Fuse housing for safe venting
By introducing a labyrinth wall and shallow venting channels into the fuse housing, the problem of arc energy exhaust control in high-voltage systems is solved, the open-circuit resistance of the fuse is improved, and circuit safety is ensured.
Patent Information
- Application Number
- CN202210362900.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2021-04-07
- Filing Date
- 2022-04-07
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2042-04-07
AI Technical Summary
Existing fuse housings are difficult to effectively control the venting of arc energy in high-voltage systems, resulting in a decrease in open-circuit resistance (OSR) and an inability to effectively protect the circuit.
A fuse housing is designed, comprising a labyrinth wall and a venting channel. The labyrinth wall provides a meandering path to guide venting material, and the venting channel is designed to be shallow to facilitate venting. Combined with a rib structure to support and disperse conductive material, this ensures efficient flow and deposition of venting material within the fuse housing.
The open-circuit resistance (OSR) of the fuse housing is increased, reducing the physical impact of venting on the housing and ensuring reliable circuit protection.
Smart Images

Figure CN115206747B_ABST
Abstract
Description
Technical Field
[0001] Embodiments of this disclosure relate to fuse housings, and more specifically, to fuse housings for high-voltage systems. Background Technology
[0002] A fuse is a current-sensitive device designed as an intentionally weak link in a circuit. The function of a fuse is to provide complete circuit protection or a discrete component by reliably melting under overcurrent conditions and thus safely interrupting the flow of current.
[0003] Fuse selection is based on the environment to be protected. For example, parameters such as rated voltage, interrupt rating, time-current characteristics, and rated current are considered when selecting a fuse. Rated voltage indicates the maximum voltage of the circuit; therefore, the fuse is designed to operate safely under overcurrent conditions. Interruption rating (also known as breaking capacity or short-circuit rating) is the maximum current that the fuse can safely interrupt at its rated voltage. The time-current characteristics determine the fuse's response speed to different overcurrent conditions. Rated current is the maximum current that the fuse can continuously carry under specific conditions.
[0004] A 12V system is a system with a rated voltage of 12V, but it can be connected to a fuse with an interrupt voltage of 32V. This means that if the 12V system receives a voltage of 32V, the fuse will trip, forming an open circuit and protecting the devices / components in the 12V system that the fuse is intended to protect. Similarly, a 48V system can have an interrupt voltage of 70V, and a suitable fuse selected for this system will interrupt at 70V.
[0005] When a fuse in a protective circuit breaks, an electric arc is generated between the two terminals of the fuse. As the fuse begins to break under interruption voltage, an arc occurs, causing the metal and other materials in the fragile parts of the fuse element to melt and deposit inside the fuse housing (where the fuse is vented), and possibly also outside the housing.
[0006] Regardless of the rated voltage of a fuse, it will generate arc energy. However, the arc energy in a 70V system is significantly higher than that in a 32V system. The arc energy in a 70V system can be three times or more than that in a 32V system. For 70V systems, fuse housing strength, venting, and open-state resistance (OSR) are more challenging than in 32V systems.
[0007] In light of these and other considerations, this improvement may be useful. Summary of the Invention
[0008] This overview is provided to present, in a simplified form, some concepts that will be further described in the detailed description below. This overview is not intended to identify key or essential features of the claimed subject matter, nor is it intended to help determine the scope of the claimed subject matter.
[0009] An exemplary embodiment of the fuse housing according to this disclosure may include a top portion and a bottom portion. The bottom portion has a first labyrinth wall on its left side, which forms a first path for venting material to move from the fuse housing when the fuse element is disconnected. The bottom portion also has a second labyrinth wall on its right side, which forms a second path for venting material to move from the fuse housing when the fuse element is disconnected. The fuse housing also has a first vent passage located at a first outlet of the first path and a second vent passage located at a second outlet of the second path.
[0010] Another exemplary embodiment of the fuse housing according to this disclosure may include a first labyrinth wall on a first side terminating at a first vent channel, and a second labyrinth wall on a second side terminating at a second vent channel. The first and second vent channels have a first depth, and the first and second labyrinth walls have a second depth, the second depth being significantly greater than the first depth. The fuse housing also has a plurality of ribs located in a central portion below the fuse element. During an arcing event, vented material comprising gaseous material, molten metal, and carbide plastic is drawn through the first and second labyrinth walls, such that the molten metal and carbide plastic are substantially retained within the first and second labyrinth walls, while the gaseous material escapes through the first and second vent channels.
