A method, device, electronic device and storage medium for monitoring human efficacy time process
By obtaining and comparing the work data of enterprise employees and calculating their work efficiency, the problem of difficulty in monitoring and recording work efficiency in the existing technology is solved, automatic monitoring and evaluation is realized, supervision vulnerabilities are reduced, and management efficiency is improved.
Patent Information
- Application Number
- CN202210175885.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-24
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2042-02-24
AI Technical Summary
The existing technology is difficult to effectively monitor and record the work efficiency of corporate employees during working hours, and there are supervision loopholes.
By obtaining preset users' work data, including workload and work time, calculating and comparing work efficiency, and judging whether they are qualified, the recording steps and supervision loopholes of the enterprise administrative department are reduced.
Automatic monitoring and evaluation of the work efficiency of enterprise employees is achieved, supervision loopholes are reduced, and work efficiency is improved.
Smart Images

Figure CN114648205B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a method, device, electronic device and storage medium for monitoring the time course of human efficacy. Background Art
[0002] With the rapid development of the Internet, more and more corporate employees can carry out work assignment, handover and communication online. While the Internet brings convenience to corporate employees, it also provides them with many ways to do other unrelated things during working hours.
[0003] Research shows that some employees browse the web and shopping interfaces during working hours, which seriously affects the work efficiency of employees. In the existing related technologies, the administrative department of the company records the working time and work results of each employee. The recording process is time-consuming and labor-intensive, and is prone to supervision loopholes.
[0004] In the process of realizing the present application, the inventor discovered that how to conveniently monitor the time progress of employee efficiency becomes a key issue. Summary of the invention
[0005] In order to facilitate the monitoring of employee efficiency time progress, the present application provides a labor efficiency time progress monitoring method, device, electronic device and storage medium.
[0006] In the first aspect, the present application provides a method for monitoring the time course of human efficacy, which adopts the following technical solution:
[0007] A method for monitoring the human efficacy time process, comprising:
[0008] Obtaining work data of a preset user, wherein the work data includes the workload and work time of the preset user;
[0009] Determining the work efficiency of the preset user based on the work data of the preset user;
[0010] Obtaining standard work efficiency, and comparing the work efficiency of the preset user with the standard work efficiency;
[0011] Determine whether the work efficiency of the preset user is qualified.
[0012] By adopting the above technical solution, the workload and work time of the preset user can be obtained, and the workload and work time of the preset user can be calculated to obtain the work efficiency of the scheduled user, thereby eliminating the step of the enterprise administrative department recording the work data of the enterprise employees in sequence, and comparing the work efficiency of the preset user with the standard work efficiency to determine whether the work efficiency of the preset user is qualified, so as to monitor the work efficiency of the enterprise employees and reduce the possibility of supervision loopholes.
[0013] In another possible implementation, the obtaining of the work data of the preset user includes:
[0014] Get the node request information of the terminal device;
[0015] Determine a node event and a node time based on the node request information of the terminal device;
[0016] Based on the node event and the node time, the work time of the preset user is determined.
[0017] By adopting the above technical solution, it is possible to obtain each node request information of the terminal device, analyze the node request information, determine the node event from the node request information, each node event corresponds to a work item, and determine the node time of the node event, so as to calculate the working time of the preset user for a certain work item, thereby facilitating the acquisition of the work efficiency of the preset user.
[0018] In another possible implementation manner, determining the node event and the node time based on the node request information of the terminal device includes:
[0019] Extracting a feature vector from the node request information of the terminal device;
[0020] The feature vector is preprocessed, and the node event and the node time are determined.
[0021] By adopting the above technical solution, a feature vector is extracted from the node request information, and the feature vector is processed, and the node event and the node time corresponding to the node event are determined from the node request information, so as to determine the work efficiency of the preset user.
[0022] In another possible implementation manner, determining the work efficiency of the preset user based on the work data of the preset user includes:
[0023] Obtaining a target date, where the target date is a target date preset by the user for the target work item;
[0024] Based on the work data of the preset user and the target date, determining the on-schedule work data and overdue work data of the preset user;
[0025] Determine a correlation coefficient based on the scheduled work data and overdue work data of the preset user, wherein the correlation coefficient includes a positive correlation coefficient and a negative correlation coefficient;
[0026] Based on the correlation coefficient, the work efficiency of the preset user is determined.
