A synchronous opening and closing bottle discharging connection mechanism
By using the cylinder drive opening and closing guide shaft and opening and closing guide rail in the bottle outlet wiring mechanism of the bottle blower, combined with the cam mechanism, the problem of instability of opening and closing action in the prior art is solved, synchronous and uniform movement is achieved, and production capacity and production continuity are improved.
Patent Information
- Application Number
- CN202011107333.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-16
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2040-10-16
AI Technical Summary
Due to the instability of cylinder drive, the bottle-out connection mechanism of the existing bottle blower has poor synchronization and position stability of the opening and closing actions, which affects production capacity and production continuity.
A synchronous opening and closing bottle wiring mechanism is adopted, and the opening and closing guide shaft and opening and closing guide rail are driven by the cylinder, and combined with the cam mechanism, the synchronous opening and closing action and uniform movement are achieved to ensure the stability of the position of each closing.
Through this mechanism, the synchronization and stability of the opening and closing actions are achieved, the production capacity and production continuity of the bottle blower are improved, and the requirements are suitable for high-speed action.
Smart Images

Figure CN112172092B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of a linear bottle blowing machine, in particular to a synchronous opening and closing bottle discharging connection mechanism. Background Art
[0002] At present, most of the bottle blowing machines are still two-step bottle blowing machines, that is, the plastic raw materials must be made into bottle embryos first, and then the bottle embryos (embryos) are blown. After being irradiated by infrared high-temperature lamps, the embryo body of the bottle embryo is heated and softened, and then placed in the prepared blow mold, and high-pressure air is inflated inside, and the bottle embryos (embryos) are blown and pulled into the required bottles. The formed bottles are taken from the heating head by the bottle-taking robot parts and placed in this mechanism. Under the action of wind force, the bottles slide along the guide rails composed of the translational bottle receiving guide rail and the rotating bottle receiving guide rail. Transfer to the subsequent equipment after the bottle blowing machine (air duct, filling machine, labeling machine, etc.) to perform the next process. This mechanism is the link between the bottle blowing machine and the rest of the manufacturer's equipment. Most of the bottle discharge connection mechanisms currently on the market are:
[0003] 1. Double cylinder drive, that is, two cylinders drive the translation and rotation of the side plates on both sides to realize the opening and closing action. Because the two cylinders start and stop synchronously, the gas source and the resistance of the sealing ring are inconsistent, and also because of the change of gas compression, it is difficult to ensure synchronization;
[0004] 2. Driven by a single cylinder, the translational and rotating side panels on both sides are connected by a connecting rod in the middle, and the opening and closing actions are realized by the cylinder driving the connecting rod. Because the closing position is controlled by adjusting the threaded cylinder control, it is affected by the changes in gas compression and the stability of the gas source. The closing position will change each time, resulting in poor dimensional stability of the guide rail pair composed of the transfer bottle guide rail and the rotating bottle guide rail. The bottle is easily stuck due to the small gap and cannot be moved, or it falls from the guide rail pair due to the large gap of the guide rail pair.
[0005] Both of the above mechanisms have relatively large stability in the movement size of the cylinder, resulting in unstable and jittery closing positions each time, affecting the capacity and production continuity of the bottle blowing machine. Summary of the invention
[0006] In view of this, the main purpose of the present invention is to provide a synchronous opening and closing bottle discharging connection mechanism.
[0007] The technical solution adopted by the present invention is as follows:
[0008] A synchronous opening and closing bottle discharging connection mechanism, comprising
[0009] A set of corresponding fixed plates,
[0010] The cylinder is arranged at the lower part of one of the fixed plates.
[0011] The cylinder push rod set on the cylinder is fixed to the guide rail fixing seat through a floating joint.
[0012] A group of opening and closing track plates are respectively fixed on the left and right ends of the upper part of the guide rail fixing seat. Each opening and closing track plate is provided with an opening and closing guide rail with a Z-shaped curve. An opening and closing guide shaft is provided in each opening and closing guide rail. The upper part of the opening and closing guide shaft is fixed to the translation connecting plate. The left and right sides of the translation connecting plate are arranged between a group of translation side plates.
[0013] A slider is disposed on the outer side of each translation side plate, each of the sliders is fixed on a Y guide rail, and each of the Y guide rails is disposed on the inner side of the fixed plate on the corresponding side.
