A hanging basket suspension structure installation system on a portal structure and a construction method thereof
By designing the main suspension mechanism and the side suspension mechanism combined with the wire rope on the gantry structure, the problem of traditional hanging baskets being unable to bear weight and site occupancy on the gantry rigid frame structure is solved, and efficient and safe hanging basket installation is achieved , reducing construction costs and risks.
Patent Information
- Application Number
- CN201911148468.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-21
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2039-11-21
AI Technical Summary
In the gantry rigid frame structure, the traditional hanging basket suspension structure cannot bear weight, and other application methods occupy large sites, high costs and complex installation, which poses construction safety hazards.
A gantry structure upper hanging basket suspension structure installation system is designed, using the main suspension mechanism and the side suspension mechanism combined with the wire rope, through the main vertical frame, main connecting piece, main horizontal frame, side front vertical frame, side rear vertical frame and The side cross frame and other components realize the suspension and stable installation of the hanging basket, and adopt a detachable connection method for easy installation and adjustment.
It realizes safe and efficient hanging basket installation in the gantry structure, saves construction site and costs, reduces workers' side-side operation risks, and improves construction safety and efficiency.
Smart Images

Figure CN110905183B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of portal building structure construction, and particularly relates to a portal structure upper hanging basket suspension structure installation system and a construction method thereof. Background Art
[0002] According to the needs of building curtain wall decoration, exterior wall panel construction, enclosure structure construction, etc., hanging baskets have been widely used in modern engineering as commonly used operating machinery. However, for portal frame structures, since the steel structure roof is a corrugated steel plate, it cannot bear the weight of the counterweight, and the bracket or counterweight of the standard hanging basket cannot be installed normally. At present, when hanging baskets are used outside large-span portal frame structures, steel pipes and fasteners are mostly used to build operating scaffolding (towers). However, this method requires a large number of steel pipes and fasteners, and the erection of the frame occupies a large area. The erection is complicated and restricted by on-site site conditions; the erection height is high, and the construction is unsafe; and general external scaffolding cannot be tied. The use of a lifting vehicle is more expensive, and the site needs to be relatively flat and barrier-free during operation. If the construction site is hardened, it will increase the construction cost and occupy construction space. Summary of the invention
[0003] The invention provides a system for installing a hanging basket suspension structure on a portal structure and a construction method thereof, so as to solve the technical problems that a traditional hanging basket suspension structure has no bearing points on a portal structure, other application modes occupy a large space, are costly and are complicated to install.
[0004] To achieve the above object, the present invention adopts the following technical solution:
[0005] A hanging basket suspension structure installation system on a portal structure comprises a group of portal structures, connecting beams connected between adjacent portal structures, side columns connected to two outer connecting beams at intervals, a main suspension mechanism connected to the connecting beams and the side columns, a side suspension mechanism connected to the portal structure and the connecting beams, and steel wire ropes respectively connected to the main suspension mechanism and the side suspension mechanism;
[0006] The portal structure comprises a crossbeam and vertical columns connected to both ends of the crossbeam; the crossbeam is connected with side columns at intervals upward; the top height of the side columns is higher than the height of the crossbeam; and a connecting beam is connected between the tops of two adjacent portal structures;
[0007] The main suspension mechanism comprises a main frame connected to the outer side connecting beam, a main connecting member connected to the main frame vertically and connected to the side column, and a main cross frame connected to the upper middle part of the main frame vertically;
[0008] The side suspension mechanism comprises a side front frame connected to the top of the cross beam, a side rear frame connected to the connecting beam, and a side cross frame connected between the side front frame and the side rear frame.
[0009] Furthermore, the main frame includes a main frame body, a main frame bottom plate connected to the bottom of the main frame body, and a main frame connecting member detachably connected between the main frame bottom plate and the connecting beam; the main frame connecting member includes a connecting bolt, a connecting screw or a clamp.
[0010] Furthermore, the main connecting member includes a main connecting member body vertically connected to the main frame body and a main connecting member side plate connected to the outer end of the main connecting member body; the main connecting member body is spliced in sections, and the main connecting member side plate is detachably connected to the side column.
