Circuit for downlink / uplink operational mode switching in a TDD wireless communication system

CA3146505CActive Publication Date: 2026-09-15TEKO TELECOM SRL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CA3146505
Authority / Receiving Office
CA · CA
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-07-11
Filing Date
2020-07-09
Publication Date
2026-09-15
Estimated Expiration
2040-07-09
Patent Text Reader

Abstract

The circuit for downlink / uplink operational mode switching in a TDD wireless communication system comprises a field-effect transistor operatively connected to a power amplifier on the downlink path of a RF front-end apparatus in a TDD wireless communication system, a first voltage generator connected to a large-value first resistor, a second voltage generator connected to a second resistor, a large- value hold capacitor, and a sample-and-hold circuit configured to be switched between a reception configuration, wherein the first voltage generator is connected to the gate of the field- effect transistor and the large- value capacitor is connected to the first voltage generator through the first resistor, and a transmission configuration, wherein the gate of the field- effect transistor is connected to the hold capacitor and the hold capacitor is connected to the second voltage generator through the second resistor.
Need to check novelty before this filing date? Find Prior Art

Description

CIRCUIT FOR DOWNLINK / UPLINK OPERATIONAL MODE SWITCHING IN A TDD WIRELESS COMMUNICATION SYSTEM Technical Field The present invention relates to a circuit for downlink / uplink operational mode switching in a TDD wireless communication system. Background Art In the field of telecommunications, it is known that an efficient and fast switching from / to DL / UL (downlink / uplink) operational mode, i.e. Tx / Rx (transmission / reception), is of outmost importance when dealing with Time Division Duplexed (TDD) signals. Particularly, when the system is in Tx mode a PA (Power Amplifier) on the DL should be turned on and this can be realized by deploying an LDMOS transistor equipped with an embedded thermal tracking device for thermal compensation. An example of high-level standard TDD RF front end designed with and high- isolation RF switch at the antenna port is showed in Figure 1. Particularly, it is known that during a RF power amplifier design phase, an important aspect to be considered is performance variation over temperature. In this perspective, one of the main parameters to control is the quiescent current trying to maintain it constant over a large temperature range, which is the real challenging task in this kind of design. Quiescent current tends to rise with working temperature, whose effect is to reduce linearity. To overcome this difficulty, transistor manufactories have embedded a quiescent current thermal tracking circuit T (a small integrated LDMOS FET located close to the active power LDMOS) in latest RF power integrated circuits. An example of tracking thermal device T is illustrated in Figure 2. When a constant current source is applied to gate voltage <com:Math><semantics>VG<annotation encoding="application / x-tex">V_G< / annotation>< / semantics>< / com:Math>, the thermal tracking RF FET draws a constant gate current I<com:Sub>G< / com:Sub>; when the temperature varies, the gate-source voltage V<com:Sub>GS< / com:Sub> changes to maintain constant the gate current I<com:Sub>G< / com:Sub>. As a consequence, the LDMOS power FET sees a varying gate voltage, V<com:Sub>GS< / com:Sub>, that also maintains its quiescent current, I<com:Sub>DQ< / com:Sub>, constant over temperature. However, the presence of the thermal tracking device T does not allow for 2 complete transistor shut down within Tx / Rx switching time as defined by the 3GPP standard (approximatively 1µs). This implies that an RF switch located at the antenna port, driven by the TDD synchronism signal, is needed to commute between Tx and Rx mode, and it has to be designed with high isolation capabilities (see Figure 1). However, several drawbacks are known for the above solution. A first drawback concerns the high cost of the components. Particularly, the high cost is due to the high-isolation requirements for the RF switch. A further drawback concerns the loss in the DL path efficiency. Particularly, the introduction of an RF switch after the PA increases DL path insertion loss, hence decreasing overall system efficiency. Furthermore, the know solution has a reduced system reliability. The reduced reliability is due to the fact that the RF switch deals with high power levels. Finally, the system realized according to the know solution has high power consumption. Particularly, since the PA is never completely turned off it draws quiescent current also during Rx time slots. Description of the Invention The main aim of the present invention is to provide a circuit for an efficient and fast switching from / to DL / UL (downlink / uplink) operational mode in a TDD wireless communication system. Particularly, when the system is in Tx mode and when dealing with Time Division Duplexed (TDD) signals, the circuit according to the invention allows to turn on / off the LDMOS transistor equipped with embedded thermal tracking device in compliancy with the stringent time requirements defined by the standard. Another object of the present invention is to provide a circuit for downlink / uplink operational mode switching in a TDD wireless communication system that allows to reduce the overall cost of the used components. Another object of the present invention is to provide a circuit for downlink / uplink operational mode switching in a TDD wireless communication system