[0014] A set of corresponding opening and closing connecting rods, one end of each opening and closing connecting rod is fixed to the lower part of the translation side plate, and the other end is fixed to a rotating side plate, and the rotating side plate is fixed to the inner side of the fixed plate.
[0015] Driven by the cylinder, the cylinder push rod drives the guide rail fixing seat to move left and right through the floating joint, so that a set of opening and closing guide rails installed on the guide rail fixing seat move along the X direction, and the opening and closing guide shaft moves along the Z-shaped curve in the opening and closing guide rail. The X-direction movement output by the cylinder is converted into the Y-direction movement of the translation connecting plate and the translation side plate through the movement of the opening and closing guide shaft along the Z-shaped curve in the opening and closing guide rail. At the same time, the opening and closing connecting rod fixed on the translation side plate drives the rotating side plate to rotate along the axis of the rotating connecting rod to realize the opening and closing action of the whole mechanism.
[0016] Furthermore, a translation bottle receiving guide rail connecting the two translation side plates is provided on the upper part of the group of translation side plates;
[0017] The first translation bottle receiving limiting rod is arranged between a group of translation side plates, and the first translation bottle receiving limiting rod is located at the lower part of the translation bottle receiving guide rail.
[0018] Furthermore, a rotating bottle receiving guide rail connecting two rotating side plates is provided on the upper part of a set of rotating side plates.
[0019] A second translation bottle receiving limiting rod is arranged between a group of translation side plates, and the second translation bottle receiving limiting rod is located at the lower part of the rotating bottle receiving guide rail;
[0020] The blowing aluminum plate is arranged between a group of the rotating side plates, and the blowing aluminum plate is located at the lower part of the rotating bottle receiving guide rail and at the upper part of the second translation bottle receiving limiting rod.
[0021] The main air blowing pipe is set inside the air blowing aluminum plate.
[0022] A plurality of blowing pipes are arranged on the main blowing pipe.
[0023] Furthermore, each of the fixing plates includes a first arm at the bottom and a second arm at the top of the first arm.
[0024] The cylinder is arranged on the first support arm.
[0025] The Y guide rail is horizontally arranged along the Y direction of the second supporting arm.
[0026] Furthermore, a cam is provided at the lower portion of the opening and closing guide shaft, and the cam is fixed in the opening and closing guide rail of the Z-shaped curve.
[0027] Further, a rotary bearing is arranged on the second arm of the fixed plate,
[0028] The lower part of the rotating side plate is fixed in a rotating bearing arranged on the second supporting arm through a first rotating connecting rod.
[0029] Furthermore, a connecting rod bearing is provided on the opening and closing connecting rod.
[0030] The lower part of the rotating side plate is fixed in a connecting rod bearing arranged on the opening and closing connecting rod through a second rotating connecting rod.
[0031] Beneficial effects:
[0032] This mechanism uses a cylinder to drive the opening and closing guide shaft, and the cam in the opening and closing guide rail controls the opening and closing stroke. The cam moves in a curve to ensure that the opening and closing process is uniform, so the stability is better. The cam has a certain movement margin, that is, the cylinder action stroke is too large and does not affect the position change of the opening and closing, which is suitable for high-speed action.
[0033] The present invention realizes the opening and closing action of the whole mechanism by driving the two sets of opening and closing guide rails installed on the guide rail fixing seat to move in the X direction under the drive of the cylinder, and the opening and closing guide rails drive the guide rail connecting rods to convert the X-direction movement of the cylinder into the Y-direction movement of the translation connecting plate and the left and right translation side plates, and at the same time, the opening and closing connecting rods fixed on the left and right translation side plates drive the left and right rotation side plates to rotate along the axis of the rotation connecting rods. The cylinder drives the opening and closing guide shaft and the opening and closing guide rails to form a cam mechanism to control the opening and closing stroke, and the cam moves in a curve to ensure that the opening and closing process is uniform. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a structural schematic diagram of the present invention;
[0035] Figure 2 It is a front view structural schematic diagram of the present invention;
[0036] Figure 3 It is a schematic diagram of the top view of the structure of the present invention;
[0037] Figure 4 It is a schematic diagram of the structure of the left fixing plate or the right fixing plate in the present invention;
[0038] Figure 5 A working status diagram provided for an embodiment of the present invention. DETAILED DESCRIPTION
[0039] The present invention will be described in detail below with reference to embodiments and drawings.
