A multi-element load elasticity prediction method based on a power distribution network grid

By using a multi-dimensional load elasticity forecasting method based on the distribution network grid, the load elasticity coefficient is classified and calculated, which solves the problem of difficult determination of load boundaries in distribution network planning, improves the accuracy of load forecasting and the precision of construction, and reduces equipment expansion investment.

CN114819251BActive Publication Date: 2026-11-24ECONOMIC TECH RES INST OF STATE GRID HENAN ELECTRIC POWER +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210186385.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-28
Publication Date
2026-11-24
Estimated Expiration
2042-02-28

AI Technical Summary

Technical Problem

Existing power distribution network planning methods struggle to comprehensively consider the temporal and spatial differences in load demand, making it difficult to determine load boundaries and affecting the accuracy of load forecasting and the precision of power distribution network construction.

Method used

A multi-variable load elasticity forecasting method based on distribution network grid is adopted. By classifying loads into emerging power generation facilities, load resources that can respond to peak and valley electricity prices, and load resources that can participate in demand-side response, the load elasticity coefficient is calculated using time series method and optimization model. Combined with K-means clustering algorithm to analyze load curves, a new maximum load forecasting model is formed.

Benefits of technology

It improves the accuracy of distribution network grid load forecasting and the precision of construction investment, reduces the need for distribution network equipment expansion, and reduces investment costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114819251B_ABST
    Figure CN114819251B_ABST
Patent Text Reader

Abstract

This invention discloses a method for flexible forecasting of multiple loads based on a distribution network grid, comprising the following steps: S1, classifying the multiple flexible loads in the distribution network grid; S2, maximum load forecasting: using a time series method to forecast the maximum annual load of the planned distribution network grid, which serves as the basic data for the multiple flexible loads in the distribution network grid; S3, calculating the elasticity coefficients of the multiple loads: calculating the elasticity coefficients of the multiple flexible loads in the distribution network grid and establishing constraints; S4, calculating the total elasticity space of the planned annual load of the distribution network grid using the multiple flexible loads in the distribution network grid, and determining the distribution network load forecasting result based on the elasticity of the multiple loads. This invention improves the accuracy of distribution network grid load forecasting considering flexible loads, effectively reducing the demand for distribution transformer capacity and lowering the investment cost of distribution network expansion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power distribution network operation analysis technology, specifically relating to a multi-dimensional load elasticity prediction method based on power distribution network grid. Background Technology

[0002] Load forecasting is the foundation and key to distribution network planning. From the perspective of the development of the energy internet, the distribution network is evolving towards new characteristics such as the widespread integration of clean energy and the flexible controllability of flexible loads. Distributed power sources, integrated energy systems, and new types of electricity loads are widely integrated into the distribution network, making the load partially controllable and adjustable "flexible" loads. The original load consumption curves are changing, making it difficult to determine the load boundaries of distribution network planning. Previous distribution network planning has formed a relatively mature rule system and is still functioning. However, the traditional "process template" distribution network planning faces severe challenges from the current changing development situation. How to comprehensively consider the differentiated energy needs of various users in time and space, predict the load elasticity space, and reasonably define the supply and demand boundaries has become an urgent problem to be solved. Therefore, it is necessary to clarify the specific impact of external changes in the distribution network on the load boundaries, establish a flexible forecasting method for multiple loads in the distribution network, and study and determine the load boundaries of distribution network planning under different electricity consumption scenarios. Summary of the Invention

[0003] To address the shortcomings of existing technologies, the present invention aims to provide a multi-dimensional load resilience forecasting method based on distribution network grids. This forecasting method improves the accuracy of distribution network grid load forecasting considering resilience loads and the precision of distribution network construction investment.

[0004] To achieve the above objectives, the present invention adopts the following technical solution:

[0005] A multi-element load resilience forecasting method based on distribution network grid includes the following steps:

[0006] S1. The diverse flexible loads in the distribution network grid are classified into three main categories: the first category of flexible loads are emerging power generation facilities or systems that affect the spatiotemporal distribution of flexible loads; the second category of flexible loads are flexible load resources that can respond to peak and valley electricity prices; and the third category of flexible loads are flexible load resources that can participate in demand-side response.

[0007] S2. Maximum load forecast: The maximum annual load of the distribution network grid is forecasted using the time series method. This forecast is the basic data for the multiple flexible loads in the distribution network grid.

[0008] S3. Calculate the elasticity coefficient of multi-element loads: Calculate the elasticity coefficient of multi-element elastic loads in the distribution network grid and form constraints;

[0009] S4. Calculate the total elastic space of the planned annual load of the distribution network grid through the multiple elastic loads in the distribution network grid, and determine the distribution network load prediction results of the multiple load elasticity.

[0010] Furthermore, in step S1, the first type of multi-element flexible load includes integrated energy systems and distributed power sources; the second type of multi-element flexible load includes electric vehicle loads; the third type of multi-element flexible load includes central air conditioning loads and communication base station loads; and the distributed power source is distributed photovoltaic.

[0011] Furthermore, the method for calculating the elastic coefficient of the multi-element load in step S3 includes the following steps:

[0012] 1) Simulate the operating characteristics of the three types of multi-element elastic loads to obtain the original typical daily power / load time series curves of the elastic loads;

[0013] 2) Simulate typical daily load curves of resilient loads considering elasticity based on optimization models and demand-side response strategies;

[0014] 3) The difference between the original daily load curve of the elastic load and the typical daily load curve of the elastic load is superimposed on the typical daily curve of the maximum load of the distribution network grid in the predicted year, to form a new typical daily curve of the maximum load that takes into account load elasticity.

[0015] 4) Based on the predicted annual distribution network grid maximum load typical daily curve changes, the multi-dimensional load elasticity space is obtained.