that allows to reduce the loss in the DL path efficiency. Another object of the present invention is to provide a circuit for downlink / uplink operational mode switching in a TDD wireless communication system that allows to improve the system reliability. Another object of the present invention is to provide a circuit for downlink / uplink operational mode switching in a TDD wireless communication system that allows to reduce the power consumption. The above-mentioned objects are achieved by the present circuit for downlink / uplink operational mode switching in a TDD wireless communication system according to the features of claim 1. Brief Description of the Drawings Other characteristics and advantages of the present invention will become better evident from the description of a preferred, but not exclusive embodiments of a circuit for downlink / uplink operational mode switching in a TDD wireless communication system, illustrated by way of an indicative but non-limiting example in the accompanying Figures, in which: Figure 1 shows a high-level standard TDD RF front end designed with a high- isolation RF switch at the antenna port, according to a known solution; Figure 2 illustrates a tracking thermal device according to a known solution; Figure 3 shows a high-level standard TDD RF front-end designed with a high- isolation RF switch at the antenna port, according to the invention; Figure 4 is a high-level electrical scheme of the switching circuit for RF LDMOS activation / deactivation, in the Rx operation mode configuration; Figure 5 shows an equivalent circuit in the Rx operational mode configuration; Figure 6 is a high-level electrical scheme of the switch circuit for RF LDMOS activation / deactivation, in the Tx operational mode configuration; Figure 7 shows an equivalent circuit in the Tx operational mode configuration. Embodiments the Invention With particular reference to such illustrations, globally indicated with reference C is a circuit for downlink / uplink operational mode switching in a TDD wireless communication system. The circuit C according to the invention allows to remove in a high-level TDD RF front end the RF switch at the antenna port and place it in the UL path before LNA, as shown in Figure 3, hence addressing all issues of the known 4 solutions. Particularly, the circuit C is designed to act on the power amplifier LDMOS FET Gate voltage, while the Drain voltage is maintained constant. From a high-level viewpoint, the circuit C according to the invention comprises: - a voltage generator for setting the quiescent Drain current of the power amplifier LDMOS; _ a large-value resistor connected in series to the voltage generator; - a sample-and-hold circuit comprising two analog switches driven by the synchronism signal of the TDD standard and a hold capacitor. This circuit C allows for LDMOS power amplifier PA complete shut down in a very limited time interval, even if the embedded thermal tracking device needs a high resistor in series at the gate port of LDMOS for its correct functioning. The resistor limits the current feeding the Gate port to change the LDMOS status (i.e. switching from on to off and vice versa), hence increasing the activation / deactivation time exceeding 3GPP standard's limits. Moreover, a long commutation period potentially causes the reactive parasite effects of surrounding circuit components to be quite heavy, resulting in larger damped oscillations of the Drain current (whose module could be much larger than the maximum LDMOS current). Focusing on a TDD scenario, RF LDMOS used to realize the power amplifier PA needs to be active only during Tx phase (DL period). One option to increase overall system efficiency, while removing possible source of thermal noise at the output of the power amplifier PA, is to turn off the RF LDMOS during RX phase (UL phase) by minimizing quiescent current, I<com:Sub>DQ< / com:Sub>. The challenge is to realize it using RF FET equipped with thermal tracking devices while keeping transitions latency from TX to RX phases lower than 1µs, as required by 3GPP standard. The invention proposed realizes the circuit C to address the issue above, its high-level electrical representation is shown in Figure 4 and Figure 6 for Rx and Tx operating mode, respectively. The circuit C comprises at least a field-effect transistor RF FET operatively connected to a power amplifier PA on the downlink path (DL) of a RF front-end apparatus in a TDD wireless communication system. Furthermore, the circuit C comprises: _ a first voltage generator Vgsoff connected to at least a large-value first resistor R<com:Sub>hold< / com:Sub>; - a second voltage generator <com:Math><semantics>VGate<annotation encoding="application / x-tex">V_{Gate}< / annotation>< / semantics>< / com:Math> connected to a second resistor <com:Math><semantics>RGate<annotation encoding="application / x-tex">R_{Gate}< / annotation>< / semantics>< / com:Math>; - at least a large-value hold capacitor Chold; _ a sample-and-hold circuit. Particularly, the sample-and-hold circuit is configured to be switched between: _ a reception (Rx) configuration, wherein the first voltage generator Vgsoff is connected to the gate G of the field-effect transistor RF FET and the large-value capacitor Chold is connected to the first voltage generator Vgsoff through the first resistor Rhold, and _ a transmission (Tx) configuration, wherein the gate (G) of the field-effect transistor RF FET is connected to the hold capacitor Chold and the hold capacitor <com:Math><semantics>Chold<annotation encoding="application / x-tex">C_{hold}< / annotation>< / semantics>< / com:Math> is connected to the second voltage generator <com:Math><semantics>VGate<annotation