An oil geological exploration drill rod device
By designing a carrier vehicle and a hydraulic system to control the unfolding and folding of the outrigger plate, the problem of drill rod equipment entering and operating in harsh surface environments was solved, achieving terrain-adaptive leveling and positioning support, and improving construction stability and efficiency.
Patent Information
- Application Number
- CN202211277661.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-19
- Publication Date
- 2026-11-06
- Estimated Expiration
- 2042-10-19
AI Technical Summary
Existing petroleum geological exploration drill pipe equipment is difficult to access and operate in harsh surface environments, resulting in low operational efficiency and requiring multi-disciplinary collaborative work.
A drill pipe device for petroleum geological exploration was designed, comprising a carrier vehicle, a bucket, an installation box, a boom plate, and a ground anchor device. The boom plate is deployed and folded by a hydraulic system to achieve terrain-adaptive leveling and positioning support. Combined with the leveling structure and the ground anchor device, the device improves construction stability and efficiency.
It facilitates the entry and construction of drilling equipment in harsh surface environments, improves construction stability and efficiency, and reduces the need for multi-disciplinary collaborative operations.
Smart Images

Figure CN115492521B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of drill pipe equipment technology, and specifically to a drill pipe equipment for petroleum geological exploration. Background Technology
[0002] As is well known, before oil extraction, it is necessary to conduct oil geological exploration. On the one hand, it is necessary to determine the oil reserves, and on the other hand, it is necessary to explore the geology of the area where the oil is located in order to provide the necessary technical parameters for subsequent oil extraction. Drill pipe devices are usually used in oil geological exploration to sample underground geology.
[0003] A search revealed that Chinese patent CN110685598A, published on January 14, 2020, discloses a drill pipe device for oil geological exploration. Its general description includes a frame and a drilling mechanism. A connecting frame is welded to the top of one end of the frame, and the connecting frame is movably connected to the drilling mechanism via a screw. A support frame fixed to the frame is provided on one side of the connecting frame. A first cylinder located inside the frame is located below the support frame. A first pneumatic rod is connected to the top of the first cylinder at an angle, and one end of the first pneumatic rod is connected to the side wall of the drilling mechanism. A first power supply located on the top of the frame is fixedly installed on one side of the support frame. Chinese patent CN112796679A, published on May 14, 2021, also discloses... A petroleum geological exploration drill pipe device includes a vehicle body, a hydraulic tank at the front end of the vehicle body, an annular frame at the lower end of the hydraulic tank, a first drill pipe at the lower end of the annular frame, a spiral sleeve at the lower end of the first drill pipe, a second drill pipe at the lower end of the spiral sleeve, and an annular sleeve at the lower end of the second drill pipe. Guide blocks are evenly installed on the surface of the annular sleeve. The spiral sleeve is bidirectionally spirally connected, with one end spirally connected to a threaded pipe and the other end spirally connected to the drill pipe. During operation, the guide blocks divert soil and other materials below, reducing blockage and improving work efficiency. The fixing plate inside the annular sleeve connects and fixes the drill bit and the annular sleeve, while reducing the stress area and improving service life. When the drill bit collects liquid samples, impurities in the liquid can be filtered out through a filter screen, improving work efficiency.
[0004] While the two existing technical solutions mentioned above can achieve sampling in petroleum geological exploration, the terrain and geological structure of the exploration sites are not entirely the same. Therefore, there are inevitably some testing sites with uneven surface environments. For relatively harsh surface environments, the two petroleum geological exploration drill pipe devices mentioned above inevitably face difficulties in access. At the same time, the drill pipe construction has a high degree of difficulty. The existing solutions all adopt the method of using leveling mechanism vehicles and drilling machinery to work separately and in coordination. Although this approach can facilitate high-quality drilling operations, it requires the cooperation of multiple trades, resulting in low work efficiency. Summary of the Invention
[0005] (a) Technical problems to be solved
[0006] To address the shortcomings of existing technologies, this invention provides a petroleum geological exploration drill rod device. During the process of entering the exploration site, it can level the difficult-to-access exploration site, facilitating the entry of the carrier vehicle. At the same time, during drilling, it can form support for the drilling mechanism according to the terrain characteristics, resulting in better positional stability of the drilling mechanism during construction and reducing the difficulty of construction. Furthermore, it is flexible in folding for transportation and unfolding for use, making it highly practical.