[0011] Furthermore, the main cross frame includes a main cross frame body, a main cross frame middle connecting piece detachably connected between the main cross frame body and the main vertical frame body, and a main cross frame side connecting piece connected to both ends of the main cross frame body; the main cross frame body is provided with connecting holes spaced apart along the length upward, the connecting holes correspond to the main cross frame middle connecting piece, and the main cross frame middle connecting piece includes bolts or screws; the main cross frame side connecting piece is a connecting plate with holes, and the holes correspond to the steel wire rope setting.
[0012] Furthermore, support rods are connected between adjacent main frame bodies, and the inclination angle of the support rods adapts to the inclination angle of the connecting beam; and pull rods are connected between the tops of adjacent main frame bodies, and the pull rods are arranged horizontally.
[0013] Furthermore, the side front frame includes a side front frame body, a side front frame bottom plate connected to the bottom of the side front frame body, and a side front frame middle connecting member and a side front frame bottom connecting member vertically connected to the side front frame body; the bottom surface of the side front frame bottom plate is an inclined surface, the inclination angle of the inclined surface adapts to the inclination angle of the connecting beam, and the top surface of the side front frame bottom plate is a horizontal plane; the side front frame middle connecting member and the side front frame bottom connecting member include connecting bolts, connecting screws or clamps.
[0014] Furthermore, the side rear frame includes a side rear frame body and a side rear frame bottom plate connected to the bottom of the side rear frame body; the bottom surface of the side rear frame bottom plate is an inclined surface, the inclination angle of the inclined surface adapts to the inclination angle of the connecting beam, and the top surface of the side front frame bottom plate is a horizontal plane; the side front frame bottom plate is detachably connected to the crossbeam.
[0015] Furthermore, the side cross frame includes a side cross frame body, a side cross frame middle connecting piece connected to the side cross frame body and the side front vertical frame body, and a side cross frame front connecting piece and a side cross frame rear connecting piece connected to the front and rear ends of the side cross frame body; the side cross frame rear connecting piece is connected between the side rear vertical frame body and the side cross frame body; the side cross frame middle connecting piece, the side cross frame front connecting piece and the side cross frame rear connecting piece are all plate bodies, and connecting holes are provided on all three, wherein the connecting holes on the side cross frame middle connecting piece and the side cross frame rear connecting piece correspond to the connecting holes spaced apart upward along the length of the side cross frame body, and the connecting holes on the side cross frame front connecting piece correspond to the steel wire rope.
[0016] Furthermore, the steel wire rope includes a lifting steel wire rope and a safety steel wire rope, one end of the lifting steel wire rope is connected to one end of the main horizontal frame on the main suspension mechanism, and is successively connected to the top of the main vertical frame and the other end of the main horizontal frame, and then passes through the connecting basket to be connected to the hoist; or one end of the lifting steel wire rope is connected to the top of the side rear vertical frame, and is successively connected to the top of the side front vertical frame and one end of the side horizontal frame on the side suspension mechanism, and then passes through the connecting basket to be connected to the hoist; one end of the safety steel wire rope is connected to one end of the main horizontal frame or the top of the side rear vertical frame, and the other end is connected to the bottom of the vertical column or the side column.
[0017] Furthermore, the construction method of the above-mentioned gantry structure upper hanging basket suspension structure installation system comprises the following specific steps:
[0018] Step 1: Design and assemble the hanging basket according to the height and length of the portal structure; determine the position and number of the main suspension mechanism or the side suspension mechanism based on the position and number of the vertical columns and side columns on the portal structure; select the wire rope and hoist according to the weight that the hanging basket needs to carry; and install the safety lock, support and electrical control box of the hanging basket;
[0019] Step 2: According to the pre-designed numbers, the main vertical frame, the main connecting member and the main cross frame on the main suspension mechanism are hoisted onto the portal structure and assembled; the side front vertical frame, the side rear vertical frame and the side cross frame in the side suspension mechanism are hoisted onto the portal structure and assembled;
[0020] Step 3: Check and correct the position and connection tightness of the main suspension mechanism and the side suspension mechanism, and make timely adjustments if they are unqualified; after they are qualified, the lifting wire rope is respectively connected to the suspension mechanism and the side suspension mechanism, and finally connected to the hanging basket; in addition, safety wire ropes are configured on the corresponding main suspension mechanism and the side suspension mechanism;
[0021] Step 4: Test run the hanging basket, check the stability of the hanging basket's rise, monitor whether the verticality and position of the main suspension mechanism and the side suspension mechanism have changed after operation and stabilization, and carry out the hanging basket construction after the inspection is qualified;
[0022] Step 5: After the construction of one portal structure is completed, lower the hanging basket, release the connection between the main suspension mechanism and the side suspension mechanism and the portal structure, and then proceed to the construction of the next portal structure.