encoding="application / x-tex">V_{Gate}< / annotation>< / semantics>< / com:Math> through the second resistor R<com:Sub>Gate< / com:Sub>. According to preferred embodiment of the circuit C, the sample-and-hold circuit comprises a first electronic switch SW1 connected to the gate G of the field- effect transistor RF FET) and configured to be connected to the first voltage generator Vgsoff in the reception configuration and to the hold capacitor Chold in the transmission configuration. Furthermore, the sample-and-hold circuit comprises a second electronic switch SW2 connected to the hold capacitor Chold and configured to be connected to the first voltage generator Vgsoff through the first resistor Rhold in the reception configuration and to the second voltage generator <com:Math><semantics>VGate<annotation encoding="application / x-tex">V_{Gate}< / annotation>< / semantics>< / com:Math> through the second resistor R<com:Sub>Gate< / com:Sub> in the transmission configuration. Particularly, during the TDD RX phase (Figure 4) the Gate G of the field-effect transistor RF FET is connected to the first voltage generator Vgsoff through the first electronic switch SW1 driven by the TDD Synchronism Signal (TDD CRTL). The first voltage generator Vgs<com:Sub>OFF< / com:Sub> is maintained to a constant value lower than the gate-source threshold voltage Vgsth of the field-effect transistor RF FET, which is defined as the voltage level corresponding to the field-effect transistor RF FET to be active (i.e. small amount of current flowing from Drain to Source). In these conditions the field-effect transistor RF FET Drain current, I<com:Sub>d< / com:Sub>, is close to zero. The second electrical switch SW2 connects the large-value capacitor Chold to the first voltage generator Vgsoff through the large-value first resistor Rhold (hold resistor). The first resistor R<com:Sub>hold< / com:Sub> allows controlling the discharge time of the hold capacitor Chold that results several orders of magnitude larger that TDD frame period. In this way, V<com:Sub>chold< / com:Sub>=Vgs<com:Sub>ON< / com:Sub> is almost constant over entire RX phase when system is stable (i.e. out of transient initial phase), wherein V<com:Sub>chold< / com:Sub> is voltage value over the hold capacitor Chold. Advantageously, the presence of the first (hold) resistor <com:Math><semantics>Rhold<annotation encoding="application / x-tex">R_{hold}< / annotation>< / semantics>< / com:Math> assures that even when the system is not fed by any signal (no TDD CTRL to pilot the sample- and-hold circuit) the circuit C will reach idle conditions in a defined amount of time, i.e. when the hold capacitor C<com:Sub>hold< / com:Sub> completes its discharge phase, and the system does not remain in the last active state (either Tx or Rx). During TX phase (see Figure 6) the Gate of the field-effect transistor RF FET is connected to the large-value hold capacitor Chold through the first electronic switch SW1 driven by TDD Synchronism Signal (TDD CRTL). The second electrical switch SW2 connects the hold capacitor Chold to the second voltage generator, <com:Math><semantics>VGate<annotation encoding="application / x-tex">V_{Gate}< / annotation>< / semantics>< / com:Math>, through the second resistor, <com:Math><semantics>RGate<annotation encoding="application / x-tex">R_{Gate}< / annotation>< / semantics>< / com:Math>, of the proper size. Particularly, the second voltage generator <com:Math><semantics>VGate<annotation encoding="application / x-tex">V_{Gate}< / annotation>< / semantics>< / com:Math> and the second resistor <com:Math><semantics>RGate<annotation encoding="application / x-tex">R_{Gate}< / annotation>< / semantics>< / com:Math> are connected in series and behaves as an equivalent current generator, allowing the transistor RF FET quiescent current, I<com:Sub>D< / com:Sub>, to be kept constant over temperature. To realize a proper dimensioning of the hold capacitor Chold and of the first hold resistor R<com:Sub>hold< / com:Sub>, the first condition to be met is that the variation of capacitor voltage value V<com:Sub>chold< / com:Sub> overt time, defined as V<com:Sub>ripple< / com:Sub>, should be minimized. At the same time, the capacitor voltage value <com:Math><semantics>Vchold<annotation encoding="application / x-tex">V_{chold}< / annotation>< / semantics>< / com:Math> should be as closer as possible to <com:Math><semantics>Vgs<annotation encoding="application / x-tex">V_{gs}< / annotation>< / semantics>< / com:Math> stady-state value, <com:Math><semantics>Vgs_SS<annotation encoding="application / x-tex">V_{gs\_SS}< / annotation>< / semantics>< / com:Math>, which is defined as the voltage upper limit reached when the system is working in Tx configuration for an infinite period of time. The voltage variation <com:Math><semantics>Vripple<annotation encoding="application / x-tex">V_{ripple}< / annotation>< / semantics>< / com:Math> is computed through the equation that describes the discharge phase of the hold capacitor <com:Math><semantics>Chold<annotation encoding="application / x-tex">C_{hold}< / annotation>< / semantics>< / com:Math> when in Rx operating configuration. In this case, the sample-and-hold circuit realizes a configuration equivalent to the one shown in Figure 5, and the voltage variation <com:Math><semantics>Vripple<annotation encoding="application / x-tex">V_{ripple}< / annotation>< / semantics>< / com:Math> is defined by: [Image disponible dans le document PDF, Image available in the PDF document] where t<com:Sub>UL< / com:Sub> is the maximum duration of the UL period in the 3GPP standard for TDD applications, i.e. worst-case condition, and V<com:Sub>chold< / com:Sub> is the