An intra-day tie-line planning adjustment method and system considering new energy fluctuation
CN111027860BActive Publication Date: 2026-08-28CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +2
Patent Information
- Application Number
- CN201911263184.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-10
- Publication Date
- 2026-08-28
- Estimated Expiration
- 2039-12-10
AI Technical Summary
Technical Problem
[0003]针对现有技术跨区跨省联络线计划较少参与后续的日内调整,无法应对新能源出力的波动情况的不足,本发明提供了一种考虑新能源波动性的日内联络线计划调整方法及系统,包括:
Benefits of technology
[0039]1、本发明提供的一种考虑新能源波动性的日内联络线计划调整方法包括:当新能源机组出力波动且区域内备用不足时,基于新能源机组日内预测出力以及预先构建的日内计划模型,对日内联络线计划进行调整;其中,所述日内计划模型的构建考虑:联络线控制惩罚项、机组总成本、电网稳定和分区域备用。可以在备用不足时对日内联络线计划进行调整,发挥互联电网的互济能力;
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN111027860B_ABST
Abstract
The application provides an intra-day tie-line plan adjustment method considering new energy fluctuation, comprising the following steps: obtaining new energy unit intra-day predicted output; when the new energy unit predicted output fluctuates and the regional reserve is insufficient, adjusting the intra-day tie-line plan based on the new energy unit intra-day predicted output and a pre-constructed intra-day plan model; wherein the construction of the intra-day plan model considers a tie-line control penalty term, a unit total cost, power grid stability and regional reserve. When applied to actual examples, the intra-day tie-line plan can be adjusted when the reserve is insufficient, the mutual aid capacity of the interconnected power grid is exerted, and wide-range active reasonable rebalancing is achieved.
Need to check novelty before this filing date? Find Prior Art
Citation Information
Patent Citations
Multi-time scale dispatching method and device of multi-regional internet power grid and storage medium
CN108808740A