Method for measuring production of microcomputer

CN115470065BActive Publication Date: 2026-09-25东莞市智微智能科技有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211053132.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-31
Publication Date
2026-09-25
Estimated Expiration
2042-08-31

AI Technical Summary

Technical Problem

[0003]本发明的目的在于提供一种微型主机的产测方法,旨在解决由于现有技术无法提供一种有效的产测方法,导致产品出货质量不佳,生产效率不高的问题

Benefits of technology

[0009]本发明有益效果在于:本发明使用SSD制作WTG系统,开机启动时间快,对于客户要求不带系统出货产品,起到防呆作用,防止漏格格系统流入客户端,方便不带硬盘出货的产品出货,简化二次拆装硬盘时间,直接利用WTG作为测试工装,测试效率提升,产测MES自动上抛过站,产品出货质量有保障,减少作业时间。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115470065B_ABST
    Figure CN115470065B_ABST
Patent Text Reader

Abstract

The application provides a kind of micro host's production measurement method, including the following steps: whole machine is configured with peripheral equipment;Enter the pre-installed test system of production measurement device, check the hard disk number X of whole machine;Enter the root directory of C disk, open the bat folder in the folder of internal production measurement stored in advance to modify the hard disk number;Read hard disk name and partition information;Configure hard disk name and partition information, save and exit;Start testing, "execute BAT" is formatted for the hard disk partition of shipment product, check hard disk name and partition capacity after formatting, and the product test is PASS if qualified;The application uses SSD to make WTG system, the boot time is fast, for the customer requirement of no system shipment product, it plays the role of foolproof, prevents the system from flowing into the client, facilitates the product shipment of no hard disk shipment, simplifies the secondary disassembly and assembly time of hard disk, directly uses WTG as test tool, test efficiency is improved, production measurement MES is automatically lifted and passed through the station, product shipment quality is guaranteed, and operation time is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of electronic information technology, and in particular relates to a method for the production and testing of a micro mainframe. Background Technology

[0002] With the rapid development of technology, more and more software and hardware products are emerging. To avoid product problems, especially regarding the proper functioning of some microcomputer products, product testing is necessary. How to make testing more accurate and efficient is a direction for product testing research. Currently, the industry can only use the method of directly running the operating system within the product during the product functional testing phase. However, this method has drawbacks such as long testing cycles, low testing efficiency, high testing costs, and the risk of forgetting to delete the testing operating system, resulting in the production test system entering the user's end. For some customers who require products to be shipped without the system or hard drive, this method is also unsatisfactory. Furthermore, the secondary disassembly and reassembly of the hard drive greatly increases the operation time, further increasing time costs. Therefore, we have specifically proposed a microcomputer production testing method to solve the above problems. Summary of the Invention

[0003] The purpose of this invention is to provide a method for testing the production of microcomputers, aiming to solve the problem that the existing technology cannot provide an effective production testing method, resulting in poor product quality and low production efficiency.

[0004] This invention provides a method for controlling the production testing of a microcomputer, the method comprising the following steps: Step 1: Take the complete machine that has been tested and passed the previous process and place it on the test table. Connect the production test device, OPS card, power supply, USB keyboard and mouse to the machine interface, and power on. Press the shortcut key to enter the startup menu. The production test device is a mobile hard drive pre-installed with the WTG system. Step 2: Enter the pre-installed test system of the production testing device and check the hard drive bit width X of the whole machine through hard drive partitioning software; Step 3: Go to the root directory of drive C, open the bat folder in the folder where the internal production test was stored in advance, modify the hard drive bit Y, and change Y to X, where X is a natural number; Step 4: Read the hard drive name and partition information; Step 5: Configure the hard drive name and partition information, save and exit; Step 6: Start the test. "Execute BAT" is to format the hard drive partition of the shipped product. After formatting, check the hard drive name and the partition capacity. If they pass, the product test is PASS. The pre-installed test system is created through the following steps: Delete all partitions on the external hard drive using the hard drive partitioning software DiskGenius, and save the changes; The hard drive uses GPT partitioning to boot a new ESP partition and clears all volume labels; Extract the image using the image processing tool Dism++, and open the pre-downloaded system ISO image through the browser window; Select the target image and confirm the root directory of the external hard drive where you are going to install; Write the boot information to the boot partition to complete the image restoration.

