Method and system for attaching a vortex suppression device to a wind turbine tower
By designing a VIV mitigation system with rod and hoop support guides on the wind turbine tower, the problem of hoop installation difficulties was solved, achieving stable hoop winding and effective vortex suppression, thereby improving the tower's resistance to vortex-induced vibration and construction efficiency.
Patent Information
- Application Number
- CN202111261883.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-10-28
- Filing Date
- 2021-10-28
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2041-10-28
AI Technical Summary
In existing technologies, the installation of hoop bars on wind turbine towers is difficult, time-consuming, and inconsistent, resulting in a decrease in vortex suppression effect, which cannot effectively alleviate vortex-induced vibration and affects tower life and construction efficiency.
Design a VIV mitigation system including a pole and hoop support guides. The pole extends along the tower axis, and the hoop support guides are laterally spaced. The hoops are spirally wound around the tower and their position is maintained by adjustable and movable support guides to accommodate different pitches and installation requirements.
It achieves stable and uniform winding of the hoop, improves the vortex suppression effect, reduces installation difficulty and time, enhances the tower's resistance to vortex-induced vibration, and extends the tower's service life.
Smart Images

Figure CN114483463B_ABST
Abstract
Description
Technical Field
[0001] The present invention generally relates to wind turbine towers, and more particularly to systems and methods for attaching hoop-type vortex suppression devices to wind turbine towers. Background Technology
[0002] Wind turbine towers and other generally slender tower structures are subject to vortex-induced vibration (VIV). Without mitigation and under suitable wind conditions, vortices can detach coherently from alternating sides of the tower, resulting in fluctuating loads and increased vertical swaying motion of the tower. For modern wind turbine towers, this motion can reach amplitudes of + / -2m or more on-site, making continuous installation of the tower and turbine head virtually impossible, leading to costly crane downtime and overall project delays. Furthermore, if the vibration persists, it can cause severe fatigue damage to the lower tower sections, potentially significantly shortening the tower's lifespan. This issue will become even more critical as the industry moves towards taller, slenderer, and / or less rigid towers.
[0003] Therefore, VIV mitigation is an ongoing concern in industry, and VIV mitigation is generally considered necessary for towers with a height exceeding 100m.
[0004] Various VIV mitigation systems and methods have been used or suggested in industry. For example, rolling mass absorbers, oil dampers, friction dampers, and vortex generator systems have been used on wind turbine towers for this purpose. Another system utilizes a tubular helical hoop, typically wound around the top 1-3 sections of the wind turbine tower. The hoop is used to disrupt the coherent vortex shedding around the tower required for VIV formation, thus preventing it before it occurs. Effective design of helical hoops, in terms of helical pitch, number, and size, is based on many factors. However, it can be difficult to implement the design and consistently maintain / retain the hoop over time. Hoops and their associated installation cables can be long (e.g., 20-30 m) and heavy, and tend to sag. This results in hoop constructions that are not robust or cannot be repeated. Over time, the hoop will lose its installation pattern, which can significantly reduce its functionality. Additionally, tensile loads in the cables cause deformation of the hoop's cross-section, making it too small relative to the tower diameter to be effective.
[0005] In addition, hoops are typically installed manually on-site, with personnel winding them around the tower for each tower section. This can occur in horizontal sections where dust and debris beneath the tower become a problem, or in vertical sections where the viewing angle makes it difficult to assess the uniformity of the hoop winding pattern. Generally, hoop installation is difficult, time-consuming, and results in inconsistent hoop placement.
[0006] Therefore, this disclosure relates to systems and methods for installing clamps in the field, which overcome at least some of the practical challenges discussed above. Summary of the Invention
[0007] Aspects and advantages of the invention will be set forth in part in the description which follows, or may be apparent from the description, or may be learned by practice of the invention.