[0023] The beneficial effects of the present invention are embodied in:
[0024] 1) The present invention can meet the requirement of installing a hanging basket on a portal structure by arranging a main hanging mechanism and a side hanging mechanism on the portal structure, and the bottom of the main hanging mechanism and the side hanging mechanism can be detachably installed on a cross beam or a side beam, without occupying a construction site;
[0025] 2) The present invention ensures the overall load-bearing capacity of the main suspension mechanism and the side suspension mechanism by detachably connecting the main suspension mechanism to the side column and detachably connecting the side rear frame of the side suspension mechanism to the side beam, and the detachable connection method is convenient for installation, adjustment and later movement;
[0026] 3) The present invention ensures the overall consistency and stability of the main suspension mechanism by arranging diagonal braces and pull rods between the main frame bodies, and plays a dual protection and fixing role by temporarily fixing the steel wire rope to the bottom of the vertical column or the side column;
[0027] The present invention not only ensures the load-bearing capacity of the hanging basket, but also helps save construction sites and construction costs through the arrangement and connection of the main suspension mechanism and the side suspension mechanism; at the same time, it meets the safety of construction and reduces the risk of workers working near the edge. The suspension structure is easy to process, convenient and quick to install and disassemble, has low cost, and greatly saves construction time. Other features and advantages of the present invention will be explained in the subsequent description, and partly become obvious from the description, or can be understood through the implementation of the present invention; the main purpose and other advantages of the present invention can be achieved and obtained through the schemes specifically pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the connection structure of the main suspension mechanism of the hanging basket on the portal structure;
[0029] Figure 2 It is a schematic diagram of the connection of the hanging mechanism on the side of the hanging basket of the portal structure;
[0030] Figure 3 It is a schematic diagram of the temporary fixing structure of the wire rope;
[0031] Figure 4 It is a schematic side view of the connection structure of the main suspension mechanism of the hanging basket on the portal structure;
[0032] Figure 5 It is a side view schematic diagram of the main suspension mechanism and the hanging basket connection structure;
[0033] Figure 6 is a schematic side view of the main suspension mechanism and the side column connection structure;
[0034] Figure 7 It is a schematic diagram of the main suspension mechanism structure;
[0035] Figure 8 is a schematic side view of the connection structure of the side suspension mechanism;
[0036] Fig. 9 It is a schematic diagram of the connection structure between the side front vertical frame and the side cross frame;
[0037] Fig.10 It is a schematic diagram of the connection structure between the side rear upright frame and the side cross frame.
[0038] Figure numerals: 1-connecting beam, 2-vertical column, 3-side column, 4-main suspension mechanism, 41-main frame, 411-main frame body, 412-main frame bottom plate, 413-main frame connecting piece, 42-main connecting piece, 421-main connecting piece body, 422-main connecting piece side plate, 43-main cross frame, 431-main cross frame body, 432-main cross frame middle connecting piece, 433-main cross frame side connecting piece, 5-strut, 6-pull rod, 7-wire rope, 71-lifting wire rope, 7 2-safety wire rope, 8-side suspension mechanism, 81-side front frame, 811-side front frame body, 812-side front frame bottom plate, 813-side front frame bottom connecting piece, 814-side front frame middle connecting piece, 82-side cross frame, 821-side cross frame body, 822-side cross frame rear connecting piece, 823-side cross frame middle connecting piece, 824-side cross frame front connecting piece, 83-side rear frame, 831-side rear frame body, 832-side rear frame bottom plate, 9-stiffening rib plate. DETAILED DESCRIPTION
[0039] Taking the installation of curtain wall of a certain airport building as an example, the building structure adopts a portal structure, which is a large-span rigid frame structure. The portal structure includes a crossbeam and vertical columns 2 connected to both ends of the crossbeam; the crossbeam is connected with side columns 3 at intervals upward; the top height of the side columns 3 is higher than the height of the crossbeam; a connecting beam 1 is connected between the tops of two adjacent portal structures, and the single-frame portal rigid frame structure is connected into a whole through the connecting beam 1. The hanging basket method is adopted during the construction of this portal structure.
