the train overshoots the beacon, the beacon sends beacon information to the train. If the requirement to send beacon information is based on the fact that the beacon does not send beacon information to the train, then when the train overshoots the beacon, the beacon does not send beacon information to the train. Simulating various different beacon failure scenarios during development and testing is facilitated, or even a scenario that cannot be implemented locally but theoretically exists can be simulated, which helps to make a train control system robust, to find various potential problems.

[0065] In one example, a specific implementation process of the present application is described in detail below:

[0066] First stage: A train body receives and analyzes a train control instruction from a VOBC periodically. The train control instruction includes a gear, a level, and similar train information. However, this mode is not limited to this. Additionally, the train body acquires bridge status information from a train simulation module. The bridge status information includes manual driving, automated driving, and similar information. However, this mode is not limited to this. The train body controls the train's path according to the VOBC's train control instruction and the bridge status information.

[0067] Second stage: The train body calculates an acceleration a, a speed v, and a displacement of the train according to the VOBC train control instruction and the bridge status information, and simultaneously sends the train displacement to a route simulation module. If the train speed exceeds a predefined speed, the train body sends the displacement within a predefined period to the route simulation module. For example, the predefined period could be a period of periods. The time between two adjacent updates of the train displacement is one period. If the train speed is less than the predefined speed, the train body skips sending the displacement within the predefined period to the Petition 870210108006, dated 11 / 22 / 2021, page 66 / 151 23 / 40 route simulation module, or sends the train displacement with a predefined period of 0 to the route simulation module.

[0068] Third stage: The route simulation module acquires a train displacement and calculates the train's position according to the train displacement, where the train displacement is represented by a track section and a number of sidings on a route, to convert the train displacement into the train's position on the route, i.e., the train's position, to facilitate the search for a beacon and other trackside device on the route. If the route simulation module acquires a displacement within a predefined period, the route simulation module determines the possibility of a predefined pre-departure parameter being "allow". If the predefined pre-departure parameter is "allow", the train's position is updated according to the displacement within the predefined period. If the predefined pre-departure parameter is "allow", the route simulation module adds the displacement within the predefined period and the train displacement.The sum of the train displacement and the displacement within the predefined period is represented by the track section and the amount of deviation in the route, to convert the train displacement into the train's position. If the predefined pre-departure parameter is "prohibit", the route simulation module does not process the displacement within the predefined period.

[0069] Fourth stage: The beacon simulation module determines the possibility of a beacon receiving fault injection and updates an attribute of a corresponding beacon according to the fault injection. The beacon attribute includes a requirement to send beacon information, a beacon position, a beacon ID, a beacon name, and similar information. However, this mode is not limited to this. The beacon simulation module cuts all beacons according to the fault injection and examines, according to the fault injection, the possibility of the corresponding beacon's attribute being changed, i.e., the possibility of the corresponding beacon having fault injection, and updates the corresponding beacon's attribute according to the injection. Petition 870210108006, dated 11 / 22 / 2021, page 67 / 151 24 / 40 failure.

[0070] Fifth stage: The beacon simulation module determines the possibility of a compensation variable being defined. If a compensation variable exists, after determining the possibility of an upstream beacon and a downstream beacon of a train having changed, when both the upstream and downstream beacons of the train have changed simultaneously, the train's position is a first position, and a position of the upstream beacon that has changed or a position of the downstream beacon that has changed is a second position. The beacon simulation module calculates a fourth distance between the first and second positions, stores the fourth distance in a compensation variable, adds the compensation variable and the amount of train deviation on the route, and updates a section and the amount of train deviation on the route to compensate for the train's position. If there is no compensation variable, the beacon simulation module skips the train position compensation.