[0007] (II) Technical Solution
[0008] To achieve the above objectives, the present invention provides the following technical solution: a petroleum geological exploration drill pipe device, comprising a drilling mechanism and a carrier vehicle, wherein a bucket is mounted on the carrier vehicle, and an installation box is rotatably connected inside the bucket. The drilling mechanism is installed inside the installation box, and a main hydraulic cylinder is installed between the carrier vehicle and the installation box. The installation box has recesses at its front end, top end, and rear end, and connecting plates are fixedly connected to each of the three recesses. Support arms are rotatably connected to each of the three connecting plates, and auxiliary hydraulic cylinders are installed between each of the three support arms and the installation box. Each of the three support arm plates has an installation port, and each of the three installation ports is equipped with a ground anchor device. Each of the three support arm plates is equipped with a locking assembly for stabilizing the ground anchor device. The front and rear ends of the carrier vehicle are rotatably connected to main arms. Each of the two main arms is equipped with a hydraulic lifting cylinder between itself and the carrier vehicle. A leveling structure is installed on each of the two main arms. An adjustment structure for adjusting the leveling structure is provided on the left end of the leveling structure. The adjustment structure is installed between the two main arms. The carrier vehicle is equipped with a hydraulic system that matches the main hydraulic cylinder, auxiliary hydraulic cylinder, hydraulic lifting cylinder, and adjustment structure.
[0009] In a preferred embodiment based on the aforementioned scheme, the ground anchor device includes a rotating block rotatably connected to the mounting port. The rotating block has a spiral hole, and a spiral rod is connected to the spiral hole. Two round rods are fixedly connected to the rotating block, and sliders are slidably connected to the two round rods. The sliders have a through-hole, and the spiral rod is rotatably connected to the through-hole. A power motor for driving the spiral rod is installed on the slider, and the power motor is electrically connected to the carrier vehicle.
[0010] Further, based on the aforementioned solution, the locking assembly includes a pin cylinder, an inner groove is provided on the support arm plate, the pin cylinder is fixedly connected in the inner groove, a pin post is slidably fitted inside the pin cylinder, a movable opening is provided on the pin cylinder, a locking plate is provided in the movable opening, the locking plate is fixedly connected to the pin post, a magnetic lock matching the locking plate is installed in the inner groove, and a pin groove matching the pin post is provided on the slider.
[0011] Furthermore, based on the aforementioned scheme, the flattening structure includes two straight slide rods, each of the two main arms having a sliding opening, the two straight slide rods being slidably connected to the two sliding openings respectively, each of the two straight slide rods being rotatably connected to a rotating slide rod, the two rotating slide rods being connected to each other via a connecting assembly, each of the two rotating slide rods being slidably connected to a sliding sleeve, each of the two sliding sleeves being fixedly connected to a flattening arc plate, and an adjusting spring being fixedly connected between the two flattening arc plates.
[0012] Furthermore, based on the aforementioned solution, the connecting assembly includes a middle plate frame, which is connected to the rotating slide rod via a rotating shaft, and a middle connecting plate is fixedly connected to the front end of the middle plate frame.
[0013] As a further embodiment of the above solution, the adjustment structure includes a fixing rod, and a hydraulic push rod is installed at the right end of the fixing rod, the hydraulic push rod being connected to the middle plate frame.
[0014] As a further step of the above solution, the hydraulic system includes a hydraulic oil tank and a hydraulic pump, both of which are installed on the carrier vehicle. The hydraulic pump is connected to the hydraulic oil tank, and the main hydraulic cylinder, auxiliary hydraulic cylinder, hydraulic lifting cylinder, and hydraulic push rod are all connected to the hydraulic pump. A protective frame for protecting the hydraulic pump is fixedly connected between the carrier vehicle and the bucket.
[0015] As a further step of the above solution, rectangular bars are fixedly connected to both the rotating slide rod and the straight slide rod, and rectangular openings matching the rectangular bars are provided on both the sliding sleeve and the main arm.
[0016] As a further embodiment of the above solution, a limit ring is fixedly connected to the straight slide rod.
[0017] As a further improvement on the above solution, one end of the screw rod is a helical tip.
[0018] (III) Beneficial Effects
[0019] Compared with the prior art, the present invention provides a drill pipe device for petroleum geological exploration, which has the following beneficial effects:
[0020] 1. In this invention, the design of the leveling structure enables the petroleum geological exploration drill pipe device to level difficult-to-access exploration sites during the process of entering the exploration site, facilitating the entry of the carrier vehicle. Through the design of the adjustable structure, the leveling mode of the leveling structure can be adjusted, which facilitates the leveling structure to push open obstacles at the exploration site and to cooperate with the hydraulic lifting cylinder to scoop up and clear obstacles.