[0011] An exemplary embodiment of the fuse housing according to this disclosure may include a bottom portion having a left labyrinth wall and a right labyrinth wall, and a central portion therebetween. The left labyrinth wall has a left vent passage at its end, and the right labyrinth wall has a right vent passage at its end. The bottom portion also has a projecting weld on a top side and a recessed weld on a bottom side. The fuse housing also has a top portion having a second projecting weld on a second top side and a second recessed weld on a second bottom side. The bottom portion mates with the top portion such that the projecting weld of the bottom portion mates with the second recessed weld of the top portion, and the second projecting weld of the top portion mates with the recessed weld of the bottom portion. Attached Figure Description
[0012] Figures 1A-1C This is a schematic diagram illustrating a fuse housing according to an exemplary embodiment;
[0013] Figure 2 This illustrates an exemplary embodiment. Figures 1A-1C A schematic diagram of the bottom part of the fuse housing;
[0014] Figure 3A and 3B These are examples illustrating the use of [specific embodiments]. Figures 1A-1C A schematic diagram of the labyrinth wall and venting channel of a fuse housing;
[0015] Figures 4A-4C This illustrates a method for using, according to an exemplary embodiment. Figures 1A-1C A schematic diagram of exemplary dimensions of a fuse housing;
[0016] Figure 5 This illustrates a method for using, according to an exemplary embodiment. Figures 1A-1C A schematic diagram of the fragment path of a fuse housing;
[0017] Figure 6 This illustrates an exemplary embodiment. Figures 1A-1C A schematic diagram of the fuse housing; and
[0018] Figure 7 This illustrates an exemplary embodiment. Figures 1A-1C A schematic diagram of a cross-sectional view of the fuse housing. Detailed Implementation
[0019] A fuse housing for safe venting of a fuse is disclosed. The fuse housing is characterized by labyrinth walls disposed on opposite sides of the fuse housing. The labyrinth walls are characterized by a meandering path for the flow of venting material. A venting channel is located at the end of the meandering path furthest from the fuse element. The depth of the venting channel is shallower than the depth of the meandering path of the labyrinth wall, thereby facilitating suction during venting. Conductive material is deposited along the meandering path, allowing the fuse to maintain a high OSR rating. The fuse housing includes a support structure for connecting the top and bottom portions and supporting the placement of terminals and the fuse element.
[0020] Figures 1A-1C This is a perspective view of a fuse housing 100 for safety venting according to an exemplary embodiment. Figure 1A and Figure 1B This is an exploded perspective view of the fuse housing 100, and Figure 1C This is a perspective view of the housing in the closed position. The fuse housing 100 includes a bottom portion 108 and a top portion 110, which together enclose the fuse element 114.
[0021] The fuse housing 100 is characterized by vent channels 102a on the left and 102b on the right on the bottom portion 108, and vent channels 102c (not visible) on the left and 102d on the right (collectively referred to as "vent channels 102") on the top portion 110. The fuse housing 100 is further characterized by labyrinth walls 104a on the left and 104b on the right on the bottom portion 108 (collectively referred to as "labyrinth walls 104"). Similarly, the top portion 110 includes a pair of labyrinth walls (not shown). In one exemplary embodiment, the bottom portion 108 and the top portion 110 are substantially similar in shape and construction. In one exemplary embodiment, the vent channels 102 and labyrinth walls 104 of the novel fuse housing 100 facilitate the outflow of gas caused by an electric arc during interruption (disconnection of the fuse element). Furthermore, as described in more detail below, the ventilation channel 102 and the labyrinth wall 104 are designed to control the outflow of gas, reduce the temperature of the gas, and reduce the effects of exhaust (e.g., visible hot gas, blackened surrounding environment, etc.), which is caused by the dissipation of arc energy when the fuse is tripped.
[0022] As used herein, venting or venting material refers to gaseous air-borne material, molten material, and housing plastic. Molten material may be caused by the breaking of a fuse element (an intentionally weak link) inside the fuse or by heating of the fuse terminals, the busbar to which the fuse is connected, or other nearby conductive materials. The plastic material constituting the fuse housing 100 will turn into semi-conductive carbon when exposed to the violent gases generated during venting.
[0023] The condition that causes a fuse to trip is called an overcurrent condition. Overcurrent is any current exceeding the rated amperes of a line, device, or installation under operating conditions. The term "overcurrent" includes overload and short circuit. The rated voltage marked on a fuse indicates the maximum voltage of the circuit against which the fuse is designed to operate safely under overcurrent conditions.