[0071] Sixth stage: The beacon simulation module calculates the position of a train BTM according to the train's position. The beacon is, in fact, triggered by the train's BTM, and therefore the position of the train's BTM needs to be calculated. The BTM is mounted at a particular distance from the locomotive. Different trains have different distances between the locomotive and the BTM. A third distance between the train's BTM and the locomotive is acquired according to the train ID. The locomotive is the final portion of the train in a travel direction.The beacon management unit acquires the train's position from the route simulation module and calculates the BTM's position based on the train's position, the train's direction of travel, and the third distance, which may include: adding the third distance and the amount of train deviation on the route according to the train's direction of travel to obtain the amount of BTM deviation on the route, where the third distance is a negative value, or subtracting the third distance from the amount of train deviation on the route according to the train's direction of travel to obtain the amount of... Petition 870210108006, dated 11 / 22 / 2021, page 68 / 151 25 / 40 deviation of the BTM on the route, where the third distance is a positive value, to acquire the track section and the amount of deviation of the BTM on the route, thus calculating the position of the BTM. The beacon simulation module searches for the nearest beacon along a first direction according to the BTM's position, where the beacon is the upstream beacon of the train, and calculates a first distance between the upstream beacon of the train and the BTM; and searches for the nearest beacon along a second direction according to the BTM's position, where the beacon is the downstream beacon of the train, and calculates a second distance between the downstream beacon of the train and the BTM. The first distance between the BTM and the upstream beacon and the second distance between the BTM and the downstream beacon are stored and displayed, and the train, the name of the upstream beacon, and the name of the downstream beacon are displayed.In one example, the first distance between the BTM and the upstream beacon and the second distance between the BTM and the downstream beacon can be displayed on a station map, and the train, the name of the upstream beacon, and the name of the downstream beacon are displayed to facilitate development and testing and at the same time, facilitate the examination of the possibility of a beacon firing being correct, thus improving the work efficiency of a developer and tester.

[0072] Seventh stage: The beacon simulation module determines the possibility of an upstream beacon and a downstream beacon of the train having changed. If both the upstream and downstream beacons of the train have changed simultaneously, and the train's direction of travel is upstream, a changed downstream beacon is triggered, the changed downstream beacon sends beacon information from the downstream beacon to the train's BTM, and at the same time, the beacon simulation module updates the upstream and downstream beacons and the distances between the train and the upstream and downstream beacons. If both the upstream and downstream beacons of the train have changed simultaneously, and the train's direction of travel is the second direction, the changed upstream beacon is triggered, and the changed upstream beacon sends beacon information from the upstream beacon to the train's BTM, and at the same time Petition 870210108006, dated 11 / 22 / 2021, page 69 / 151 26 / 40 time the upstream and downstream beacons and the distances between the train and the upstream and downstream beacons are updated. Then, the beacon simulation module compensates for the train's position. Otherwise, the train does not trigger a beacon, and it is only necessary to update the distances between the train and the upstream and downstream beacons. In this case, it is not necessary to compensate for the train's position.

[0073] Eighth step: When both the upstream and downstream beacons of the train have changed simultaneously, the train's position is the first position, and the position of the upstream beacon that has been changed or the downstream beacon that has been changed is the second position, calculate the fourth distance between the first and second positions, store the fourth distance in a compensation variable, and send the fourth distance to the route simulation module. During the calculation of a beacon firing within a subsequent period, the route simulation module adds the compensation variable when updating the train's position or adds the train's position and the compensation variable, which may include: adding the compensation variable and the amount of train deviation on the route, and updating a section and the amount of train deviation on the route, thus reducing an error caused by inaccurate transmission of beacon information, to make beacon firing more likely to be accurate.

[0074] Ninth stage: If a beacon is triggered, the triggered beacon sends beacon information to the train's BTM, the BTM receives the beacon information, and sends the beacon information to the train's VOBC, and the train controls the train's path according to the beacon information. The beacon information includes the beacon's position. The train can calibrate the train's displacement according to the beacon information. However, this mode is not limited to this. For example, when the beacon is a passive beacon, the beacon information includes the beacon's position, a route gradient, and a permissible route speed, and the like. When the beacon is an active beacon, the beacon information includes the beacon's position, a route gradient, a permissible route speed, a speed limit. Petition 870210108006, dated 11 / 22 / 2021, page 70 / 151 Temporary 27 / 40 and similar systems control the train's route according to this beacon information. The BTM communicates with the VOBC periodically to ensure normal communication between the BTM and the VOBC. If a beacon is triggered, the BTM sends a message that includes the beacon information to the VOBC. If no beacon is triggered, the BTM sends a message that does not include beacon information to the VOBC.