[0021] 2. In this invention, the design of the ground anchor device enables the support plate to be positioned relative to the exploration site, which facilitates the improvement of the stability of the relative position of the drilling mechanism and the exploration site during construction. This allows the drilling mechanism to be supported according to the terrain characteristics during construction, resulting in better positional stability of the drilling mechanism during construction and reducing the difficulty of construction.
[0022] 3. In this invention, the rotating connection between the connecting plate and the support plate facilitates the unfolding of the support plate during support and its folding after use. The cooperation between the mounting box and the bucket allows the main hydraulic cylinder to control the rotation of the mounting box relative to the bucket, thereby facilitating the rotation and erection of the mounting box during drill rod operation and the storage of the mounting box into the bucket after use. This facilitates the drill rod operation of the drilling mechanism and the transportation after operation. Attached Figure Description
[0023] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0024] Figure 2 For the present invention Figure 1 A magnified schematic diagram of the local structure at point A;
[0025] Figure 3 This is a three-dimensional structural diagram of the drilling mechanism of the present invention during operation;
[0026] Figure 4 This is a three-dimensional structural diagram of the sliding sleeve, flat arc plate, and adjusting spring of the present invention.
[0027] Figure 5 For the present invention Figure 4 A magnified view of the structure at point B in the middle;
[0028] Figure 6 This is a three-dimensional structural diagram of the rotating slide bar, the middle plate frame, and the rectangular bar of the present invention.
[0029] In the diagram: 1. Drilling mechanism; 2. Carrier vehicle; 3. Cargo bucket; 4. Mounting box; 5. Connecting plate; 6. Support arm plate; 7. Main arm; 8. Rotating block; 9. Helical rod; 10. Round rod; 11. Sliding block; 12. Pin cylinder; 13. Pin column; 14. Locking plate; 15. Straight slide rod; 16. Rotating slide rod; 17. Sliding sleeve; 18. Flat arc plate; 19. Adjusting spring; 20. Middle plate frame; 21. Middle connecting plate; 22. Fixed rod; 23. Hydraulic oil tank; 24. Rectangular bar; 25. Limiting ring; 26. Helical tip. Detailed Implementation
[0030] Example
[0031] Please see Figures 1-6A drilling rod device for petroleum geological exploration includes a drilling mechanism 1 and a carrier vehicle 2. A carrying bucket 3 is mounted on the carrier vehicle 2, and an installation box 4 is rotatably connected inside the carrying bucket 3. A main hydraulic cylinder controls the rotation of the installation box 4 relative to the carrying bucket 3, facilitating the rotation and erection of the installation box 4 during operation and its subsequent storage inside the carrying bucket 3. This facilitates drilling rod operation of the drilling mechanism 1 and transportation after operation. The drilling mechanism 1 is installed inside the installation box 4. A main hydraulic cylinder is installed between the carrier vehicle 2 and the installation box 4. The front, top, and rear ends of the installation box 4 have recesses, each with a connecting plate 5 fixedly connected. Support plates 6 are rotatably connected to each of the three connecting plates 5. The rotatable connection between the connecting plates 5 and the support plates 6 facilitates the unfolding of the support plates 6 during support and their folding after use. Auxiliary hydraulic cylinders are installed between each of the three support plates 6 and the installation box 4. Each of the three support plates 6 has... The installation ports are equipped with ground anchor devices, each consisting of a rotating block 8 rotatably connected to one of the installation ports. The rotating block 8 has a spiral hole through which a spiral rod 9 is connected. One end of the spiral rod 9 has a spiral tip 26 for drilling. Two round rods 10 are fixedly connected to the rotating block 8, and sliders 11 are slidably connected to the two round rods 10. A circular opening is provided on the slider 11, through which the spiral rod 9 is rotatably connected. A power motor for driving the spiral rod 9 is installed on the slider 11. The power motor is electrically connected to the carrier vehicle 2, enabling the support arm plate 6 to be positioned relative to the exploration site. This improves the stability of the relative position of the drilling mechanism 1 to the exploration site during construction, allowing the drilling mechanism 1 to be supported according to the terrain features. The drilling mechanism 1 exhibits good positional stability during construction, reducing the difficulty of construction.
