The method using a flexitube from a well intervention rig efficiently clears complex submarine pipe obstructions by mechanical means, reducing intervention time and cost by eliminating the need for submarine tools and rig preparation.

CA3160888CActive Publication Date: 2026-07-07PETROLEO BRASILEIRO SA PETROBRAS

Patent Information

Authority / Receiving Office
CA · CA
Patent Type
Patents
Current Assignee / Owner
PETROLEO BRASILEIRO SA PETROBRAS
Filing Date
2020-12-02
Publication Date
2026-07-07

AI Technical Summary

Technical Problem

Conventional methods for clearing flexible submarine pipes are ineffective for complex obstructions like hydrates and require lengthy rig interventions, which are costly and inefficient, especially when submarine tools are not immediately available.

Method used

A method using a flexitube from a well intervention rig to mechanically clear obstructions by pumping a solvent or mechanical power through the pipe, eliminating the need for submarine tools and reducing mobilization time.

Benefits of technology

Reduces intervention time and cost by directly addressing obstructions, efficiently clearing complex blockages without the need for conventional rig preparation and tool descent, and allows for mechanical action beyond depressurization.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention relates to a method for clearing undersea lines, in which the method resolves the most complex obstructions of flexible undersea lines where a conventional approach is not effective. Furthermore, the present invention is a cheaper alternative to clearing lines in situations where a conventional approach can be used. The clearance method for flexible lines using coiled tubing from a well intervention rig according to the present invention includes as one of the main steps thereof: using a remotely operated vehicle (51) to open a flanged connection (10) between two flanges (15) of the sections (12 and 14) of an undersea line (40) and installing a pull head (16 and 17) on each of these sections (12 and 14); and using operations with well intervention rig (120): to mount the hoisting unit (58) to hoist the section (14) of undersea lines (40) with a drill string (50); to hoist the section (14) of the undersea line (40) via one of the ends thereof using the hoisting unit (58) coupled to the pull head (16); to drain the internal pressure in the line by connecting a tube (67) to the pull head (16); to mount the surface flow tree (70) on the end of the section (14) of the undersea line (40), using the connection adapter parts (90) and (91) to make the end of the surface flow tree section compatible; to assemble the coiled tubing (80) on the surface flow tree (70) and surface lines (72); to perform the clearance operation of the section (14) of the undersea line (40) with coiled tubing (80).
Need to check novelty before this filing date? Find Prior Art

Description

1 METHOD FOR CLEARING FLEXIBLE LINES USING COILED TUBING FROM A WELL INTERVENTION RIG Field of the Invention

[0001] The present invention addresses to solutions for more complex cases of obstruction of flexible submarine pipes where the conventionally applied approach is ineffective. Additionally, the present invention provides a lower cost alternative for clearing said flexible submarine pipes. Description of the State of the Art

[0002] Production pipe obstructions are quite common in the oil industry, and can occur due to several causes; among the most frequent, there are the formation of hydrates and paraffins, scaling, and the deposit of solids and debris.

[0003] Depending on the nature and severity of the obstruction, it can be resolved by carrying out operations from the production unit itself, which implies lower costs when compared to interventions with a rig.

[0004] Some examples of these operations would be, in increasing order of costs, the passage of a pig through the clogged pipe, cycles of pressurization and depressurization of the pipe, and descending a flexitube <semantics>TM<annotation encoding="application / x-tex">^{TM}< / annotation>< / semantics> inside the submarine pipe from the production platform.

[0005] However, it is common to have cases in which the clearing of the submarine pipe by means of the production platform is unfeasible, wherein the most typical scenario is the one where the production and service (annular) pipes are clogged with hydrates.

[0006] In this scenario, the production platform is not able to apply low pressures in the deepest sections of the pipes to dissociate the hydrate, requiring an intervention with a rig that, conventionally, consists of the following steps: a) recovery of the corrosion cap; b) preparation of submarine tools - TRT (Intervention Tool of Christmas Tree), BOPW (Safety Equipment of Wellhead) and FIBOP (Quick Disconnect Tool); c) removal of the Christmas tree cap (Tree Cap); d) descent of the completion riser, or drill pipe riser (DPR); e) filling the completion riser with nitrogen; f) connection of submarine tools to the WCT (Wet Christmas Tree); g) WCT tests; h) operations with wire (slick line) to gauge the production string and laying the BRV (valve to block the well surge); i) filling the production string with nitrogen; j) depressurization of the production string plus the completion riser; k) opening of the side valves of the WCT and hydraulic communication of the obstructed submarine pipe with the interior of the completion riser string and production string and waiting for the production string plus the completion riser to be filled with the liquid from the dissociation of the hydrate; 1) repetition of steps 9, 10 and 11 until the submarine pipe is cleared.