[0075] In the beacon simulation method provided in this application embodiment, the possibility of a beacon upstream and a beacon downstream of a train having changed is determined; if both the upstream and downstream beacons of the train have changed simultaneously, and the train's direction of travel is a first direction, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and if both the upstream and downstream beacons of the train have changed simultaneously, and the train's direction of travel is a second direction, the changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train. After the train passes a beacon, the beacons nearest to the train along the first and second directions change permanently.Therefore, when both the upstream and downstream beacons of the train have changed simultaneously, it can be determined that the train has overshot a beacon. Additionally, because a beacon triggered when the train overshoots must be consistent with the train's direction of travel, a beacon triggered by the train can also be specifically determined from the changed upstream beacon and downstream beacon according to the train's direction of travel. Because the distances between the train and the upstream and downstream beacons are updated in real time, even if neither of the displacements in two train updates falls within a beacon's triggering window, a beacon triggered in a displacement update can still be determined based on changes in the upstream and downstream beacons and the train's direction of travel. Therefore, Petition 870210108006, dated 11 / 22 / 2021, page 71 / 151 28 / 40 there is no loss of benchmark in the present request.

[0076] Figure 6 is a schematic flowchart of another beacon simulation method according to an embodiment of the present application, applied to a train simulation module. As shown in Figure 6, the beacon simulation method includes the following steps.

[0077] S201: A beacon simulation module determines the possibility of an upstream beacon and a downstream beacon of a train having changed, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction.

[0078] S202: When a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, the beacon simulation module determines that a changed downstream beacon is triggered by a train BTM, and the changed downstream beacon sends beacon information to the train, to enable the train to control the train's path according to the beacon information.

[0079] S203: When the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, the beacon simulation module determines that a changed upstream beacon is triggered by the train's BTM, and the changed upstream beacon sends beacon information to the train, to enable the train to control the train's path according to the beacon information.

[0080] S204: The train receives beacon information and controls the train's path according to the beacon information.

[0081] In addition, the method includes: acquiring, using the beacon simulation module, a train position, determining the upstream and downstream beacons of the train according to the train position, calculating a first distance between the upstream beacon and the train and a second distance between the downstream beacon and the train, and detecting, according to the first Petition 870210108006, dated 11 / 22 / 2021, page 72 / 151 29 / 40 distance and the second distance, the possibility of the shot being correct.

[0082] In addition, the acquisition, by the beacon simulation module, of a train position, determination of the upstream and downstream beacons of the train according to the train position, and calculation of a first distance between the upstream beacon of the train and the train and a second distance between the downstream beacon of the train and the train specifically include: acquiring, by the beacon simulation module, a third distance between the train's BTM and a locomotive according to a train ID; calculating, by the beacon simulation module, a BTM position according to the train position, the train's direction of travel and the third distance; determining, by the beacon simulation module, the upstream and downstream beacons of the train according to the BTM position; and calculating, by the beacon simulation module, a distance between the BTM and the upstream beacon as the first distance and a distance between the BTM and the downstream beacon as the second distance.

[0083] In addition, the method includes: displaying, by the beacon simulation module, the upstream beacon of the train and the downstream beacon of the train; and displaying, by the beacon simulation module, the first distance between the upstream beacon of the train and the train and the second distance between the downstream beacon of the train and the train. A train displacement, position, and similar values ​​can be intuitively and quickly determined according to changes in the first distance and the second distance, to facilitate development and testing. Additionally, the distance between the triggered beacon and the train increases gradually before the change occurs, and the distance between the triggered beacon and the train increases gradually after the change occurs. For example, when the train's direction of travel is the first direction, before the train triggers the beacon, the beacon is the upstream beacon, and the first distance between the train and the upstream beacon gradually decreases.After the change occurs, the marker is the downstream marker, and the second distance between the train and the downstream marker gradually increases. Therefore, the first distance between the train and the upstream marker... Petition 870210108006, dated 11 / 22 / 2021, page 73 / 151 30 / 40 and the second distance between the train and the downstream beacon are displayed to facilitate the examination of whether a beacon firing is correct, thus improving the work efficiency of a developer and tester.

