A construction method for vertical lifting and vertical hanging of arch rib segments of a steel tube basket handle arch bridge
By adopting the upright hoisting method in the construction of the arch rib segments of the steel pipe basket arch bridge, the problems of increased steel consumption of the tower and cable saddle torsion caused by 'Z' shaped hoisting were solved, thus improving the safety and efficiency of construction.
Patent Information
- Application Number
- CN202110301713.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-03-22
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2041-03-22
AI Technical Summary
In the existing steel pipe basket arch bridge arch rib hoisting construction without scaffolding, the 'Z' shaped hoisting method leads to an increase in the amount of steel used for the tower, strict terrain restrictions, and a high risk of cable saddle torsion, affecting safety and progress.
The steel pipe basket arch bridge arch rib segment direct hoisting construction method is adopted. By simultaneously moving the top of the tower laterally and detachably fixing the cable saddle, a straight hoisting line is formed, which avoids cable saddle twisting, reduces the amount of steel used in the tower, and ensures the stability of the hoisting rope.
This reduced the amount of steel used in the tower, improved construction safety and efficiency, reduced the risk of cable saddle torsion, and met the stability and safety requirements of construction.
Smart Images

Figure CN112779867B_ABST
Abstract
Description
[Technical Field]
[0001] This invention relates to the field of bridge construction technology, specifically to a construction method for the upright hoisting of arch rib segments in a steel pipe basket arch bridge. [Background Technology]
[0002] Currently, in the scaffold-free hoisting construction of steel pipe basket arch bridges, the "Z"-shaped hoisting method is commonly used for the arch ribs. This means that the cable saddles on both banks are arranged in a "Z" shape during the hoisting and transportation of the arch ribs. Figure 1 As shown, the "Z" shaped hoisting method has the following problems:
[0003] 1. The "Z" shaped hoisting method has high requirements for the width of the tower and the tower top structure, which leads to an increase in the amount of steel used in the tower and a significant increase in cost.
[0004] 2. The tower layout is limited by terrain conditions, making it difficult to meet the requirements of "Z" shaped hoisting towers.
[0005] 3. During the "Z" shaped hoisting method, the saddle will be torn and generate torque when the tower top is moved laterally and the arch rib segment is hoisted. This will cause uneven stress on the saddle and there is a risk that the main cable will detach from the saddle during the operation of the hoisting rope, which will affect the safety and progress of the hoisting. [Summary of the Invention]
[0006] The present invention aims to solve at least one of the above-mentioned technical problems and provides a construction method for the upright hoisting of arch rib segments of a steel pipe basket arch bridge. This method has strong adaptability to on-site construction conditions and environment, greatly reduces the amount of steel used, and avoids cable saddle torsion, thereby ensuring the stability of the lifting rope during operation and increasing construction safety.
[0007] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0008] A construction method for hoisting and installing arch rib segments of a steel pipe basket arch bridge is disclosed. This method is based on a construction system comprising:
[0009] The towers are erected on the riverbanks at opposite ends of the bridge;
[0010] An arch seat, located on the riverbanks at opposite ends of the bridge, has pre-embedded pipes for connecting with the upper and lower chords of the first arch rib segment, and a hinge seat for connecting with the hinge shaft of the first arch rib segment.
[0011] The cable system includes a suspension rope, a main cable, and two saddles. The two saddles are respectively installed on the top of the towers located at opposite ends of the bridge. The opposite ends of the main cable are respectively installed with the two saddles. One end of the suspension rope is connected to the main cable, and the other end of the suspension rope is used for hoisting the arch rib segment.
[0012] The method includes the following steps:
[0013] Step S1: Install the first arch rib segment, which becomes the first installed arch rib segment;
[0014] Step S2: Using the joint end of the installed arch rib segment as a reference, determine the cable saddle pre-fixing point at the top of the tower;
[0015] Step S3: Simultaneously move the two cable saddles laterally to the cable saddle pre-fixing point on the top of the tower, and detachably fix them to the cable saddle pre-fixing point. Then the two cable saddles are aligned so that the main cable is tensioned to form a straight hoisting line.
[0016] Step S4: Use hoisting ropes to hoist the pre-installed arch rib segment to the joint end of the installed arch rib segment;
[0017] Step S5: Connect the pre-installed arch rib segment to the installed arch rib segment using a joint flange.
[0018] Step S6: Further refine the elevation of the pre-installed arch rib segment and the axis of the pre-installed arch rib segment.