value taken at the beginning of the UL period. Given <com:Math><semantics>Vchold<annotation encoding="application / x-tex">V_{chold}< / annotation>< / semantics>< / com:Math> and <com:Math><semantics>Vgsoff<annotation encoding="application / x-tex">V_{gsoff}< / annotation>< / semantics>< / com:Math>, the aim is to minimize the voltage variation <com:Math><semantics>Vripple<annotation encoding="application / x-tex">V_{ripple}< / annotation>< / semantics>< / com:Math> for an optimized choice of the hold capacitor Chold and of the hold resistor Rhold. Preferably, the hold capacitor Chold should take a much-larger value (e.g. 10<com:Sup>5< / com:Sup> times more) than the transistor RF FET inherent input capacity, to disregard the parasite effects that may take place during the commutation phase. As described above, the voltage variation <com:Math><semantics>Vripple<annotation encoding="application / x-tex">V_{ripple}< / annotation>< / semantics>< / com:Math> should also meet a second requirement, hence the hold capacitor Chold and the first resistor Rhold should be optimized to minimize the equation below, describing the charge phase of the hold capacitor <com:Math><semantics>Chold<annotation encoding="application / x-tex">C_{hold}< / annotation>< / semantics>< / com:Math> during the transmission (Tx) configuration: [Image disponible dans le document PDF, Image available in the PDF document] where t<com:Sub>DL< / com:Sub> is the minimum duration of the DL period in the 3GPP standard for TDD applications, and V<com:Sub>chold< / com:Sub> is the voltage value taken at the beginning of the DL period. If <com:Math><semantics>Vchold<annotation encoding="application / x-tex">V_{chold}< / annotation>< / semantics>< / com:Math> is close to <com:Math><semantics>Vgs_SS<annotation encoding="application / x-tex">V_{gs\_SS}< / annotation>< / semantics>< / com:Math>, then the quiescent current actually drown by RF FET is very close to the nominal expected I<com:Sub>q< / com:Sub>. In the transmission configuration, the sample-and-hold circuit realizes a configuration equivalent to the one shown in Figure 7. Considering the circuit C layout and functioning principle explained above, during the time intervals when the transistor RF FET is supposed to be ON (i.e. TX periods), the Gate measures a low dynamic impedance due to the large- value capacitor, Chold, connected in parallel. Similarly, during the time intervals when the transistor RF FET is supposed to be OFF (i.e. RX periods), the Gate still measures a low dynamic impedance, this time due to the connection to the first voltage generator, <com:Math><semantics>VgsOFF<annotation encoding="application / x-tex">V_{gsOFF}< / annotation>< / semantics>< / com:Math>. In this way, transistor RF FET switching latency is short enough to comply with the limits defined by the standard, while assuring a precise thermal compensation over temperature of the quiescent current, I<com:Sub>D< / com:Sub>. Moreover, achieving a short commutation latency between Tx / Rx phases minimizes the potential damaging impacts of reactive parasite effects of surrounding circuit components. The TDD wireless communication system S according to the invention, showed in Figure 3, comprises a downlink path DL PATH provided with at least a power amplifier PA, at least an uplink path UL PATH provided with at least a low-noise amplifier LNA, and at least an antenna ANT connected to the downlink path DL PATH and to the uplink path UL PATH. The system S further comprises the circuit C for downlink / uplink operational mode switching as disclosed above, wherein the circuit C is operatively interposed between said power amplifier PA and said antenna ANT. Furthermore, the system S comprises an RF switch placed in the uplink path UL PATH and connected to the circuit C, configured to be switched between the reception (Rx) configuration, wherein it is connected to said low-noise amplifier LNA, and the transmission (Tx) configuration, wherein it is disconnected from said low-noise amplifier LNA. Particularly, in the transmission (Tx) configuration, the RF switch is connected to a resistor R. With respect to the know system, the benefits introduced in the new system S by the new circuit C proposed allows then to remove the RF switch at the antenna port and place it in the UL path before LNA, as shown in Figure 3. Therefore, the circuit according to the invention allows to comply with stringent time requirements defined by the 3GPP standard for TDD operational mode switching latency. 9 The invention proposed realizes a solution a solution to control an LDMOS transistor equipped with an embedded thermal tracking device used in RF front end circuit to realize PA stages for TDD applications. Particularly, the circuit according to the invention allows to reduce the overall cost of the used components. Requirements for RF switch isolation can be reduced thanks to the introduction of the invention proposed that allows transistor RF FET to be completely turned off. Furthermore, the circuit according to the invention allows to reduce the loss in the DL path efficiency. Particularly, the introduction of the invention proposed avoids the introduction of an RF switch after the PA in the DL path, hence reducing DL I.L. and increasing overall system efficiency. The circuit according to the invention further lets to improve the system reliability. The RF switch is placed on the UL path hence dealing with lower power levels and increasing system reliability. Furthermore, the circuit according to the invention allows to reduce the power consumption. Particularly, the RF FET transistor is completely turned off in Rx phase, with quiescent current maintained almost zero.