[0007] However, this conventional intervention can last from 15 days to more than 100 days (extreme cases), and a typical average duration of 30 days can be considered. In addition, it must be taken into account that submarine tools for connection to the WCT are generally not immediately available, which delays the return to production. In addition, the conventional rig intervention approach works well to remove hydrates, but may be ineffective for obstructions of another nature, where it is not enough to depressurize the pipe to clear it, but mechanically act on the obstruction to remove the same.

[0008] Document BRPI0817188A2 discloses a hydrocarbon production system with a method for controlling hydrate formation in a submarine production system. The document further discloses a method comprising steps of depressurizing the production line to substantially reduce a concentration of gas in solution in the produced hydrocarbon fluids and then repressurizing the production line to urge any remaining gas in the free gas phase into the production line from the production line back to the solution. Further, the method includes displacing production fluids within the production line by moving displacement fluids from a service line into the umbilical line and the production line. The displacement fluids preferably comprise a hydrocarbon-based fluid having a low dose hydrate inhibitor (LDHI).

[0009] Document US20100018693A1 discloses an apparatus for inserting a flexitube Into submarine pipes during, for example, hydrate remediation activity, which comprises a curved guide for guiding the flexitube™ in vertical orientation, at the inlet end, for horizontal orientation, or near-horizontal, at the exit end, wherein the adapter allows the vertical position of the exit end of the curved guide to be adjusted for a specific situation, preventing misalignment without the use of sharp bends in a transition element, allowing the flexitubeTM to move smoothly along the transition element, reducing friction between the flexitube <semantics>TM<annotation encoding="application / x-tex">^{TM}< / annotation>< / semantics> and the transition element.

[0010] Document WO2004053935A2 discloses an apparatus for umbilical that comprises electrically heated composite umbilical, installed inside a submarine flow line for the transport of produced hydrocarbons, in which the heater has the function of preventing the formation of hydrates in the line.

[0011] Document US20080067129A1 discloses a method for treating a piping system for hydrocarbons useful to inhibit paraffin deposition which involves the injection of a catalyst fluid and the induction of the electromagnetic field in hydrocarbons carried by the piping system.

[0012] Document EP1794408B1 discloses a method for removing hydrate plugs from a pipe, comprising the following steps: inserting an impeller pig into the piping that has a return flow line connected, advancing the pig forward in the piping, pumping a propulsion fluid into a ring between the oil pipeline and the return flow line while continuously or intermittently removing deposits and returning flow as appropriate from the front of the pig through the return flow line.

[0013] W02017135941A1 discloses a hydrate blockage remediation skid adapted to be assembled on a remotely operated vehicle (ROV) and used to effectively remove blockages from a submarine flow line and submarine equipment. Its system ensures pressure reduction on an upstream side of the blockage so as to create a differential pressure across the blockage with higher pressure present on a downstream side of the blockage to force the blockage through a manifold and into a separator vessel on the flow line remediation skid.

[0014] However, as will be seen later, none of the mentioned documents presents the method of clearing flexible pipes using flexitube<semantics>TM<annotation encoding="application / x-tex">^{TM}< / annotation>< / semantics> from a well intervention rig of the present invention. Brief Description of Drawings