[0008] In one aspect, this disclosure relates to a wind turbine including a tower, which may be formed from tower sections. The wind turbine may be an onshore or offshore installation. The wind turbine includes a vortex-induced vibration (VIV) mitigation system constructed on the tower, for example, on one or more sections of the tower. The VIV mitigation system includes one or more rods attached to an outer surface of the tower and extending longitudinally along the axis of the tower. The rods may flush against or be spaced apart from the outer surface of the tower. A plurality of hoop support guides extend laterally from the rods and are spaced apart along the rods, the hoop support guides having length and shape to retain the hoops supported thereon. The VIV mitigation system includes one or more hoops wound in a helical manner around the tower, wherein at least a plurality of wraps of the hoops are laid on and supported by the hoop support guides. The use of hoops is known in industry, and the hoops may have any suitable conventional construction, such as a multifaceted geometry with a hollow profile. Cables or ropes can extend through the hoop to wrap around and attach the hoop to the tower.
[0009] In some embodiments, the rod is a rigid, slender member, such as a lightweight metal beam or strip mounted to the tower at one or more connection points. In another embodiment, the rod may be a non-rigid, flexible member, such as a strip, which is drawn into a longitudinally extending member and mounted to the tower at least at its endpoints.
[0010] In a particular embodiment, the VIV mitigation system includes a plurality of rods and a plurality of hoop supports spaced circumferentially around the tower.
[0011] In another embodiment, a sufficient number of hoop support guides are provided on the rod, such that each turn of the hoop is supported by a corresponding hoop support guide.
[0012] In yet another embodiment, the hoop support guide is adjustable along the length of the rod to accommodate varying pitches of the same helical pattern within the same turn or varying pitches between different turn patterns.
[0013] The hoop support guide is movable between an active position and a retracted position. In the active position, the hoop support guide extends substantially perpendicular to the tower. In the retracted position, the hoop support guide is moved to be adjacent to the tower (i.e., next to and tangential to the tower). The retracted position is desirable for use in shipping, transporting, and erecting towers, particularly when the pole is pre-installed / assembled on the tower / tower section.
[0014] For example, the hoop support guide may be immovably fixed (i.e., rigidly fixed) to the pole, wherein the pole is rotatable relative to the tower to move the hoop support guide between an active position and a retracted position. In this embodiment, the pole may be connected to the outer surface of the tower using a pivoting connection (e.g., a hinge bolt or universal joint) at opposite ends of the pole, wherein the pivoting connection allows rotatable movement of the pole relative to the tower.
[0015] In another embodiment, the hoop support guide is pivotally mounted on a pole rigidly fixed to the tower, wherein the hoop support guide pivots relative to the pole between an active position and a retracted position. For example, in the retracted position, the hoop support guide may be folded into or onto the pole, or may be laterally pivoted away from the pole to the retracted position, thereby extending substantially adjacent to or alongside the tower and tangentially relative to the tower.
[0016] The hoop support guide can have various configurations. In some embodiments, the hoop support guide may include an open profile, such as a hook-shaped member, a C-shaped member, or a U-shaped member, wherein the hoop can be easily inserted into the guide. Closure members, such as elastic bands or buckles, can be configured to have an open profile guide to reliably (positively) retain the hoop in the guide.
[0017] In an alternative embodiment, the hoop support guide may have a closed profile, such as a ring or eyelet construction, wherein the hoop passes through the support guide.
[0018] The present invention also covers various embodiments of a method for installing a vortex-induced vibration (VIV) mitigation system on a wind turbine tower, the method comprising: attaching a rod to an outer surface of the tower such that the rod extends longitudinally along the axis of the tower; and providing a plurality of hoop support guides on the rod, the hoop support guides extending laterally from the rod and spaced apart along the rod, the hoop support guides including lengths and shapes for retaining hoops supported thereon. The method includes helically winding the hoops around the tower, including laying at least a plurality of turns of the hoops on the hoop support guides.
[0019] In a particular embodiment, at the wind turbine site, a rod with a hoop-supported guide is pre-installed on the tower before the tower is erected in a vertical orientation. Alternatively, with the tower in a vertical or horizontal orientation, the rod with the hoop-supported guide can be installed on the tower (tower section) on-site, wherein the hoop is then wrapped around the tower in either a vertical or horizontal orientation.
[0020] Various embodiments of the method include any embodiment of installing or operating the VIV mitigation system described above.
