A mortise and tenon beam-to-beam spliced joint
By using mortise and tenon beam-beam splicing joints, the joints are moved to locations with smaller beam bending moments. The combination of open steel hoops and mortise and tenon joints solves the problem of difficult quality control in the construction of joints in prefabricated reinforced concrete structures, achieving the effects of simplified construction and improved mechanical properties.
Patent Information
- Application Number
- CN202210817277.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-12
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2042-07-12
AI Technical Summary
The beam-column connection nodes of existing prefabricated reinforced concrete structures require on-site wet work, making it difficult to control the construction quality of the nodes. In addition, the nodes are subjected to large torques, which affects the mechanical properties.
The beam-to-beam splicing joint adopts mortise and tenon joints. The joints are moved to a position with smaller beam bending moment by prefabricating short beams. The joints are connected by a combination of open steel hoops and mortise and tenon joints to avoid wet work on site. High-strength steel and bolts are used to fix the joints.
It simplifies the construction process, shortens the construction period, improves the mechanical properties of the nodes, reduces the difficulty of structural design and installation, and avoids wet work on the construction site.
Smart Images

Figure CN115126085B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building structural engineering, and in particular to a mortise and tenon beam-beam splicing joint. Background Technology
[0002] In recent years, in response to the national policy of energy conservation and emission reduction, green prefabricated buildings have developed rapidly, with many new prefabricated structural systems emerging for steel and concrete structures. Steel structures inherently possess the characteristics of prefabricated structures, requiring only the assembly of factory-produced components on-site, with connection methods primarily including welding, bolting, and riveting. While concrete structural components such as beams, slabs, and columns can also be fabricated in factories, assembling these components on-site is not straightforward. Connecting concrete structural components requires formwork at the connection points, reinforcement binding, concrete pouring, and curing, making construction complex, cumbersome, and time-consuming.
[0003] According to the standards, the design of building structures must follow the principle of "strong nodes and weak components". Good mechanical properties of nodes are of great significance to the overall safety of the structure. However, in existing prefabricated reinforced concrete structural systems, such as the Shigou system, cast-in-place node structural system and cast-in-place column structural system, the prefabricated splicing nodes are mostly placed at the beam-column connection position. The moment at this position is large. In addition, there is wet work on the node connection site, and the construction quality is difficult to control, which has a significant impact on the mechanical properties of the node. Summary of the Invention
[0004] The purpose of this invention is to address the current situation where the beam-column connection nodes of prefabricated reinforced concrete structures require on-site wet work and the construction quality of the nodes is difficult to control. By using prefabricated short beams to move the beam-column connection nodes outward, a new type of mortise and tenon beam-beam splicing node is proposed.
[0005] The technical solution adopted in this invention is as follows: a novel mortise and tenon beam-beam splicing node, comprising a precast beam I, a precast beam II, a steel hoop I, a steel hoop II, a mortise and tenon I, and a mortise and tenon II cast together with a precast column. The precast beam I and precast beam II are manufactured in a factory, and their splicing ends are provided with tenons. The steel hoop is an open steel hoop with an inner diameter identical to the cross-sectional dimensions of the precast beam. Before splicing, taking advantage of the deformable nature of the open steel hoop, steel hoop I and steel hoop II are slightly pried open from their open portions and fitted onto the precast beam I. At this time, a certain gap exists between steel hoop I and steel hoop II and the precast beam to ensure that steel hoop I and steel hoop II can move freely on the precast beam I. During installation, the groove at the tenon end of the precast beam I furthest from the precast column is first... First, install mortise and tenon joints one and two at their positions. Then, engage the tenons at the two ends of the precast beam with the tenons at the one end of the precast beam. Next, move steel hoops one and two, which are fitted onto the precast beam one, to the corresponding positions of the splicing node. Finally, use bolts to connect and close the openings of the steel hoops, and apply a certain pre-tightening force to the steel hoops to achieve the purpose of fixing the node. The mortise and tenon joints one and two, as well as steel hoops one and two, used in the node must be rust-removed and corrosion-resistant before installation and use. After the node is spliced, the joints must be waterproofed and sealed.
[0006] Optionally, the precast beam one and precast beam two are factory-precast reinforced concrete beams.
[0007] Optionally, the first and second mortise and tenon joints are steel mortise and tenon joints.
[0008] Optionally, the first and second steel hoops are made of high-strength steel and are open steel hoops with connecting ear plates at the opening. Bolt holes are opened on the ear plates, and stiffening plates are provided on both sides. During installation, bolts are used to connect and close the opening of the steel hoop, and the opening of the steel hoop is placed on the bottom surface of the precast beam.