Claims

1. A Circuit (C) for downlink / uplink operational mode switching in a TDD wireless communication system, comprising at least a field-effect transistor (RF FET) operatively connected to a power amplifier (PA) on the downlink path (DL) of a RF front-end apparatus in the TDD wireless communication system, characterized in that it comprises: - a first voltage generator ( V g s O F F Vgs_{OFF} ) connected to at least a first resistor ( R h o l d R_{hold} ); - a second voltage generator ( V G a t e V_{Gate} ) connected to a second resistor ( R G a t e R_{Gate} ); - at least a hold capacitor (Chold) having a capacitance of at least 10 5 times more than an inherent input capacitance of the field-effect transistor (RF FET); -the first resistor (R hold ) having a resistance sufficiently large that a discharge time of the hold capacitor (Chold) is larger than a TDD frame period of the TDD wireless communication system; - a sample-and-hold circuit configured to be switched between a reception (Rx) configuration, wherein said first voltage generator (Vgs OFF ) is connected to the gate (G) of said field-effect transistor (RF FET) and said hold capacitor (Chold) is connected to said first voltage generator (Vgs OFF ) through said first resistor (R hold ), and a transmission (Tx) configuration, wherein the gate (G) of said field-effect transistor (RF FET) is connected to said hold capacitor (Chold) and said hold capacitor (Chold) is connected to said second voltage generator ( V G a t e V_{Gate} ) through said second resistor ( R G a t e R_{Gate} ).

2. The circuit (C) according to claim 1, characterized in that said sample-and-hold circuit comprises a first electronic switch (SW1) connected to the gate (G) of the field-effect transistor (RF FET) and configured to be connected to said first voltage generator (Vgs OFF ) in said reception configuration and to said hold capacitor (Chold) in said transmission configuration.