[0040] like Figure 1 and Figure 2 As shown, a system for installing a hanging basket suspension structure on a portal structure comprises a group of portal structures, connecting beams 1 connected between adjacent portal structures, side columns 3 connected to two outer connecting beams 1 at intervals, a main hanging mechanism 4 connected to the connecting beams 1 and the side columns 3, a side hanging mechanism 8 connected to the portal structure and the connecting beams 1, and steel wire ropes 7 respectively connected to the main hanging mechanism 4 and the side hanging mechanism 8; wherein the main hanging mechanism 4 and the side hanging mechanism 8 are both steel components, and their strength and height are determined according to the installation design requirements of the hanging basket.
[0041] In this embodiment, in order to ensure the stable operation of the hanging basket during construction, a support rod 5 is connected between adjacent main frame bodies 411, and the inclination angle of the support rod 5 adapts to the inclination angle of the crossbeam; a pull rod 6 is connected between the tops of adjacent main frame bodies 411, and the pull rod 6 is arranged horizontally. The support rod 5 and the pull rod 6 are both steel rods, and the number of them between adjacent main frame bodies 411 is designed according to the stability requirements of the main frame bodies 411. In addition, the support rod 5 and the pull rod 6 can also be correspondingly arranged on the side suspension mechanism 8.
[0042] In this embodiment, the steel wire rope 7 is divided into two types, one is a lifting steel wire rope 71 for lifting the hanging basket, and the other is a safety steel wire rope 72 for temporary protection. Among them, one end of the lifting steel wire rope 71 is connected to one end of the main horizontal frame 43 on the main suspension mechanism 4, and is successively connected to the top of the main vertical frame 41 and the other end of the main horizontal frame 43, and then passes through the hanging basket to be connected to the hoist; or one end of the lifting steel wire rope 71 is connected to the top of the side rear vertical frame 83, and is successively connected to the top of the side front vertical frame 81 and one end of the side horizontal frame 82 on the side hanging mechanism 8, and then passes through the hanging basket to be connected to the hoist.
[0043] like Figure 3 As shown, the safety wire rope 72 for temporary protection is connected to the end of the main horizontal frame 43 not adjacent to the hanging basket, and the bottom end of the wire rope 7 is fixed to the bottom of the vertical column 2 or the side column 3; or the safety wire rope 72 is connected to the end of the side horizontal frame 82 not adjacent to the hanging basket, and the bottom end of the safety wire rope 72 is fixed to the bottom of the vertical column 2 or the side column 3. Hooks are connected at the bottom of the vertical column 2 and the side column 3 for tying and fixing the safety wire rope 72.
[0044] like Figures 4 to 6 As shown, the main suspension mechanism 4 includes a main frame 41 connected to the connecting beam 1, a main connecting member 42 connected to the main frame 41 vertically and connected to the side column 3, and a main cross frame 43 connected to the vertical middle and upper part of the main frame; the number of the main suspension mechanisms 4 is determined according to the number of the side columns 3. When the number of the main suspension mechanisms 4 needs to be increased, a temporary column can be added between the two side columns 3 by connecting steel plates or hoops and other detachable connection methods. The height and strength of this temporary column are not lower than the side column 3. In addition, stiffening ribs 9 are symmetrically connected at the inner corner where the main frame 41 is connected to the main cross frame 43.
[0045] like Figure 7 As shown, the main frame 41 comprises a main frame body 411, a main frame bottom plate 412 connected to the bottom of the main frame body 411, and a main frame connecting member 413 detachably connected between the main frame bottom plate 412 and the connecting beam 1; the main frame connecting member 413 comprises a connecting bolt, a connecting screw or a clamp. The main frame body 411 is a steel rod body, and when there are two or more main frame bodies 411, they are connected by a transverse steel connecting rod; the main frame bottom plate 412 is a steel plate, on which connecting holes are pre-punched.
[0046] In this embodiment, the main connecting member 42 includes a main connecting member body 421 vertically connected to the main frame body 411 and a main connecting member side plate 422 connected to the outer end of the main connecting member body 421; the main connecting member body 421 is spliced in sections by bolts, and its splicing length is adapted to the distance between the main frame 41 and the side column 3; the main connecting member side plate 422 is detachably connected to the side column 3, and the detachable connection is achieved by connecting bolts, connecting screws or clamps.