[0027] By adopting the above technical scheme, the target date and the actual delivery date of the target work item can be determined. By comparing the target date with the actual delivery date, the work data delivered on time and the work data delivered overdue by the preset user can be determined. Therefore, the work data can be preliminarily classified as on time and overdue, and then the correlation coefficient can be determined based on the on-time work data and the overdue work data. The work efficiency can be determined by the correlation coefficient, which makes it easy to calculate the work efficiency of the preset user and eliminates the step of manually calculating the work efficiency.
[0028] In another possible implementation, determining the correlation coefficient based on the scheduled work data and the overdue work data of the preset user includes:
[0029] Determining relevant factors based on the scheduled work data and overdue work data of the preset user;
[0030] Determine the correlation coefficient corresponding to each of the related factors.
[0031] By adopting the above technical solution, based on the on-time work data and overdue work data, the influencing factors of the preset users on the work items delivered on time, as well as the influencing factors of the preset users on the work items delivered overdue are determined, and the correlation coefficients corresponding to the relevant factors are determined, thereby determining different correlation coefficients for different relevant factors, so as to determine the work efficiency through the corresponding correlation coefficients.
[0032] In another possible implementation manner, the obtaining of the standard working efficiency includes:
[0033] Get the job information of the preset user;
[0034] Based on the job information of the preset users, a list of target users and the work efficiency of the target users are obtained;
[0035] Based on the work efficiency of the target user, a standard work efficiency is determined.
[0036] By adopting the above technical solution, by acquiring a target user with similar job information to the preset user, the standard work efficiency is determined based on the work efficiency of the target user, thereby facilitating comparison between the work efficiency of the preset user and the standard work efficiency.
[0037] In another possible implementation manner, the determining whether the work efficiency of the preset user is qualified further includes:
[0038] Obtaining completed work item data of a preset user, and establishing an estimation model based on the completed work item data;
[0039] Based on the estimation model, the to-do items of a preset user are estimated.
[0040] By adopting the above technical solution, it is possible to obtain the completed work item data of the preset user, analyze the completed work item data, determine parameter information based on the completed work item data, and establish an estimation model, so that the preset user's to-do work items can be input into the established estimation model, and the to-do work items can be estimated, thereby obtaining information such as the estimated completion time of the scheduled user's to-do items.
[0041] In the second aspect, the present application provides a device for monitoring the human efficacy time process, which adopts the following technical solution:
[0042] A human efficacy time process monitoring device, comprising:
[0043] A first acquisition module is used to acquire work data of a preset user, wherein the work data includes the workload and work time of the preset user;
[0044] A determination module, used to determine the work efficiency of a preset user based on the work data of the preset user;
[0045] The second acquisition module is used to acquire the standard work efficiency;
[0046] The comparison module is used to compare the work efficiency of the preset user with the standard work efficiency.
[0047] The judging module is used to judge whether the working efficiency of the preset user is qualified.
[0048] By adopting the above technical solution, the first acquisition module can obtain the workload and work time of the preset user, and calculate the workload and work time of the preset user. The determination module calculates the work efficiency of the scheduled user, thereby eliminating the step of the enterprise administrative department recording the work data of the enterprise employees in sequence. The comparison module compares the work efficiency of the preset user with the standard work efficiency. The judgment module determines whether the work efficiency of the preset user is qualified, so as to monitor the work efficiency of the enterprise employees and reduce the possibility of supervision loopholes.
[0049] In another possible implementation, when the first acquisition module acquires the work data of the preset user, it is specifically used to:
[0050] Get the node request information of the terminal device;
[0051] Determine a node event and a node time based on the node request information of the terminal device;
[0052] Based on the node event and the node time, the work time of the preset user is determined.
[0053] In another possible implementation, when the first acquisition module determines the node event and the node time based on the node request information of the terminal device, it is specifically used to:
[0054] Extracting a feature vector from the node request information of the terminal device;
[0055] The feature vector is preprocessed, and the node event and the node time are determined.
