Tunnel lock foot anchor cable and initial support arch foot horizontal convergence deformation control method
By installing anchor cables with steel strands, steel strips, and anchor plates at the arch foot of the tunnel initial support, the problem of controlling the horizontal convergence deformation of the arch foot in weak surrounding rock tunnels was solved, achieving efficient deformation suppression and improved construction safety.
Patent Information
- Application Number
- CN202210156184.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-21
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2042-02-21
AI Technical Summary
Existing technologies are insufficient to effectively control the horizontal convergence deformation of the initial support arch foot in tunnels with weak surrounding rock. Commonly used measures such as anchor pipes and temporary invert arches are ineffective and have problems such as inconvenience in construction and grout leakage, which affect the construction progress and safety.
The anchor cable, consisting of steel strands, steel strips, and anchor plates with a length of 5-12m, is used to quickly anchor the anchor cable to the surrounding rock by installing the steel strands and applying prestress at the arch foot of the tunnel initial support, and using resin anchoring agent to form permanent support and control the horizontal convergence deformation of the arch foot.
Locking anchor cables can effectively penetrate the loose zone of the surrounding rock to achieve deep anchoring, avoid grout leakage, provide diagonal tension and restraint, suppress horizontal and vertical settlement deformation of the arch foot, and improve construction efficiency and safety.
Smart Images

Figure CN114718601B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of tunnel engineering, specifically to a method for controlling the horizontal convergence deformation of tunnel anchor cables and initial support arch feet. Background Technology
[0002] Tunnels in weak surrounding rock often employ segmented excavation methods such as the bench excavation. During this process, the vertical settlement and horizontal convergence deformation of the initial support arch foot are often significant, exacerbating the loosening of the surrounding rock behind the initial support and easily causing deformation encroachment and damage to the initial support, potentially leading to tunnel collapse in severe cases. Therefore, controlling the arch foot deformation is one of the key aspects of deformation control in tunnels in weak surrounding rock.
[0003] Currently, the main technical measures for controlling the settlement of the arch foot in the initial support of tunnels include installing anchor pipes, setting longitudinal support beams for the arch foot, and large arch feet. These measures have been tested in a large number of engineering practices and have significant technical effects. However, in terms of controlling the horizontal convergence deformation of the arch foot in the initial support of tunnels, although temporary inverted arches, temporary cross braces, and long anchor rods with grouting have been tried, they are often inconvenient in actual construction operations and often fail to achieve the expected technical effects. For example, temporary inverted arches or temporary cross braces not only affect the normal muck removal construction of the tunnel, but also cause excessive deformation of the arch foot after removal. Due to the limited construction space, the commonly used anchor pipes (rods) are generally only 3 to 5 meters long, rarely able to pass through the loose rock zone. Moreover, grout leakage and runoff are easy to occur during grouting and anchoring, making it difficult to guarantee the grouting and anchoring effect. As a result, the role of anchor pipes (rods) in suppressing the horizontal convergence deformation of the tunnel arch foot is very limited.
[0004] For the reasons mentioned above, the application of existing tunnel arch foot horizontal convergence deformation control technology is decreasing. When significant horizontal convergence deformation of the initial support arch foot, opening and bulging deformation of the steel frame connecting plate occur, only emergency measures such as temporary support, surrounding rock grouting and arch replacement can be forced, which seriously affects the construction progress, safety and quality. Summary of the Invention
[0005] To address the aforementioned technical problems, this invention provides a method for controlling the horizontal convergence deformation of the tunnel anchor cable and the initial support arch foot, thereby achieving effective control over the horizontal convergence deformation of the initial support arch foot in tunnels with weak surrounding rock.
[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows:
[0007] A tunnel anchor cable includes a steel strand, a steel strip, an anchor plate and an anchor installed on the surface of the shotcrete at the arch foot of the tunnel initial support. One end of the steel strand is anchored to the tunnel surrounding rock by an anchoring agent, and the other end of the steel strand is exposed on the outer surface of the shotcrete between adjacent steel frames of the tunnel initial support.