[0016] Furthermore, the calculation method for the comprehensive energy system elasticity coefficient among the three types of multi-element elastic loads includes the following steps:

[0017] Step 4.1: Establish the objective function model of the integrated energy system, as shown in equation (1):

[0018]

[0019] in, This represents the typical daily maximum electrical load power within a comprehensive energy system unit.

[0020] Step 4.2: Establish a constraint model, which includes power balance constraints and equipment operation constraints;

[0021] ① The power balance constraint model is shown in equation (2):

[0022]

[0023] in, The power purchased from the upper-level power grid by the integrated energy system unit; To power the wind turbine; The power output of CHP; The electrical power absorbed by the P2G; P e,t Power of electrical load; The heat production capacity of CHP; P is the heat production power of GF; h,t This refers to the heat load power; The integrated energy unit purchases gas power from the upstream gas grid; The gas production capacity of P2G; Gas power absorbed by CHP; The gas power absorbed by GF; the variable subscript t represents the time period;

[0024] ②The equipment operation constraint model is shown in equation (3):

[0025]

[0026] Where, η P2G The electro-gas conversion efficiency of P2G; η GB The gas-to-heat conversion efficiency is defined in GB standards. These are the gas-to-electricity and gas-to-heat efficiencies of CHP, respectively.

[0027] Step 4.3: Calculate the elasticity coefficient of the integrated energy system.

[0028] Based on the established optimization model of the integrated energy system's objective function and constraints, the output of the internal equipment of the integrated energy system is optimized to change the original power load curve within the system, thereby reducing the peak-to-valley difference in power load. The load elasticity coefficient K of the integrated energy system is considered. Hub The calculation is shown in equation (4):

[0029]

[0030] Among them, P WG This represents the conventional load forecasting results for the distribution network grid; P' WG,Hub To take into account the peak load of the distribution network grid after the optimized operation of the integrated energy system.

[0031] Furthermore, the calculation method for the distributed generation resilience coefficient in the three types of multi-element resilient loads includes the following steps:

[0032] Step 5.1: The K-means clustering algorithm is used to cluster the collected historical data of distributed photovoltaic power output. The specific steps are as follows:

[0033] Suppose we have a set X = {x1, x2, ..., xn} containing n data points. nThe number of clusters is K, meaning the algorithm ultimately outputs K clusters {S1, S2, ..., S}. K The specific method of the K-means clustering algorithm includes the following steps:

[0034] Step 5.1.1: Let I = 1, and randomly select K data points from the entire sample dataset X as the initial cluster centers m. j (I), where j = 1, 2, ..., K;

[0035] Step 5.1.2: Calculate the Euclidean distance between any two data points in Step 5.1.1 using Equation (5), that is, calculate the distance between each data point x in the sample dataset X. i To K cluster centers m j (I) distance d(x) i ,m j (I)), search for the data point x corresponding to the minimum distance. i Incorporate it into the m j (I) Category S j middle;

[0036]

[0037] Where d(i,j) represents each data point x in the sample dataset X. i To K cluster centers x j The distance;

[0038] Step 5.1.3: Calculate m using equation (6) j The value of (I+1) is used as the next cluster center.

[0039]

[0040] Where, N j This represents the number of data points in the j-th class;

[0041] Step 5.1.4: If the classification result obtained in step I is completely consistent with that in step (I-1), then the clustering result can be considered as the final result, and the clustering result is output; otherwise, continue the iteration from step 5.1.2.

[0042] Step 5.2: Calculate the resilience coefficient of the distributed power source.

[0043] Based on the predicted distributed photovoltaic (PV) penetration rate within the distribution network grid for the planning year, the K-means clustering algorithm is used to obtain the typical daily output curve of distributed PV. By superimposing this curve with the load curve of the typical day of maximum load in the distribution network grid, the load elasticity coefficient K, which takes into account the output characteristics of distributed PV, is obtained. PVThe specific calculation formula is shown in equation (7):

[0044]

[0045] Among them, P WG This represents the conventional load forecasting results for the distribution network grid; P' WG,PV Typical daily peak load of the distribution network grid considering the operating characteristics of distributed photovoltaic power;

[0046] Furthermore, the calculation method for the elastic coefficient of electric vehicles in the three types of multi-element elastic loads includes the following steps:

[0047] Step 6.1: For electric vehicle users who choose sequential charging, the initial charging time T c,i The power grid should accept the dispatch control of the distribution network or try to choose a time when the load is low to avoid increasing the pressure on the power grid during peak load periods.

[0048]

[0049] Where t1 and t2 are the start and end times of the load trough period, respectively; χ is a random number in the interval [0,1]; and p is the charging load of electric vehicle user i in the j-th time period. i,j The calculation formula is shown in equation (9):

[0050]

[0051] Then the total charging load P of electric vehicle user i at time j j The calculation formula is shown in equation (10):

[0052]

[0053] Where N is the number of electric vehicles in the area;

[0054] Step 6.2: Calculate the elastic coefficient of the electric vehicle.

[0055] Based on the above ordered strategy for electric vehicles, considering the load elasticity coefficient K of the electric vehicle... EV The calculation formula is shown in equation (11):

[0056]

[0057] Among them, P WG This represents the conventional load forecasting results for the distribution network grid; P' WG,EV This is to take into account the typical daily peak load of the power grid after the electric vehicle adopts an orderly charging strategy.