[0056] In another possible implementation, when the determination module determines the work efficiency of the preset user based on the work data of the preset user, it is specifically used to:
[0057] Obtaining a target date, where the target date is a preset target date for a user to set a target work item;
[0058] Based on the work data of the preset user and the target date, determining the on-schedule work data and overdue work data of the preset user;
[0059] Determine a correlation coefficient based on the scheduled work data and overdue work data of the preset user, wherein the correlation coefficient includes a positive correlation coefficient and a negative correlation coefficient;
[0060] Based on the correlation coefficient, the work efficiency of the preset user is determined.
[0061] In another possible implementation, when the determination module determines the correlation coefficient based on the scheduled work data and the overdue work data of the preset user, it is specifically used to:
[0062] Determining relevant factors based on the scheduled work data and overdue work data of the preset user;
[0063] Determine the correlation coefficient corresponding to each of the related factors.
[0064] In another possible implementation, when acquiring the standard working efficiency, the second acquiring module is specifically configured to:
[0065] Get the job information of the preset user;
[0066] Based on the job information of the preset users, a list of target users and the work efficiency of the target users are obtained;
[0067] Based on the work efficiency of the target user, a standard work efficiency is determined.
[0068] In another possible implementation, the device further includes: a third acquisition module, a model building module and an estimation module, wherein:
[0069] The third acquisition module is used to obtain the completed work items data of the preset user;
[0070] A model building module, used to build an estimation model based on the completed work item data;
[0071] The estimation module is used to estimate the to-do items of a preset user based on the estimation model.
[0072] In a third aspect, the present application provides an electronic device, which adopts the following technical solution:
[0073] An electronic device, comprising:
[0074] at least one processor;
[0075] Memory;
[0076] At least one application, wherein the at least one application is stored in the memory and configured to be executed by the at least one processor, and the at least one application is configured to: execute a human efficacy time process monitoring method shown in any possible implementation of the first aspect.
[0077] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:
[0078] A computer-readable storage medium includes: a computer program that can be loaded and executed by a processor to implement a human efficacy time process monitoring method shown in any possible implementation of the first aspect.
[0079] In summary, the present application includes at least one of the following beneficial technical effects:
[0080] 1. It can obtain the workload and working time of the preset user, calculate the workload and working time of the preset user, and calculate the work efficiency of the scheduled user, thereby eliminating the step of the enterprise administrative department recording the work data of the enterprise employees in sequence, and compare the work efficiency of the preset user with the standard work efficiency to determine whether the work efficiency of the preset user is qualified, so as to monitor the work efficiency of the enterprise employees and reduce the possibility of supervision loopholes;
[0081] 2. It can obtain the completed work items data of the preset users, analyze the completed work items data, determine the parameter information based on the completed work items data, and establish an estimation model, so that the preset users' to-do work items can be input into the established estimation model, and the to-do work items can be estimated, thereby obtaining information such as the estimated completion time of the scheduled users' to-do items. BRIEF DESCRIPTION OF THE DRAWINGS
[0082] Figure 1 It is a flow chart of a method for monitoring the time course of human efficacy according to an embodiment of the present application.
[0083] Figure 2 It is a schematic diagram of the structure of a human efficacy time process monitoring device according to an embodiment of the present application.
[0084] Figure 3 It is a structural schematic diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION
[0085] The following is attached to the instruction manual Figure 1 -Attached Figure 3 The embodiments of the present application are described in further detail.
[0086] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, those skilled in the art may make modifications to the present embodiment without any creative contribution as needed, but such modifications are protected by the patent law as long as they are within the scope of the claims of the present application.
[0087] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0088] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.
[0089] The embodiment of the present application provides a method for monitoring the labor efficiency time process, which can obtain the work data of a preset user (employee), calculate the work efficiency of the preset user, and judge whether the work efficiency of the preset user is qualified based on the standard work efficiency.
[0090] In the embodiments of the present application, the scenario of monitoring the work efficiency of enterprise employees is mainly described as an example, but it is not intended to limit the embodiments of the present application.
[0091] In order to better implement the human efficacy time process monitoring method, the following is explained through specific embodiments in conjunction with the accompanying drawings.
[0092] The embodiment of the present application provides a method for monitoring the time course of human effectiveness, which is performed by an electronic device, which can be a server or a terminal device, wherein the server can be an independent physical server, or a server cluster or a distributed system composed of multiple physical servers. The terminal device can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc., but is not limited thereto, and the embodiment of the present application does not limit this.