[0040] Reference Figures 1 to 5 The present invention provides a synchronous opening and closing bottle discharging connection mechanism, comprising
[0041] A set of corresponding left fixing plates 12 and right fixing plates 11,
[0042] The cylinder 31 is arranged at the lower part of the left fixed plate 12, and the cylinder push rod 33 is fixed to the guide rail fixing seat 2 through the floating joint 7, and the floating joint 7 and the guide rail fixing seat 2 are connected through the floating head fixing block 26.
[0043] A group of opening and closing track plates are respectively fixed on the left and right ends of the upper part of the guide rail fixing seat 2, each opening and closing track plate is provided with an opening and closing guide rail 36, and an opening and closing guide shaft 24 is provided in each opening and closing guide rail 36, and the upper part of the opening and closing guide shaft 24 is fixed to the translation connecting plate 15, and the left and right sides of the translation connecting plate 15 are respectively provided on the left translation side plate 12 and the right translation side plate 11, and the left and right sides of the translation connecting plate 15 are respectively provided with a left slider 40 and a right slider 37, and the left slider 40 and the right slider 37 are respectively fixed on the left guide rail 39 and the right guide rail 38, and the left guide rail 39 and the right guide rail 38 are respectively provided on the inner side of the left fixed plate 9 and the right fixed plate 10 (the inner side of the left fixed plate 9 refers to the right side of the left fixed plate 9, and the inner side of the right fixed plate 9 refers to the left side of the right fixed plate 9).
[0044] The left opening and closing connecting rod 35 has one end fixed to the lower part of the left translation side plate 12, and the other end fixed to a left rotation side plate 13, and the left rotation side plate 13 is fixed to the inner side of the left fixed plate 9 (the right side of the left fixed plate).
[0045] A right opening and closing connecting rod 28, one end of which is fixed to the lower part of the right translation side plate 11, and the other end is fixed to a right rotating side plate 14, and the right rotating side plate 14 is fixed to the inner side of the right fixed plate 10 (the left side of the right fixed plate).
[0046] Driven by the cylinder 31, the cylinder push rod 33 drives the guide rail fixing seat 2 to move left and right through the floating joint 7, so that a group of opening and closing guide rails 36 installed on the guide rail fixing seat 2 move along the X direction, and the opening and closing guide shaft 24 moves along the Z-shaped curve in the opening and closing guide rail 36. The X-direction movement output by the cylinder 31 is converted into the Y-direction movement of the translation connecting plate 15, the left translation side plate 12 and the right translation side plate 11 through the movement of the opening and closing guide shaft 24 along the Z-shaped curve in the opening and closing guide rail 36. At the same time, the left rotation side plate 13 and the right rotation side plate 14 are driven to rotate along the first rotation connecting rod axis 30 by the left opening and closing connecting rod 35 and the right opening and closing connecting rod 28 fixed on the left translation side plate 1 and the right translation side plate 11, so as to realize the opening and closing action of the whole mechanism.
[0047] In the above, the upper parts of the left translation side plate 12 and the right translation side plate 11 are provided with a translation bottle receiving guide rail 18 connecting the left translation side plate 12 and the right translation side plate 11;
[0048] The first translation bottle receiving limiting rod 8 is arranged between the left translation side plate 12 and the right translation side plate 11 , and the first translation bottle receiving limiting rod 8 is located at the lower part of the translation bottle receiving guide rail 18 .
[0049] In the above, the upper parts of the left rotating side plate 13 and the right rotating side plate 14 are provided with a rotating bottle receiving guide rail 17 connecting the left rotating side plate 13 and the right rotating side plate 14.
[0050] The second translation bottle receiving limiting rod is arranged between the left rotating side plate 13 and the right rotating side plate 14, and the second translation bottle receiving limiting rod is located at the lower part of the rotating bottle receiving guide rail 17;
[0051] The blowing aluminum plate 19 is arranged between the left rotating side plate 13 and the right rotating side plate 14, and the blowing aluminum plate 14 is located at the lower part of the rotating bottle receiving guide rail 17 and at the upper part of the second translation bottle receiving limit rod, and is not on the same side as the second translation bottle receiving limit rod.
[0052] The main air blowing pipe is arranged inside the air blowing aluminum plate 19.