[0008] The steel strip is set on the outer surface of the shotcrete of the initial support. Each steel strip has several reserved holes that match the outer diameter and longitudinal spacing of the steel strands for fixing the corresponding steel strands. The anchor plate has a reserved hole in the middle that matches the outer diameter of the steel strand. After the exposed end of the steel strand passes through the reserved hole on the steel strip and the anchor plate, the exposed end of the steel strand after applying prestress is locked by the anchor.
[0009] In the aforementioned tunnel anchor cable, the axial direction of the steel strand is perpendicular to the surface of the initial support shotcrete at the location.
[0010] In the aforementioned tunnel anchor cables, the steel strands are 5–12 m long and 17–25 mm in diameter.
[0011] In the aforementioned tunnel anchor cables, the exposed length of the steel strand is 25–30 cm.
[0012] In the aforementioned tunnel anchor cables, the steel strip has a width of 25–30 cm and a thickness of 2.5–3.5 mm.
[0013] In the aforementioned tunnel anchor cable, the length, width, and thickness of the anchor plate are 28–32 cm, 28–32 cm, and 14–16 mm, respectively.
[0014] In the aforementioned tunnel anchor cables, the anchorage is matched with the steel strand.
[0015] A method for controlling the horizontal convergence deformation of the initial support arch foot includes the following steps:
[0016] [1] After the tunnel is excavated, steel frames are installed, anchor pipes and advance small guide pipes are installed, and shotcrete operations are carried out;
[0017] [2] Repeat step [1] 1 to 2 times. After the shotcrete of the 1 to 2 cycles has hardened, install 1 to 2 rows of tunnel anchor cables on the shotcrete surface at the initial support arch foot of the tunnel to control the horizontal convergence deformation of the initial support arch foot of the tunnel.
[0018] In the above-mentioned method for controlling the horizontal convergence deformation of the initial support arch foot, the installation steps of the tunnel anchor cable in step [2] are as follows:
[0019] 【2.1】Drilling:
[0020] On the shotcrete surface between two adjacent steel frames of the initial support arch foot, a single-unit pneumatic anchor drill or a pneumatic rock drill is used to drill holes one by one according to the set position. The drilling position is 50-150cm away from the arch foot, the drilling diameter is 28-32mm, and the drilling angle is perpendicular to the initial support surface at the drilling point.
[0021] 【2.2】Installation of anchoring agent:
[0022] After cleaning the hole, use a plastic round tube to send the resin anchoring agent cartridge into the deepest part of the hole and tamp it down. The total installation length of the resin anchoring agent cartridge should not be less than 1.2m.
[0023] 【2.3】Insert the steel strand into the hole and mix the anchoring agent:
[0024] The steel strand is manually fed into the borehole to the position of the resin anchoring agent cartridge. Then, a mixing driver is installed on the outer end of the steel strand. The drilling rig is started, and while the steel strand is mixing the anchoring agent, the drilling rig is kept advancing. The mixing time is controlled at 20-30 seconds to ensure that the anchoring agent is mixed evenly. Attention should be paid to controlling the length of the steel strand exposed on the shotcrete surface to be 25-30 cm.
[0025] 【2.4】Install the steel strip, anchor plate, and anchorage, and apply prestress to the steel strand:
[0026] Along the longitudinal direction of the tunnel, the exposed steel strands on the surface of the initial support shotcrete are passed one by one through the reserved holes on the steel strip, so that a steel strip connects several steel strands in series. Anchor plates and anchors are then installed at the exposed ends of each steel strand. Then, a tensioning machine is used to apply prestress to each steel strand, so that the steel strands locked by the anchors and the steel strip together constrain the deformation of the arch foot of the initial support.
[0027] The beneficial technical effects of the present invention are as follows:
[0028] (1) This invention first proposes the concept of a locking anchor cable. Compared with existing locking anchor pipes (rods) that generally use 3-5m long steel pipes or reinforcing bars, locking anchor cables use small-diameter steel strands with a certain degree of flexibility. Their installation length is not limited by the tunnel construction work space and can reach 12m or even longer. They can pass through the loose zone of the surrounding rock and then anchor to the stable rock mass deep in the surrounding rock. The locking anchor cable achieves anchoring with the surrounding rock through resin anchoring agent, eliminating the problems of grout leakage and runoff that occur during grouting anchoring of locking anchor pipes (rods). The anchoring agent also hardens much faster, achieving a rapid anchoring effect. Therefore, the advantages of locking anchor cables are very obvious in terms of anchoring depth, anchoring quality, and anchoring efficiency, resulting in better technical effects in controlling the horizontal convergence deformation of the tunnel arch foot.