[0093] Furthermore, the present application embodiment provides a method for monitoring the human efficacy time process, such as Figure 1 As described above, an example is given to implement a human efficacy time process monitoring method, which is as follows:
[0094] Step S101, obtaining work data of a preset user.
[0095] The work data includes the workload and work time of the preset user.
[0096] For the embodiment of the present application, the electronic device determines the target object of the labor efficiency time process monitoring as a preset user, and the preset user includes each employee in each position of the enterprise. Obtaining the work data of the preset user: The electronic device can pre-acquire the work data stored in the company system, and the work data includes the workload of all employees, and the workload includes at least one work item, and determines the work time of each work item. The electronic device can obtain the account information of the preset user, and based on the account information of the preset user, determine the work data of the preset user from the work data of all employees.
[0097] Furthermore, the job information of preset users can be pre-set, for example, obtaining the work data of optimizers, or obtaining the work efficiency of material managers. The work efficiency of preset users within a specified time can also be pre-set, for example, obtaining the work data of preset users from 8 am to 5 pm.
[0098] Step S102: determining the work efficiency of the preset user based on the work data of the preset user.
[0099] For the embodiment of the present application, the work efficiency of the preset user refers to the ratio of the input and output of the preset user in a work item. When the output of the preset user in a work item is greater than the input, it is positive efficiency and the efficiency value is high; conversely, when the output of the preset user in a work item is less than the input, it is negative efficiency and the efficiency value is low. The electronic device can determine the time consumption corresponding to each work item according to the workload and work time consumption of the preset user.
[0100] Step S103, obtaining the standard work efficiency, and comparing the work efficiency of the preset user with the standard work efficiency.
[0101] For the embodiments of the present application, the standard work efficiency is obtained: the electronic device can obtain the average efficiency of employees in the same position as the preset user for the same work item, and use the average efficiency of employees in the same position as the standard work efficiency. The average efficiency of the work items completed by the preset user can also be obtained, and the average efficiency of the work items completed by the preset user is used as the standard work efficiency. Compare the work efficiency of the preset user with the standard work efficiency: the electronic device can represent the work efficiency in digital form, and compare the work efficiency of the preset user with the standard work efficiency using efficiency values. For example, the standard work efficiency can be set to 10 points.
[0102] Step S104, determining whether the work efficiency of the preset user is qualified.
[0103] For the embodiment of the present application, when the work efficiency of the preset user is higher than the standard work efficiency, it is determined to be qualified, and when the work efficiency of the preset user is lower than the standard work efficiency, it is determined to be unqualified. The electronic device can also send the comparison result of the work efficiency of the preset user and the standard work efficiency to the direct supervisor of the preset user, so that the direct supervisor can understand the work situation of the preset user.
[0104] Specifically, in the embodiment of the present application, obtaining the work data of the preset user in step S101 may specifically include step S1011 (not shown in the figure), step S1012 (not shown in the figure) and step S1013 (not shown in the figure), wherein:
[0105] Step S1011, obtaining node request information of the terminal device.
[0106] For the embodiment of the present application, the node request of the terminal device includes a GET request and a POST request, wherein the request data of the GET request can be sent with the HTTP request header, and the request data of the POST request is sent after the HTTP request header is sent. Obtaining the node request information of the terminal device: The electronic device can obtain the node request information corresponding to the terminal device when detecting the node request of sending, allocating and submitting triggered by the preset user.
[0107] Step S1012, determining the node event and the node time based on the node request information of the terminal device.
[0108] For the embodiment of the present application, the node event and the node time are determined: the electronic device can obtain the node request data packet, parse the node request data packet, and determine the node event corresponding to the node request. The node event includes the operation events such as the reception, processing, and completion of a certain work item by a preset user. After determining the node event, the node time of the node event is determined according to the generation time of the node request.
[0109] Step S1013, determining the work time of the preset user based on the node event and the node time.
[0110] For the embodiment of the present application, the electronic device obtains the node flow time of the work item in real time by obtaining the node event, starting from the start of generating the work item. It can start from detecting the "start processing" node triggered by the preset user and end with detecting the "submit" node triggered by the preset user. The time period between the two nodes is determined as the work time consumed by the preset user for this work item.