[0058] Furthermore, the calculation method for the central air conditioning elastic coefficient among the three types of multi-element elastic loads includes the following steps:

[0059] Step 7.1: Central air conditioning load participates in demand response strategy

[0060] The survey results show that commercial users of central air conditioning in Henan Province are mainly concentrated in the wholesale and retail industry, as well as the accommodation and catering industry. These commercial users participate in demand response at a certain rate during peak hours. The characteristics of their participation during peak hours are shown in the table below, where the response rate λ... DR This is the ratio of the load that the industry can reduce during the response period to the industry's peak summer operating load (i.e., the proportion of central air conditioning load in commercial load);

[0061] Henan Province Commercial Users' Central Air Conditioning Load Participation Response Characteristics Table

[0062] Step 7.2: Calculate the elasticity coefficient of the central air conditioning system.

[0063] The load elasticity coefficient K after considering the participation of central air conditioning load in demand response CAC The calculation formula is shown in equation (12):

[0064]

[0065] Where, η b The proportion of commercial load within the distribution network grid; λ DR The proportion of central air conditioning load within the commercial load; n top This refers to the number of periods when the distribution network grid is at its peak load.

[0066] Furthermore, the calculation method for the elasticity coefficient of the communication base station in the three types of multi-element elastic loads includes the following steps:

[0067] Step 8.1: Use the K-means clustering algorithm to cluster the historical load data of communication base stations. The specific steps are the same as those described in claim 5 for the K-means clustering algorithm.

[0068] Step 8.2: Calculate the resilience coefficient of the communication base station.

[0069] Considering the load elasticity coefficient K of the communication base station BS The calculation formula is shown in equation (13):

[0070]

[0071] Among them, P WG This represents the conventional load forecasting results for the distribution network grid; P' WG,BS This is to take into account the typical daily peak load of the distribution network grid after the energy storage of communication base stations participates in the response.

[0072] Furthermore, the method for calculating the distribution network load forecasting results with multi-element load resilience in step S4 is as follows:

[0073] By accumulating the elasticity coefficients and taking into account the simultaneous coefficient of the load elasticity space, the load elasticity coefficient, load elasticity space, and load forecast results for the distribution network grid planning year are calculated after comprehensively considering various influencing factors such as the load of the integrated energy system, distributed power generation, electric vehicle load, central air conditioning load, and communication base station load. The specific calculation formula is shown in Equation (14):

[0074]

[0075] Among them, K WG The elasticity coefficient of the power grid is determined by comprehensively considering various influencing factors; K t It is the simultaneous coefficient of the load elasticity space, that is, the ratio of the load elasticity space after the curves of various types of load elasticity coefficients are superimposed to the load elasticity space of the sum of all types of elasticity coefficients. The load elasticity space after considering various influencing factors; P' WG The annual load forecast results for distribution network planning take load flexibility into account.

[0076] Compared with the prior art, the positive and beneficial effects of this invention are as follows:

[0077] This invention comprehensively considers future changes in the supply and demand characteristics and market environment of the distribution network. Taking the distribution network grid as the unit and accurate load as the prediction target, it uses the K-means clustering algorithm to analyze load forecasting that considers multiple load elasticity spaces, which can comprehensively improve the accuracy of regional load forecasting. Integrated energy systems, distributed power sources, and central air conditioning can provide a large load elasticity space, which can effectively reduce the maximum load. The proportion of communication base station load and private electric vehicle charging load is relatively small, and the load elasticity space they provide is limited. After considering load elasticity, this invention can scientifically and effectively determine the peak elastic load value of the distribution network, reduce the distribution network construction needs, and reduce the investment cost of distribution network expansion. Attached Figure Description

[0078] Figure 1 This is a flowchart of the overall process for calculating the elastic coefficient of the elastic load according to the present invention.

[0079] Figure 2 This is a typical daily curve of maximum load for the predicted year (2025) using clustered grids;

[0080] Figure 3 These are typical daily curves of maximum load in 2025 for a grid of a comprehensive energy system under different scenarios.

[0081] Figure 4 These are typical daily curves of maximum load in a grid under different scenarios considering distributed power sources in 2025;

[0082] Figure 5 It is a load curve diagram of disordered and orderly charging of private electric vehicles;

[0083] Figure 6 This is a typical daily curve of maximum load in a certain grid in 2025 before and after orderly charging of private electric vehicles;

[0084] Figure 7 This is a typical daily curve of maximum load in a certain grid in 2025 before and after the central air conditioning response;

[0085] Figure 8 These are typical daily load curves for communication base stations;

[0086] Figure 9 This is a typical daily curve of the maximum load of a certain grid in 2025 before and after the base station energy storage response; Detailed Implementation

[0087] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to embodiments and accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0088] Example

[0089] A multi-element load resilience forecasting method based on distribution network grid includes the following steps:

[0090] S1, a certain grid in a new district of a city in Henan Province, is primarily residential, commercial, and business-oriented. This grid is a built-up area with no currently under construction. Currently, the load within this grid is supplied by two 110kV substations, A1 and A2. There are a total of 45 10kV lines and 4 110kV lines within the grid. Based on the user information of this grid, the diverse flexible loads within it are classified into three main categories: Category 1 flexible loads are emerging power generation facilities or systems that influence the spatiotemporal distribution of flexible loads; Category 2 flexible loads are flexible load resources that can respond to peak-valley electricity pricing; and Category 3 flexible loads are flexible load resources that can participate in demand-side response. Specifically, Category 1 diverse flexible loads include integrated energy systems and distributed power sources; Category 2 diverse flexible loads include electric vehicle loads; and Category 3 diverse flexible loads include central air conditioning loads and communication base station loads. The distributed power source is distributed photovoltaic power.

[0091] S2. Based on the historical load data of each power supply unit in a certain grid in step S1, the power load demand of the certain grid in 2025 is predicted by using the univariate linear regression prediction method based on time series as the unit. The prediction results are shown in Table 1. Since the time interval between the prediction year and the current year is short, the simultaneity rate is not considered.