[0053] A plurality of blowing pipes 22 are arranged on the main blowing pipe.
[0054] In the above, the left fixing plate 9 and the right fixing plate 10 both include a first arm 100 located at the lower part of the left fixing plate 9 or the right fixing plate 10 and a second arm 101 located at the upper part of the first arm 100.
[0055] The cylinder 31 is arranged on the first arm on the left fixed plate 9.
[0056] The left Y guide rail 39 is horizontally arranged along the Y direction of the second arm on the left fixed plate 9;
[0057] The right Y guide rail 37 is horizontally arranged along the Y direction of the second support arm on the right fixed plate 10;
[0058] In the above, a cam is disposed at the lower portion of the opening and closing guide shaft 24, and the cam is fixed in the opening and closing guide rail 36 of the Z-curve.
[0059] In the above, a left-handed rotating bearing 4 is arranged on the second arm of the left fixed plate.
[0060] The lower part of the left rotating side plate 13 is fixed in the left rotating bearing 4 arranged on the second arm through the left first rotating connecting rod 30.
[0061] a right-hand rotating bearing, which is arranged on the second arm of the right fixed plate,
[0062] The lower part of the right rotating side plate is fixed in the right rotating bearing arranged on the second supporting arm through the right first rotating connecting rod.
[0063] In the above, a left connecting rod bearing 3 is provided on the left opening and closing connecting rod 35.
[0064] The lower part of the left rotating side plate 13 is fixed in the left connecting rod bearing provided on the left opening and closing connecting rod through the left second rotating connecting rod 29.
[0065] a right connecting rod bearing, the right connecting rod bearing being arranged on the right opening and closing connecting rod,
[0066] The lower part of the right rotating side plate is fixed in a right connecting rod bearing arranged on the right opening and closing connecting rod through a right second rotating connecting rod.
[0067] Specifically, refer to Figure 5 In the initial position, the cam is located at point B of the opening and closing guide rail 36. At this time, the cylinder 31 drives the cylinder push rod 33 to extend, the driving mechanism is closed, the left rotating side plate 13 is parallel to the left translation side plate 12 in the Z-axis direction, the right rotating side plate 14 is parallel to the right translation side plate 11 in the Z-axis direction, the translation bottle receiving guide rail 18 and the rotation bottle receiving guide rail 17 are flush, at this time the translation bottle receiving guide rail 18 and the rotation bottle receiving guide rail 17 form a guide rail pair, the bottle is in the middle of the guide rail pair, the first translation bottle receiving limit rod 8 and the second translation bottle receiving limit rod form a closed limit, at this time, the blowing port of the blowing pipe 22 is just located at the upper part of the formed guide rail pair, and the blowing port is inclined to the left, and the bottle 32 will be blown to the next process under the action of wind.
[0068] When the cam of the opening and closing guide shaft 24 moves along the opening and closing guide rail 36 of the Z-curve, that is, when it moves from point B to point A, under the drive of the cylinder 31, a set of opening and closing guide rails 36 installed on the guide rail fixing seat 2 moves along the X direction, and the opening and closing guide shaft 24 moves along the Z-curve in the opening and closing guide rail 36. The X-direction movement output by the cylinder 31 is converted into the Y-direction movement of the translation connecting plate 15, the left translation side plate 12 and the right translation side plate 11 through the movement of the opening and closing guide shaft 24 along the Z-curve in the opening and closing guide rail 36. At this time, the cylinder 31 gradually forms a contracted state until point A, when the entire mechanism is in an open state. Since the left slider 40 and the right slider 37 on the left translation side plate 12 and the right translation side plate 11 move along the left Y guide rail 39 and the right Y guide rail 38 respectively, the left opening and closing connecting rod 35 and the right opening and closing connecting rod 28 at the lower parts of the left translation side plate 12 and the right translation side plate 11 are respectively driven to move together with the left slider 40 and the right slider 37, so that the right rotating side plate 14 is separated from the right translation side plate 11 along the Y direction, and the left rotating side plate 13 is separated from the left translation side plate 12 along the Y direction, and the bottle blowing machine part places the blow-molded bottle on the translation connecting plate 15.