[0084] Furthermore, prior to the acquisition, by the beacon simulation module, of a train position, the method includes: acquiring, by a route simulation module, a train displacement, and calculating the train position according to the train displacement; acquiring, by the route simulation module, a displacement within a predefined period; and if a predefined pre-departure parameter is “allow”, updating, by the route simulation module, the train position according to the displacement within the predefined period.

[0085] Furthermore, the acquisition, by the route simulation module, of a train displacement, and calculating the train position according to the train displacement specifically includes: acquiring, by the route simulation module, the train displacement, where the train displacement is represented by a track section and a number of deviations on a route, to convert the train displacement into the train position.

[0086] Furthermore, after the beacon simulation module determines the possibility of an upstream beacon and a downstream beacon of a train having changed, when both the upstream and downstream beacons of the train have changed simultaneously, the train's position is a first position, a position of the upstream fired beacon changed or a downstream beacon changed is a second position, and the method includes: calculating, by the beacon simulation module, a fourth distance between the first position and the second position, and sending the fourth distance to the route simulation module, to enable the route simulation module to compensate the train's position according to the fourth distance.

[0087] Furthermore, when both the upstream and downstream beacons of the train have changed simultaneously, the position of the train is the first position, and the position of the upstream beacon that has been changed or the downstream beacon that has been changed is the second position; and the method includes: acquiring, by the module Petition 870210108006, dated 11 / 22 / 2021, page 74 / 151 31 / 40 of route simulation, the fourth distance between the first and second positions, and adjusting the train's position according to the fourth distance.

[0088] In addition, the acquisition, by the route simulation module, of the fourth distance between the first and second positions, and compensation of the train's position according to the fourth distance specifically includes: acquiring, by the route simulation module, the fourth distance between the first and second positions, and if a compensation parameter of the route simulation module is “allow”, compensating, by the route simulation module, the train's position according to the fourth distance.

[0089] Furthermore, before a route simulation module acquires a train displacement and calculates the train's position based on the train displacement, the method includes: the train simulation module acquires a train control instruction from a VOBC and bridge status information; the train simulation module calculates a train speed based on the VOBC train control instruction and bridge status information; and if the train speed exceeds a predefined speed, the train simulation module sends the displacement within the predefined period to the route simulation module, enabling the route simulation module to calculate and update the train's position.

[0090] Furthermore, after the train simulation module acquires a train control instruction from a VOBC and bridge status information, the method includes: calculating, by the train simulation module, the train displacement according to the VOBC train control instruction and the bridge status information, and sending the train displacement to the route simulation module, to enable the route simulation module to calculate the train's position.

[0091] In addition, the method includes: controlling, by the train simulation module, the train's path according to the VOBC train control instruction and the bridge status information.

[0092] In addition, the beacon simulation module determines the Petition 870210108006, dated 11 / 22 / 2021, page 75 / 151 32 / 40 possibility of fault injection being received; if fault injection is received, the beacon simulation module updates an attribute of a corresponding beacon according to the fault injection, where the beacon attribute includes at least one of a requirement to send beacon information, a beacon position, a beacon ID, or a beacon name.

[0093] It is necessary to note that the above description of the beacon simulation method is also applicable to the beacon simulation method in the embodiments of this application. Details that are not disclosed in the embodiments of this application are not described again in this document.

[0094] In the beacon simulation method provided in the embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train.After the train passes a beacon, the upstream and downstream beacons have changed. Therefore, there is no beacon loss in the present application.