[0021] Technical Solution 1. A wind turbine, comprising: Tower; A vortex-induced vibration (VIV) mitigation system, constructed on the tower, the VIV mitigation system comprising: A rod, which is attached to the outer surface of the tower and extends longitudinally along the axis of the tower; A plurality of hoop support guides extend laterally from the rod and are spaced apart along the rod, the hoop support guides comprising length and shape to hold the hoops supported thereon; and At least one hoop is spirally wound around the tower, wherein at least a plurality of turns of the hoop are laid on and supported by the hoop support guide.
[0022] Technical Solution 2. The wind turbine according to Technical Solution 1, wherein the VIV mitigation system includes a plurality of rods and a plurality of hoop support guides spaced circumferentially around the tower.
[0023] Technical Solution 3. The wind turbine according to Technical Solution 1, wherein the plurality of said hoop support guides are configured to support each turn of the hoop surrounding the tower.
[0024] Technical Solution 4. The wind turbine according to Technical Solution 1, wherein the hoop support guide is positionally adjustable along the length of the rod to accommodate the pitch of the varying helical pattern of the hoop.
[0025] Technical Solution 5. The wind turbine according to Technical Solution 1, wherein the hoop support guide is movable between an active position and a retracted position, wherein in the active position the hoop support guide extends substantially perpendicular to the tower, and in the retracted position the hoop support guide is moved to a position to extend along and adjacent to the tower.
[0026] Technical Solution 6. The wind turbine according to Technical Solution 5, wherein the hoop support guide is immovably fixed to the rod, and the rod is rotatable relative to the tower to move the hoop support guide between the active position and the retracted position.
[0027] Technical Solution 7. The wind turbine according to Technical Solution 6, wherein the rod is connected to the outer surface of the tower via a pivoting connection at opposite ends of the rod, the pivoting connection allowing rotatable movement of the rod relative to the tower.
[0028] Technical Solution 8. The wind turbine according to Technical Solution 5, wherein the hoop support guide is pivotally mounted on the rod and pivots relative to the rod between the active position and the retracted position.
[0029] Technical Solution 9. The wind turbine according to Technical Solution 8, wherein, in the retracted position, the hoop support guide can be vertically folded into or onto the rod.
[0030] Technical Solution 10. The wind turbine according to Technical Solution 8, wherein the hoop support guide is laterally swingable away from the pole to the retracted position, thereby substantially adjacent to the tower and extending tangentially relative to the tower.
[0031] Technical Solution 11. The wind turbine according to Technical Solution 1, wherein the rod comprises an elongated rigid member or a flexible band member.
[0032] Technical Solution 12. A method for installing a vortex-induced vibration (VIV) mitigation system on a wind turbine tower, comprising: The rod is attached to the outer surface of the tower such that the rod extends longitudinally along the axis of the tower; A plurality of hoop support guides are provided on the rod, the plurality of hoop support guides extending laterally from the rod and spaced apart along the rod, the hoop support guides having a length and shape to hold the hoops supported thereon; and At least one hoop is wound around the tower in a spiral pattern, including at least a plurality of turns of the hoop laid on the hoop support guide.
[0033] Technical Solution 13. The method according to Technical Solution 12, wherein, at the site of the wind turbine, before the tower is erected, the rod with attached hoop support guide is pre-installed on a section of the tower.
[0034] Technical Solution 14. The method according to Technical Solution 12 includes attaching a plurality of rods with hoop-supported guides circumferentially around the tower.
[0035] Technical Solution 15. The method according to Technical Solution 12 includes adjusting the positioning of the hoop support guide vertically along the rod to accommodate the changing pitch of the helical pattern.
[0036] Technical Solution 16. The method according to Technical Solution 12 includes moving the hoop support guide between an active position and a retracted position, wherein in the active position the hoop support guide extends substantially perpendicular to the tower, and in the retracted position the hoop support guide is moved adjacent to the tower.
[0037] Technical Solution 17. The method according to Technical Solution 16, wherein the hoop support guide is immovably fixed to the rod, and the rod rotates relative to the tower to move the hoop support guide between the active position and the retracted position.
[0038] Technical Solution 18. The method according to Technical Solution 16, wherein the rod is connected to the outer surface of the tower via a pivoting connection at opposite ends of the rod, the pivoting connection allowing rotatable movement of the rod relative to the tower.