[0092] Table 1. Load forecast results for a certain grid and its power supply unit in 2025.

[0093]

[0094] Based on the collected historical load data, a typical day of maximum load is July 29th in summer. Using the load characteristics of the typical day of maximum load curve for the current year (2019), the typical day of maximum load within a certain grid for the forecast year (2025) is predicted, as follows: Figure 2 As shown. From Figure 2 As can be seen, the peak load period of a certain grid is concentrated between 10:00 and 14:00 in the afternoon, which is the peak time for residential and commercial users to use air conditioning and other equipment in summer. However, between 00:00 and 07:00 in the early morning, the overall load of the grid is at its lowest point, with an electricity demand of about 40MW. Its lowest load is 35.08MW, and the peak-to-valley difference reaches 73.46%, which is not conducive to the efficient and economical operation of equipment in the distribution network.

[0095] S3. Based on the load forecast results for a certain grid in 2025 (planning year) from step S2, and considering the development trends of the integrated energy system, distributed photovoltaic, private electric vehicle load, central air conditioning load, and communication base station load within the grid, calculate the load elasticity coefficient for each of the above five influencing factors within the grid:

[0096] (1) Integrated Energy System

[0097] The calculation method for the load elasticity coefficient of the integrated energy system based on the multivariate load elasticity prediction model is detailed in steps 4.1-4.3. This involves simulating the proportion of power supply load η of different integrated energy units within the grid, assuming the energy equipment is configured with the goal of optimal overall cost. Hub The impact of the ratio of maximum load within an integrated energy unit to maximum load in the power grid on the planned load boundary of the distribution network is as follows: Figure 3 As shown in Table 2.

[0098] Table 2 Different η Hub Load forecast results for a certain grid in the scenario in 2025

[0099]

[0100] With η HubTaking 10% as an example, according to the calculation method (optimization model) of the load elasticity coefficient of the integrated energy system in the multi-dimensional load elasticity prediction model, please refer to formula (4) for details, and calculate as follows with the parameters in Table 2:

[0101] Consider the load elasticity coefficient of a grid in an integrated energy system:

[0102] K Hub =(P WG -P' WG,Hub ) / P WG =3.0%

[0103] Load elasticity space:

[0104]

[0105] Load forecasting results considering load resilience:

[0106] P' WG,Hub =P WG (1-K Hub = 128.22MW

[0107] The results above show that when the integrated energy unit's power supply load accounts for 10% and 20% of the grid's total power supply in 2025, the load elasticity coefficients are 3.00% and 6.00%, respectively, and the load elasticity space is 3.97MW and 7.93MW, respectively. The predicted load for this grid is reduced to 128.22MW and 124.26MW, respectively. This demonstrates that the introduction of an integrated energy system has a certain promoting effect on reducing the distribution network load boundary and increasing the load elasticity space. Furthermore, since natural gas is mainly used to replace electricity demand, the demand for natural gas power will only increase during peak electricity load periods, and no new peak electricity loads will be generated at other times.

[0108] (2) Distributed power supply

[0109] Currently, there are no other power sources such as distributed power sources or integrated energy systems within this grid. However, based on the development trend of renewable energy in Henan Province and the further deepening of concepts such as low-carbon living and sustainable development in Henan Province, clean and renewable distributed power sources, such as distributed photovoltaics, will be widely connected to the Henan Province power distribution network in the future. This project uses the K-means clustering algorithm to analyze the typical daily power output characteristics of photovoltaic power plants based on the collected historical real-time output data throughout the year, as detailed in step 5.1, which includes steps 5.1.1-5.1.4.

[0110] Based on the clustered grid load, assuming that distributed photovoltaic (PV) power can achieve full grid integration on the maximum typical day, and based on the distributed PV power generation curve for a typical summer day, this project simulates the distributed PV penetration rate η of a certain grid in 2025 under different distributed PV penetration rates. PV The impact of the ratio of the rated capacity of distributed photovoltaic power generation to the maximum load of the power grid on the planned load boundary of the distribution network is as follows: Figure 4 As shown in Table 3.

[0111] Table 3 Different η PV Load forecast results for a certain grid in the scenario in 2025

[0112]

[0113] With η PV Taking 5% as an example, according to the calculation method of the distributed power load elasticity coefficient in the multi-element load elasticity prediction model, please refer to formula (7) for details, and calculate as follows with the parameters in Table 3:

[0114] Consider the load resilience coefficient of a grid for distributed photovoltaic (PV) systems:

[0115] K PV =(P WG -P' WG,PV ) / P WG =1.70%

[0116] Load elasticity space:

[0117]

[0118] Load forecasting results considering load resilience:

[0119] P' WG,PV =129.94MW

[0120] The results show that when the distributed photovoltaic (PV) penetration rate is considered to be 5%, 10%, and 20%, the load forecast for this grid in 2025 is reduced to 129.94MW, 127.70MW, and 123.20MW, respectively, with load elasticity spaces of 2.25MW, 4.49MW, and 8.99MW, and elasticity coefficients of 1.70%, 3.40%, and 6.80%, respectively. This demonstrates that the integration of distributed PV can effectively reduce the maximum load of the distribution network. This is because the output characteristics of distributed PV are well-matched with the load distribution characteristics of the grid. When the grid is in the peak load period (10:00-13:00), the solar irradiance is also at its peak, resulting in a larger output from distributed PV. By absorbing the load locally, the peak load is reduced, increasing the load elasticity space and effectively reducing the need for expansion and investment in distribution network lines, transformers, and other equipment.