[0024] According to an exemplary embodiment, the fuse housing 100 further includes a fuse element 114. A left terminal 112a is connected to the fuse element 114 on the left side of the fuse housing 100, and a right terminal 112b is connected to the fuse element on the right side of the fuse housing 100 (collectively referred to as "terminal 112"). The fuse element 114 is centrally located within the fuse housing 100 and positioned above the rib 106. The fuse element 114 is an "intentional weak point" of the fuse, designed to disconnect at rated voltage.
[0025] Ribs 106 of the fuse housing 100 are protruding portions of the fuse housing wall. In the bottom portion 108, the wall will be a bottom or base plate, and in the case of the top portion 110, the wall will be a top or top plate (not shown). The fuse element 114 of the fuse is disposed above the ribs 106. Multiple rows of serrated ribs 106 occupy the central portion of the fuse housing 100. However, the ribs 106 can take any of a variety of shapes other than the serrated configuration shown, can have different dimensions, and can have more or fewer rows of features than shown. Thus, the ribs 106 increase the surface area of the central portion of the fuse housing 100. The ribs 106 can be formed by a molding process when the bottom portion 108 and the top portion 110 of the fuse housing 100 are formed.
[0026] Figure 2 This is according to an exemplary embodiment. Figures 1A-1C A perspective view of the bottom portion 108 of the fuse housing 100. The bottom portion 108 is divided into a left labyrinth chamber 118, a rib chamber 116, and a right labyrinth chamber 120. Although only the bottom portion 108 is shown, Figure 2 The illustration could alternatively depict the top portion 110, as both portions 108 and 110 are identical in the exemplary embodiment. The bottom portion 108 of the fuse housing 100 further includes receiving apertures 202a and 202b (collectively referred to as "receiving aperture 202"), cylindrical protrusions 204a and 204b (collectively referred to as "cylindrical protrusion 204"), a projection weld 206, and a recess weld 208. These components are used to secure the bottom portion 108 of the fuse housing to the top portion 110. Figures 1A-1C In an exemplary embodiment, the bottom portion 108 and the top portion 110 are fixed together by welding. The top portion 110 also includes a receiving aperture 202, a cylindrical protrusion 204, a convex weldment 206, and a concave weldment 208. The top portion 110 can be considered as a mirror image of the bottom portion 108. Alternatively, the top portion 110 can be considered as axially symmetrical with respect to the bottom portion 108. The cylindrical protrusion 204a of the bottom portion 108 is fitted into the receiving aperture 202 of the top portion 110, and the cylindrical protrusion 204b of the bottom portion 108 is fitted into the receiving aperture 202 of the top portion 110.
[0027] In one exemplary embodiment, the top portion 110 of the fuse housing 100 is identical to the bottom portion 108 and further includes a vent channel 102, a labyrinth wall 104, and a rib 106. In an alternative embodiment, the top portion 110 includes some, but not all, of the features of the bottom portion 108. In one exemplary embodiment, when manufacturing the fuse housing 100, the vent channel 102, labyrinth wall 104, rib 106, receiving aperture 202, cylindrical protrusion 204, projection weld 206, and concave weld 208 can be formed into an integral structure by a molding process.
[0028] Overcurrent and high-voltage conditions can lead to unfavorable open-circuit resistance results. Guiding and controlling the outflow of gas induced by the arc during interruptions is crucial for fuse performance. By guiding and controlling the outflow of gas, a well-designed fuse housing (e.g., in exemplary fuse housing 100) can reduce the temperature of the generated gas. In one exemplary embodiment, fuse housing 100 is also able to reduce the physical and observable effects of the venting.
[0029] As explained above, the arc energy to be dissipated in a 48V system is significantly higher than in a 12V system. The case strength, venting, and open-state resistance (OSR) present greater challenges for 48V systems compared to those used for low-voltage systems. OSR is typically listed as a fuse parameter and is a test condition that measures the resistance of a fuse after it has been opened. Because the purpose of a fuse is to break to form an open circuit and protect other circuits, an opened fuse ideally has the highest possible resistance to prevent any current from reaching the protected circuit. For example, a fuse specification might state "Open-state resistance (after fuse is opened) > 1 MOhm".
[0030] However, it is possible for a poorly designed fuse to continue carrying current between its terminals after it has broken. Although there is no fuse element between the terminals, the arc energy and venting that occur simultaneously with the fuse's breaking can leave residue (such as conductive residue from the fuse element) inside the fuse housing. When this happens, a conductive path can form along the debris path, sufficient to allow current to travel through the terminals. This phenomenon is called creep, resulting in a low OSR rating for the fuse. Furthermore, a low OSR rating means the fuse is not fulfilling its intended purpose: preventing damage to other components in the circuit, because current continues to flow through the fuse even after the fuse element has broken.