[0019] Further, step S2 specifically includes:
[0020] The pre-installation distance from the joint end of the installed arch rib segment to the bridge centerline is determined based on the bridge centerline. The point on the top of the tower that is at the pre-installation distance from the bridge centerline is the pre-fixing point of the cable saddle.
[0021] Further, step S4 specifically includes:
[0022] S4.1: Connect the suspension rope of the cable system to the lacing tube of the upper chord tube in the pre-installed arch rib segment;
[0023] S4.2: The pre-installed arch rib segment is hoisted upwards along the direction perpendicular to the ground using the hoisting ropes of the cable system, so that the joint end of the pre-installed arch rib segment is hoisted to the pre-installation height, wherein the pre-installation height is the vertical distance from the joint end of the pre-installed arch rib segment to the ground.
[0024] S4.3: Using the cable system, the pre-installed arch rib segment is hoisted along the hoisting line to above the joint end of the installed arch rib segment. The pre-installed arch rib segment 102 is then lowered towards the water surface so that the joint end of the pre-installed arch rib segment corresponds to the joint end of the installed arch rib segment.
[0025] Furthermore, the connection points of the suspension rope and the two augers are located at the same position on the corresponding augers.
[0026] Furthermore, the connection point is the end of the ferrule.
[0027] Further, step S5 specifically includes:
[0028] S5.1: Using the axis of the installed arch rib segment as a reference, install a hand chain hoist, so that the two opposite ends of the hand chain hoist are respectively fixed to the joint end of the pre-installed arch rib segment and the joint end of the installed arch rib segment.
[0029] S5.2: Install arch rib fastening cables and arch rib side cables on the pre-installed arch rib segment;
[0030] S5.3: Manually tension the side cables of the arch rib and the hand-operated hoist to initially adjust the position of the pre-installed arch rib segment so that the axis of the pre-installed arch rib segment coincides with the axis of the installed arch rib segment, and so that the joint end of the pre-installed arch rib segment can be spliced and installed with the joint end of the installed arch rib segment.
[0031] S5.4: Install the joint end of the pre-installed arch rib segment to the joint end of the installed arch rib segment, thereby initially fixing the pre-installed arch rib segment and the installed arch rib segment.
[0032] Further, step S6 specifically includes:
[0033] S6.1: Measure the deviation between the actual elevation of the pre-installed arch rib segment and the design elevation of the arch rib, and adjust the design elevation of the arch rib of the pre-installed arch rib segment precisely by tensioning the arch rib fastening cable based on the obtained data;
[0034] S6.2: Measure and monitor the deviation between the axis of the pre-installed arch rib segment and the bridge design alignment, and adjust the axis of the pre-installed arch rib segment precisely by tensioning the side cables of the arch rib based on the obtained data.
[0035] Further, step S1 specifically includes:
[0036] Determine the vertical distance from the midpoint of the side of the arch seat with the pre-embedded pipe to the bridge centerline. Simultaneously move the two cable saddles laterally to a point on the tower at a distance from the bridge centerline equal to the vertical distance, and detachably fix the two cable saddles. Use the cable system to hoist the first arch rib segment to a height higher than the arch seat. Hoist the first arch rib segment above the arch seat along the line connecting the two cable saddles. Lower the first arch rib segment towards the water surface, aligning the hinge axis of the first arch rib segment with the hinge seat. Install the first arch rib segment onto the arch seat.
[0037] By adopting the above technical solution, the present invention has the following beneficial effects:
[0038] 1. The above-mentioned construction method of hoisting and hanging the arch rib segments of the steel pipe basket arch bridge in the correct manner ensures that the two cable saddles are aligned when they are moved laterally at the top of the tower and after being detached and fixed. The tensioning of the main cable forms a straight hoisting line, which makes the two cable saddles bear the force evenly when the cable system moves laterally and hoists the pre-installed arch rib segments. This can prevent the cable saddles from twisting, thereby ensuring the stability of the lifting rope during operation and increasing the safety of construction.
[0039] 2. When using the above-mentioned construction method of hoisting the arch rib segments of the steel pipe basket arch bridge, the tower to be erected only needs to meet the condition that the two cable saddles are aligned. Compared with the tower to be erected using the "Z" shaped hoisting method, the tower design is simpler and the amount of steel used can be reduced by at least half.