[0095] Figure 7 is a schematic flowchart of yet another beacon simulation method according to an embodiment of the present application, applied to a train simulation module. As shown in Figure 7, the beacon simulation method includes the following steps.

[0096] S301: Acquire a train control instruction from a VOBC Petition 870210108006, dated 11 / 22 / 2021, page 76 / 151 33 / 40 and bridge status information.

[0097] S302: Calculate a train speed according to the VOBC train control instruction and bridge status information.

[0098] S303: If the train speed exceeds a predefined threshold, send an offset within the predefined period to a route simulation module, to enable the route simulation module to update a train position.

[0099] A train body receives and analyzes the train control instruction from the VOBC periodically. The train control instruction includes a gear, a level, and similar train settings. However, this mode is not limited to this. Additionally, bridge status information from the train simulation module is acquired. Bridge status information includes manual driving, automated driving, and similar settings. However, this mode is not limited to this. The train body controls the train's path according to the VOBC train control instruction and the bridge status information.The train body calculates an acceleration a, a speed v, and a displacement of the train according to the VOBC train control instruction and the bridge status information. Simultaneously, it sends the train displacement to the route simulation module, enabling the route simulation module to acquire the train displacement and calculate the train's position based on that displacement. If the train's speed exceeds the predefined speed, the train body sends the displacement within a predefined period to the route simulation module, allowing the route simulation module to update the train's position. For example, the predefined period could be a period of periods. The time between two adjacent updates of the train displacement is one period.If the train speed is less than the predefined speed, the train body either skips sending the displacement within the predefined period to the route simulation module, or sends the train displacement with a predefined period of 0 to the route simulation module, to enable the simulation module. Petition 870210108006, dated 11 / 22 / 2021, page 77 / 151 34 / 40 of the route to update the train's position.

[00100] In addition, the method includes: calculating the train displacement according to the VOBC train control instruction and the bridge status information, and sending the train displacement to the route simulation module, to enable the route simulation module to calculate the train's position.

[00101] In addition, the method includes: receiving beacon information and controlling the train's path according to the beacon information.

[00102] In addition, the method includes: controlling the train's path according to the VOBC train control instruction and the bridge status information.

[00103] It is necessary to note that the above description of the beacon simulation method is also applicable to the beacon simulation method in the embodiments of this application. Details that are not disclosed in the embodiments of this application are not described again in this document.

[00104] In the beacon simulation method provided in the embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train.After the train moves past a marker, the marker upstream and the marker downstream of the train. Petition 870210108006, dated 11 / 22 / 2021, page 78 / 151 35 / 40 have changed. Therefore, there is no loss of benchmark in the present request.

[00105] Figure 8 is a schematic flowchart of yet another beacon simulation method according to an embodiment of the present application, applied to a route simulation module. As shown in Figure 8, the beacon simulation method includes the following steps.

[00106] S401: Acquire a train displacement, and calculate a train position based on the train displacement.

[00107] S402: Acquire a displacement within a predefined period.

[00108] S403: If a predefined pre-departure parameter is enabled, update the train position according to the displacement within the predefined period.

[00109] In addition, the train's position is acquired, where the train's displacement is represented by a track section and a number of deviations on a route, to convert the train's displacement into the train's position.

[00110] Furthermore, when both an upstream and a downstream beacon of the train have changed simultaneously, the position of the train is a first position, and a position of a changed upstream or downstream beacon is a second position; and the method includes: acquiring a fourth distance between the first position and the second position, and compensating the position of the train according to the fourth distance.

[00111] In addition, the fourth distance between the first position and the second position is acquired; if a compensation parameter of the route simulation module is set to “allow”, the route simulation module compensates the train's position according to the first distance.

[00112] It is necessary to note that the above description of the beacon simulation method is also applicable to the beacon simulation method in the embodiments of this application. Details not disclosed in the embodiments of this application are not described again herein. Petition 870210108006, dated 11 / 22 / 2021, p. 79 / 151 36 / 40 document.