[0039] Technical Solution 19. The method according to Technical Solution 16, wherein the hoop support guide is pivotally mounted on the rod and pivots relative to the rod between the active position and the retracted position.
[0040] Technical Solution 20. According to the method of Technical Solution 19, the hoop support guide is folded into or on the rod in the retracted position or swings laterally away from the rod in the retracted position. Attached Figure Description
[0041] The complete and feasible disclosure of the invention, including its best mode, is set forth in the description with reference to the accompanying drawings, which are intended for those skilled in the art. Figure 1 This is a view of a wind turbine with a VIV mitigation system according to various aspects of the present invention; Figure 2 This is a side view of a section of a wind turbine tower with an embodiment of the VIV mitigation system (without hoops); Figure 3 This is a top view of a section of a wind turbine tower with an embodiment of the VIV mitigation system (without hoops); Figure 4 This is a side view of a section of a wind turbine tower with an embodiment of the VIV mitigation system (without hoops); Figure 5a and Figure 5b This is an operational top view of the wind turbine tower, depicting the pivotal movement of the rods and hoop support guides relative to the tower; Figure 6 This is a side view of a section of the wind turbine tower, depicting the movement of the hoop support guide toward the retracted position in an embodiment of the VIV mitigation system. Figure 7 This is a side view of a section of a wind turbine tower, depicting the movement of the hoop support guide toward a retracted position in another embodiment of the VIV mitigation system; Figure 8 This is a side view of a section of the wind turbine tower, depicting the movement of the hoop support guide toward a retracted position in yet another different embodiment of the VIV mitigation system. Figure 9 This is a side view of a section of a wind turbine tower, depicting an adjustable hoop support guide on a pole according to an embodiment of the VIV mitigation system; and Figure 10 This is a side view of a section of a wind turbine tower with an embodiment of a VIV mitigation system that utilizes belt rods and ring-shaped clamps to support the guide. Detailed Implementation
[0042] Reference will now be made in detail to embodiments of the invention, one or more examples of which are illustrated in the accompanying drawings. Each example is provided by way of explanation rather than limitation of the invention. Indeed, it will be apparent to those skilled in the art that various modifications and variations may be made to the invention without departing from the scope or spirit thereof. For example, a feature shown or described in part as one embodiment may be used with another embodiment to produce yet another embodiment. Therefore, it is intended that the invention cover such modifications and variations and their equivalents as fall within the scope of the appended claims.
[0043] Refer to the attached diagram. Figure 1A perspective view of one embodiment of a wind turbine 10 equipped with a vortex-induced vibration (VIV) mitigation system 24 according to aspects of this disclosure is shown. As shown, the wind turbine 10 generally includes a tower 12 extending from a support surface 14, a nacelle 16 mounted on the tower 12, and a rotor 18 coupled to a drivetrain component located within the nacelle 16. The rotor 18 includes a rotatable hub 20 and at least one rotor blade 22 coupled to and extending outward from the hub 20. For example, in the illustrated embodiment, the rotor 18 includes three rotor blades 22. However, in alternative embodiments, the rotor 18 may include more or fewer than three rotor blades 22. Each rotor blade 22 may be spaced apart around the hub 20 to facilitate rotation of the rotor 18, thereby enabling kinetic energy to be converted from wind energy into usable mechanical energy, and subsequently into electrical energy. For example, the hub 20 may be rotatably coupled to a generator (not shown) positioned within the nacelle 16 to allow the generation of electrical energy.
[0044] although Figure 1 An installation device for an "onshore" (land-based) wind turbine 10 is described, but it should be understood that the invention is not limited to onshore wind turbines, but is equally applicable to "offshore" (water-based) wind turbine installation devices.
[0045] The wind turbine 10 includes a vortex-induced vibration (VIV) mitigation system 24, which is constructed on the tower 12, for example, on one or more sections 30 of the tower 12. The VIV mitigation system 24 can ideally be pre-installed, in whole or in part, to the tower sections 30 at the manufacturing facility to minimize on-site work and tower 12 installation time at the wind turbine site. The VIV mitigation system 24 can be constructed on one or more sections 30 of the same tower 12.