[0031] When a fuse trips due to an overcurrent condition, the sudden arc generates hot gases. For example, during an interruption, the arc temperature can exceed 6000°C, even reaching 20,000°C. The sudden increase in air temperature, hot gases, and molten material creates a significant pressure increase (shock wave) within the fuse housing, which will attempt to escape the housing very rapidly if possible. The molten material is generated by the tripping of the fuse element, or by heating the fuse terminals, the busbar to which the fuse is connected, or other nearby conductive materials. The housing plastic itself, when exposed to this intense gas, transforms into semi-conductive carbon. The explosion of vented material inside the fuse is a result of the combination of hot gases, molten material, and carbonized plastic material.
[0032] A fuse can operate without a vent, ensuring all vented material remains within the fuse housing. This may be preferred in environments where the adverse consequences of a blown fuse must be avoided. However, all molten material (from the copper element to the housing walls) will remain within the fuse. This can result in an excessively low OSR (and unreliable fuse protection), particularly if the area around the fuse element is small. However, if there is an opening somewhere within the fuse housing, venting will occur, and the gas will transport the molten and vaporized copper and carbonized semiconductor plastic material from the housing to a location outside the fuse housing.
[0033] Therefore, although some venting is acceptable (or even unavoidable) when the fuse breaks, it should be minimized or controlled as much as possible to maintain good OSR specifications. The venting passage 102 and labyrinth wall 104 of the novel fuse housing 100 are designed to strategically control the venting that occurs when the fuse breaks, thus keeping the fuse's OSR very high. Figure 2 As shown, the labyrinth wall 104 provides a meandering path for exhaust gas to flow out of the fuse housing 100. At the top edge of the labyrinth wall 104, the vent passage 102 provides an exit path for the exhaust gas.
[0034] Figure 3A and Figure 3B The exemplary embodiments are shown in more detail below. Figures 1A-1C The fuse housing 100 has a left-side labyrinth wall 104a and a left-side vent passage 102a. The labyrinth wall 104a provides a current path 302 for venting, such as... Figure 3A As shown in the bird's-eye view. The explosion caused by the electric arc energy begins in the central part of the fuse housing 100 where rib 106 is located ( Figure 2When the exhaust gas is released, it will rapidly move to the labyrinth walls 104a and 104b on both sides of the central portion. The protruding structures 304 and 306 contribute to the formation of the labyrinth wall 104a. The protruding structure 304 is shaped somewhat like the lowercase letter "p" (p-shaped) and features a cylindrical protrusion 204 located on the top of the protruding structure. The protruding structure 306 is shaped somewhat like the lowercase letter "d" (d-shaped) and features a receiving aperture 202 located on the top of the protruding structure. Similarly, as... Figure 2 As shown, the protruding structure for the right labyrinth wall 104b is shaped somewhat like the lowercase letter "q" (q-shaped) and features a receiving aperture 202b located on the top of the protruding structure. The protruding structure for the right labyrinth wall 104b is shaped somewhat like the lowercase letter "b" (b-shaped) and features a cylindrical protrusion 202b located on the top of the protruding structure. When manufacturing the fuse housing, the protruding structure 306 can be integrally formed with the other structures of the fuse housing 100 described above through a molding process.
[0035] The labyrinth wall 104 is used to guide and diffuse the gas and particles of the exhaust material. The meandering path of the labyrinth wall 104 allows generated debris to adhere to more surfaces, which in some embodiments helps to reduce the increase of conductive material and conductive paths, thereby improving the OSR of the fuse housing 100. Furthermore, in an exemplary embodiment, the venting channel 102 located at the farthest end of the meandering path from the fuse element 114 is shallower in depth than the meandering path of the labyrinth wall 104, which facilitates a better suction effect during exhaust.
[0036] The fuse housing 100 includes a top portion 110 fixed to the bottom portion 108, such as Figures 1A-1C As shown. When the structures of the top portion 110 and the bottom portion 108 are fixed to each other, the protruding structures 304 and 306 provide a path (by...) Figure 3A (As indicated by the current path arrow 302 in the diagram), to allow the exhaust gas to move toward the ventilation passage 102 in the desired direction. Figure 3B Perspective view 300 of the venting channel 102 further illustrates the relationship between the labyrinth wall 104 and the venting channel 102. In an exemplary embodiment, the volume of space in the labyrinth wall 104 that can be used as a path for venting is larger than the depth of the venting channel 102, which is shallower. However, in some embodiments, this relatively small exit path of the venting channel 102 can attract venting material because the venting material is under very high pressure, and the venting channel 102 provides an opening for releasing pressure inside the fuse housing 100. The venting channel 102 and the labyrinth wall 104 are therefore designed to allow debris to be cleared more quickly from the central portion of the fuse housing 100.