[0111] Specifically, in the embodiment of the present application, in step S1022, based on the node request information of the terminal device, the node event and the node time are determined, which may specifically include step S1021 (not shown in the figure) and step S1022 (not shown in the figure), wherein:
[0112] Step S10221, extracting a feature vector from the node request information of the terminal device.
[0113] For the embodiment of the present application, feature vectors are extracted: the electronic device can perform dimensionality reduction processing on the data in the node request information through principal component analysis, extract the main features in the data, ignore unimportant features, and compress the data into an M*N matrix.
[0114] Step S10222, pre-process the feature vector and determine the node event and node time.
[0115] For the embodiments of the present application, the feature vector can be subjected to feature selection through filtering, wrapping or embedding, abnormal feature vectors can be removed, linear dimension reduction and normalization processing can be performed on the feature vector, and then the pre-processed feature vector can be analyzed.
[0116] Specifically, in the embodiment of the present application, in step S102, based on the work data of the preset user, the work efficiency of the preset user is determined, which may specifically include step S1021 (not shown in the figure), step S1022 (not shown in the figure), step S1023 (not shown in the figure) and step S1024 (not shown in the figure), wherein:
[0117] Step S1021, obtaining the target date.
[0118] The target date is the target date preset by the user for a certain work item.
[0119] For the embodiment of the present application, the electronic device can obtain the work items to be monitored in advance, and determine the work items to be monitored as target work items. Based on the target work items, the target date set by the preset user is obtained, or the target date set by the direct supervisor of the preset user is obtained, and the target date is the date that the preset user should submit.
[0120] Step S1022, based on the preset user's work data and target date, determining the preset user's on-schedule work data and overdue work data.
[0121] For the embodiment of the present application, the work data of the preset user includes the delivery date of the preset user. The delivery date is compared with the target date, and the work data with a delivery date earlier than the target date is determined as on-schedule work data, and the work data with a delivery date later than the target date is determined as overdue work data.
[0122] For example, for target work item A, the target date is September 10. If the preset user delivery date is September 1, then target work item A is a scheduled work item, and target work item A and its specific content, the delivery date of September 1, and the scheduled delivery days of 9 days are determined as the scheduled work data.
[0123] Step S1023, determining a correlation coefficient based on the on-schedule work data and overdue work data of a preset user.
[0124] Among them, the correlation coefficient includes positive correlation coefficient and negative correlation coefficient.
[0125] For the embodiment of the present application, the electronic device can determine a positive correlation coefficient based on the scheduled work data of the preset user, and the positive correlation coefficient is a positive number. When the scheduled time of the preset user is longer, the positive correlation coefficient is larger. For example, if the scheduled delivery time of the preset user is 3 days, the correlation coefficient is 0.3. Based on the overdue work data of the preset user, a negative correlation coefficient is determined, and the negative correlation coefficient is a negative number. For example, if the overdue delivery time of the preset user is 5 days, the correlation coefficient is -0.5.
[0126] Step S1024: determining the work efficiency of the preset user based on the correlation coefficient.
[0127] For the embodiment of the present application, the electronic device can pre-set a formula to calculate the work efficiency of the preset user. Specifically, the initial work efficiency can be set to 10, and the work efficiency of the preset user = initial work efficiency + positive correlation coefficient - negative correlation coefficient to determine the work efficiency of the preset user.
[0128] Specifically, in the embodiment of the present application, in step S1023, the correlation coefficient is determined based on the scheduled work data and overdue work data of the preset user, which may specifically include step S10231 (not shown in the figure) and step S10232 (not shown in the figure), wherein:
[0129] Step S10231, determining relevant factors based on the scheduled work data and overdue work data of the preset user.
[0130] For the embodiment of the present application, the relevant factors include subjective factors and objective factors that affect the progress of the work items. Determine the relevant factors: The electronic device can perform difficulty analysis on the work items contained in the scheduled work data based on the scheduled work data of the preset user, determine the difficulty coefficient of the work items, and use the difficulty coefficient as the relevant factor.
[0131] Step S10232, determining the correlation coefficient corresponding to each correlation factor.