[0040] 3. When using the "Z" shaped hoisting method, the main cable is parallel to the axis of the installed arch rib segment. After the joint end of the pre-installed arch rib segment is hoisted to the position corresponding to the joint end of the installed arch rib segment, it is necessary to use a hand-operated hoist and tensioning cable on the arch rib side to tension the joint end of the pre-installed arch rib segment to the joint end of the installed arch rib segment. During this tensioning process, the pre-installed arch rib segment needs to adjust its angle and undergoes displacement. Compared with the "Z" shaped hoisting method, the construction method of this invention greatly reduces the angle that the pre-installed arch rib segment needs to adjust and the displacement that occurs, which can reduce the number of times the joint end of the pre-installed arch rib segment needs to be repeatedly adjusted and improve work efficiency. [Attached Image Description]
[0041] Figure 1 This is a construction diagram illustrating the use of the "Z"-shaped hoisting method to hoist arch rib segments.
[0042] Figure 2 This is a construction diagram of steps S2 and S3 in a preferred embodiment of the construction method for the upright hoisting of arch rib segments of a steel pipe basket arch bridge according to the present invention.
[0043] Figure 3 This is a schematic diagram showing the connection between the hoisting rope and the pre-installed arch rib segment.
[0044] Figure 4 This is a schematic diagram showing the pre-installation height.
[0045] Figure 5 This is a construction diagram for step S4.
[0046] Figure 6 This is a magnified view of a pre-installed arch rib segment being hoisted onto an already installed arch rib segment.
[0047] Figure 7 This is a construction diagram for step S5.
[0048] In the attached diagram, 1-tower, 11-saddle pre-fixing point, L-pre-installation distance, 20-saddle, 21-main cable, 3-bridge centerline, 4-suspending rope, 52-arch rib side cable wind, H-pre-installation height, 6-arch seat, 100-first arch rib segment, 101-installed arch rib segment, 111-joint end of installed arch rib segment, 112-axis of installed arch rib segment, 102-pre-installed arch rib segment, 120-axis of pre-installed arch rib segment, 121-upper chord, 122-lacing pipe, 123-connection point, 124-lower chord, 125-web member, 126-joint end of pre-installed arch rib segment.
Detailed Implementation Methods
[0049] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0050] It should be noted that when a component is described as "fixed to" another component, it can be directly on the other component or it may be centered within another component. When a component is described as "set to" another component, it can be directly set on the other component or it may be centered within another component. The terms "vertical," "horizontal," "left," "right," and similar expressions used in this article are for illustrative purposes only.
[0051] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein in the specification of this invention is for the purpose of describing particular embodiments only and is not intended to limit the invention. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0052] like Figures 2 to 7As shown, a preferred embodiment of the present invention provides a construction method for hoisting and installing arch rib segments of a steel pipe basket arch bridge, which is used to lift and install arch rib segments in an arch bridge.
[0053] The structure of the arch rib segment is in Figure 3 As shown, specifically, the arch rib segment includes a pair of upper chord tubes 121, a pair of lower chord tubes 124, two sets of web members 125, and two sets of connecting tubes 122. The pair of upper chord tubes 121 and the pair of lower chord tubes 124 are arranged opposite to each other. The two sets of web members 125 are arranged along the width direction of the pair of upper chord tubes 121. Each set of web members 125 includes a pair of web members 125. The opposite ends of the pair of web members 125 are respectively connected to the upper chord tube 121 and the lower chord tube 124 on the corresponding side. The two sets of connecting tubes 122 are located at the opposite ends of the pair of web members 125. Each set of connecting tubes 122 includes two connecting tubes 122. The opposite ends of the two connecting tubes 122 at the top are respectively connected to a pair of upper chord tubes 121, and the opposite ends of the two connecting tubes 122 at the bottom are respectively connected to a pair of lower chord tubes 124.
[0054] The construction method is based on a construction system, which includes:
[0055] Tower 1, which is built on the riverbanks at opposite ends of the bridge;
[0056] Arch seat 6, which is located on the riverbanks at opposite ends of the bridge, has pre-embedded pipes for connecting with the upper chord pipe 121 and lower chord pipe 124 of the first arch rib segment 100, and hinge seat for connecting with the hinge shaft of the first arch rib segment 100.
[0057] The cable system includes a main cable 21, a suspension rope 4, and two cable saddles 20. The two cable saddles 20 are respectively installed on the top of the tower 1 located at opposite ends of the bridge. The opposite ends of the main cable 21 are respectively installed with the two cable saddles 20. One end of the suspension rope 4 is connected to the main cable 21, and the other end of the suspension rope 4 is used to hoist the arch rib segment.