[0005] The microcomputer production testing method of the present invention includes DiskGenius as the hard disk partitioning software.

[0006] The microcomputer testing method of the present invention includes opening a bat file in the folder where the internal testing is stored in advance, opening and editing the DISKPART file under the bat file with Notepad, and changing the item "sele disk Y" to "sele disk X" in the DISKPART file, where X is 0.

[0007] The microcomputer production testing method of the present invention includes running "GetHardInfo_PC_Win_V1.00" in the production testing directory to read the hard disk name and partition information, and copying the hard disk name and partition information to the production testing settings interface.

[0008] The microcomputer testing method of the present invention, wherein step 5 specifically includes: The internal production test is named "Auto_Test". To run the internal production test, open the production test configuration interface, enter the hard drive information, and after setting it up, save and exit.

[0009] The beneficial effects of this invention are as follows: This invention uses SSDs to create WTG systems, resulting in fast boot times. For products that customers require to be shipped without a system, it serves as a foolproof method, preventing the system from being leaked to the client. It facilitates the shipment of products without hard drives, simplifies the time required for secondary hard drive disassembly and assembly, directly utilizes WTG as a testing fixture, improves testing efficiency, and enables automatic uploading and passing of production testing data by the MES, ensuring product quality and reducing operation time. Attached Figure Description

[0010] Figure 1 This is a flowchart illustrating the implementation of the micro-host production testing method control method provided in this embodiment of the invention. Detailed Implementation

[0011] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.

[0012] The specific implementation of the present invention will be described in detail below with reference to specific embodiments: Figure 1 The implementation flow of the microcomputer testing method control method provided in Embodiment 1 of the present invention is shown. For ease of explanation, only the parts related to the embodiments of the present invention are shown, and are described in detail below: Step 1: Place the completed unit that has been tested and passed the previous test on the test bench. Connect the production test device, OPS card, power supply, USB keyboard and mouse to the unit interface, and power on. Press the shortcut key to enter the boot menu. The production test device is a portable hard drive pre-installed with the WTG system. Step 2: Enter the pre-installed test system of the production test device, that is, enter the WTG system - "Windows BootManager (FORESEE 128GB SSD 0301)" (Note: the part after Windows Boot Manager is the name of the WTG hard drive used, and the display name is different for different hard drives). After entering the system, run the "DiskGenius" program on the desktop to check the bitness of the product hard drive X. Step 3: Open This PC, go to the root directory of drive C, open the bat folder in the folder where the internal production test was stored in advance, modify the hard drive bit Y, and change Y to X, where X is a natural number; Step 4: In the production test directory, run "GetHardInfo_PC_Win_V1.00" to read the hard drive name and partition information; Step 5: Configure the hard drive name and partition information, i.e., copy the hard drive name and partition information to the production testing settings interface, save and exit; Step 6: Start testing. "Execute BAT" is to format the hard drive partition of the shipped product. After formatting, check the hard drive name and partition capacity. If they pass, the product test is PASS. The pre-installed test system is created through the following steps: Delete all partitions on the external hard drive using the hard drive partitioning software DiskGenius, and save the changes; The hard drive uses GPT partitioning to boot a new ESP partition and clears all volume labels; Extract the image using the image processing tool Dism++, and open the pre-downloaded system ISO image through the browser window; Select the target image using the image processing tool Dism++, and confirm the root directory of the external hard drive to be installed. Write the boot information to the boot partition, complete the image restoration, and finally confirm the creation of the WTG system to the solid-state drive until completion.