[0132] For the embodiment of the present application, the relevant factors are classified into subjective factors and objective factors, and the correlation coefficients of the subjective factors and the objective factors are determined respectively. The correlation coefficient and the weight of the correlation coefficient can also be determined according to the relevant factors. For a certain work item, if the work item is overdue due to subjective factors, such as low work efficiency, staff delay, etc., the weight value of the correlation coefficient of the subjective factor is large; if the contract is not signed on time due to objective factors, such as bad weather, etc., resulting in the overdue delivery of the work item, the weight value of the correlation coefficient of the objective factor is small.
[0133] Specifically, in the embodiment of the present application, obtaining the standard working efficiency in step S103 may include step S1031 (not shown in the figure), step S1032 (not shown in the figure) and step S1033 (not shown in the figure), wherein:
[0134] Step S1031, obtaining the position information of the preset user.
[0135] For the embodiment of the present application, the job information of the preset user includes the department information, work number, and entry time of the preset user. Among them, the department information includes the department and group information of the preset user. For example, the preset user 1 belongs to the administrative department group 1, and the entry time is August 1, 2012. The electronic device can also obtain the preset user's work number and separate the work number by digits to obtain the preset user's department information and entry time. The electronic device can pre-set the work numbering rules. For example, the first digit of the work number indicates the branch company to which the preset user belongs, the second digit of the work number is the department information of the preset user, and the third to tenth digits of the work number are the entry time of the preset user, so as to determine the preset user's department information and entry time and other information.
[0136] Step S1032, based on the job information of the preset users, obtain a list of target users and the work efficiency of the target users.
[0137] For the embodiment of the present application, the users in the target user list and the preset users are in the same position or job, and the electronic device retrieves the work data of the target users to determine the average work efficiency of the target users. The target user can also be a user who belongs to the same department as the preset user and whose joining time is no more than two months apart. For example, if the preset user belongs to the administrative department and joined on March 10, 2019, the users whose joining time in the administrative department is between January 10, 2019 and May 10, 2019 are retrieved and determined as the target users.
[0138] Step S1033: determining the standard work efficiency based on the work efficiency of the target user.
[0139] For the embodiment of the present application, the standard working efficiency is determined: the electronic device can calculate the average working efficiency of the target user and determine the average working efficiency of the target user as the standard working efficiency. For example, the working efficiency of the target user is 10.3, 12 and 8.0 respectively, that is, the standard working efficiency is 10.1.
[0140] In a possible implementation manner of the embodiment of the present application, the method may further include: step S105 (not shown in the figure) and step S106 (not shown in the figure), wherein step S105 (not shown in the figure) and step S106 (not shown in the figure) may be performed after step S104, wherein:
[0141] Step S105, obtaining completed work item data of a preset user, and establishing an estimation model based on the completed work item data.
[0142] For the embodiment of the present application, the electronic device can obtain the completed work items data of the preset user, that is, obtain the completed work items of the preset user and the work efficiency values corresponding to the completed work items. Establish an estimation model based on the completed work items data: a prediction curve can be drawn based on the completed work items data, quantitative prediction can be performed based on the time series method, and quantitative prediction can also be performed based on the causal analysis method.
[0143] Specifically, the electronic device can input the completed work item data into the grey prediction model. The grey prediction model can predict the uncertain factors, conduct correlation analysis by identifying the differences in the development trends between system factors, generate regular data sequences and establish differential equation models, thereby achieving the purpose of prediction.
[0144] Step S106: estimating the to-do items of the preset user based on the estimation model.
[0145] For the embodiment of the present application, the electronic device obtains the to-do work items of the preset user in advance, and inputs the to-do work items of the preset user into the estimation model to obtain the estimated completion time of the to-do work items of the preset user, so as to facilitate the preset user and the preset user's direct supervisor to arrange work items.
[0146] The above embodiment introduces a method for monitoring the progress of human efficiency time by means of a method flow. The following embodiment introduces a device for monitoring the progress of human efficiency time from a virtual perspective. For details, please refer to the following embodiment:
[0147] The present application embodiment provides a human efficacy time process monitoring device, such as Figure 2 As shown, the human efficacy time process monitoring device 20 may specifically include:
[0148] The first acquisition module 201 is used to acquire work data of a preset user, where the work data includes the workload and work time of the preset user;
[0149] A determination module 202, configured to determine the work efficiency of a preset user based on the work data of the preset user;
[0150] The second acquisition module 203 is used to acquire the standard working efficiency;
[0151] The comparison module 204 is used to compare the work efficiency of the preset user with the standard work efficiency.