[0047] In this embodiment, the main cross frame 43 includes a main cross frame body 431, a main cross frame middle connecting piece 432 detachably connected between the main cross frame body 431 and the main vertical frame body 411, and a main cross frame side connecting piece 433 connected to both ends of the main cross frame body 431; the main cross frame body 431 is provided with connecting holes spaced apart in the lengthwise direction, and the connecting holes correspond to the main cross frame middle connecting piece 432, and the main cross frame middle connecting piece 432 includes bolts or screws; the main cross frame side connecting piece 433 is a connecting plate with holes, and the holes are provided corresponding to the steel wire rope 7.
[0048] like Figures 8 to 10 As shown, the side suspension mechanism 8 comprises a side front frame 81 connected to the top of the vertical column 2, a side rear frame 83 connected to the connecting beam 1, and a side cross frame 82 connected between the side front frame 81 and the side rear frame 83. In addition, a stiffening rib plate 9 is symmetrically connected at the inner corner where the side front frame 81 and the side cross frame 82 are connected, and a stiffening rib plate 9 is also symmetrically connected at the inner corner where the side rear frame 83 and the side cross frame 82 are connected.
[0049] In this embodiment, the side front frame 81 includes a side front frame body 811, a side front frame bottom plate 812 connected to the bottom of the side front frame body 811, and a side front frame middle connecting piece 814 and a side front frame bottom connecting piece 813 vertically connected to the side front frame body 811; the bottom surface of the side front frame bottom plate 812 is an inclined surface, the inclination angle of the inclined surface adapts to the inclination angle of the connecting beam 1, and the top surface of the side front frame bottom plate 812 is a horizontal surface; the side front frame middle connecting piece 814 and the side front frame bottom connecting piece 813 include connecting bolts, connecting screws or clamps. When the main suspension mechanism 4 and the side suspension mechanism 8 are simultaneously arranged on the top of the vertical column 2, the main frame body 411 of the main suspension mechanism 4 is connected to the side column 3; the side front frame middle connecting piece 814 and the side front frame bottom connecting piece 813 are connected to the main frame body 411 and the side column 3 from the outside; when the main suspension mechanism 4 is not arranged on the top of the vertical column 2, the side front frame middle connecting piece 814 and the side front frame bottom connecting piece 813 are connected to the side column 3. The installation positions and numbers of the above side front frame middle connecting piece 814 and the side front frame bottom connecting piece 813 are determined according to the actual force design on site.
[0050] In this embodiment, the side rear frame 83 includes a side rear frame body 831 and a side rear frame bottom plate 832 connected to the bottom of the side rear frame body 831; the side rear frame body 831 is a steel rod body, and the side rear frame bottom plate 832 is a steel plate; the bottom surface of the side rear frame bottom plate 832 is an inclined surface, the inclination angle of the inclined surface adapts to the inclination angle of the connecting beam 1, and the top surface of the side rear frame bottom plate 832 is a horizontal surface; the side rear frame bottom plate 832 is connected to the connecting beam 1 through a clamp.
[0051] In this embodiment, the side cross frame 82 includes a side cross frame body 821, a side cross frame middle connecting piece 823 connected to the side cross frame body 821 and the side front vertical frame body 811, and a side cross frame front connecting piece 824 and a side cross frame rear connecting piece 822 connected to the front and rear ends of the side cross frame body 821; the side cross frame rear connecting piece 822 is connected between the side rear vertical frame body 831 and the side cross frame body 821, and the side cross frame body 821 is a steel rod body; the side cross frame middle connecting piece 823, the side cross frame front connecting piece 824 and the side cross frame rear connecting piece 822 are all steel plate bodies, and all three are provided with connecting holes. Among them, the connecting holes on the side cross frame middle connecting piece 823 and the side cross frame rear connecting piece 822 correspond to the connecting holes arranged at intervals in the long direction of the side cross frame body 821 and are connected and fixed by bolts or screws; the connecting hole on the side cross frame front connecting piece 824 corresponds to the steel wire rope 7.