[0121] (3) Private electric vehicles

[0122] Determining the load boundary of private electric vehicles: The projected number of private electric vehicles in the planning year (2025) can be predicted based on the current number of private cars in 2019, the penetration rate of private electric vehicles, and the development status of private electric vehicles. Based on the population density index of developed regions in China, the population density of a certain grid in 2025 is taken as 4000 people / square kilometer. Given that the area of ​​this grid is 3.34 square kilometers, its permanent resident population in 2025 can be estimated at 13360 people. Based on a private car ownership rate of 222.36 vehicles / thousand people, there are a total of 1966 private cars. By 2025, with an electric vehicle penetration rate of 15%, there are a total of 445 private electric vehicles. Furthermore, private electric vehicles mostly use slow charging, with a charging power of 15kW, a power factor of 0.9, and a Monte Carlo simulation of 100 times. The travel characteristics of private electric vehicles are shown in Figure 4. The number, configuration, and number of charging stations of private electric vehicles in this grid in 2025 are shown in Table 5.

[0123] Table 4. Probability Models for Various Electric Vehicle Trips

[0124]

[0125] Note: N(a,b) represents a data set with expected value a and variance b. 2 It follows a normal distribution.

[0126] Table 5. Private Electric Vehicle Configuration Table for a Certain Grid in 2025

[0127]

[0128] Based on the orderly charging strategy for electric vehicles in the multivariate load elasticity prediction model, the charging load curves for all private electric vehicles in a certain grid under disordered and orderly charging conditions in 2025, as well as the typical daily curve of maximum load for that grid, are simulated as follows: Figure 5 , Figure 6 As shown.

[0129] from Figure 6 It can be seen that when private electric vehicles are charged haphazardly, their peak charging load occurs during the midday and evening peak hours, mainly the evening peak from 19:00 to 22:00. The peak load period for this grid is around 11:00 in the afternoon. The charging load and the overall peak load do not overlap, and the simultaneity rate is low. After adopting the proposed orderly charging strategy, the evening load shifts to around 03:00 to 06:00 in the early morning, and the midday peak charging load is slightly reduced. The load reduction is about 1.01MW, which has little impact on the grid's maximum load curve.

[0130] The load forecast results for a certain grid in 2025 are shown in Table 5 after the private electric vehicles adopt an orderly charging strategy.

[0131] Table 5. Load forecast results for a certain grid in 2025 after considering the orderly charging of private electric vehicles.

[0132]

[0133] According to the calculation method of the load elasticity coefficient of private electric vehicles, please refer to formula (11) and calculate the following based on the parameters in Table 5:

[0134] Considering the load elasticity coefficient of a certain grid for the orderly charging of private electric vehicles:

[0135] K EV =(P WG -P' WG,EV ) / P WG =0.76%

[0136] Load elasticity space:

[0137]

[0138] Load forecasting results considering load resilience:

[0139] P' WG,EV =131.18MW

[0140] The results above show that after considering the orderly charging strategy for private electric vehicles, the predicted load for this grid in 2025 becomes 131.18MW, with only 1.01MW of load elasticity space and an elasticity coefficient of only 0.76%. This is because the charging load demand of private electric vehicles at the peak load time of this grid in 2025 is relatively small; on the other hand, the proportion of vehicles meeting the requirements of the orderly charging strategy is small, resulting in a limited proportion of the load that can be reduced to the total charging load. Therefore, considering the orderly charging strategy for private electric vehicles has little effect on reducing the peak load of the distribution network and reducing investment and construction in the distribution network. After adopting the orderly charging strategy, the peak charging load is from 03:00 to 06:00, which is the low period of the entire grid load, and the proportion of the charging load of private electric vehicles in the entire grid load is low, so it will not affect the peak-valley characteristics of the grid load.

[0141] (4) Central air conditioning load

[0142] Based on the electricity consumption of various industries in Henan Province and the load composition within a specific grid, the ratio η of commercial load to total load within that grid in 2025 is estimated. b The response ratio λ of commercial central air conditioning load within the clustered grid is 50%. DRBased on a 33.5% calculation, the total responsive load of central air conditioning within this grid in 2025 is estimated to be approximately 22.1 MW, assuming the central air conditioning load is uniformly distributed within the grid. Figure 7 It can be seen that the peak load period of this grid is from 10:00 to 14:00. Considering the user's comfort experience and without affecting the peak-valley characteristics of the entire power grid, it is assumed that the responsive central air conditioning load has the same response capability during each peak period.

[0143] When the central air conditioning load participates in demand response, the load forecast for this grid in 2025 is as follows: Figure 7 As shown in Table 6.

[0144] Table 6. Load Forecast Results for a Certain Grid in 2025 After Central Air Conditioning Load Response

[0145]

[0146] According to the calculation method of the central air conditioning load elasticity coefficient in the multivariate load elasticity prediction model, please refer to formula (12) for details, and calculate as follows with the parameters in Table 6:

[0147] Considering the load elasticity coefficient of a grid where central air conditioning load participates in demand response:

[0148] K CAC =η b *λ DR / n top =50% * 33.55% / 4 = 4.19%

[0149] Load elasticity space:

[0150]

[0151] Load forecasting results considering load resilience:

[0152] P' WG =P WG (1-K CAC = 126.65MW

[0153] The results show that utilizing the responsiveness of central air conditioning can effectively reduce the peak load of the distribution network. When the central air conditioning load participates in demand response, the planned load boundary of the xx grid in 2025 becomes 126.65MW, with a load elasticity space of 5.54MW. Considering the elasticity coefficient of central air conditioning load participating in demand response, it is 4.19%, which plays a positive role in reducing investment in the expansion of distribution network equipment. Since central air conditioning is an interruptible load and will not increase electricity load at other times, it will not affect the peak-valley characteristics of the entire grid.

