M-CRD excavation support and excavation method of joint arch tunnel

CN115478872BActive Publication Date: 2024-12-27CHINA RAILWAY 19 BUREAU GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211060371.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-31
Publication Date
2024-12-27
Estimated Expiration
2042-08-31

Smart Images

  • Figure CN115478872B_ABST
    Figure CN115478872B_ABST
Patent Text Reader

Abstract

The present disclosure relates to excavation support and excavation method of a linked arch tunnel M‑CRD, comprising two connected auxiliary guide tunnels and a main guide tunnel; support steel frames are arranged in the auxiliary guide tunnel and the main guide tunnel, and prefabricated secondary linings are arranged in the auxiliary guide tunnel and the main guide tunnel, and the prefabricated secondary linings are located on the inner walls of the corresponding support steel frames; a part of the prefabricated secondary lining is shared at the connection between the auxiliary guide tunnel and the main guide tunnel to form a middle partition wall separating the auxiliary guide tunnel and the main guide tunnel, that is, by making the shared part of the prefabricated secondary lining serve as the middle partition wall separating the auxiliary guide tunnel and the main guide tunnel, the problem of high cost and complicated process caused by respectively setting two middle partition walls at the connection between the auxiliary guide tunnel and the main guide tunnel to connect the auxiliary guide tunnel and the main guide tunnel respectively can be avoided.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Three-arched tunnel construction method

    CN109488311A

  • Method for laying steel frames of multi-arch tunnel without middle pilot tunnel

    CN112177616A