[0046] In the illustrated embodiment, the VIV mitigation system 24 includes a rod 26 that is connected to the outer surface 54 of the tower 12 and runs along the axis 32 of the tower 12. Figure 2 The rod 26 extends longitudinally. It may extend parallel to the longitudinal axis 32 or at an angle relative to the axis 32. The rod 26 does not need to extend completely vertically on the tower 12. The rod 26 may be mounted flush against the tower surface 54 or spaced apart from the tower surface 54.
[0047] Multiple hoop support guides 36 extend laterally from and are spaced apart along the rod 26. These hoop support guides 36 may take various shapes and forms, but generally have a length and shape to hold the hoop 38 supported thereon. Figure 4 For example, in some embodiments, the hoop support guide 36 may include a hook-shaped member, a C-shaped or U-shaped member (such as...). Figure 2An open profile (as depicted in the image) is provided in which the hoop 38 can be easily inserted into the guide. A closing member, such as an elastic band or buckle, can be configured to have an open profile guide to reliably retain the hoop in the guide.
[0048] exist Figure 10 In the alternative embodiments depicted, the hoop support guide 36 may have a closed profile, such as a ring or eyelet construction, wherein the hoop 38 passes through the support guide.
[0049] refer to Figure 4 The VIV mitigation system 24 includes a hoop 38 wound in a spiral pattern around the tower section 30, wherein at least a plurality of turns of the hoop 38 are laid on and supported by a hoop support guide 36. A "turn" can be considered as a complete loop of the hoop 38 relative to a longitudinal baseline. If each turn of the hoop 38 is supported by the hoop support guide 36 (as in...), Figure 4 In the middle), the guide 36 determines the pitch (angle) of the turn relative to the axis 32 and the number of turns of the hoop 38 per unit length of tower section 30 along the spacing of the rod 26.
[0050] As mentioned, the use of hoop 38 to mitigate vibration-induced vortices is known in industry, and hoop 38 can have any suitable conventional construction. For example, in Figure 4 In the upper tower section 30 depicted, the hoop 38 has a generally tubular shape with a circular hollow cross-sectional profile. In the lower tower section 30, the hoop is depicted as a multifaceted hoop 39 with a triangular or other polygonal hollow profile. Cables or ropes (not depicted) may extend through the hoops 38 and 39 for wrapping and attaching the hoops 38 and 39 to the tower section 30, as is known in industry. It is also known to fill the hollow hoops 38 and 39 with filler material or to expand the hoops 38 and 39.
[0051] In some embodiments, rod 26 is a rigid, slender member, such as a lightweight metal beam or strip, mounted to one or more connection points to tower section 30. For rigid members, it may be sufficient to mount rod 26 at its opposite ends 48 using any conventional fasteners or connectors 52 (e.g., bolts, rivets, etc.). Figure 8 In one embodiment, the rod 26 is rigid and has a U-shaped cross-sectional profile defining an open internal channel storage space 50, as explained below.
[0052] refer to Figure 10In an alternative embodiment, the rod may be a non-rigid, flexible member 34, such as canvas or polymer tape, which is attached to the tower section 30 at its opposite ends 48. Once the flexible member 34 is pulled taunt and attached to the tower section 30, it functions substantially the same as the rigid rod member 26. In this embodiment, the hoop support guide 36 may also be formed of a non-rigid ring 37, such as a ring of canvas or polymer material sewn onto the tape 34. This embodiment offers advantages in terms of weight and cost of the rod 26 component of the VIV mitigation system 24, as well as ease of transport and installation.
[0053] VIV mitigation system 24 can utilize a single pole 26 or multiple poles 26 spaced circumferentially around the tower section 30 (e.g., Figure 3 (As depicted in the text).
[0054] The hoop support guide 36 can be fixedly positioned relative to the rod 26 and is immovable. For example, the guide can be welded, bolted, bonded, or otherwise permanently fixed in place to the rod 26. Alternatively, the hoop support guide 36 can be positionally adjustable along the length of the rod 26 to accommodate varying pitches or inter-turn spacing of the spiral turns of the hoop 38, such as... Figure 9 As depicted in the figure. For example, the rod 26 may include spaced connection points 40 for the guide 36 in the form of mounting holes, slots, etc., into which protrusions on the guide 36 can be inserted. The guide 36 may also be non-detachably attached to the rod 26 and be slidable along a channel formed in the rod 26. Various devices or apparatuses are readily conceivable for making the guide 36 positionally adjustable along the rod 26.