[0009] Optionally, the beam lap method during node splicing is front-to-back lap.
[0010] Optionally, the node should preferably be placed in a location where the bending moment is relatively small, and the specific consideration should be based on the different load distribution patterns and end constraint patterns on the beam.
[0011] Optionally, the mortise and tenon and the steel hoop need to be treated for rust removal and corrosion prevention before use. The rust removal method is sandblasting; the corrosion prevention method is galvanizing the surface of the mortise and tenon and the steel hoop.
[0012] Optionally, after the splicing construction is completed, the joint is waterproofed and sealed. The treatment method is to evenly lay epoxy material on the surface of the joint.
[0013] Beneficial effects: This invention utilizes precast short beams cast together with precast columns, moving the splicing nodes of the precast reinforced concrete assembly structure from the connection point between the precast beam end and the precast column to a location with lower beam bending moment, and replacing cast-in-place nodes with mortise and tenon joints. Compared to existing precast reinforced concrete structures, the node design proactively avoids areas with high bending moments, reducing the difficulty of structural design and installation; the use of novel mortise and tenon joints ensures the mechanical performance of the nodes while avoiding wet work on-site, simplifying construction procedures and shortening the construction period.
[0014] Scope of application: This invention is mainly applicable to the field of prefabricated reinforced concrete structures, especially to prefabricated beams with large spans that require segmented processing or prefabricated beams with splicing nodes between spans, as well as prefabricated prefabricated building projects with short construction periods and large project volumes. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the nodes of the present invention.
[0016] Figure 2 This is a schematic diagram of the node explosion of the present invention.
[0017] Figure 3 This is a schematic diagram of the stress and deformation of the nodes in this invention.
[0018] Figure 4 This is a diagram showing the reinforcement details of the precast beam at the node of this invention.
[0019] Figure 5 This is a schematic diagram of the steel hoop with opening at the node of the present invention.
[0020] Figure 6 This is a flowchart of the node installation process for the present invention. The specific implementation method is
[0021] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0022] like Figure 1 and Figure 2 As shown, a novel mortise and tenon beam-beam splicing node includes a precast beam 1, a precast beam 2, a steel hoop 4, a steel hoop 5, a mortise and tenon 6, and a mortise and tenon 7, which are cast together with the precast column 3.
[0023] The nodes are joined using mortise and tenon joints. The reinforcing steel at the joint is discontinuous. Axial force, shear force, and bending moment at the node are transmitted through the compression and friction of the steel hoops, mortises, and interlocking tenons. The stress and deformation of the node are as follows: Figure 3 As shown; Figure 3 (a) is a schematic diagram of the shear force and bending moment experienced by a node in the negative bending moment section, and the bending moment in the positive bending moment section is the opposite. Figure 3(c) is a diagram of the deformation of the node under bending moment. The bending moment at the node will cause the two tenons of the precast beam 1 and the precast beam 2 to rotate relative to each other in the vertical plane around the center of the node. This tendency will cause the two tenons to squeeze each other in the contact area (the thickened part in the figure) and cause the tenon 6 and tenon 7 in the groove to bend and deform. Figure 3 (d) shows the deformation of the node under shear force. The shear force at the node causes vertical relative displacement of the tenons of precast beam 1 and precast beam 2, which in turn shears the tenons 6 and 7 in the tenon slots. The tenons 6 and 7 also compress against the concrete in the tenon slots of the precast beams. In addition, both bending moment and shear force cause vertical relative displacement of the two tenons at the node, leading to... Figure 3 (b) shows the deformation of the steel hoop, which generates tensile force inside the steel hoop.
[0024] As can be seen from the above stress analysis of the nodes, the axial force at the nodes is mainly transmitted through the compression and friction between the two tenons, while the bending moment and shear force are mainly transmitted through the deformation of the steel hoop and mortise. Therefore, mortise 6, mortise 7, steel hoop 4, and steel hoop 5 are crucial to the stress performance of the nodes and should have sufficient strength to resist shear and tensile deformation. High-strength steel should be selected for their materials. When the steel hoop is closed by bolt connection, a certain preload should be applied in the steel hoop to reduce the deformation of the nodes.
[0025] The tenon joint of the splicing node is a front-to-back overlap rather than a top-to-bottom overlap; the moment of inertia of the rectangular beam section is proportional to the section width and proportional to the cube of the section height. The cross-sectional area of the precast beam is reduced at the tenon part. Compared with reducing the section height, reducing the section width has a smaller impact on the moment of inertia. Therefore, the node overlap method is selected as a front-to-back overlap.