[0037] In an exemplary embodiment, the labyrinth wall 104 cools the exhaust material as it passes through the meandering channels formed by the protruding structures of the wall and exits the fuse housing 100 via the venting channel 102. The labyrinth wall 104 can therefore be considered a silencer for the exhaust material.
[0038] The labyrinth wall can be modified in a variety of ways. The labyrinth wall can be replicated side-by-side once, twice, three times, or more, depending on the size of the fuse housing. Alternatively, the shape of the labyrinth wall can be changed. Or, the edges of the "p," "d," "q," and / or "b" portions can be modified, for example, by adding "teeth," "serrations," frills, etc. Fuse designers skilled in the art will recognize that there are many different ways the design of the labyrinth wall can be altered while still providing the venting protection described herein.
[0039] exist Figure 3B In a simplified perspective view of the left vent passage 102a, the vent passage 102 has a depth (e.g., height) and a length of 310. When the top portion 110 and the bottom portion 108 of the fuse housing 100 are attached together, the vent passage 102 provides a gap of depth 308 for the escape of vent material. This gap forms a path of minimal resistance for the pressure escape of the arc discharge that occurs when the fuse element 114 disconnects. The internal cavity pressure increases during an arc episode and is discharged into the environment through the vent passage 102. Furthermore, the small size of the vent passage 102 creates a suction-like effect that draws vent material toward the vent passage. In an exemplary embodiment, because molten metal is heavier than gaseous material, the molten metal will remain on the walls of the labyrinth wall 104, and the gas will escape from the vent passage 102.
[0040] In an exemplary embodiment, the depth 308 of the vent channel 102 is maintained slightly less than the depth of the labyrinth wall 104. This relatively small depth prevents too many fragments from leaving the fuse housing 100, while still allowing some venting material to escape, and very quickly. In one exemplary embodiment, a large amount of gaseous material can leave the vent channel 102, while only a small amount of molten material escapes.
[0041] Figures 4A-4C These are representative illustrations of the maze walls 104 and ribs 106 according to some embodiments, including exemplary dimensions of each. Figure 4AAs shown, in the exemplary embodiment, the dimensions of the maze wall 104 are varied. A first wall portion 402 (entrance wall or right wall) is on the right, a second wall portion 410 (center wall) is in the middle, and a third wall portion 418 (exit wall or left wall) is on the left. In the exemplary embodiment, the distance 408 between the first wall portion 402 and the second wall portion 410 is greater than the distance 416 between the second wall portion 410 and the third wall portion 418. Furthermore, in the exemplary embodiment, the depth 404 of the first wall portion 402 is greater than the depth 414 of the second wall portion 410. Additionally, in the exemplary embodiment, the width 406 of the first wall portion 402 is the same as the width 412 of the second wall portion 410. Therefore, in the exemplary embodiment, although walls 402 and 410 have the same thickness, the distance between the walls decreases as the path of the maze wall 104 approaches the ventilation channel 102.
[0042] Figure 4B and Figure 4C The dimensions of rib 106 are shown, and... Figure 4B In this case, the distance between the ribs and the fuse element 114 is shown. In an exemplary embodiment, the depth 422 of the ribs 106, the distance 424 between the ribs 106, and the distance 420 between the ribs 106 and the fuse element 114 are shown. Figure 4B The dimensions can vary. Sizes 420, 422, and 424 do not affect the operation of the novel fuse housing disclosed herein.
[0043] In an exemplary embodiment, the depth 308 of the vent channel 102 is smaller than the depth of the labyrinth wall 104 to facilitate very rapid venting of debris from the fuse housing. In one embodiment, the depth 308 of the vent channel 102 ( Figure 3B Approximately the width 406 of the first wall portion 402 or the intermediate wall portion 410. Figure 4A One-fifth of the length of the vent passage 102. In another embodiment, the length 310 of the vent passage 102 is approximately the same as the depth 414 of the center wall 410. In another embodiment, the length 310 of the vent passage 102 is approximately twice the distance 416 between the center wall 410 and the left wall 418. In another embodiment, the distance 408 between the right wall 402 and the center wall 410 is approximately 80% of the length 310 of the vent passage 102. In exemplary embodiments, the dimensions of the various features of the vent passage 102 and the labyrinth wall 104 can be scaled according to any size fuse housing.