[0055] refer to Figures 6 to 8 The hoop support guide 36 is movable between an active position 42 and a retracted position 44. In the active position 42, the hoop support guide 36 extends substantially perpendicular to the tower section 30. In the retracted position 44, the hoop support guide 36 is moved to be adjacent to the tower section 30 (i.e., next to and tangential to the tower). The retracted position 44 is desirable for use in shipping, transporting, and erecting the tower, particularly when the pole 26 is pre-installed / assembled on the tower / tower section 30.
[0056] For example, in Figure 6 In one embodiment, the hoop support guide 36 is pivotally mounted on the rod 26, which is rigidly fixed to the tower section 30 and pivots between an active position 42 and a retracted position 44. In the active position 42, the hoop support guide 36 extends laterally from the rod 26; in the retracted position 44, the hoop support guide 36 is folded onto the rod 26. Similarly, in which the rod 26 has a generally U-shaped profile... Figure 8In one embodiment, the hoop support guide 36 is folded or pivoted into the channel storage space 50 within the rod 26. The hoop support guides 36 can be connected together such that they can be deployed or retracted together, for example, via a drive mechanism or a line / tether system.
[0057] exist Figure 7 In one embodiment, the hoop support guides swing laterally away from the rod 26 to a retracted position 44, in which they extend substantially adjacent to or alongside the tower.
[0058] exist Figure 5a and Figure 5b In one embodiment, the hoop support guide 36 is immovably fixed (i.e., rigidly fixed) to the rod 26. However, the rod 26 is rotatable relative to the tower section 30, such that the entire assembly of the rod 26 and the fixed guide 36 is... Figure 5a The position 42 depicted in the diagram rotates laterally to... Figure 5b The stowage position 44 is depicted in the diagram. For this purpose, a pivoting connection 46 of any kind, such as a universal joint or a hinged device, can be used to mount the pole 26 to the tower section 30.
[0059] The invention also covers various embodiments of a method for mounting an embodiment of the vortex-induced vibration (VIV) mitigation system 24 onto a wind turbine tower 12 or tower section 30, as discussed above. In this respect, the method includes: attaching a rod 26 to an outer surface 54 of the tower 12, 30 such that the rod 26 extends longitudinally along an axis 32 of the tower 12, 30; and providing a plurality of hoop support guides 36 on the rod 26, these hoop support guides 36 extending laterally from the rod 26 and spaced apart along the rod 26. The method includes helically winding hoops 38 around the tower 12, 30, including laying at least a plurality of turns of the hoop 38 on the hoop support guides 36.
[0060] The method may include pre-installing a rod 26 with a hoop support guide 36 on the tower section 30 at the site of the wind turbine 10 before the tower 12 is erected in a vertical orientation. Alternatively, with the tower 12 in a vertical or horizontal orientation, the rod 26 with the hoop support guide 36 may be installed on the towers 12 and 30 at the site, wherein the hoops 38 are then wrapped around the towers 12 and 30 in a vertical or horizontal orientation.
[0061] After the wind turbine 10 is installed, it is not necessary to remove the mast 36 from the tower 12. The mast 36 can be designed to remain attached to the tower 12 even after installation. For example, the mast 36 can be relatively compact and have a low surface profile relative to the tower 12, and can also have a color that blends substantially with the tower.
[0062] Further aspects of the invention are provided by the subject matter of the following provisions: Clause 1: A wind turbine comprising: Tower; A vortex-induced vibration (VIV) mitigation system, constructed on the tower, comprising: A pole, which is attached to the outer surface of the tower and extends longitudinally along the axis of the tower; Multiple hoop support guides extend laterally from the rod and are spaced apart along the rod. The hoop support guides include length and shape to retain the hoops supported thereon. A hoop, which is spirally wound around the tower, wherein at least a plurality of turns of the hoop are laid on and supported by a hoop support guide.