[00113] In the beacon simulation method provided in the embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, the changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train.After the train passes a beacon, the upstream and downstream beacons have changed. Therefore, there is no beacon loss in the present application.

[00114] Figure 9 is a schematic structural diagram of a beacon simulation system according to an embodiment of the present application. As shown in Figure 9, the system includes a beacon simulation module 501 and a train simulation module 502. The train simulation module 502 includes a train.

[00115] The 501 beacon simulation module is configured to: To determine the possibility of an upstream and a downstream beacon of the train having changed, where the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction, where, when a direction of travel of the train is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train, to enable... Petition 870210108006, dated 11 / 22 / 2021, pp. 80 / 151 37 / 40 to the train to control the train's path according to the beacon information; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train, to enable the train to control the train's path according to the beacon information.

[00116] The train is configured to: receive beacon information, and control the train's path according to the beacon information.

[00117] It is necessary to note that the above description of the beacon simulation method is also applicable to the beacon simulation system in the embodiments of this application. Details that are not disclosed in the embodiments of this application are not described again in this document.

[00118] In the beacon simulation system provided in the embodiment of the present application, the possibility of an upstream beacon and a downstream beacon of a train having changed is determined, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction; when a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, a changed downstream beacon is triggered, and the changed downstream beacon sends beacon information to the train; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, the changed upstream beacon is triggered, and the changed upstream beacon sends beacon information to the train.After the train moves past a beacon, the upstream and downstream beacons of the train have changed. Therefore, there is no loss of goal in the present request.

[00119] To achieve the aforementioned modalities, this application additionally provides a computer device, which includes: a Petition 870210108006, dated 11 / 22 / 2021, p. 81 / 151 38 / 40 processor and a memory, wherein the processor is configured to read an executable program code stored in memory and run a program corresponding to the executable program code to perform the method provided in the aforementioned embodiments.

[00120] In the descriptive report, descriptions of terms of reference, such as “one (1) embodiment”, “some embodiments”, “example”, “specific example” or “some examples” means including specific features, structures, materials, or resources described in the embodiment or example in at least one embodiment or example of this application. In this descriptive report, schematic descriptions of the aforementioned terms are not necessarily directed to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics that are described may be combined in appropriate ways in any one or more embodiments or examples. In addition, an individual skilled in the art may integrate or combine different embodiments or examples described in the descriptive report and features of the different embodiments or examples provided that they are not contradictory to each other.

[00121] Furthermore, the terms first and second are used merely for descriptive purposes and should not be interpreted as indicating or implying relative importance or implying a quantity of indicated technical features. Therefore, a feature restricted by first or second may explicitly indicate or implicitly include at least one of such features. In the description of the present application, multiple means at least two, such as two and three unless specifically defined otherwise.

[00122] Any description of a process or method described in a flowchart or otherwise may be understood as a module, segment, or part representing code that includes one or more executable instructions to implement specific logical functions or steps of a process. Additionally, a range of preferred implementations of the present application Petition 870210108006, dated 11 / 22 / 2021, page 82 / 151 39 / 40 includes another implementation, and functions may be executed not in the sequence shown or discussed, including in a basically simultaneous manner according to the functions involved or in the opposite sequence, which must be understood by someone skilled in the art of the embodiments of the present application.

[00123] The logic and / or steps shown in the flowcharts or described in any other way in this document, for example, a sequenced list that can be considered as executable instructions used to implement logical functions, can be specifically implemented on any computer-readable media to be used by an instruction execution system, apparatus or device (for example, a computer-based system, a system that includes a processor or other system that can obtain an instruction from the instruction execution system, apparatus or device and execute the instruction) or be used by combining such instruction execution systems, apparatus or devices.In the context of this descriptive report, a computer-readable medium may be any device that can contain, store, communicate, propagate, or transmit the program for use by the instruction execution system, apparatus, or device, or in combination with the instruction execution system, apparatus, or device. More specific examples (a non-exhaustive list) of computer-readable media include the following: an electrical connection (electronic device) having one or more wires, a portable computer floppy disk (magnetic device), random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disc read-only memory (CDROM).Additionally, computer-readable media can also be a piece of paper for printing the program, or other suitable media, due to the fact that, for example, optical reading can be performed on paper or other media, and then processing is carried out by editing and decrypting, or otherwise. Petition 870210108006, dated 11 / 22 / 2021, page 83 / 151 40 / 40 is appropriate for obtaining the program electronically. Then the program is stored in computer memory.