[0069] In the above, the left opening and closing connecting rod 35 and the right opening and closing connecting rod 28 fixed on the left translation side plate 12 and the right translation side plate 11 drive the left rotating side plate 13 and the right rotating side plate 14 to rotate along the axis of the first rotating connecting rod 30 and the second rotating connecting rod 29 to realize the opening and closing action of the whole mechanism. The cylinder 31 drives the opening and closing guide shaft 24 and the opening and closing guide rail 36 to form a cam mechanism to control the opening and closing stroke. The cam moves in a curve to ensure that the opening and closing process is uniform.
[0070] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A synchronous opening and closing bottle discharging connection mechanism, characterized in that: include A set of corresponding fixed plates, The cylinder is arranged at the lower part of one of the fixed plates. The cylinder push rod set on the cylinder is fixed to the guide rail fixing seat through a floating joint. A group of opening and closing track plates are respectively fixed on the left and right ends of the upper part of the guide rail fixing seat. Each opening and closing track plate is provided with an opening and closing guide rail with a Z-shaped curve. An opening and closing guide shaft is provided in each opening and closing guide rail. The upper part of the opening and closing guide shaft is fixed to the translation connecting plate. The left and right sides of the translation connecting plate are arranged between a group of translation side plates. A slider is disposed on the outer side of each translation side plate, each of the sliders is fixed on a Y guide rail, and each of the Y guide rails is disposed on the inner side of the fixed plate on the corresponding side. A set of corresponding opening and closing connecting rods, one end of each opening and closing connecting rod is fixed to the lower part of the translation side plate, and the other end is fixed to a rotating side plate, and the rotating side plate is fixed to the inner side of the fixed plate. Driven by the cylinder, the cylinder push rod drives the guide rail fixing seat to move left and right through the floating joint, so that a set of opening and closing guide rails installed on the guide rail fixing seat move along the X direction, and the opening and closing guide shaft moves along the Z-shaped curve in the opening and closing guide rail. The X-direction movement output by the cylinder is converted into the Y-direction movement of the translation connecting plate and the translation side plate through the movement of the opening and closing guide shaft along the Z-shaped curve in the opening and closing guide rail. At the same time, the opening and closing connecting rod fixed on the translation side plate drives the rotating side plate to rotate along the axis of the rotating connecting rod to realize the opening and closing action of the whole mechanism; A cam is arranged at the lower part of the opening and closing guide shaft, and the cam is fixed in the opening and closing guide rail of the Z-shaped curve.
2. The synchronous opening and closing bottle discharging connection mechanism according to claim 1 is characterized in that: A translation bottle receiving guide rail connecting the two translation side plates is provided on the upper part of the group of translation side plates; The first translation bottle receiving limiting rod is arranged between a group of translation side plates, and the first translation bottle receiving limiting rod is located at the lower part of the translation bottle receiving guide rail.
3. The synchronous opening and closing bottle discharging connection mechanism according to claim 1 is characterized in that: A rotating bottle receiving guide rail connecting the two rotating side plates is provided on the upper part of the rotating side plates. A second translation bottle receiving limiting rod is arranged between a group of translation side plates, and the second translation bottle receiving limiting rod is located at the lower part of the rotating bottle receiving guide rail; The blowing aluminum plate is arranged between a group of the rotating side plates, and the blowing aluminum plate is located at the lower part of the rotating bottle receiving guide rail and at the upper part of the second translation bottle receiving limiting rod. The main air blowing pipe is set inside the air blowing aluminum plate. A plurality of blowing pipes are arranged on the main blowing pipe.
4. The synchronous opening and closing bottle discharging connection mechanism according to claim 1, characterized in that: Each of the fixing plates comprises a first arm at the bottom and a second arm at the top of the first arm. The cylinder is arranged on the first support arm. The Y guide rail is horizontally arranged along the Y direction of the second supporting arm.
5. The synchronous opening and closing bottle discharging connection mechanism according to claim 1, characterized in that: a rotary bearing, the rotary bearing being arranged on the second arm of the fixed plate, The lower part of the rotating side plate is fixed in a rotating bearing arranged on the second supporting arm through a first rotating connecting rod.
6. The synchronous opening and closing bottle discharging connection mechanism according to claim 1, characterized in that: A connecting rod bearing, which is arranged on the opening and closing connecting rod, The lower part of the rotating side plate is fixed in a connecting rod bearing arranged on the opening and closing connecting rod through a second rotating connecting rod.
Citation Information
Patent Citations
Synchronous opening and closing bottle outlet connecting mechanism
CN213733337U