[0015] The present invention will be described in more detail below, with reference to the attached figures illustrating an example of embodiment not limiting the scope of the invention, in which: - Figure 1 illustrates an initial condition in which the submarine pipe is coupled between an FPSO and a well; - Figure 2 illustrates a step of the method of the present invention, in which an arrangement for opening a submarine connection between legs of the submarine pipe is illustrated; - Figure 3 illustrates one of the steps of the method of the present invention, illustrating only one of the legs coupled to the well; - Figure 4 illustrates one of the steps of the method of the present invention, in which the collection of the obstructed flexible pipe with a rig is illustrated; - Figure 5 illustrates in detail the flexible pipe hoisting assembly of the present invention; - Figure 6 illustrates in detail the anchoring of the submarine pipe on the rotary table of the rig using a side door elevator; - Figure 7 illustrates the connection of a cable to the pull head; - Figure 8 illustrates the assembly of the surface flow tree on the end of the submarine pipe; - Figure 9 illustrates a layout of surface assembled pieces of equipment; - Figure 10 illustrates a flowchart of the method of the present invention, showing the flow traveled by the fluid that is pumped through the flexitube <semantics>TM<annotation encoding="application / x-tex">^{TM}< / annotation>< / semantics>. The fluid is pumped into the flexitube using a standard pump unit, exits through the end of the flexitube <semantics>TM<annotation encoding="application / x-tex">^{TM}< / annotation>< / semantics>, returns to the rig through the annular space between the flexitube™ and the production pipe, arrives at the surface flow tree and is diverted to a well test plant, where the hydrocarbons are separated from the water in the water treatment plant, wherein the clean water is discharged into the sea and the hydrocarbons burned to the atmosphere. Detailed Description of the Invention

[0016] The present invention comprises a method of clearing flexible pipes using flexitube TM from a well intervention rig comprising the following steps: a. opening a flanged connection (10) between two flanges (13 and 15) of two legs (12 and 14) of a submarine pipe (40) and installing a pull head (16 and 17) in each of these legs (12 and 14), in which the step of opening the flanged connection (10) and installing the pull heads (16 and 17) is preferably carried out by an ROV, and comprises the attachment of floats (18 and 19) in each of the legs (12 and 14), so that each leg (12 and 14) has a curved section towards the surface, like a hump (20), thus limiting the volume of oil possible to leak. Additionally, a hood (08) and a shuttle tank (09) can be used, which will serve to prevent any leakage of oily fluid from the pipe to the marine environment; b. moving a rig (30) to the georeferenced place where the end of the pipe to be recovered by the surface is abandoned; c. assembling the hoisting assembly (58) for hoisting the leg (14) of submarine pipe (40) with the drill string (50), wherein the hoisting assembly (58) preferably comprises a drill pipe elevator (47) assembled on inverted, "upside down" position (supported over the drill pipe connection) (52) attached to a drill string (50), and attached to this inverted drill pipe elevator (52), anchor ties (54) comprising a hook (56); d. descending the drill string (50) with the hoisting assembly (58) and engage the hook (56) to the pull head (17) with the aid of an ROV; e. hoisting the leg (14) of the submarine pipe (40) through its end using the hoisting assembly (58) coupled to the pull head (16); f. anchoring the end of the leg (14) of the submarine pipe (40) on the rotary table (60) of the rig (120) using a side door elevator (47); this anchorage is obtained by the geometric interference between the elevator collar and the end fitting of the flexible line; once installed, the collar is simply supported on the rotary table; q. draining the internal pressure of the pipe by means of the connection of a tube (67) preferably comprising a JIC-8 connection with the pull head (16); h. disconnecting the pull head (17) and assembling the Surface Flow Tree (70) at the end of the leg (14) of the submarine pipe (40), and if necessary, connection adapters (90) and (91) to match the end of the leg with the Surface Flow Tree; i. assembling the FlexitubeTM (80) on the Surface Flow Tree (70) and surface lines (72); j. carrying out the operation of clearing the leg (14) of the submarine pipe (40) with FlexitubeTM (80), where a liquid is pumped through the interior of the flexitube TM (for example, diesel), which has the power to solubilize the obstruction, or which has the mechanical power to remove the obstruction; k. cleaning the leg (14) of the submarine pipe (40) with high flow rate seawater circulation, until seawater returns with an oil content within the accepted environmental standards for disposal at the sea; 1. disassembling the FlexitubeTM (80), surface lines (72) and Surface Flow Tree (70) pieces of equipment; m. installing the pull head (16) at the end of the leg (14) of the cleared submarine pipe (40), assembling the hoisting assembly (58) for hoisting the leg (14) of the submarine pipe (40) with the drill string (50), and descending the leg (14) of the submarine pipe (40) to the seabed, where the leg (12) of the submarine pipe (40) is located; n. removing the pull heads (16 and 17) from the legs (12) and 14) of the submarine pipe (40) and connecting the legs (12 and 14) via the flanged connection (10).