[0044] According to some embodiments, Figures 4A-4CSome relative information is provided for the labyrinth wall 104 and rib 106. However, the dimensions of the novel fuse housing 100 disclosed herein can be scaled for different applications. The dimensions of the rib chamber 116, the left labyrinth wall chamber 118, and the right labyrinth wall chamber can be adjusted. Alternatively, the height or width of the rib 106, the features of the labyrinth wall 104, or the vent passage 102 can be adjusted.
[0045] In some embodiments, the performance of the fuse is controlled by combining two features of the fuse housing 100, namely the venting channel 102 and the labyrinth wall 104, through venting and control of the OSR. The venting channel 102 and the labyrinth wall 104 facilitate the outflow of gas caused by an arc following an overcurrent state. The novel features (venting channel 102 and labyrinth wall 104) further control the outflow of gas through the combination of the thin gap in the venting channel 102 for discharging exhaust material and the meandering path of the labyrinth wall 104. In some embodiments, the venting channel 102 and the labyrinth wall 104 further contribute to reducing the high temperature of the gas in the exhaust material by creating a path for rapid gas movement and an exit path through the fuse housing 100. Furthermore, in the exemplary embodiment, the venting passage 102 and labyrinth wall 104 of the fuse housing 100 reduce the impact of exhaust (visible hot gas, blackened surrounding environment) because the gas deposits copper (of the fuse element) and graphite (of the carbide plastic of the housing) on the labyrinth wall as it leaves the fuse housing.
[0046] Figure 5 This is according to an exemplary embodiment. Figures 1A-1C A bird's-eye view of the bottom portion 108 or top portion 110 of the fuse housing 100. The location 502 of the initial arcing event (fuse element explosion) is shown, along with the left path 504 and right path 506 where venting occurs. When the fuse blows, the pressure accumulated at the central arcing event location 502 is released, some along the ribs 106, some within the labyrinth walls 104, and some through the venting channels 102. The meandering paths of the labyrinth walls 104 form long exit paths to these venting channels 102, with most of the venting debris deposited on the walls of the labyrinth walls, and ideally, very little deposited on the ribs 106 in the central portion of the fuse housing 100. In other words, the fuse housing 100, with its labyrinth walls 104 and venting channels 102 on the left and right sides, is designed such that debris containing conductive material diffuses as far away as possible from the arcing explosion location 502. In an exemplary embodiment, this ensures that conductive material does not accumulate in a manner that allows current to flow between the two sides of the fuse housing, thereby maintaining a high OSR rating for the fuse and allowing for protective operation (for which the fuse element 114 within the fuse housing 100 is designed).
[0047] In one exemplary embodiment, the thickness of the housing wall behind the rib 106 is 0.6 mm, while the thickness of the rib is 0.9 mm. Therefore, although material is deposited on the rib, the thickness of the rib 106 is insufficient to prevent the exhaust material from leaving towards the labyrinth wall 104. In one exemplary embodiment, the distance from the fuse element 114 to the top of the rib 106 is sufficient so that the rib does not obstruct the flow of gas. Therefore, the rib 106 conceals and disperses the conductive copper and plastic between each row of ribs.
[0048] Figure 6 This is a perspective view of a fuse housing 100 featuring a fuse element 114 according to an exemplary embodiment. A left terminal 112a is connected to the fuse element 114 on the left side of the fuse housing 100, and a right terminal 112b is connected to the fuse element on the right side of the fuse housing 100. The fuse element 114 is centrally located within the fuse housing 100 and positioned above the rib 106. The fuse element 114 is the "intentional weak point" of the fuse, designed to disconnect at its rated voltage. In one embodiment, the fuse element for a 48V circuit will disconnect when an overcurrent causes the maximum voltage of the circuit to exceed 70V. Both the fuse element 114 and the terminal 112 are made of a conductive material (e.g., copper), but the terminal is manufactured to be thicker and more robust (by design) than the fuse element. When an arcing event occurs due to an overcurrent condition, the fuse element 114 will be destroyed, while the terminal 112 will only be damaged.