[00124] It should be understood that parts of the present application may be implemented using hardware, software, firmware, or combinations thereof. In the aforementioned implementations, a plurality of steps or methods may be implemented using software or firmware that are stored in memory and are executed by an appropriate instruction execution system. For example, if hardware is used for implementation, even as in another implementation, the implementation may be performed by any of the following well-known technologies in the art or a combination thereof: a logic circuit distinct from a gate logic circuit to perform a logic function for a data signal, an application-specific integrated circuit having a suitable combined gate logic circuit, a programmable gate array (PGA), and a field-programmable gate array (FPGA).

[00125] A common skill element in the technique may understand that all or some of the steps of the method modalities can be implemented by a program that instructs relevant hardware. The program can be stored on a computer-readable storage medium. When the program is run, a step or a combination of the steps of the method modalities are performed.

[00126] Additionally, functional units in the embodiments of this application may be integrated into a processing module, or each of the units may exist physically on its own, or two or more units may be integrated into a module. The integrated module may be implemented in the form of hardware, or it may be implemented in the form of a software functional module. If deployed in the form of software functional modules and sold or used as a standalone product, the integrated module may also be stored on a computer-readable storage medium. Petition 870210108006, dated 11 / 22 / 2021, p. 84 / 151

Claims

1 / 6 CLAIMS 1. A beacon simulation method, applicable to a beacon simulation module, characterized by comprising the following steps: determining the possibility of an upstream beacon and a downstream beacon of a train having changed, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction, and the first direction is opposite to the second direction (101); when a train travel direction is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, determining that a changed downstream beacon is triggered by a train beacon transit module (BTM), and sending, via the changed downstream beacon, beacon information to the train, to enable the train to control the train's route according to the beacon information (102);when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed simultaneously, determine that a changed upstream beacon is triggered by the train's BTM, and send, via the changed upstream beacon, beacon information to the train, to enable the train to control the train's route according to the beacon information (103).

2. Method, according to claim 1, characterized by further comprising: acquiring a train position; determining the upstream and downstream train beacons according to the train position; calculating a first distance between the upstream train beacon and the train, and a second distance between the downstream train beacon and the train, and detecting, according to the first and second distances, the possibility of the triggered beacon being correct.

3. A method according to claim 2, characterized in that acquiring a train position; determining the upstream and downstream train beacons according to the train position; calculating a first distance between the upstream train beacon and the train and a second distance between the downstream train beacon and the train, specifically comprise: acquiring a third distance between the train's BTM and a locomotive according to a train ID; calculating a BTM position according to the train position, the train's direction of travel, and the third distance; determining the upstream and downstream train beacons according to the BTM position; and calculating a distance between the BTM and the upstream beacon as the first distance and a distance between the BTM and the downstream beacon as the second distance.

4. A method according to claim 2 or 3, characterized in that after acquiring a train position; determining the upstream and downstream train markers according to the train position; calculating a first distance between the upstream train marker and the train and a second distance between the downstream train marker and the train, the method further comprises: displaying the upstream train marker and the downstream train marker; and displaying the first distance between the upstream train marker and the train and the second distance between the downstream train marker and the train.

5. Method according to claim 2 or 3, characterized in that before acquiring a train position, the method further comprises: Petition 870260098492, dated 09 / 24 / 2026, page 9 / 19 3 / 6 acquiring, by a route simulation module, a train displacement; calculating, by a route simulation module, a train position according to the train displacement (401); acquiring, by the route simulation module, a displacement within a predefined period (402); and updating, by the route simulation module, the train position according to the displacement within the predefined period, if a predefined pre-departure parameter is “allow” (403).