[0154] (5) Communication base station

[0155] To gain a deeper understanding of the load characteristics of communication base stations and their impact on the load elasticity of distribution network planning, this project collected and organized data on a communication base station in a certain district of a city. This base station is equipped with a 5G communication system, connected to the distribution network via a 30kVA dedicated transformer, installed in 2018, with a maximum load of 13.9kW and an annual electricity consumption of 59,700 kWh. For the annual load curve of this base station, the K-means clustering method was used, with specific steps detailed in steps 5.1.1-5.1.4, to obtain the load curves for typical days in spring, summer, autumn, and winter. Figure 8 As shown.

[0156] from Figure 8 As can be seen, the power load of communication base stations has strong seasonal characteristics. Its summer load is significantly higher than that of the other three seasons, with an average load power of 10.1kW, compared to 7.45kW in other seasons. This is mainly because the air conditioning of base stations needs to run all day in summer, resulting in an average power consumption of 30% higher in summer than in other seasons. Secondly, since the power load of base stations is linearly related to the communication service load, and the communication service load has a certain time-series fluctuation, the power load of base stations exhibits a certain degree of random fluctuation.

[0157] Based on the development needs of a certain grid and its future base station layout model, and assuming a three-hour base station energy storage backup time, the geographical locations and energy storage configurations of communication base stations in 2025 can be estimated. The communication base station layout is a cellular mesh structure, and the number of base stations is related to the area and the coverage radius of the base stations, as shown in the following formula:

[0158]

[0159] Where N is the number of communication base stations, S is the area of ​​the region, and R is the coverage radius of the base stations.

[0160] Table 7. Communication base station and energy storage configuration for a certain grid in 2025.

[0161]

[0162] Based on a power distribution network reliability rate of 99.99%, the power outage time is estimated to be approximately 53 minutes. Therefore, the base station's backup energy storage needs to have a one-hour backup power duration to ensure reliable power supply to the communication base station. The remaining two hours of energy storage capacity can be supplied to the base station's power load during peak grid load periods (11:00 to 13:00). After participating in the response during the midday peak period, the base station's energy storage will be charged during off-peak load periods (04:00 to 06:00).

[0163] Based on the peak-valley characteristics of the typical daily maximum load curve for this grid in 2025, it is planned to arrange base station energy storage to participate in the response during the two time periods from 11:00 to 13:00. After participating in the response, the load forecast results for this grid in 2025 are as follows. Figure 9 As shown in Table 8.

[0164] Table 8 shows the load forecast results for a certain grid in 2025 after considering the energy storage response of the base station.

[0165]

[0166] According to the calculation method of the load elasticity coefficient of communication base stations in the multivariate load elasticity prediction model, please refer to formula (13) for details, and calculate as follows with the parameters in Table 8:

[0167] Considering the load resilience coefficient of a certain grid in which the communication base station participates in the response:

[0168] K BS =(P WG -P' WG,BS ) / P WG =0.38%

[0169] Load elasticity space:

[0170]

[0171] Load forecasting results considering load resilience:

[0172] P' WG =131.69MW

[0173] The results show that, due to the relatively small total load of base station users, the adjustment amount involved in demand response is small compared to the baseline load of the entire power grid. Therefore, after base station energy storage participates in demand response, the load forecast for this grid in 2025 becomes 131.69MW, with only 0.50MW of load elasticity space and an elasticity coefficient of only 0.38%. This has little effect on reducing the power supply capacity of distribution network equipment and reducing investment in distribution network construction. Furthermore, after base station energy storage participates in demand response during the midday peak period, it is scheduled to charge during off-peak periods, having minimal impact on the overall grid load distribution and not affecting the peak-valley characteristics of the entire grid load.

[0174] S4. Distribution network load forecasting results considering load flexibility

[0175] Based on the conventional load forecasting results of the clustered grid and the calculation results of the load elasticity coefficient considering the five influencing factors mentioned above, the load forecast results for a certain grid in 2025 considering load elasticity are obtained. Furthermore, based on the distribution network operation state simulation method, the impact of load elasticity space on the power supply capacity and investment demand of distribution equipment is quantitatively analyzed, and the planned load boundary of the distribution network is determined. The results are shown in Table 9. In Table 9, K... PV The distributed photovoltaic penetration rate η of a certain grid in 2025 is respectively. PV The elastic modulus K is the elastic modulus at 0%, 5%, 10%, and 20%. Hub The respective percentages of power supply load for the integrated energy unit in a certain grid in 2025 are η. Hub The elastic coefficients at 0%, 10%, and 20%.

[0176] Table 9. Load forecast results and planned load boundaries for a certain grid in 2025 considering load elasticity.

[0177]

[0178] Taking into account the impact of private electric vehicle load, communication base station load, central air conditioning load, and distributed photovoltaic penetration rate η. PV The proportion of power supply load in the integrated energy system unit is 10%. Hub Taking the elastic load forecast and planning impact assessment of a certain grid at 20% as an example, by accumulating the elasticity coefficient and taking into account the simultaneous coefficient of the load elasticity space, the load elasticity coefficient, load elasticity space and load forecast results of the distribution network grid planning year are calculated after comprehensively considering various influencing factors such as the load of the integrated energy system, the load of distributed power sources, the load of electric vehicles, the load of central air conditioning and the load of communication base stations. Combined with formula (14) and the parameters in Table 9, the following calculations are performed:

[0179] Total load elasticity coefficient of a certain grid:

[0180] K WG =K t (K CAC +K BS +K EV +K PV +K Hub )=

[0181] 0.9117 * (0.76% + 4.19% + 0.38% + 3.4% + 6.0%) = 13.43%

[0182] Considering the load elasticity space of 5 types of influencing factors:

[0183]

[0184] A new planned load boundary that comprehensively considers five types of influencing factors (annual load forecast results for distribution network planning considering the flexibility of five types of loads):

[0185] P' WG =P WG *(1-K WG )=132.19*(1-13.43%)=114.44MW

[0186] Considering load flexibility to reduce the capacity requirements of distribution network lines:

[0187]

[0188] Considering load flexibility, reduce the required transformer capacity in the distribution network:

[0189]

[0190] Considering the reduction in distribution network investment returns due to load flexibility:

[0191] ΔC=c l *ΔP L +c t *ΔP T =1*6.74+25*42.44=10.6767 million yuan

[0192] The results above show that when only the development of new electricity loads within a certain grid and their participation in the distribution network response are considered, it will bring a load flexibility space of 7.04MW to the grid planning in 2025, reducing the load forecast result to 125.15MW, reducing the power supply capacity demand of distribution network lines by 2.05MW and the power supply capacity demand of distribution network transformers by 13.49MVA, and reducing the investment demand for distribution equipment capacity of the distribution network by 3.392 million yuan. The relatively small total load of communication base stations and private electric vehicles results in a lower response and adjustment capacity for the distribution network. The main reason for this is the participation of central air conditioning load in demand response, which creates a significant plan load flexibility for the distribution network. When considering the impact of distributed photovoltaic and integrated energy systems on the spatiotemporal distribution of load, the load forecast for this grid in 2025 varies between 118.94 and 108.23 MW. This results in a reduction of 4.86 to 7.72 MW in the demand for power supply capacity of distribution network lines and 28.03 to 53.92 MVA in the demand for power supply capacity of distribution network transformers. This reduces the investment demand for the distribution network by 7.0555 million to 13.5569 million yuan. It is evident that the future development of distributed power sources and integrated energy systems will have a significant impact on the planning of the distribution network.

[0193] The five types of influencing factors mentioned in this invention refer to five types of loads: integrated energy systems, distributed photovoltaics, central air conditioning, private electric vehicles, and communication base stations.

[0194] The calculation conditions, illustrations, tables, etc. in the embodiments of this invention are only used to further illustrate the invention and are not exhaustive. They do not constitute a limitation on the scope of protection of the claims. Those skilled in the art, based on the inspiration gained from the embodiments of this invention, can conceive of other substantially equivalent alternatives without creative effort, all of which are within the scope of protection of this invention.

Claims

1. A multi-element load resilience forecasting method based on distribution network grid, characterized in that, Includes the following steps: S1. The diverse flexible loads in the distribution network grid are classified into three main categories: the first category of flexible loads are emerging power generation facilities or systems that affect the spatiotemporal distribution of flexible loads; the second category of flexible loads are flexible load resources that can respond to peak and valley electricity prices; and the third category of flexible loads are flexible load resources that can participate in demand-side response. S2. Maximum load forecast: The maximum annual load of the distribution network grid is forecasted using the time series method. This forecast is the basic data for the multiple flexible loads in the distribution network grid. S3. Calculate the elasticity coefficient of multi-element loads: Calculate the elasticity coefficient of multi-element elastic loads in the distribution network grid and form constraints; S4. Calculate the total elastic space of the planned annual load of the distribution network grid through the multiple elastic loads in the distribution network grid, and determine the distribution network load forecast result of the multiple load elasticity; In step S1, the first type of flexible load includes integrated energy systems and distributed power sources; the second type of flexible load includes electric vehicle loads; the third type of flexible load includes central air conditioning loads and communication base station loads; and the distributed power source is distributed photovoltaic power. The method for calculating the elastic coefficient of the multi-element load in step S3 includes the following steps: 1) Simulate the operating characteristics of the three types of multi-element elastic loads to obtain the original typical daily power / load time series curves of the elastic loads; 2) Simulate typical daily load curves of resilient loads considering elasticity based on optimization models and demand-side response strategies; 3) The difference between the original daily load curve of the elastic load and the typical daily load curve of the elastic load is superimposed on the typical daily curve of the maximum load of the distribution network grid in the predicted year, to form a new typical daily curve of the maximum load that takes into account load elasticity; 4) Based on the predicted annual maximum load typical daily curve changes of the distribution network grid, a multi-dimensional load elasticity space is obtained; The calculation method for the comprehensive energy system elasticity coefficient in the three types of multi-element elastic loads includes the following steps: Step 4.1: Establish the objective function model of the integrated energy system, as shown in equation (1): (1) in, This represents the typical daily maximum electrical load power within a comprehensive energy system unit. Step 4.2: Establish a constraint model, which includes power balance constraints and equipment operation constraints; ① The power balance constraint model is shown in equation (2): (2) in, The power purchased from the upper-level power grid by the integrated energy system unit; To power the wind turbine; The power output of CHP; The electrical power absorbed by the P2G; Power of electrical load; The heat production capacity of CHP; The heat generation power of GF; This refers to the heat load power; The integrated energy unit purchases gas power from the upstream gas grid; The gas production capacity of P2G; Gas power absorbed by CHP; The gas power absorbed by GF; the variable subscript t represents the time period; ②The equipment operation constraint model is shown in equation (3): (3) in, The electro-gas conversion efficiency of P2G; The gas-to-heat conversion efficiency of GF; , These are the gas-to-electricity and gas-to-heat efficiencies of CHP, respectively. Step 4.3: Calculate the elasticity coefficient of the integrated energy system. Based on the established optimization model of the integrated energy system's objective function and constraints, the output of internal equipment within the integrated energy system is optimized to alter the original power load curve, thereby reducing the peak-to-valley difference in power load. The load elasticity coefficient of the integrated energy system is also considered. The calculation is shown in equation (4): (4) in, This refers to the conventional load forecast results for the distribution network grid. To take into account the peak load of the distribution network grid after the optimized operation of the integrated energy system; The calculation method for the distributed generation resilience coefficient in the three types of multi-element resilient loads includes the following steps: Step 5.1: The K-means clustering algorithm is used to cluster the collected historical data of distributed photovoltaic power output. The specific steps are as follows: Suppose we have a set X = {x1, x2, ..., xn} containing n data points. n The number of clusters is K, meaning the algorithm ultimately outputs K clusters {S1, S2, ..., S}. K The specific method of the K-means clustering algorithm includes the following steps: Step 5.1.1: Let I=1, and randomly select K data points from the entire sample dataset X as the initial cluster centers m. j (I), where j=1,2,…,K; Step 5.1.2: Calculate the Euclidean distance between any two data points in step 5.1.1 using equation (5), that is, calculate the distance between each data point x in the sample dataset X. i To K cluster centers m j (I) distance d(x) i ,m j (I)), search for the data point x corresponding to the minimum distance. i Incorporate it into the m j (I) Category S j middle; (5) in, For each data point x in the sample dataset X i To K cluster centers x j The distance; Step 5.1.3: Calculate m using equation (6) j The value of (I+1) is used as the next cluster center. (6) Where, N j This represents the number of data points in the j-th class; Step 5.1.4: If the classification result obtained in step I is completely consistent with that in step (I-1), then the clustering result can be considered as the final result, and the clustering result is output; otherwise, continue the iteration from step 5.1.