[0032] It should be further explained that each of the three support arm plates 6 is equipped with a locking assembly for stabilizing the ground anchor device. The locking assembly includes a pin cylinder 12, with an embedded groove on the support arm plate 6. The pin cylinder 12 is fixedly connected to the embedded groove, and a pin post 13 is slidably fitted inside the pin cylinder 12. The pin cylinder 12 has a movable opening, and a locking plate 14 is installed in the movable opening. The locking plate 14 is fixedly connected to the pin post 13. A magnetic lock matching the locking plate 14 is installed in the embedded groove. The slider 11 has a pin groove matching the pin post 13 to facilitate the stability of the slider 11 in the installation opening after use. The front and rear ends of the carrier vehicle 2 are rotatably connected to the main arms 7. Hydraulic lifting cylinders are installed between the two main arms 7 and the carrier vehicle 2. A flattening structure is installed on the two main arms 7. The entire structure includes two straight slide rods 15, each with a sliding opening on one of the two main arms 7. The two straight slide rods 15 are slidably connected within these openings. Rotating slide rods 16 are rotatably connected to each of the two straight slide rods 15, and the two rotating slide rods 16 are connected by a connecting assembly. Sliding sleeves 17 are slidably connected to each of the two rotating slide rods 16. Rectangular bars 24 are fixedly connected to both the rotating slide rods 16 and the straight slide rods 15. Rectangular openings matching the rectangular bars 24 are provided on both the sliding sleeves 17 and the main arms 7, facilitating the directional movement between the rotating slide rods 16 and the sliding sleeves 17, and between the straight slide rods 15 and the main arms 7. Limiting rings 25 are fixedly connected to the straight slide rods 15 to restrict the movement between the straight slide rods 15 and the main arms 7. At extreme positions, the system is relatively reliable. Two sliding sleeves 17 are each fixedly connected to a flat arc plate 18, and an adjusting spring 19 is fixedly connected between the two flat arc plates 18. This allows the oil geological exploration drill pipe device to flatten difficult-to-access exploration sites during entry, facilitating the entry of the carrier vehicle 2. The connecting assembly includes a middle plate frame 20, which is connected to a rotating slide rod 16 via a rotating shaft. A middle connecting plate 21 is fixedly connected to the front end of the middle plate frame 20, facilitating the connection of the gap between the two flat arc plates 18. An adjustment structure for adjusting the flattening structure is provided at the left end of the flattening structure. The adjustment structure includes a fixed rod 22, and a hydraulic push rod is installed at the right end of the fixed rod 22. The hydraulic push rod is connected to the middle plate frame 20, enabling… The leveling structure can be adjusted to a leveling mode, facilitating the leveling structure to push open obstacles at the exploration site and to cooperate with the hydraulic lifting cylinder to scoop up and clear obstacles. The adjustment structure is installed between the two main arms 7. The carrier vehicle 2 is equipped with a hydraulic system that matches the main hydraulic cylinder, auxiliary hydraulic cylinder, hydraulic lifting cylinder and adjustment structure. The hydraulic system includes a hydraulic oil tank 23 and a hydraulic pump. Both the hydraulic oil tank 23 and the hydraulic pump are installed on the carrier vehicle 2. The hydraulic pump is connected to the hydraulic oil tank 23. The main hydraulic cylinder, auxiliary hydraulic cylinder, hydraulic lifting cylinder and hydraulic push rod are all connected to the hydraulic pump to provide hydraulic power for the hydraulic components in the petroleum geological exploration drill pipe device. A protective frame for protecting the hydraulic pump is fixedly connected between the carrier vehicle 2 and the bucket 3 to protect the hydraulic pump.
[0033] In summary, before use, this petroleum geological exploration drill pipe device is first moved to the desired exploration location. The carrier vehicle 2 is designed with a driver's cab, which is equipped with a driving system. During the movement, the operator enters the driver's cab and uses the driving system to control the carrier vehicle 2 to move the bucket 3, transporting the drilling mechanism 1 to the desired exploration location. During the movement, when there are obstacles in the area traversed by the carrier vehicle 2, the relative positions of the two flat arc plates 18 are adjusted according to the specific circumstances of the obstacles. When the obstacle is small, the hydraulic push rod pushes the middle plate frame 20 forward. During the movement of the middle plate frame 20, the two flat arc plates 18 are moved forward. The sliding rod 16 is rotated so that the two adjacent ends of the sliding rod 16 tilt to the right, causing the two adjacent ends of the flat arc plates 18 to also tilt to the right. After adjustment, the main arm 7 is rotated by the hydraulic lifting cylinder, causing the right end of the main arm 7 to fall and the two flat arc plates 18 to fall as well. This allows the carrier vehicle 2 to push away obstacles that hinder its movement during its movement. When the obstacle is large, the flat arc plate 18 is controlled by the hydraulic lifting cylinder, causing it to fall and rise repeatedly in coordination with the left and right movement of the carrier vehicle 2, thus decomposing and clearing larger obstacles and facilitating the smooth entry of the carrier vehicle 2 into the exploration area.