[0017] At the end of the execution of the steps a-m described above, if necessary, relocate the submarine pipe to bring the ends of the clean leg closer to the leg that was abandoned on the seabed; and

[0018] The flanged connection (10) is the junction of two legs (12 and 14), in which each leg comprises at its end a flange (15).

[0019] As can be seen in Figure 8, this illustrates an exploded view of the surface flow tree (70), where its main components can be observed. The hoisted leg of the production tube (14) is anchored to the rotary table, its flanged end (15) resting on an elevator used for hoisting well casings (47), known as a side door elevator. A transition flange (90) is connected on the flanged end of the production pipe (15), to make the production leg flange compatible with the surface flow tree flange, and above this transition flange, there is connected another transition piece (91) of flange connection for the base connection of the surface flow tree (generally 8 1 / 4" BUTTRESS), to next connect the surface flow tree itself, which consists of the accessories (92), (93), (94), (95), (96) that are already pre-assembled in the base of the manufacturer of the same.

[0020] Figure 9 illustrates a layout of surface assembled pieces of equipment, where it is possible to identify the flexitubeTM injector (101), articulated lines (102), BOP (103), extended arms elevator (104), hose (105), manifold (106), surface flow tree (70), production pipe (15), leg (14) and rotary table (60).

[0021] Compared to the conventional approach, the present invention brings some advantages, such as not needing to use submarine tools for intervention in the WCT or completion risers (or DPR), which reduces the time of resource mobilization and eliminates time of rig spent in the preparation and descent steps of these tools, which lasts an average of 7 to 10 days, still allows to act mechanically directly on the obstruction, which can be more efficient than the indirect action by pressurizations and depressurizations and allows to remove more complex obstructions that cannot be removed by the conventional approach.

Claims

<pat:ClaimStatement>11 CLAIMS [Image disponible dans le document PDF, Image available in the PDF document] and surface lines; j. carrying out an operation of clearing said leg of the submarine pipe with the FlexitubeTM; k cleaning said leg of the submarine pipe with a high flow rate seawater circulation;< / pat:ClaimStatement> <pat:Claims com:id="claims"> <pat:Claim com:id="CLM-00001"> <pat:ClaimNumber>1< / pat:ClaimNumber> <pat:ClaimText>1. disassembling the FlexitubeTM, the surface lines and the Surface Flow Tree pieces of equipment; m. installing the pull head at the end of said leg of the cleared submarine pipe, assembling the hoisting assembly for hoisting said leg of the submarine pipe with the drill string, and descending said leg of the submarine pipe to the seabed, where other one of the two legs of the submarine pipe is located; and n. removing the pull heads from the two legs of the submarine pipe and connecting the two legs via the flanged connection. < / pat:ClaimText> < / pat:Claim> <pat:Claim com:id="CLM-00002"> <pat:ClaimNumber>2< / pat:ClaimNumber> <pat:ClaimText>2. The method according to claim 1, wherein the step of opening the flanged connection and installing the pull heads is performed by a remotely operated vehicle (ROV). < / pat:ClaimText> < / pat:Claim> <pat:Claim com:id="CLM-00003"> <pat:ClaimNumber>3< / pat:ClaimNumber> <pat:ClaimText>3. The method according to claim 1 or 2, wherein the attachment of the float in each of the two legs makes each of the two legs to have a hump-shaped curved section. < / pat:ClaimText> < / pat:Claim> <pat:Claim com:id="CLM-00004"> <pat:ClaimNumber>4< / pat:ClaimNumber> <pat:ClaimText>4. The method according to any one of claims 1 to 3, wherein the hoisting assembly comprises an inverted drill pipe elevator attached to the drill string, and, attached to said inverted drill pipe elevator, there are anchor ties comprising the hook. < / pat:ClaimText> < / pat:Claim> <pat:Claim com:id="CLM-00005"> <pat:ClaimNumber>5< / pat:ClaimNumber> <pat:ClaimText>5. The method according to any one of claims 1 to 4, wherein the tube comprises a JIC-8 connection. < / pat:ClaimText> < / pat:Claim> < / pat:Claims>