2. Step 5.2: Calculate the resilience coefficient of the distributed power source. Based on the predicted distributed photovoltaic (PV) penetration rate within the distribution network grid for the planning year, the K-means clustering algorithm is used to obtain the typical daily output curve of distributed PV. By superimposing this curve with the load curve of the typical day of maximum load in the distribution network grid, a load resilience coefficient considering the output characteristics of distributed PV is obtained. The specific calculation formula is shown in equation (7): (7) in, This refers to the conventional load forecast results for the distribution network grid. Typical daily peak load of the distribution network grid considering the operating characteristics of distributed photovoltaic power; The calculation method for the elastic coefficient of electric vehicles in the three types of multi-element elastic loads includes the following steps: Step 6.1: For electric vehicle users who choose sequential charging, the initial charging time T c,i The power grid should accept the dispatch control of the distribution network or try to choose a time when the load is low to avoid increasing the pressure on the power grid during peak load periods. (8) Where t1 and t2 are the start and end times of the load trough period, respectively; A random number in the interval [0,1]; the charging load of electric vehicle user i in the j-th time period. The calculation formula is shown in equation (9): (9) Then the total charging load of electric vehicle user i at time j The calculation formula is shown in equation (10): (10) Where N is the number of electric vehicles in the load forecasting calculation area; Step 6.2: Calculate the elastic coefficient of the electric vehicle. Based on the aforementioned ordered strategy for electric vehicles, the load elasticity coefficient of electric vehicles is considered. The calculation formula is shown in equation (11): (11) in, This refers to the conventional load forecast results for the distribution network grid. To account for the typical daily peak load of the power grid after the electric vehicle adopts an orderly charging strategy; The calculation method for the central air conditioning elastic coefficient in the three types of multi-element elastic loads includes the following steps: Step 7.1: Central air conditioning load participates in demand response strategy According to the survey results, commercial users of central air conditioning in Henan Province are mainly concentrated in the wholesale and retail industry and the accommodation and catering industry. Commercial users of central air conditioning participate in demand response according to a certain response ratio during peak hours. Step 7.2: Calculate the elasticity coefficient of the central air conditioning system. Load elasticity coefficient after considering central air conditioning load participation in demand response The calculation formula is shown in equation (12): (12) in, The proportion of commercial load within the distribution network grid; The proportion of central air conditioning load within the commercial load; This refers to the number of periods during which the distribution network grid is at its peak load. The calculation method for the elasticity coefficient of communication base stations in the three types of multi-element elastic loads includes the following steps: Step 8.1: Use the K-means clustering algorithm to cluster the historical data of communication base station load. The specific steps are the same as those of the K-means clustering algorithm described above. Step 8.2: Calculate the resilience coefficient of the communication base station. Considering the load elasticity coefficient of communication base stations The calculation formula is shown in equation (13): (13) in, This refers to the conventional load forecast results for the distribution network grid. This is to account for the typical daily peak load of the distribution network grid after the energy storage of communication base stations participates in the response; The specific method for calculating the distribution network load forecasting results with multi-element load resilience in step S4 is as follows: By accumulating the elasticity coefficients and taking into account the simultaneous coefficient of the load elasticity space, the load elasticity coefficients, load elasticity space, and load forecast results for the distribution network grid planning year are calculated after comprehensively considering various influencing factors such as the load of the integrated energy system, the load of distributed power sources, the load of electric vehicles, the load of central air conditioning, and the load of communication base stations. The specific calculation formula is shown in formula (14): (14) in, The elasticity coefficient of the power grid is determined by comprehensively considering various influencing factors; It is the simultaneous coefficient of the load elasticity space, that is, the ratio of the load elasticity space after the curves of various types of load elasticity coefficients are superimposed to the load elasticity space of the sum of all types of elasticity coefficients. This refers to the load flexibility space after considering various influencing factors; The annual load forecast results for distribution network planning take load flexibility into account.

Citation Information

Patent Citations

  • Electric vehicle load demand response-considered network-source-load coordination planning method

    CN108446796A

  • CNN-LSTM combined load prediction method considering electric vehicle charging load influence

    CN113435663A