[0058] The construction method includes the following steps:
[0059] Step S1: Install the first arch rib segment 100, which becomes the first installed arch rib segment 101;
[0060] Step S2: Using the joint end 111 of the installed arch rib segment as a reference, determine the cable saddle pre-fixing point 11 of the cable saddle 20 at the top of the tower 1;
[0061] Step S3: Move the two cable saddles 20 horizontally at the top of the tower 1 to the cable saddle pre-fixing point 11 at the same time, and fix them detachably at the cable saddle pre-fixing point 11. Then the two cable saddles 20 are aligned and the main cable 21 is tensioned to form a straight hoisting line.
[0062] Step S4: Use the hoisting rope 4 to hoist the pre-installed arch rib segment 102 to the joint end 111 of the installed arch rib segment;
[0063] Step S5: Connect the pre-installed arch rib segment 102 to the installed arch rib segment 101 using a joint flange.
[0064] Step S6: Further refine the elevation of the arch rib of the pre-installed arch rib segment 102 and the axis 120 of the pre-installed arch rib segment.
[0065] The above-mentioned construction method of hoisting the arch rib segment of the steel pipe basket arch bridge in the correct direction ensures that the two cable saddles 20 are aligned when they move laterally at the top of the tower 1 and after being detached and fixed. The main cable 21 is tensioned to form a hoisting straight line, so that the two cable saddles 20 are evenly stressed when the cable system moves the cable saddles 20 laterally and hoists the pre-installed arch rib segment 102. This can prevent the cable saddles 20 from twisting, thereby ensuring the stability of the lifting rope during operation and increasing the safety of construction.
[0066] When using the above-mentioned construction method of hoisting the arch rib segments of the steel pipe basket arch bridge, the tower 1 to be erected only needs to meet the condition that the two cable saddles 20 are aligned. Compared with the tower to be erected using the "Z" shaped hoisting method, the tower 1 that meets this condition is simpler to design and its steel consumption can be reduced by at least half.
[0067] In this embodiment, step S2 specifically includes:
[0068] Based on the bridge centerline 3, determine the pre-installation distance L from the joint end 111 of the installed arch rib segment to the bridge centerline 3. Specifically, determine the vertical distance from the intersection of the connecting line of the two upper chord pipes 121 of the joint end 111 of the installed arch rib segment and the plane containing the axis 112 of the installed arch rib segment to the bridge centerline 3; this is the pre-installation distance L. The point at the top of the tower 1 that is at the pre-installation distance L from the bridge centerline 3 is the cable saddle pre-fixing point 11.
[0069] In this embodiment, the specific method of step S3 is as follows: simultaneously move the cable saddle 20 laterally at the top of the tower 1 so that the center point of the cable saddle 20 corresponds to the cable saddle pre-fixing point 11, and fix the cable saddle 20. The method of simultaneous movement and fixing of the cable saddle 20 is well known to those skilled in the art and will not be described in detail here.
[0070] In this embodiment, step S4 specifically includes:
[0071] S4.1: Connect the hoisting rope 4 of the cable system to the connecting pipe 122 of the upper chord tube 121 in the pre-installed arch rib segment 102. Specifically, the connection point 123 between the hoisting rope 4 and the two connecting pipes 122 is located at the same position of the corresponding connecting pipes 122. The connection point 123 is the end of the connecting pipe 122, which can ensure the stability of the pre-installed arch rib segment 102 after hoisting. In the actual construction process, if the pre-installed arch rib segment 102 is in a side-lying state when it is transported to the construction site, that is, the web member 125 is not in a vertical state relative to the horizontal plane, it is necessary to use a transport flatcar in conjunction with the hoisting rope 4 of the cable system to turn the pre-installed arch rib segment 102 so that the web member 125 is in a vertical state relative to the horizontal plane and the upper chord tube 121 is located on the side of the lower chord tube 124 away from the ground before hoisting the pre-installed arch rib segment 102. This operation can reduce the tension on the hoisting rope 4 when hoisting the pre-installed arch rib segment 102. The method of turning over the pre-installed arch rib segment 102 using a transport flatcar is well known to those skilled in the art and will not be described in detail here.