[0029] (2) In terms of controlling the horizontal convergence deformation of the arch foot of the tunnel initial support, compared with the temporary invert arch and temporary cross brace used in the prior art, the locking foot anchor cable of the present invention is a kind of permanent support. There is no sudden increase in the horizontal convergence deformation of the arch foot of the initial support when the temporary invert arch and temporary cross brace are removed. Moreover, it achieves "cable instead of support" and does not interfere with the subsequent construction procedures of the tunnel.
[0030] (3) One end of the locking anchor cable of the present invention is anchored deep in the surrounding rock, and the other end is prestressed by the steel strip, anchor plate and anchor installed on the surface of the shotcrete at the initial support arch foot. This securely locks the initial support arch foot and controls the deformation of the initial support arch foot. For the locking anchor cable located in the tunnel arch, since the locking anchor cable is installed perpendicular to the initial support surface, the actual angle is obliquely upward. The locking anchor cable can provide obliquely upward tension and constraint force to the initial support arch foot. While suppressing the horizontal convergence deformation of the initial support arch foot, it can also suppress the vertical settlement deformation of the initial support arch foot. Attached Figure Description
[0031] Figure 1 This is a schematic diagram of the arrangement of tunnel anchor cables in an embodiment of the present invention;
[0032] Figure 2 This is a side view of the tunnel anchor cable in an embodiment of the present invention.
[0033] Attached reference numerals: 1-Tunnel upper step; 2-Upper step steel frame; 3-Anchor pipe; 4-Advanced small guide pipe; 5-Shotcrete; 6-Anchor cable; 7-Steel strand; 8-Steel strip; 9-Anchor plate; 10-Anchor. Detailed Implementation
[0034] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
[0035] Conversely, this invention encompasses any substitutions, modifications, equivalent methods, and solutions made within the spirit and scope of the invention as defined in the claims. Furthermore, to provide a better understanding of the invention, certain specific details are described in detail below. However, those skilled in the art will fully understand the invention even without these detailed descriptions.
[0036] Anchor cables are commonly used in tunnels and coal mine roadways, solely for the direct reinforcement of surrounding rock. In existing tunnel projects involving anchor cable construction, after tunnel excavation, anchor cables are first used to reinforce the surrounding rock, followed by initial support construction to reinforce the surrounding rock again. However, since there is no connection between the anchor cables and the initial support, the anchor cables offer no constraint on the deformation of the initial support, especially the arch foot. The arch foot is the weakest point in the initial support structure, and controlling its deformation is crucial for controlling the deformation of tunnels in weak surrounding rock. This invention involves constructing locking anchor cables after the initial support construction is completed. By installing a locking anchor cable support system consisting of steel strands, steel strips, anchor plates, and anchors on the sprayed concrete surface at the arch foot of the initial support, the system constrains the deformation of the arch foot, effectively locking it in place. This solves the technical problem of controlling the horizontal convergence deformation of the arch foot in tunnels with weak surrounding rock.
[0037] This invention takes the construction of the anchor cable 6 at the arch foot of the upper step 1 of the tunnel as an example to introduce the specific solution of this invention.
[0038] like Figure 1 As shown, it includes the following steps:
[0039] [1] After the excavation of the upper step 1 of the tunnel, the upper step steel frame 2 was installed in time, the locking foot anchor pipe 3 and the advanced small guide pipe 4 were installed, and the shotcrete 5 was carried out.
[0040] [2] After the sprayed concrete 5 of the first two construction cycles has hardened, install a row of anchor cables 6 on the surface of the sprayed concrete of the first two construction cycles of the upper step initial support arch foot.