[0026] Precast beam 1 and precast beam 2 are manufactured in the factory and are reinforced concrete precast beams. Their splicing ends are equipped with tenons. Precast beam 1 and precast column 3 are cast together to form a reinforced concrete precast short beam. This method transfers the splicing node of the precast reinforced concrete assembly structure from the connection position between the precast beam end and the precast column to a position with a smaller beam bending moment, reducing the difficulty of structural design and construction. However, the processing of precast components should strictly follow the relevant provisions in the specifications. A sufficient number of reinforcing bars and stirrups should be configured in the precast beam. The negative bending moment bars configured in the negative bending moment section should have a sufficient anchorage length in the precast column. When the anchorage length is insufficient, the ends should be bent or welded end plates should be made.
[0027] The cross-sectional width and moment of inertia of the precast beam tenon section are reduced, and the original number of reinforcing bars is reduced. In order to prevent premature failure of this position and thus joint failure, an appropriate number of additional reinforcing bars can be configured at the tenon section. These additional reinforcing bars are only arranged in the tenon section of the precast beam, but have a sufficiently long anchorage length in the precast beam.
[0028] When adding additional reinforcing bars at the tenon joint of the precast beam, the influence of factors such as beam cross-section width, stress characteristics and construction feasibility should be considered. Two feasible reinforcement schemes are provided below.
[0029] The reinforcement diagram for precast beams with small cross-sectional widths is as follows: Figure 4 As shown in (a), the cross-sectional width decreases at the tenon position. The longitudinal reinforcing bars 15 and 16 have a smaller eccentricity in the cross-sectional width direction after the relative reduction. It is not advisable to arrange additional reinforcing bars 19 on the cross-sectional width. The additional reinforcing bars 19 can be arranged on the cross-sectional height together with the stirrups 18. When the reinforcement is arranged in this way, the longitudinal reinforcing bars 13, 14, and 17 are broken at the tenon position, while the longitudinal reinforcing bars 15, 16, and 18 extend to the tenon and are tied together with the additional reinforcing bars 19 and the additional stirrups 20 at the tenon position. The additional reinforcing bars 19 have sufficient anchorage length in the precast beam.
[0030] The reinforcement diagram for precast beams with large cross-sectional widths is as follows: Figure 4 As shown in (b), the cross-sectional width decreases at the tenon position. The longitudinal reinforcing bars 15 and 16 have a larger eccentricity in the cross-sectional width direction after the relative reduction. To avoid the cross-section from twisting, the additional reinforcing bars 21 and 22 can be arranged symmetrically with the original reinforcing bars in the cross-sectional width, just like the longitudinal reinforcing bars 15 and 16. When the reinforcement is arranged in this way, the longitudinal reinforcing bars 13, 14, and 17 are broken at the tenon position, while the longitudinal reinforcing bars 15, 16, and 18 extend to the tenon and are tied together with the additional reinforcing bars 21, 22, and 23 and the additional stirrups 24 at the tenon position. The additional reinforcing bars 21 and 22 have sufficient anchorage length in the precast beam.
[0031] The two precast beam reinforcement methods mentioned above are only for reference. The specific reinforcement is not fixed and can be adjusted according to the actual situation, such as changing the cross-section, spacing, quantity and stirrup type of the steel bars. In addition, new reinforcement methods different from the two methods mentioned above can also be designed.
[0032] The steel hoop 1 (4) and steel hoop 2 (5) are open steel hoops, as shown in the schematic diagram. Figure 5As shown, a connecting ear plate 9 is welded to the opening of the steel hoop, and bolt holes 10 are opened on the ear plate. The diameter of the bolt holes 10 is 1-2 mm larger than the diameter of the bolt shank. Triangular stiffening plates 11 are provided on both sides of the ear plate. One side of the triangular stiffening plate 11 is welded to the ear plate 9, and the other side is welded to the steel hoop. The steel hoop 1 4 and steel hoop 2 5 are made of high-strength steel, and their inner diameter is the same as the cross-sectional size of the precast beam. In order to apply a certain preload in the steel hoop when the bolt connection closes the opening of the steel hoop, a gap 8 of appropriate width should be left at the opening of the steel hoop. In order to facilitate the installation of the floor slab above the precast beam, the opening of the steel hoop should be placed on the bottom surface of the precast beam during installation.