[0049] exist Figure 6 In the diagram, the portion of terminal 112 located above fuse housing 100 is partially transparent, making the vent channel 102 and labyrinth wall 104 somewhat visible. Besides securing the bottom portion to the top portion of fuse housing 100, the cylindrical protrusion 204 and receiving aperture 202 facilitate placement of terminal 112 to the bottom portion of fuse housing. For this purpose, each terminal includes two apertures. The left terminal 112a includes apertures 602a (used) and 604a (unused), while the right terminal 112b includes apertures 602b (used) and 604b (unused) (collectively referred to as "aperture 602" and "aperture 604"). Furthermore, the receiving aperture 202 and cylindrical protrusion 204 (…) are located below each terminal. Figure 2 This provides support for the placement of terminal 112.
[0050] Figure 6As further illustrated, in the exemplary embodiment, a portion of each terminal 112 is disposed within the fuse housing 100, directly above the labyrinth wall 104 and the venting channel 102. Therefore, even after the fuse element 114 has melted, conductive material will remain, i.e., the portion disposed within the housing. Furthermore, this indicates that the presence of conductive material within the labyrinth wall 104 is insignificant, considering that the terminals also occupy this space. The novel design features described herein (venting channel 102 and labyrinth wall 104) only mitigate the presence of conductive material within the central portion of the fuse housing 100.
[0051] Figure 7 This is according to an exemplary embodiment. Figures 1A-1C A side sectional view of the fuse housing 100. The top portion 110 and the bottom portion 108, as well as the left terminal 112a, are shown. Due to the axisymmetry of the fuse housing 100, the vent will travel "below" and "above" terminals 112a (and 112b). When the fuse element 114 (not shown) blows, a first debris path 702 travels through the labyrinth wall 104 above the left terminal 112a. Similarly, a second debris path 704 travels through the labyrinth wall 104 below the left terminal 112a.
[0052] Therefore, due to the axial symmetry of the top portion 110 and the bottom portion 108, the exhaust has four paths, as the exhaust will travel "below" and "above" the terminal 112: 1) to the left side of the fuse element 114, below the terminal 112a, through the labyrinth wall 104a, and out of the vent passage 102a (of the bottom portion 108); 2) to the right side of the fuse element 114, below the terminal 112b, through the labyrinth wall 104b, and out of the vent passage 102b (of the bottom portion 108); 3) to the left side of the fuse element 114, above the terminal 112a, through the labyrinth wall 104a, and out of the vent passage (of the top portion 110); and 4) to the right side of the fuse element 114, above the terminal 112b, through the labyrinth wall 104b, and out of the vent passage 102b (of the top portion 110).
[0053] As used herein, elements or steps described in the singular and beginning with the words "a" or "an" should be understood to not exclude multiple elements or steps unless such exclusion is explicitly stated. Furthermore, references to "one embodiment" in this disclosure are not intended to exclude the existence of other embodiments that also incorporate the described features.
[0054] While this disclosure references certain embodiments, many modifications, alterations, and variations of the described embodiments are possible without departing from the field and scope of this disclosure as defined by the appended claims. Therefore, this disclosure is not limited to the described embodiments but has the full scope defined by the language of the appended claims and their equivalents.
Claims
1. A fuse housing comprising a top portion and a bottom portion, the bottom portion further comprising: A first labyrinth wall is provided on the left side, forming a first path for the movement of vent material from the fuse housing when the fuse element is disconnected; A second labyrinth wall is provided on the right side, which forms a second path for the movement of vent material from the fuse housing when the fuse element is disconnected; The first ventilation channel is set at the first exit of the first path; as well as A second ventilation channel is installed at the second exit of the second path. The first and second ventilation channels have a first depth, and the first and second maze walls have a second depth, wherein the second depth is greater than the first depth; and During an arc event, the exhaust material, comprising gaseous material, molten metal, and carbide plastic, is drawn through the first and second labyrinth walls, so that the molten metal and carbide plastic remain in the first and second labyrinth walls, while the gaseous material escapes through the first and second ventilation channels.
2. The fuse housing according to claim 1, wherein the bottom portion further comprises: The first receiving port is set on the first maze wall; and The second receiving port is located on the second labyrinth wall.
3. The fuse housing according to claim 2, wherein, The first receiving port is located above the first protrusion within the first labyrinth wall, and the second receiving port is located above the second protrusion within the second labyrinth wall.
4. The fuse housing according to claim 3, wherein, The first protrusion has a d-shaped structure, and the second protrusion has a q-shaped structure.
5. The fuse housing according to claim 4, wherein the bottom portion further comprises: The first cylindrical protrusion is set on the first maze wall; and The second cylindrical protrusion is located on the wall of the second maze.