[0041] like Figure 2 As shown, in step [2], the locking anchor cable 6 includes a steel strand 7, a steel strip 8, an anchor plate 9, and an anchor 10 installed on the surface of the shotcrete near the arch foot of the initial support. One end of the steel strand 7 is anchored to the inside of the tunnel surrounding rock by an anchoring agent, and the other end of the steel strand 7 is exposed on the outer surface of the shotcrete 5 between the adjacent steel frames of the initial support of the tunnel. The steel strip 8 is set on the outer surface of the shotcrete 5 of the initial support. Each steel strip 8 is provided with several reserved holes that match the outer diameter and longitudinal spacing of the steel strand 7, which are used for the fixed connection between the corresponding number of locking anchor cables 6. The middle part of the anchor plate 9 is provided with a reserved hole that matches the outer diameter of the steel strand 7. The exposed end of the steel strand 7 passes through the reserved hole on the steel strip 8 and the anchor plate 9. The exposed end of the steel strand after the prestress is applied is locked by the anchor 10.
[0042] The steel strand 7 is 10m long and 21.8mm in diameter; the steel strip 8 is 28cm wide and 2.8mm thick, with pre-drilled holes for the steel strand to pass through, the spacing of which matches the spacing of the steel frame; the anchor plate 9 is 30cm long, 30cm wide, and 16mm thick; the anchor 10 is a KM22 type, matching the diameter of the steel strand. The axis of the steel strand 7 is perpendicular to the surface of the initial support shotcrete at its location.
[0043] The specific construction steps for the anchor cable in step [2] are as follows:
[0044] 1) Drilling:
[0045] On the shotcrete surface between two adjacent steel frames of the initial support arch foot, a single-unit pneumatic anchor drilling machine was used to drill holes one by one. The drilling position was 70cm away from the arch foot, the drilling diameter was 32mm, and the drilling angle was perpendicular to the shotcrete surface of the initial support at the drilling point.
[0046] 2) Install anchoring agent:
[0047] After cleaning the hole, a plastic round tube is used to send the resin anchoring agent cartridge into the deepest part of the hole and tamp it down. Three Z2350 resin anchoring agent cartridges are used, with a total installation length of 1.5m.
[0048] 3) Insert the steel strand into the hole and mix the anchoring agent:
[0049] First, the steel strand 7 is manually fed into the borehole to the position of the resin anchoring agent cartridge. Then, a mixing driver is attached to the outer end of the steel strand 7, and the lower end of the mixing driver is installed on the drilling rig. The drilling rig is started, and the drilling rig drives the mixing driver to rotate, which in turn drives the steel strand to rotate. During the rotation of the steel strand, the anchoring agent is mixed. While the steel strand 7 is mixing the anchoring agent, the drilling rig is kept advancing. The mixing time is controlled within 30 seconds to ensure that the anchoring agent is mixed evenly. The steel strand and the surrounding rock are quickly bonded and anchored together by the mixed anchoring agent. In addition, special attention should be paid to the length of the steel strand 7 exposed above the shotcrete surface, which should be controlled to 25-30 cm to avoid the steel strand 7 being unable to be tensioned due to the short exposed length.
[0050] 4) Install the steel strip 8, anchor plate 9, and anchor 10, and apply prestress to the steel strand 7:
[0051] Along the longitudinal direction of the tunnel, the exposed steel strands 7 are passed one by one through the reserved holes on the steel strip 8, that is, the steel strip 8 connects the various steel strands in series. Then, anchor plates and anchors are installed one by one. Finally, the tensioning equipment is used to apply prestress to each steel strand. After the prestress is applied, the steel strands and steel strip locked by the anchors together play a restraining role on the deformation of the initial support arch foot.
[0052] In summary, one end of the steel strand 7 is rapidly anchored to the surrounding rock through the mixing of resin anchoring agent. The other end of the steel strand 7, with the aid of the steel strip 8, anchor plate 9, and anchorage 10, and after prestressing is applied to the steel strand 7, forms a locking anchor cable, thereby controlling the horizontal convergence deformation of the tunnel initial support arch foot, especially the steel frame foot. The above description is merely illustrative of the technical concept of this invention and should not be construed as limiting the scope of protection of this invention. Any modifications made to the technical solution based on the technical concept proposed in this invention fall within the scope of protection of the claims of this invention.