[0072] S4.2: Using the cable system's sling 4, the pre-installed arch rib segment 102 is hoisted upwards in a direction perpendicular to the ground, so that the joint end 126 of the pre-installed arch rib segment is hoisted to the pre-installation height H. The pre-installation height H is the vertical distance from the joint end 126 of the pre-installed arch rib segment to the ground, which is higher than the installed arch rib segment 101. In this embodiment, the pre-installation height H is the vertical distance from the lower chord tube 124 of the joint end 126 of the pre-installed arch rib segment to the ground.
[0073] S4.3: Using the hoisting rope 4 of the cable system, the pre-installed arch rib segment 102 is hoisted along the hoisting straight line to above the joint end 111 of the installed arch rib segment. The pre-installed arch rib segment 102 is then lowered towards the water surface so that the joint end 126 of the pre-installed arch rib segment corresponds to the joint end 111 of the installed arch rib segment. Specifically, the upper chord tube 121 of the joint end 126 of the pre-installed arch rib segment corresponds to the upper chord tube 121 of the joint end 111 of the installed arch rib segment, and the lower chord tube 124 of the joint end 126 of the pre-installed arch rib segment corresponds to the lower chord tube 124 of the joint end 111 of the installed arch rib segment.
[0074] When using the "Z" shaped hoisting method, the main cable 21 is parallel to the axis 112 of the installed arch rib segment. After the joint end 126 of the pre-installed arch rib segment is hoisted to the position corresponding to the joint end 111 of the installed arch rib segment, the joint end 126 of the pre-installed arch rib segment needs to be tensioned to the joint end 111 of the installed arch rib segment using a tensioning hoist and the arch rib side cable 52. During this tensioning process, the pre-installed arch rib segment 102 needs to adjust its angle and undergoes displacement. Compared with the "Z" shaped hoisting method, the construction method of this embodiment greatly reduces the angle that the pre-installed arch rib segment 102 needs to adjust and the displacement that occurs, which can reduce the number of times the joint end 126 of the pre-installed arch rib segment is repeatedly adjusted and improve work efficiency.
[0075] In this embodiment, step S5 specifically includes:
[0076] S5.1: Using the axis 112 of the installed arch rib segment as a reference, install a hand chain hoist, fixing the opposite ends of the hoist to the joint end 126 of the pre-installed arch rib segment and the joint end 111 of the installed arch rib segment, respectively, so that the joint end 126 of the pre-installed arch rib segment and the joint end 111 of the installed arch rib segment form a pull-out relationship. Specifically, the opposite ends of one pair of hand chain hoists are respectively connected to the upper chord tube 1 of the joint end 126 of the pre-installed arch rib segment. 21 and the upper chord tube 121 of the joint end 111 of the installed arch rib segment are connected to each other, so that the upper chord tubes 121 of the two arch rib segments are pulled against each other; the opposite ends of one hand chain hoist are respectively connected to the lower chord tube 124 of the joint end 126 of the pre-installed arch rib segment and the lower chord tube 124 of the joint end 111 of the installed arch rib segment, so that the lower chord tubes 124 of the two arch rib segments are pulled against each other. The installation method of the hand chain hoist is well known to those skilled in the art and will not be described in detail here.
[0077] S5.2: Install arch rib fasteners and arch rib side cables 52 on the pre-installed arch rib segment 102. Specifically, an arch rib side cable 52 is installed on the upper chord tube 121 and lower chord tube 124 on the side of the pre-installed arch rib segment 102 away from the bridge centerline 3; an arch rib side cable 52 is installed on the lower chord tube 124 on the side of the pre-installed arch rib segment 102 facing the bridge centerline 3. This method of installation makes it easier to tension the arch rib side cables 52 and allows for quick adjustment of the position of the axis 120 of the pre-installed arch rib segment. The installation methods of the arch rib fasteners and arch rib side cables 52 are well known to those skilled in the art and will not be described in detail here.
[0078] S5.3: Manually tension the arch rib side cable 52 and use a hand-operated hoist to initially adjust the position of the pre-installed arch rib segment, so that the axis 120 of the pre-installed arch rib segment coincides with the axis 112 of the installed arch rib segment, and that the joint end 126 of the pre-installed arch rib segment can be spliced and installed with the joint end 111 of the installed arch rib segment. Specifically, by manually loosening and tensioning the arch rib side cable 52 and using the counter-tensioning hand-operated hoist, the position of the joint end 126 of the pre-installed arch rib segment is adjusted so that the flange of the upper chord tube 121 in the joint end 126 of the pre-installed arch rib segment is tightly closed with the flange of the upper chord tube 121 in the joint end 111 of the installed arch rib segment, and the flange of the lower chord tube 124 in the joint end 126 of the pre-installed arch rib segment is tightly closed with the flange of the lower chord tube 124 in the joint end 111 of the installed arch rib segment, and the bolt holes are precisely aligned.