[0013] The WTG system hardware includes a solid-state HDD / SSD, a USB 3.0 flash drive, and a USB 3.0 to SATA cable. The software base is a Windows 10 LTSB original system image. This invention uses SSDs to create WTG systems, resulting in fast boot times. For customers who require products to be shipped without a system, it serves as a foolproof method, preventing the system from being leaked to the client. It facilitates the shipment of products without hard drives, simplifies the time required for secondary hard drive disassembly and assembly, and directly utilizes WTG as a testing fixture, improving testing efficiency. Production testing MES automatically forwards the data to the testing station, ensuring product quality and reducing operation time.

[0014] WTG stands for Windows to Go, a Windows feature that allows the complete Windows operating system to be installed on removable storage media. The WTG system requires 4K read and write performance, which is the smallest unit of disk read and write. The minimum file read and write size is 4k, and if the file storage size is less than 4k, it will be automatically padded to 4k before reading and writing. The official hardware testing tool for the WTG system is "AS SSD Benchmark".

[0015] Furthermore, the hard drive partitioning software used is DiskGenius.

[0016] Furthermore, after opening the bat file in the folder where the internal production test is stored in advance, open and edit the DISKPART file under the bat file with Notepad. In the DISKPART file, change the item "sele disk Y" to "sele disk X", where X is 0.

[0017] Furthermore, in the production testing directory, run "GetHardInfo_PC_Win_V1.00" to read the hard drive name and partition information, and copy the hard drive name and partition information to the production testing settings interface.

[0018] Furthermore, step 5 specifically includes: The internal production test is named "Auto_Test". To run the internal production test, open the production test configuration interface, enter the hard drive information, and after setting it up, save and exit.

[0019] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for testing a microcomputer, characterized in that, The method includes the following steps: Step 1: Take the complete machine that has been tested and passed the previous process and place it on the test table. Connect the production test device, OPS card, power supply, USB keyboard and mouse to the machine interface, and power on. Press the shortcut key to enter the startup menu. The production test device is a mobile hard drive pre-installed with the WTG system. Step 2: Enter the pre-installed test system of the production testing device and check the hard drive bit width X of the whole machine through hard drive partitioning software; Step 3: Go to the root directory of drive C, open the bat folder in the folder where the internal production test was stored in advance, modify the hard drive bit Y, and change Y to X, where X is a natural number; Step 4: Read the hard drive name and partition information; Step 5: Configure the hard drive name and partition information, save and exit; Step 6: Start the test. "Execute BAT" is to format the hard drive partition of the shipped product. After formatting, check the hard drive name and partition capacity. If it passes, the product test is PASS. The pre-installed test system is created through the following steps: Delete all partitions on the external hard drive using the hard drive partitioning software DiskGenius, and save the changes; The hard drive uses GPT partitioning to boot a new ESP partition and clears all volume labels; Extract the image using the image processing tool Dism++, and open the pre-downloaded system ISO image through the browser window; Select the target image and confirm the root directory of the external hard drive where you are going to install; Write the boot information to the boot partition to complete the image restoration; After opening the .bat file in the folder where the internal production test is stored in advance, open and edit the DISKPART file under the .bat file with Notepad. In the DISKPART file, change the item "sele disk Y" to "seledisk X", where X is 0. In the production test directory, run "GetHardInfo_PC_Win_V1.00" to read the hard drive name and partition information, and copy the hard drive name and partition information to the production test settings interface.

2. The method for testing a microcomputer as described in claim 1, characterized in that, Step 5 specifically includes: The internal production test is named "Auto_Test". To run the internal production test, open the production test configuration interface, enter the hard drive information, and after setting it up, save and exit.

Citation Information

Patent Citations

  • Method for detecting computer hardware of Unix-like operating system

    CN105068902A

  • Solid state disk automatic test method based on USB flash disk PE system

    CN112068998A