[0052] Combination Figures 1 to 10 , further illustrating the construction method of the above-mentioned hanging basket suspension structure installation system on the portal structure, the specific steps are as follows:
[0053] Step 1: Design and assemble the hanging basket according to the height and length of the portal structure; determine the position and number of the main suspension mechanism 4 and the side suspension mechanism 8 based on the position and number of the vertical columns 2 and side columns 3 on the portal structure; select the wire rope 7 and the hoist according to the weight that the hanging basket needs to bear; and install the safety lock, support and electrical control box of the hanging basket.
[0054] When assembling the hanging basket, first assemble the hanging basket base frame and the front and rear railings with bolts, assemble the basket body length according to the actual needs of the site, and then assemble the hoist mounting frames at both ends.
[0055] Step 2. According to the pre-designed numbers, respectively hoist the main upright frame 41, the main connecting member 42 and the main cross frame 43 on the main suspension mechanism 4 onto the portal structure and assemble them; respectively hoist the side front upright frame 81, the side rear upright frame 83 and the side cross frame 82 in the side suspension mechanism 8 onto the portal structure and assemble them.
[0056] During the construction of the main suspension mechanism 4 and the side suspension mechanism 8, the construction workers first wear safety protection equipment, use a 0.5T hoist to transport them to the top of the portal structure according to the number, use M16 clamps to fix the components to be connected to the connecting beam 1, the cross beam or the side column 3, and then install other components; when placing the main suspension mechanism 4 and the side suspension mechanism 8, their front ends must meet the construction position requirements, and at the same time, ensure that the distance at the front end is consistent with the width of the basket below to avoid the hanging basket from forming an eight-shaped shape after installation, which affects the safe use of the hanging basket.
[0057] Step three, check and correct the position and connection tightness of the main suspension mechanism 4 and the side suspension mechanism 8, and make timely adjustments if they are unqualified; after they are qualified, the lifting wire rope 71 will be respectively passed through the suspension mechanism and the side suspension mechanism 8, and finally connected to the hanging basket; in addition, a safety wire rope 72 is configured on the corresponding main suspension mechanism 4 and the side suspension mechanism 8.
[0058] During the construction of the wire rope 7, tighten the connecting bolts at each part, tighten the reinforcing wire rope 7 with the rigging spiral buckle, add a certain pre-tightening force to the wire rope 7, and take anti-slip measures. The end of the wire rope 7 is tightened with a rope clamp. There are four rope clamps with a spacing of 80mm. The rope seat of the wire rope 7 is clamped on the working section of the wire rope 7. The U-bolt is buckled on the tail section of the wire rope 7, and a safety bend is left between the 3rd and 4th rope clamps. When the main suspension mechanism 4 and the side suspension mechanism 8 extend 1.5 meters forward, the front end of the lifting wire rope 71 should be bent upward by 30mm. Assemble the lifting wire rope 71 and the safety wire rope 72 on the main suspension mechanism 4 and the side suspension mechanism 8 and install the limit block.
[0059] After the main suspension mechanism 4 and the side suspension mechanism 8 are all installed and checked for problems, the lifting wire rope 71 is lowered from the top to the ground. The lifting wire rope 71 should be lowered little by little and cannot be thrown down directly. When the lifting wire rope 71 is lowered, a soft isolation such as wood should be placed between the lifting wire rope 71 and the structure to prevent the lifting wire rope 71 from being damaged by friction with the structure during the lowering process, thereby affecting safety.
[0060] After lowering the lifting wire rope 71, turn on the power supply of the hanging basket, pass the lifting wire rope 71 through the lifting frame guide rope wheel, and then insert it into the rope inlet of the hoist, start the hoist, and the lifting wire rope 71 will automatically wind up and extend from the other exit. For the safety wire rope 72, just insert it directly when the safety lock is in the non-clamped state. After the whole machine is installed, check whether each connection is reliable.
[0061] Step 4: Test run the hanging basket, check the stability of the hanging basket's ascent, monitor whether the verticality and position of the main suspension mechanism 4 and the side suspension mechanism 8 change after operation and stabilization, and carry out the hanging basket construction after passing the inspection.