[0079] S5.4: Install the joint end 126 of the pre-installed arch rib segment to the joint end 111 of the installed arch rib segment. Specifically, fix the flange of the upper chord tube 121 in the joint end 126 of the pre-installed arch rib segment to the upper chord tube 121 in the joint end 111 of the installed arch rib segment using the installation flange and high-strength bolts. Fix the flange of the lower chord tube 124 in the joint end 126 of the pre-installed arch rib segment to the lower chord tube 124 in the joint end 111 of the installed arch rib segment using the installation flange and high-strength bolts. Thus, the pre-installed arch rib segment 102 and the installed arch rib segment 101 are initially fixed.
[0080] In this embodiment, step S6 specifically includes:
[0081] S6.1: Measure the deviation between the actual elevation of the pre-installed arch rib segment 102 and the design elevation of the arch rib, and adjust the actual elevation of the pre-installed arch rib segment 102 precisely by tensioning the arch rib fastening cable based on the obtained data;
[0082] S6.2: Measure and monitor the deviation between the axis 120 of the pre-installed arch rib segment and the bridge design alignment, and adjust the axis 120 of the pre-installed arch rib segment precisely by tensioning the side cable 52 of the arch rib based on the obtained data.
[0083] In this embodiment, step S1 specifically involves: determining the vertical distance from the midpoint of the side of the arch seat 6 with the pre-embedded pipe to the bridge centerline 3; simultaneously moving the two cable saddles 20 laterally to the point on the tower 1 at a distance from the bridge centerline 3 equal to the vertical distance; and detachably fixing the two cable saddles 20; using the cable system's hoisting rope 4 to hoist the first arch rib segment 100 to a height higher than the arch seat 6; hoisting the first arch rib segment 100 above the arch seat 6 along the line connecting the two cable saddles 20, i.e., the side of the arch seat 6 facing away from the water surface; lowering the first arch rib segment 100 towards the water surface, so that the hinge axis of the first arch rib segment 100 corresponds to the hinge seat; and installing the first arch rib segment 100 on the arch seat 6. Specifically, connecting the upper chord tube 121 and the lower chord tube 124 of the first arch rib segment 100 to the pre-embedded pipe, and connecting the hinge axis of the first arch rib segment 100 to the hinge seat. After the first arch rib segment 100 is installed, its actual elevation and axis are further adjusted to meet the design standards. The installation and connection method of the first arch rib segment 100 and the method of adjusting its actual elevation and axis are well known to those skilled in the art and will not be described in detail here.
[0084] It is understood that the hoisting method of the first arch rib segment 100 is not limited to the method of step S1 in this embodiment. In other embodiments, the first arch rib segment 100 can be hoisted using methods in the prior art, such as the "Z" shaped hoisting method.
[0085] The above description is a detailed description of the preferred embodiments of the present invention. However, the embodiments are not intended to limit the scope of the patent application of the present invention. All equivalent changes or modifications made under the technical spirit of the present invention should fall within the patent scope covered by the present invention.
