Two-stage optimal dispatch strategy for integrated energy system with P2G considering demand response
By adopting two-stage optimization scheduling strategies of demand response and P2G technology in an integrated energy system, the problem of difficult to absorb the excess output of renewable energy is solved, and efficient energy utilization and system stability are achieved.
Patent Information
- Application Number
- CN202210697459.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-20
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2042-06-20
AI Technical Summary
The coupling between the existing power system and the natural gas system only realizes the one-way conversion of natural gas to electricity, resulting in difficult to absorb the excess output of renewable energy, resulting in wind and light abandonment, and the independent combined heat and power supply microgrid has a weak ability to resist the random fluctuations of renewable energy.
A two-stage optimization scheduling strategy for integrated P2G energy systems that consider demand response is adopted. Through technologies such as demand response, electric to gas and electric to heat, energy retail prices and equipment output are optimized, the net income of system operators is maximized, and the excess electricity is converted into natural gas for storage through P2G equipment.
Effectively reduce wind and light abandonment, improve energy utilization, enhance the system's ability to resist renewable energy fluctuations, and promote energy conservation and emission reduction.