[0062] Power on the hanging basket for normal test run. The operator controls the handle to start and run the hanging basket up and down 3-5 times, 1-1.5 meters above the ground. If there are no other problems, put the hanging basket on the ground. During operation, hang the weight on the lower end of the lifting wire rope 71 and the safety wire rope 72, slightly away from the ground, so that the lifting wire rope 71 and the safety wire rope 72 are kept in a suspended and tensioned state during the operation of the hanging basket to ensure the normal operation of the safety lock.
[0063] Step 5: After the construction of one portal structure is completed and the hanging basket is lowered, the connection between the main suspension mechanism 4 and the side suspension mechanism 8 and the portal structure is released, and then the construction of the next portal structure can be carried out.
[0064] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field can think of within the technical scope disclosed in the present invention should be covered within the protection scope of the present invention.
Claims
1. A system for installing a hanging basket suspension structure on a portal structure, characterized in that: It comprises a group of portal structures, connecting beams (1) connected between adjacent portal structures, side columns (3) connected to two outer side connecting beams (1) at intervals, a main suspension mechanism (4) connected to the connecting beams (1) and the side columns (3), a side suspension mechanism (8) connected to the portal structures and the connecting beams (1), and steel wire ropes (7) respectively connected to the main suspension mechanism (4) and the side suspension mechanism (8); The portal structure comprises a crossbeam and vertical columns (2) connected to both ends of the crossbeam; the crossbeam is connected to side columns (3) at intervals upward; the top height of the side columns (3) is higher than the height of the crossbeam; and a connecting beam (1) is connected between the tops of two adjacent portal structures; The main suspension mechanism (4) comprises a main frame (41) connected to the outer side connecting beam (1), a main connecting member (42) connected vertically to the main frame (41) and connected to the side column (3), and a main cross frame (43) connected to the upper middle part of the main frame (41) in the vertical direction; The side suspension mechanism (8) comprises a side front frame (81) connected to the top of the cross beam, a side rear frame (83) connected to the connecting beam (1), and a side cross frame (82) connected between the side front frame (81) and the side rear frame (83); The main frame (41) comprises a main frame body (411), a main frame bottom plate (412) connected to the bottom of the main frame body (411), and a main frame connecting member (413) detachably connected between the main frame bottom plate (412) and the connecting beam (1); the main frame connecting member (413) comprises a connecting bolt, a connecting screw or a clamp; The side front frame (81) comprises a side front frame body (811), a side front frame bottom plate (812) connected to the bottom of the side front frame body (811), and a side front frame middle connecting piece (814) and a side front frame bottom connecting piece (813) connected vertically to the side front frame body (811); the bottom surface of the side front frame bottom plate (812) is an inclined surface, the inclination angle of the inclined surface adapts to the inclination angle of the connecting beam (1), and the top surface of the side front frame bottom plate (812) is a horizontal surface; the side front frame middle connecting piece (814) and the side front frame bottom connecting piece (813) comprise connecting bolts, connecting screws or clamps.
2. A gantry structure upper hanging basket suspension structure installation system as claimed in claim 1, characterized in that: The main connecting member (42) comprises a main connecting member body (421) vertically connected to the main frame body (411) and a main connecting member side plate (422) connected to the outer end of the main connecting member body (421); the main connecting member body (421) is formed by splicing in sections, and the main connecting member side plate (422) is detachably connected to the side column (3).
3. A gantry structure upper hanging basket suspension structure installation system as claimed in claim 2, characterized in that: The main cross frame (43) comprises a main cross frame body (431), a main cross frame middle connecting piece (432) detachably connected between the main cross frame body (431) and the main vertical frame body (411), and a main cross frame side connecting piece (433) connected to both ends of the main cross frame body (431); the main cross frame body (431) is provided with connecting holes spaced apart in an upward direction, the connecting holes corresponding to the main cross frame middle connecting piece (432), the main cross frame middle connecting piece (432) comprising bolts or screws; the main cross frame side connecting piece (433) is a connecting plate with holes, the holes being arranged corresponding to the steel wire rope (7).
4. A gantry structure upper hanging basket suspension structure installation system as claimed in claim 3, characterized in that: A support rod (5) is connected between adjacent main frame bodies (411), and the inclination angle of the support rod (5) adapts to the inclination angle of the connecting beam (1); a pull rod (6) is connected between the tops of adjacent main frame bodies (411), and the pull rod (6) is arranged horizontally.