6. The fuse housing according to claim 5, wherein, The first cylindrical protrusion is positioned above the third protrusion within the first maze wall, and the second cylindrical protrusion is positioned above the fourth protrusion within the second maze wall.
7. The fuse housing according to claim 6, wherein, The third protrusion has a p-shaped structure, and the fourth protrusion has a b-shaped structure.
8. The fuse housing according to claim 7, wherein the top portion further comprises: A third cylindrical protrusion that mates with the first receiving aperture; and A fourth cylindrical protrusion that mates with the second receiving aperture.
9. The fuse housing according to claim 1, wherein the bottom portion further includes a central portion and a plurality of ribs disposed in the central portion, wherein, The central portion further accommodates the fuse element.
10. A fuse housing, comprising: A first maze wall is provided on the first side, wherein the first maze wall terminates through a first ventilation channel; A second maze wall is provided on the second side, wherein the second maze wall terminates through a second ventilation channel, the first and second ventilation channels have a first depth, and the first and second maze walls have a second depth, wherein the second depth is greater than the first depth; and Multiple ribs are disposed in the central portion of the fuse housing, and the multiple ribs are disposed below the fuse element; During an arc event, the exhaust material, comprising gaseous material, molten metal, and carbide plastic, is drawn through the first and second labyrinth walls, so that the molten metal and carbide plastic remain in the first and second labyrinth walls, while the gaseous material escapes through the first and second ventilation channels.
11. The fuse housing according to claim 10, wherein, The first labyrinth wall is disposed below the first terminal, and the second labyrinth wall is disposed below the second terminal, wherein the first terminal and the second terminal are connected together by the fuse element.
12. The fuse housing according to claim 11, wherein the first labyrinth wall further comprises a first protrusion structure and a second protrusion structure, wherein, The structures of the first protrusion and the second protrusion form a meandering path through which the exhaust material travels during an arcing event.
13. The fuse housing according to claim 12, wherein, The first protrusion has a p-shaped structure, and the second protrusion has a d-shaped structure.
14. The fuse housing according to claim 11, wherein the second labyrinth wall further comprises a first protrusion structure and a second protrusion structure, wherein, The structures of the first protrusion and the second protrusion form a meandering path through which the exhaust material travels during an arcing event.
15. The fuse housing according to claim 14, wherein, The first protrusion has a q-shaped structure, and the second protrusion has a b-shaped structure.
16. A fuse housing comprising: The bottom portion includes: The left labyrinth wall terminates through the left ventilation channel; Pass through the right labyrinth wall, which terminates at the right ventilation passage; It is located in the central part between the left and right maze walls; A protruding weldment is provided on the top side; and A recessed weldment is provided on the bottom side; The top portion includes: The second protruding weldment is provided on the second top side; and The second concave weldment is provided on the second bottom side; Specifically, the bottom portion will mate with the top portion, such that the convex weldment of the bottom portion mates with the second concave weldment of the top portion, and the second convex weldment of the top portion mates with the concave weldment of the bottom portion. The left and right ventilation channels have a first depth, and the left and right labyrinth walls have a second depth, wherein the second depth is greater than the first depth; and During an arc event, the exhaust material, including gaseous material, molten metal, and carbide plastic, is drawn through the left and right labyrinth walls, so that the molten metal and carbide plastic remain in the left and right labyrinth walls, while the gaseous material escapes through the left and right ventilation channels.
17. The fuse housing according to claim 16, further comprising: The first cylindrical protrusion is disposed in the structure of the first protrusion; A first receiving opening is provided in the structure of the second protrusion, wherein the structure of the first protrusion and the structure of the second protrusion are provided in the left labyrinth wall to create a meandering path for the discharge of exhaust material. The bottom portion will mate with the top portion, such that the first cylindrical protrusion mates with the second receiving aperture provided in the top portion, and the second cylindrical protrusion provided in the top portion mates with the first receiving aperture.
18. The fuse housing according to claim 17, wherein, The first cylindrical protrusion, the second cylindrical protrusion, the first receiving aperture, and the second receiving aperture further hold the terminals in the proper position when the terminals are connected to the fuse housing.
19. The fuse housing of claim 16, wherein the bottom portion further includes a plurality of ribs disposed between the left labyrinth wall and the right labyrinth wall.
20. The fuse housing of claim 16, wherein the top portion further comprises: The second left labyrinth wall terminates through the second left ventilation channel; as well as, The second right labyrinth wall terminates through the second right ventilation channel.
Citation Information
Patent Citations
Ventilated fuse housing
CN109983557A
Insert for fuse housing
US20160141140A1