[0063] Clause 2: The wind turbine as described in Clause 1, wherein the VIV mitigation system includes a plurality of rods and a plurality of hoop supports spaced circumferentially around the tower.
[0064] Clause 3: The wind turbine as described in Clause 1, wherein a plurality of hoop support guides are configured to support each turn of the hoop surrounding the tower.
[0065] Clause 4: The wind turbine as described in Clause 1, wherein the hoop support guide is positionally adjustable along the length of the rod to accommodate the pitch of a change in the helical pattern of the hoop.
[0066] Clause 5: The wind turbine according to Clause 1, wherein the hoop support guide is movable between an active position and a retracted position, wherein in the active position the hoop support guide extends substantially perpendicular to the tower, and in the retracted position the hoop support guide is moved to a position to extend along and adjacent to the tower.
[0067] Clause 6: The wind turbine as described in Clause 5, wherein the hoop support guide is immovably fixed to the pole, and the pole is rotatable relative to the tower to move the hoop support guide between an active position and a retracted position.
[0068] Clause 7: The wind turbine as described in Clause 6, wherein the pole is connected to the outer surface of the tower by means of a pivoting connection at opposite ends of the pole, the pivoting connection allowing rotatable movement of the pole relative to the tower.
[0069] Clause 8: The wind turbine as described in Clause 5, wherein the hoop support guide is pivotally mounted on the pole and pivots relative to the pole between an active position and a retracted position.
[0070] Clause 9: The wind turbine as described in Clause 8, wherein, in the retracted position, the hoop support guide can be vertically folded into or onto the pole.
[0071] Clause 10: The wind turbine as described in Clause 8, wherein the hoop support guide is laterally swingable away from the pole to a retracted position, thereby substantially adjacent to and extending tangentially relative to the tower.
[0072] Clause 11: The wind turbine as described in Clause 1, wherein the rod comprises an elongated rigid member or a flexible band member.
[0073] Clause 12: A method for installing a vortex-induced vibration (VIV) mitigation system on a wind turbine tower, comprising: The rod is attached to the outer surface of the tower so that it extends longitudinally along the axis of the tower; A plurality of hoop support guides are provided on the pole, the plurality of hoop support guides extending laterally from the pole and spaced apart along the pole, the hoop support guides having a length and shape to hold the hoops supported thereon; and The hoop is wound around the tower in a spiral pattern, including at least a plurality of turns of the hoop laid on the hoop support guide.
[0074] Clause 13: The method described in Clause 12, wherein, at the wind turbine site, before the tower is erected, a rod with attached hoop support guides is pre-installed on a section of the tower.
[0075] Clause 14: The method described in Clause 12 includes attaching a plurality of rods with hoop-supported guides circumferentially around the tower.
[0076] Clause 15: The method described in Clause 12 includes adjusting the positioning of the hoop support guide vertically along the rod to accommodate a pitch variation in the helical pattern.
[0077] Clause 16: The method described in Clause 12 includes moving the hoop support guide between an active position and a retracted position, wherein in the active position the hoop support guide extends substantially perpendicular to the tower, and in the retracted position the hoop support guide is moved to be adjacent to the tower.
[0078] Clause 17: The method according to Clause 16, wherein the hoop support guide is immovably fixed to the pole, and the pole rotates relative to the tower to move the hoop support guide between an active position and a retracted position.
[0079] Clause 18: The method according to Clause 16, wherein the rod is connected to the outer surface of the tower by means of a pivoting connection at opposite ends of the rod, the pivoting connection allowing rotatable movement of the rod relative to the tower.
[0080] Clause 19: The method described in Clause 16, wherein the hoop support guide is pivotally mounted on the rod and pivots relative to the rod between an active position and a retracted position.
[0081] Clause 20: As described in Clause 19, the hoop support guide is folded into or onto the pole in the retracted position or swings laterally away from the pole in the retracted position.
[0082] This written description uses examples to disclose the invention, including the best mode, and also enables any person skilled in the art to practice the invention, including making and using any device or system and performing any incorporated methods. The patentability of the invention is defined by the claims and may include other examples that would occur to a person skilled in the art. These other examples are intended to be within the scope of the claims if they include structural elements that are not different from the literal language of the claims, or if they include equivalent structural elements that are not substantially different from the literal language of the claims.