[0152] The judgment module 205 is used to judge whether the work efficiency of the preset user is qualified.
[0153] In another possible implementation of the embodiment of the present application, when the first acquisition module 201 acquires the work data of the preset user, it is specifically used to:
[0154] Get the node request information of the terminal device;
[0155] Determine node events and node times based on node request information from terminal devices;
[0156] Based on node events and node times, determine the work time of the preset user.
[0157] In another possible implementation of the embodiment of the present application, when the first acquisition module 201 determines the node event and the node time based on the node request information of the terminal device, it is specifically used to:
[0158] Extracting feature vectors from node request information of terminal devices;
[0159] Preprocess the feature vector and determine the node events and node times.
[0160] In another possible implementation of the embodiment of the present application, when the determination module 202 determines the work efficiency of the preset user based on the work data of the preset user, it is specifically used to:
[0161] Get the target date, which is the target date preset by the user for the target work item;
[0162] Based on the work data and target date of the preset user, determine the on-schedule work data and overdue work data of the preset user;
[0163] Determine a correlation coefficient based on the scheduled work data and overdue work data of the preset user, where the correlation coefficient includes a positive correlation coefficient and a negative correlation coefficient;
[0164] Based on the correlation coefficient, the work efficiency of the preset user is determined.
[0165] In another possible implementation of the embodiment of the present application, when the determination module 202 determines the correlation coefficient based on the scheduled work data and the overdue work data of the preset user, it is specifically used to:
[0166] Determine relevant factors based on the preset user's on-schedule work data and overdue work data;
[0167] Determine the correlation coefficient corresponding to each relevant factor.
[0168] In another possible implementation of the embodiment of the present application, when acquiring the standard working efficiency, the second acquisition module 203 is specifically used to:
[0169] Get the job information of the preset user;
[0170] Based on the preset user's job information, obtain the target user list and the target user's work efficiency;
[0171] Determine standard work efficiency based on the work efficiency of target users.
[0172] In another possible implementation of the embodiment of the present application, the device 20 further includes: a third acquisition module, a model building module and an estimation module, wherein:
[0173] The third acquisition module is used to obtain the completed work items data of the preset user;
[0174] Model building module, used to build an estimation model based on completed work items data;
[0175] The estimation module is used to estimate the to-do items of a preset user based on the estimation model.
[0176] The embodiment of the present application provides a labor efficiency time process monitoring device. By adopting the above technical solution, the first acquisition module can obtain the workload and work time of the preset user, and calculate the workload and work time of the preset user. The determination module calculates the work efficiency of the scheduled user, thereby eliminating the step of the enterprise administrative department recording the work data of the enterprise employees in sequence. The comparison module compares the work efficiency of the preset user with the standard work efficiency. The judgment module determines whether the work efficiency of the preset user is qualified, so as to monitor the work efficiency of the enterprise employees and reduce the possibility of supervision loopholes.
[0177] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0178] The present application also provides an electronic device, such as Figure 3 As shown, Figure 3 The electronic device 30 shown includes: a processor 301 and a memory 303. The processor 301 and the memory 303 are connected, such as through a bus 302. Optionally, the electronic device 30 may also include a transceiver 304. It should be noted that in actual applications, the transceiver 304 is not limited to one, and the structure of the electronic device 30 does not constitute a limitation on the embodiments of the present application.
[0179] The processor 301 may be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. It may implement or execute various exemplary logic blocks, modules and circuits described in conjunction with the disclosure of this application. The processor 301 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0180] The bus 302 may include a path to transmit information between the above components. The bus 302 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus 302 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 Only one thick line is used in the diagram, but this does not mean that there is only one bus or only one type of bus.
[0181] The memory 303 may be a ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage devices that can store information and instructions, or an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory) or other optical disk storage, optical disk storage (including compressed optical disk, laser disk, optical disk, digital versatile disk, Blu-ray disk, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto.
[0182] The memory 303 is used to store the application code for executing the solution of the present application, and the execution is controlled by the processor 301. The processor 301 is used to execute the application code stored in the memory 303 to implement the contents shown in the above method embodiment.