Claims
1. A tunnel anchor cable, characterized in that, This includes steel strands (7), steel strips (8), anchor plates (9), and anchorages (10) installed on the shotcrete surface at the arch foot of the tunnel initial support. One end of several steel strands (7) is anchored inside the tunnel surrounding rock with the aid of resin anchoring agent, and the other end of the steel strands (7) is exposed on the outer surface of the shotcrete (5) between the adjacent steel frames of the tunnel initial support; the exposed end of the steel strands (7) is 25-30cm long. The steel strip (8) is set on the outer surface of the shotcrete (5) of the initial support. Each steel strip (8) is provided with a number of reserved holes that match the outer diameter and longitudinal spacing of the steel strands (7). The spacing of the reserved holes is consistent with the spacing of the steel frame and is used for the fixed connection between the corresponding number of steel strands (7). The width of the steel strip (8) is 25-30cm and the thickness is 2.5-3.5mm. The anchor plate (9) has a reserved hole in the middle that matches the outer diameter of the steel strand (7); The exposed ends of the steel strands (7) along the longitudinal direction of the tunnel pass through the reserved holes on the steel strip (8), that is, the steel strip (8) connects each steel strand in series, and then the anchor plate (9) and anchor (10) are installed one by one; After applying prestress to each steel strand (7), a locking anchor cable is formed to control the horizontal convergence deformation of the arch foot of the tunnel initial support. The steel strand (7) has a length of 5 to 12 m and a diameter of 17 to 25 mm; The steel strand (7) and steel strip (8) locked by the anchor jointly constrain the deformation of the initial support arch foot.
2. The tunnel anchor cable according to claim 1, characterized in that, The axial direction of the steel strand (7) is perpendicular to the surface of the initial support shotcrete at the location.
3. The tunnel anchor cable according to claim 1, characterized in that: The length, width, and thickness of the anchor plate (9) are 28-32cm, 28-32cm, and 14-16mm, respectively.
4. The tunnel anchor cable according to claim 1, characterized in that, The anchor (10) is matched with the diameter of the steel strand.
5. A method for controlling the horizontal convergence deformation of the initial support arch foot, characterized in that, Includes the following steps: [1] After the tunnel is excavated, steel frames are installed, anchor pipes and advance small guide pipes are installed, and shotcrete operations are carried out; [2] Repeat step [1] 1 to 2 times. After the sprayed concrete of the cyclic construction has hardened, install 1 to 2 rows of tunnel anchor cables as described in any one of claims 1 to 4 on the surface of the sprayed concrete at the arch foot of the tunnel initial support to achieve control over the horizontal convergence deformation of the arch foot of the tunnel initial support.
6. The method for controlling the horizontal convergence deformation of the initial support arch foot according to claim 5, characterized in that: The installation steps for the tunnel anchor cable in step [2] are as follows: [2.1] Drilling: On the shotcrete surface between two adjacent steel frames of the initial support arch foot, a single-unit pneumatic anchor drill or a pneumatic rock drill is used to drill holes one by one at the set position. The distance between the drilling position and the arch foot is 50-150cm, the diameter of the drilling hole is 28-32mm, and the drilling angle is perpendicular to the shotcrete surface of the initial support at the drilling point. 【2.2】Installation of anchoring agent: After cleaning the hole, use a plastic round tube to send the resin anchoring agent cartridge into the deepest part of the hole and tamp it down. The total installation length of the resin anchoring agent cartridge should not be less than 1.2m. 【2.3】Insert the steel strand into the hole and mix the anchoring agent: The steel strand is manually fed into the borehole to the position of the resin anchoring agent cartridge. Then, a mixing driver is installed on the outer end of the steel strand. The drilling rig is started, and while the steel strand is mixing the anchoring agent, the drilling rig is kept advancing. The mixing time is controlled at 20-30 seconds to ensure that the anchoring agent is mixed evenly. The length of the steel strand exposed on the shotcrete surface is controlled to be 25-30 cm. 【2.4】Install the steel strip, anchor plate, and anchorage, and apply prestress to the steel strand: Along the longitudinal direction of the tunnel, the exposed steel strands on the surface of the initial support shotcrete are passed one by one through the reserved holes on the steel strip, so that a steel strip connects several steel strands in series. Anchor plates and anchors are then installed at the exposed ends of each steel strand. Then, a tensioning machine is used to apply prestress to each steel strand, so that the steel strands locked by the anchors and the steel strip together constrain the deformation of the arch foot of the initial support.
Citation Information
Patent Citations
Four-line large-span tunnel cable-arch combined primary support structure
CN102226407A