Claims
1. A wind turbine, comprising: Tower; A vortex-induced vibration (VIV) mitigation system, constructed on the tower, the VIV mitigation system comprising: A rod, which is attached to the outer surface of the tower and extends longitudinally along the axis of the tower; A plurality of hoop support guides extend laterally from the rod and are spaced apart along the rod, the hoop support guides comprising length and shape to hold the hoops supported thereon; and At least one hoop is spirally wound around the tower, wherein at least a plurality of turns of the hoop are laid on and supported by the hoop support guide.
2. The wind turbine according to claim 1, wherein, The VIV mitigation system includes a plurality of rods and a plurality of hoop support guides spaced circumferentially around the tower.
3. The wind turbine according to claim 1, wherein, The plurality of said hoop support guides are configured to support each turn of the hoop surrounding the tower.
4. The wind turbine according to claim 1, wherein, The hoop support guide is positionally adjustable along the length of the rod to accommodate the pitch of the varying helical pattern of the hoop.
5. The wind turbine according to claim 1, wherein, The hoop support guide is movable between an active position and a retracted position. In the active position, the hoop support guide extends substantially perpendicular to the tower. In the retracted position, the hoop support guide is moved to a position to extend along and adjacent to the tower.
6. The wind turbine according to claim 5, wherein, The hoop support guide is immovably fixed to the rod, and the rod is rotatable relative to the tower to move the hoop support guide between the active position and the retracted position.
7. The wind turbine according to claim 6, wherein, The rod is connected to the outer surface of the tower via a pivoting connection at opposite ends of the rod, the pivoting connection allowing rotatable movement of the rod relative to the tower.
8. The wind turbine according to claim 5, wherein, The hoop support guide is pivotally mounted on the rod and pivots relative to the rod between the active position and the retracted position.
9. The wind turbine according to claim 8, wherein, In the retracted position, the hoop support guide can be vertically folded into or onto the rod.
10. The wind turbine according to claim 8, wherein, The hoop support guide can swing laterally away from the pole to the retracted position, thereby extending substantially adjacent to and tangentially relative to the tower.
11. The wind turbine according to claim 1, wherein, The rod may comprise a slender rigid member or a flexible band member.
12. A method for installing a vortex-induced vibration (VIV) mitigation system on a wind turbine tower, comprising: The rod is attached to the outer surface of the tower such that the rod extends longitudinally along the axis of the tower; A plurality of hoop support guides are provided on the rod, the plurality of hoop support guides extending laterally from the rod and spaced apart along the rod, the hoop support guides having length and shape to hold the hoops supported thereon; and At least one hoop is wound around the tower in a spiral pattern, including at least a plurality of turns of the hoop laid on the hoop support guide.
13. The method according to claim 12, wherein, At the site of the wind turbine, before the tower is erected, the rod with attached hoop support guides is pre-installed on a section of the tower.
14. The method of claim 12, further comprising attaching a plurality of said rods with hoop-supported guides circumferentially around said tower.
15. The method of claim 12, further comprising vertically adjusting the positioning of the hoop support guide along the rod to accommodate the varying pitch of the helical pattern.
16. The method of claim 12, further comprising moving the hoop support guide between an active position and a retracted position, wherein in the active position the hoop support guide extends substantially perpendicular to the tower, and in the retracted position the hoop support guide is moved adjacent to the tower.
17. The method according to claim 16, wherein, The hoop support guide is immovably fixed to the rod, and the rod rotates relative to the tower to move the hoop support guide between the active position and the retracted position.
18. The method according to claim 16, wherein, The rod is connected to the outer surface of the tower via a pivoting connection at opposite ends of the rod, the pivoting connection allowing rotatable movement of the rod relative to the tower.
19. The method of claim 16, wherein, The hoop support guide is pivotally mounted on the rod and pivots relative to the rod between the active position and the retracted position.
20. The method of claim 19, wherein the hoop support guide is folded into or onto the rod in the retracted position or swings laterally away from the rod in the retracted position.
Citation Information
Patent Citations
Vortex-shedding-arrangement
US20200056593A1
Helical strake attachment for tubular structural members
US20200124221A1