[0183] The electronic devices include but are not limited to: mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc., and can also be servers, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0184] The embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored, and when the computer is run on a computer, the computer can execute the corresponding content in the aforementioned method embodiment. Compared with the related art, the embodiment of the present application can obtain the workload and work time of the preset user, and calculate the workload and work time of the preset user, and calculate the work efficiency of the scheduled user, thereby eliminating the step of the enterprise administrative department recording the work data of the enterprise employees in sequence, and comparing the work efficiency of the preset user with the standard work efficiency to determine whether the work efficiency of the preset user is qualified, so as to monitor the work efficiency of the enterprise employees and reduce the possibility of supervision loopholes.
[0185] It should be understood that, although the steps in the flowchart of the accompanying drawings are displayed in sequence as indicated by the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless otherwise specified herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed in turn or alternately with other steps or at least a part of the sub-steps or stages of other steps.
[0186] The above are only some implementation methods of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A method for monitoring the time course of human efficacy, It is characterized in that include: Get the node request information of the terminal device; Extracting a feature vector from the node request information of the terminal device; Preprocessing the feature vector and determining the node event and node time; Determine the work time of a preset user based on the node event and the node time; Determining the work efficiency of the preset user based on the work data of the preset user; Obtaining standard work efficiency, and comparing the work efficiency of the preset user with the standard work efficiency; Determining whether the work efficiency of the preset user is qualified; Wherein, determining the work efficiency of the preset user based on the work data of the preset user includes: Obtaining a target date, where the target date is a target date preset by the user for the target work item; Based on the work data of the preset user and the target date, determining the on-schedule work data and overdue work data of the preset user; Determine a correlation coefficient based on the scheduled work data and overdue work data of the preset user, wherein the correlation coefficient includes a positive correlation coefficient and a negative correlation coefficient; Based on the correlation coefficient, determining the work efficiency of the preset user; The determining the work efficiency of the preset user based on the correlation coefficient includes: The work efficiency of the preset user is determined by the following formula: The work efficiency of the preset user = initial work efficiency + the positive correlation coefficient - the negative correlation coefficient; The determining of the correlation coefficient based on the scheduled work data and the overdue work data of the preset user includes: Determining relevant factors based on the scheduled work data and overdue work data of the preset user; Determine the correlation coefficient corresponding to each of the related factors; The determining of the correlation coefficients corresponding to the respective correlation factors comprises: Categorize the relevant factors to identify subjective and objective factors; Determine the correlation coefficients corresponding to the subjective factors and the objective factors respectively.
2. The method for monitoring the time course of human efficacy according to claim 1, It is characterized in that The obtaining of standard working efficiency includes: Get the job information of the preset user; Based on the job information of the preset users, a list of target users and the work efficiency of the target users are obtained; Based on the work efficiency of the target user, a standard work efficiency is determined.
3. The method for monitoring the human efficacy time course according to claim 1, It is characterized in that The step of determining whether the work efficiency of the preset user is qualified further comprises: Obtaining completed work item data of a preset user, and establishing an estimation model based on the completed work item data; Based on the estimation model, the to-do items of a preset user are estimated.
4. A device for monitoring the progress of human efficacy time, It is characterized in that A method for monitoring the human efficacy time course as described in any one of claims 1 to 3, comprising: A first acquisition module is used to acquire work data of a preset user, wherein the work data includes a workload and work time of the preset user; A determination module, used to determine the work efficiency of a preset user based on the work data of the preset user; The second acquisition module is used to acquire the standard work efficiency; A comparison module, used for comparing the work efficiency of the preset user with the standard work efficiency; The judging module is used to judge whether the working efficiency of the preset user is qualified.
5. An electronic device, It is characterized in that include: at least one processor; Memory; At least one application, wherein the at least one application is stored in the memory and configured to be executed by the at least one processor, and the at least one application is configured to: execute a human efficacy time course monitoring method according to any one of claims 1 to 3.
6. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, a human efficacy time course monitoring method as described in any one of claims 1 to 3 is implemented.
Citation Information
Patent Citations
A wearable device-based work efficiency evaluation system and method
CN109146028A
Digital twinning workshop material punctual distribution method and system
CN111210184A
Method and device for determining employment scheme
CN111310105A
Method and device for monitoring working efficiency of auditors
CN111429036A
Work task management method and device, storage medium and electronic equipment
CN113723758A