[0033] The node installation process Figure 6 As shown, after the precast column is installed, the deformable open steel hoops 4 and 5 are slightly pried open from the opening and fitted onto the precast beam 1. At this time, there is a certain gap between steel hoops 4 and 5 and the precast beam 1 to ensure that steel hoops 4 and 5 can move freely on the precast beam 1. During installation, mortises 6 and 7 are first installed at the slot of the tenon at the end of the precast beam 1 away from the precast column 3. Then, the tenon at the end of the precast beam 2 is engaged with the tenon at the end of the precast beam 1 to complete the joint beam overlap. Then, steel hoops 4 and 5 fitted onto the precast beam 1 are moved to the corresponding position of the splicing node. Finally, bolts 12 are used to connect and close the opening of the steel hoops and apply a certain preload to the steel hoops to achieve the purpose of fixing the node.
[0034] The mortise and tenon type beam-beam splice joint is suitable for placement in the part of the beam where the bending moment is small. The specific placement should be considered according to the different load forms and end constraint forms of the beam. For example, for a beam with both ends fixed under uniform load, the bending moment is the smallest at the three-thirds point, so the splice joint can be placed here.
[0035] The mortise and tenon joint 6, mortise and tenon joint 7, and steel hoop joint 4 and steel hoop joint 5 need to be rust-removed and corrosion-proofed before use. The rust-removal method is sandblasting. The corrosion-proofing method is galvanizing the surfaces of the mortise and tenon joint 6, mortise and tenon joint 7, and steel hoop joint 4 and steel hoop joint 5.
[0036] After the splicing construction is completed, the joints of the nodes need to be sealed. The sealing method is to evenly lay epoxy material on the surface of the nodes.
Claims
1. A mortise and tenon beam-beam splicing joint, comprising a precast column (3), a precast beam one (1), a precast beam two (2), a steel hoop one (4), a steel hoop two (5), a mortise and tenon one (6) and a mortise and tenon two (7), wherein the precast beam one (1) is cast together with the precast column (3), and the precast beam one (1) and the precast beam two (2) are factory-prefabricated reinforced concrete beams, and their splicing ends are respectively provided with tenons, characterized in that: The precast beam (1) and the precast column (3) form a precast short beam. The splicing node is set at the end of the precast beam (1) away from the precast column (3) and located at the part where the beam is subjected to a smaller bending moment. The tenons of the precast beam 1 (1) and the precast beam 2 (2) overlap each other along the width of the precast beam section. The width of the tenon section is smaller than the width of the precast beam body. The tenons of the precast beam 1 (1) and the precast beam 2 (2) are provided with slots for installing tenon 1 (6) and tenon 2 (7). The slots are set horizontally. The tenon of the precast beam 2 (2) is engaged with the tenon of the precast beam 1 (1). The tenon section is provided with additional reinforcing bars, which are arranged only in the tenon section of the precast beam and have an anchorage length in the corresponding precast beam. The first steel hoop (4) and the second steel hoop (5) are both open steel hoops that can be fitted around the splicing node. Their inner diameter is the same as that of the precast beam. The open part is provided with a connecting ear plate (9). The connecting ear plate (9) is provided with bolt holes (10). The connecting ear plate (9) is provided with stiffening plates (11) on both sides. During installation, the open part of the steel hoop is located on the bottom surface of the precast beam. Before splicing, the openings of steel hoop one (4) and steel hoop two (5) can be pried open and fitted onto precast beam one (1), and there is a gap between steel hoop one (4) and steel hoop two (5) and precast beam one (1) to allow steel hoop one (4) and steel hoop two (5) to move along precast beam one (1); after the two tenons are engaged, steel hoop one (4) and steel hoop two (5) move to the corresponding position of the splicing node, and bolt (12) passes through bolt hole (10) to close the opening of the steel hoop and apply pre-tightening force in steel hoop one (4) and steel hoop two (5).
2. The mortise and tenon beam-beam splice joint according to claim 1, characterized in that: Both the first (4) and the second (5) steel hoop are made of high-strength steel.
3. The mortise and tenon beam-beam splice joint according to claim 1, characterized in that: When the splicing node is used for a beam with both ends fixed under uniformly distributed load, the splicing node is set near the third point of the beam span.
4. The mortise and tenon beam-beam splice joint according to claim 1, characterized in that: Before installation and use, the mortise and tenon one (6), mortise and tenon two (7), steel hoop one (4) and steel hoop two (5) are sandblasted to remove rust and then galvanized for corrosion protection.
5. The mortise and tenon beam-beam splice joint according to claim 1, characterized in that: After the splicing construction is completed, the joint of the node is sealed. The sealing method is to evenly lay epoxy material on the surface of the node.