5. The installation system of the hanging basket suspension structure on the portal structure as claimed in claim 1, characterized in that: The side rear frame (83) comprises a side rear frame body (831) and a side rear frame bottom plate (832) connected to the bottom of the side rear frame body (831); the bottom surface of the side rear frame bottom plate (832) is an inclined surface, the inclination angle of the inclined surface adapts to the inclination angle of the connecting beam (1), and the top surface of the side rear frame bottom plate (832) is a horizontal surface; the side rear frame bottom plate (832) is detachably connected to the cross beam.
6. The installation system of the hanging basket suspension structure on the portal structure as claimed in claim 5, characterized in that: The side cross frame (82) comprises a side cross frame body (821), a side cross frame middle connecting piece (823) connected to the side cross frame body (821) and the side front vertical frame body (811), and a side cross frame front connecting piece (824) and a side cross frame rear connecting piece (822) connected to the front and rear ends of the side cross frame body (821); the side cross frame rear connecting piece (822) is connected between the side rear vertical frame body (831) and the side cross frame body (821); the side cross frame middle connecting piece (823), the side cross frame front connecting piece (824) and the side cross frame rear connecting piece (822) are all plate bodies, and are all provided with connecting holes, wherein the connecting holes on the side cross frame middle connecting piece (823) and the side cross frame rear connecting piece (822) correspond to the connecting holes arranged at intervals in the longitudinal direction of the side cross frame body (821), and the connecting holes on the side cross frame front connecting piece (824) correspond to the steel wire rope (7).
7. The gantry structure upper hanging basket suspension structure installation system as claimed in claim 1, characterized in that: The steel wire rope (7) comprises a lifting steel wire rope (71) and a safety steel wire rope (72), wherein one end of the lifting steel wire rope (71) is connected to one end of a main horizontal frame (43) on a main suspension mechanism (4), and is successively connected to the top of a main vertical frame (41) and the other end of the main horizontal frame (43), and then passes through a hanging basket to be connected to a hoist; or one end of the lifting steel wire rope (71) is connected to the top of a side rear vertical frame (83), and is successively connected to the top of a side front vertical frame (81) and one end of a side horizontal frame (82) on a side suspension mechanism (8), and then passes through a hanging basket to be connected to a hoist; one end of the safety steel wire rope (72) is connected to one end of the main horizontal frame (43) or the top of the side rear vertical frame (83), and the other end is connected to the bottom of a vertical column (2) or a side column (3).
8. A construction method for installing a hanging basket suspension structure on a portal structure according to any one of claims 1 to 7, characterized in that: The specific steps are as follows: Step 1: Design and assemble the hanging basket according to the height and length of the portal structure; determine the position and number of the main suspension mechanism (4) or the side suspension mechanism (8) in combination with the position and number of the vertical column (2) and the side column (3) on the portal structure; select the steel wire rope (7) and the hoist according to the weight that the hanging basket needs to bear; and install the safety lock, support and electrical control box of the hanging basket; Step 2: According to the pre-designed numbers, the main upright frame (41), the main connecting member (42) and the main cross frame (43) on the main suspension mechanism (4) are hoisted onto the portal structure and assembled; the side front upright frame (81), the side rear upright frame (83) and the side cross frame (82) in the side suspension mechanism (8) are hoisted onto the portal structure and assembled; Step 3: Check and calibrate the position and connection tightness of the main suspension mechanism (4) and the side suspension mechanism (8), and make timely adjustments if they are unqualified; after they are qualified, the lifting wire rope (71) is respectively passed through the suspension mechanism and the side suspension mechanism (8), and finally connected to the hanging basket; in addition, a safety wire rope (72) is configured on the corresponding main suspension mechanism (4) and the side suspension mechanism (8); Step 4: Test run the hanging basket, check the stability of the hanging basket's ascent, monitor whether the verticality and position of the main suspension mechanism (4) and the side suspension mechanism (8) have changed after operation and stabilization, and proceed with the construction of the hanging basket after the inspection is qualified; Step 5: After the construction of one portal structure is completed and the hanging basket is lowered, the connection between the main suspension mechanism (4) and the side suspension mechanism (8) and the portal structure is released, and the construction of the next portal structure can be carried out.
Citation Information
Patent Citations
Hanging basket suspension structure mounting system on door-type structure
CN211369478U