3. The circuit (C) according to claim 1 or 2, characterized in that said sample-and-hold circuit comprises a second electronic switch (SW2) connected to said hold capacitor (Chold) and configured to be connected to said first voltage generator (Vgs OFF ) through said first resistor (R hold ) in said reception configuration and to said second voltage generator ( V G a t e V_{Gate} ) through said second resistor (R Gate ) in said transmission configuration.

4. The circuit (C) according to any one of claims 1 to 3, characterized in that said first voltage generator (Vgsoff) is maintained to a constant value lower than a gate-source threshold voltage (Vgs th ) of said field-effect transistor (RF FET).

5. The circuit (C) according to any one of claims 1 to 4, characterized in that said hold capacitor ( C h o l d ) (C_{hold}) and said first resistor ( R h o l d ) (R_{hold}) are dimensioned to minimize the variation ( V r i p p l e ) (V_{ripple}) of capacitor voltage value (V chold ) over time.

6. The circuit (C) according to any one of claims 1 to 5, characterized in that said hold capacitor (Chold) and said first resistor (Rhold) are dimensioned to maintain the hold capacitor (Chold) voltage value (V chold ) as close as possible to gate-source voltage steady-state value (V gs SS ), which is defined as the voltage upper limit reached when the system is working in Tx configuration for an infinite period of time.

7. The circuit (C) according to any one of claims 1 to 6, characterized in that said hold capacitor (Chold) and said first resistor (Rhold) are dimensioned to minimize the following equation, that describes the discharge phase of said hold capacitor (Chold) in said reception (Rx) configuration: V r i p p l e = ( V c h o l d − V g s O F F ) * e − t U L / ( R h o l d * C h o l d ) V_{ripple} = (V_{chold} - V_{gsOFF}) * e^{-t_{UL} / (R_{hold} * C_{hold})} wherein: V r i p p l e V_{ripple} is the variation of said hold capacitor ( C h o l d C_{hold} ) voltage value ( V c h o l d V_{chold} ); V chold is the hold capacitor (C hold ) voltage value; Vgsoff is the voltage value of said first voltage generator; t UL is the maximum duration of the UL period in the 3GPP standard for TDD applications; R hold is the value of said first resistor; Chold is the value of said hold capacitor.

8. The circuit (C) according to any one of claims 1 to 7, characterized in that said hold capacitor ( C h o l d ) (C_{hold}) and said second resistor ( R G a t e ) (R_{Gate}) are dimensioned to minimize the following equation, describing the charge phase of said hold capacitor ( C h o l d C_{hold} ) during said transmission configuration: V r i p p l e = ( V g s _ S S − V c h o l d ) * ( 1 − e − t D L / ( R G a t e * C h o l d ) ) V_{ripple} = \left(V_{gs\_SS} - V_{chold}\right) * \left(1 - e^{-t_{DL} / (R_{Gate} * C_{hold})}\right) wherein: V r i p p l e V_{ripple} is the variation of said hold capacitor ( C h o l d C_{hold} ) voltage value ( V c h o l d V_{chold} ); V gs s s is the V gs steady-state value, which is defined as the voltage upper limit reached when the system is working in transmission configuration for an infinite period of time; V c h o l d V_{chold} is the hold capacitor ( C h o l d C_{hold} ) voltage value, taken at the beginning of the downlink period; t DL is the minimum duration of the downlink period in the 3GPP standard for TDD applications; R Gate is the value of said second resistor; Chold is the value of said hold capacitor.

9. A TDD wireless communication system (S), comprising at least downlink path (DL PATH) provided with at least a power amplifier (PA), at least an uplink path (UL PATH) provided with at least a low-noise amplifier (LNA), and at least an antenna (ANT) connected to said downlink path (DL PATH) and to said uplink path (UL PATH), characterized in that the system comprises: - a circuit (C) for downlink / uplink operational mode switching according any one of claims 1 to 8, wherein said circuit (C) is operatively interposed between said power amplifier (PA) and said antenna (ANT), and - at least an RF switch (RF SWITCH) placed in said uplink path (UL PATH) and connected to said circuit (C), wherein said RF switch is configured to be switched between a reception (Rx) configuration, wherein it is connected to said low-noise amplifier (LNA), and a transmission (Tx) configuration, wherein it is disconnected from said low-noise amplifier (LNA).