A hierarchical and zonal grid connection planning method and system for a new energy power station group

CN114626675BActive Publication Date: 2025-07-08RES INST OF ECONOMICS & TECH STATE GRID SHANDONG ELECTRIC POWER
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210124677.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-10
Publication Date
2025-07-08
Estimated Expiration
2042-02-10

Smart Images

  • Figure CN114626675B_ABST
    Figure CN114626675B_ABST
Patent Text Reader

Abstract

The present invention discloses a hierarchical and zonal grid connection planning method and system for a new energy power station group, including: hierarchically and zonally dividing the power grid based on line impedance, and determining a feasible new energy grid connection plan according to the historical output data of new energy in each zone; constructing a multi-index evaluation system for new energy access to the power grid, including voltage deviation, power flow fluctuation, and active power loss; establishing a new energy zonal grid connection planning model with the goal of minimizing the curtailment of wind and light, so as to obtain various evaluation indexes under different new energy grid connection plans; combining the multi-index evaluation system to evaluate the new energy grid connection plan, so as to obtain the optimal new energy grid connection plan. Solve problems such as power flow fluctuation and voltage deviation after large-scale grid connection of new energy.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Multi-target grid planning method and device considering new energy consumption and environmental benefit

    CN107681654A

  • Active power distribution network distributed power supply partition in-situ voltage control strategy setting method

    CN109728603A