6. Method according to claim 5, characterized in that the acquisition, by a route simulation module, of a train displacement; the calculation, by a route simulation module, of a train position according to the train displacement specifically comprise: acquiring, by the route simulation module, the train displacement, wherein the train displacement is represented by a track section and a number of deviations on a route; converting the train displacement into the train position (401).

7. A method according to claim 5 or 6, characterized in that when both the upstream and downstream beacons of the train have changed simultaneously, the position of the train is the first position, and the position of the upstream beacon that has been changed or the downstream beacon that has been changed is the second position; and the method further comprises: acquiring, by the route simulation module, the fourth distance between the first position and the second position and compensating the position of the train according to the fourth distance.

8. Method, according to claim 7, characterized by the acquisition, by the route simulation module, of the fourth distance between the first position and the second position, and compensation of the train's position according to the fourth distance, specifically comprising: acquiring, by the route simulation module, the fourth distance between the first position and the second position; compensating, by the route simulation module, the train's position according to the fourth distance, if a compensation parameter of the route simulation module is “allow”.

9. A method according to claim 5, wherein, prior to the acquisition, by a route simulation module, of a train displacement, and the calculation of the train's position according to the train displacement, the method is characterized by comprising: acquiring, by a train simulation module, a train control instruction from a vehicle on-board controller (VOBC) and bridge status information (301); calculating, by the train simulation module, a train speed according to the VOBC train control instruction and the bridge status information (302); and sending, by the train simulation module, the displacement within the predefined period to the route simulation module, if the train speed exceeds a predefined speed, to enable the route simulation module to calculate and update the train's position (303).

10. A method according to claim 9, wherein, after a train simulation module acquires a train control instruction from a VOBC and bridge status information, the method is characterized by further comprising: calculating, by the train simulation module, the train displacement according to the VOBC train control instruction and the bridge status information, and sending the train displacement to the route simulation module, to enable the route simulation module to calculate the train position. Petition 870260098492, dated 09 / 24 / 2026, p. 11 / 19 5 / 6 11. Method, according to claim 9 or 10, characterized by further comprising: controlling, by means of the train simulation module, the train's path in accordance with the VOBC train control instruction and the bridge status information.

12. A method according to any one of claims 1 to 11, characterized by further comprising: determining the possibility of a fault injection; and updating an attribute of a corresponding beacon in accordance with the fault injection, if a fault injection exists, wherein the beacon attribute comprises at least one of a requirement to send beacon information, a beacon position, a beacon ID, or a beacon name.

13. Beacon simulation system characterized by comprising a beacon simulation module (501) and a train simulation module (502), wherein the train simulation module (502) comprises a train, in which: the beacon simulation module (501) is configured to: determine the possibility of an upstream beacon and a downstream beacon of the train having changed, wherein the upstream beacon is a beacon closer to the train along a first direction, the downstream beacon is a beacon closer to the train along a second direction and the first direction is opposite to the second direction;When a train's direction of travel is the first direction, if both the upstream and downstream beacons of the train have changed simultaneously, it is determined that a changed downstream beacon is triggered by a train beacon transit module (BTM), and sending beacon information to the train via the changed downstream beacon, to enable the train to control its course according to the beacon information; and when the train's direction of travel is the second direction, if both the upstream and downstream beacons of the train have changed, it is determined that a changed upstream beacon is triggered by a train beacon transit module (BTM), and sending beacon information to the train via the changed upstream beacon, to enable the train to control its course according to the beacon information;The train is configured to: receive beacon information, and control the train's path according to that beacon information.

14. Computer device characterized by comprising: a processor and a memory, wherein the processor is configured to read an executable program code stored in memory and run a program corresponding to the executable program code to perform the method, as defined in any one of claims 1 to 12. Petition 870260098492, dated 09 / 24 / 2026, pp. 13 / 19