Claims
1. A construction method for hoisting and installing arch rib segments of a steel pipe basket arch bridge, used to lift and install arch rib segments in an arch bridge, the construction method being implemented based on a construction system comprising: Towers (1) are built on the riverbanks at opposite ends of the bridge; Arch seat (6), which is located on the riverbanks at opposite ends of the bridge, the arch seat (6) has a pre-embedded pipe for connecting with the upper chord pipe (121) and lower chord pipe (124) of the first arch rib segment (100), and a hinge seat for connecting with the hinge shaft of the first arch rib segment (100). The cable system includes a suspension rope (4), a main cable (21) and two saddles (20). The two saddles (20) are respectively installed on the top of the tower (1) located at opposite ends of the bridge. The opposite ends of the main cable (21) are respectively installed with the two saddles (20). One end of the suspension rope (4) is connected to the main cable (21), and the other end of the suspension rope (4) is used for hoisting the arch rib segment. The method is characterized by comprising the following steps: Step S1: Install the first arch rib segment (100), which becomes the first installed arch rib segment (101); Step S2: Using the joint end (111) of the installed arch rib segment as a reference, determine the pre-fixing point (11) of the cable saddle (20) at the top of the tower (1): The pre-installation distance (L) from the joint end (111) of the installed arch rib segment to the bridge centerline (3) is determined according to the bridge centerline (3). The point on the top of the tower (1) at the distance from the bridge centerline (3) to the pre-installation distance (L) is the cable saddle pre-fixing point (11). Step S3: Move the two cable saddles (20) simultaneously to the cable saddle pre-fixing point (11) on the top of the tower (1) and fix them detachably to the cable saddle pre-fixing point (11). Then the two cable saddles (20) are aligned so that the main cable (21) is tensioned to form a hoisting straight line. Step S4: Using the hoisting rope (4), the pre-installed arch rib segment (102) is hoisted to the joint end (111) of the installed arch rib segment: S4.1: Connect the suspension rope (4) of the cable system to the lacing tube (122) of the upper chord tube (121) in the pre-installed arch rib segment (102); S4.2: The pre-installed arch rib segment (102) is hoisted upward in a direction perpendicular to the ground using the hoisting rope (4) of the cable system, so that the joint end (126) of the pre-installed arch rib segment is hoisted to the pre-installation height (H), where the pre-installation height (H) is the vertical distance from the joint end (126) of the pre-installed arch rib segment to the ground. S4.3: Using the hoisting rope (4) of the cable system, the pre-installed arch rib segment (102) is hoisted along the hoisting line to above the joint end (111) of the installed arch rib segment. The pre-installed arch rib segment 102 is lowered towards the water surface so that the joint end (126) of the pre-installed arch rib segment corresponds to the joint end (111) of the installed arch rib segment. Step S5: Connect the pre-installed arch rib segment (102) to the installed arch rib segment (101) using a joint flange: S5.1: Using the axis (112) of the installed arch rib segment as a reference, install a hand chain hoist, so that the two ends of the hand chain hoist are respectively fixed on the joint end (126) of the pre-installed arch rib segment and the joint end (111) of the installed arch rib segment. S5.2: Install arch rib fastening cables and arch rib side cables (52) on the pre-installed arch rib segment (102); S5.3: Manually tension the side cable (52) of the arch rib and the hand-operated hoist to initially adjust the position of the pre-installed arch rib segment so that the axis (120) of the pre-installed arch rib segment coincides with the axis (112) of the installed arch rib segment, and so that the joint end (126) of the pre-installed arch rib segment and the joint end (111) of the installed arch rib segment can be spliced and installed. S5.4: Install the joint end (126) of the pre-installed arch rib segment to the joint end (111) of the installed arch rib segment, and the pre-installed arch rib segment (102) and the installed arch rib segment (101) are initially fixed.
2. The construction method for the upright hoisting of arch rib segments of a steel pipe basket arch bridge as described in claim 1, characterized in that: The connection point (123) between the suspension rope (4) and the two tethers (122) is located at the same position corresponding to the tethers (122).
3. The construction method for the upright hoisting of arch rib segments of a steel pipe basket arch bridge as described in claim 2, characterized in that: The connection point (123) is the end of the lacing tube (122).
4. The construction method for the upright hoisting of arch rib segments of a steel pipe basket arch bridge as described in claim 1, characterized in that, It also includes step S6: further precisely adjusting the arch rib elevation of the pre-installed arch rib segment (102) and the axis (120) of the pre-installed arch rib segment: S6.1: Measure the deviation between the actual elevation of the pre-installed arch rib segment (102) and the design elevation of the arch rib, and adjust the design elevation of the arch rib of the pre-installed arch rib segment (102) precisely by tensioning the arch rib fastening cable according to the obtained data; S6.2: Measure and monitor the deviation between the axis (120) of the pre-installed arch rib segment and the bridge design alignment, and adjust the axis (120) of the pre-installed arch rib segment precisely by tensioning the side cable (52) of the arch rib based on the obtained data.
Citation Information
Patent Citations
Cable saddle transverse moving system and cable saddle transverse moving construction method
CN102808380A
Secondary transversal hoisting construction system and method for X-arch bridge arch rib segment
CN106702911A
System of cable hoisting and swivel construction
CN107354873A
Integral transverse movement type cable crane
CN108639968A
Construction device and method for positioning, matching and closing large-span basket type steel arch ribs
CN112431139A