[0034] Furthermore, after the carrier vehicle 2 enters the exploration area, the best working location within the exploration area is selected, and the carrier vehicle 2 is parked at that location. The main hydraulic cylinder controls the installation box 4 to rotate relative to the bucket 3, so that the installation box 4 forms a suitable angle with the working surface of the exploration location. Then, the auxiliary hydraulic cylinder controls the support arm plate 6 to rotate and open relative to the connecting plate 5 until the support arm plate 6 contacts the working surface. Before the support arm plate 6 contacts the working surface, the magnetic lock is opened, and the locking plate 14 moves the pin 13 relative to the pin cylinder 12 until the pin 13 completely exits the pin groove, so that the positioning function of the slider 11 in the installation port is invalidated. The rotating block 8 is adjusted to rotate in the installation port, and the helical rod 9 is adjusted to match the working surface. After the support arm plate 6 is adjusted, the power motor is turned on, so that the power motor drives the helical rod 9 to feed relative to the rotating block 8 until the helical rod 9 enters the working surface and is sufficient to achieve the positioning of the installation box 4. Then, the drilling mechanism 1 is started to carry out the operation.
[0035] Furthermore, since there are many mature products on the market for main hydraulic cylinders, auxiliary hydraulic cylinders, hydraulic lifting cylinders, hydraulic push rods, hydraulic pumps, and power motors, the products involved in this implementation are all existing products selected from the market based on actual usage needs. The structure and function of these products have not been changed, and the corresponding manufacturers will provide instruction manuals and related technical support for the installation and use of the products. Therefore, we will not go into too much detail about these aspects here.
Claims
1. A drill pipe device for petroleum geological exploration, comprising a drilling mechanism (1), characterized in that, It also includes a carrier vehicle (2), on which a bucket (3) is provided. An installation box (4) is rotatably connected inside the bucket (3). The drilling mechanism (1) is installed inside the installation box (4). A main hydraulic cylinder is installed between the carrier vehicle (2) and the installation box (4). The front end, top end and rear end of the installation box (4) are all provided with recessed openings. A connecting plate (5) is fixedly connected to each of the three recessed openings. A support arm plate (6) is rotatably connected to each of the three connecting plates (5). An auxiliary hydraulic cylinder is installed between each of the three support arm plates (6) and the installation box (4). An installation port is provided on each of the three support arm plates (6). A ground anchor device is installed in each of the three installation ports. The ground anchor device includes a rotating block (8). The rotating block (8) is rotatably connected to the mounting port. A spiral hole is provided on the rotating block (8), and a spiral rod (9) is connected in the spiral hole. One end of the spiral rod (9) is a spiral tip (26). Two round rods (10) are fixedly connected to the rotating block (8). A slider (11) is slidably connected to the two round rods (10). A through round opening is provided on the slider (11), and the spiral rod (9) is rotatably connected in the through round opening. A power motor for driving the spiral rod (9) is installed on the slider (11). The power motor is electrically connected to the carrier vehicle (2). Locking components for stabilizing the ground anchor device are installed on the three support arm plates (6). The locking components include pin cylinders (12). An embedded groove is provided on the plate (6), and the pin cylinder (12) is fixedly connected in the embedded groove. A pin column (13) is slidably fitted inside the pin cylinder (12). An movable opening is provided on the pin cylinder (12), and a locking plate (14) is provided in the movable opening. The locking plate (14) is fixedly connected to the pin column (13). A magnetic lock matching the locking plate (14) is installed in the embedded groove. A pin groove matching the pin column (13) is provided on the slider (11). The front and rear ends of the carrier vehicle (2) are rotatably connected to the main arms (7). A hydraulic lifting cylinder is installed between the two main arms (7) and the carrier vehicle (2). A flat structure is installed on the two main arms (7). The flat structure includes two straight sliding rods (15). Each of the two straight slide rods (15) is provided with a sliding opening. The two straight slide rods (15) are slidably connected in the two sliding openings respectively. Rotating slide rods (16) are rotatably connected to each of the two straight slide rods (15). The two rotating slide rods (16) are connected to each other by a connecting component. Sliding sleeves (17) are slidably connected to each of the two rotating slide rods (16). Flat arc plates (18) are fixedly connected to each of the two sliding sleeves (17). Adjusting springs (19) are fixedly connected between the two flat arc plates (18). An adjustment structure for adjusting the flat structure is provided at the left end of the flat structure. The adjustment structure includes a fixed rod (22). A hydraulic push rod is installed at the right end of the fixed rod (22). The adjustment structure is installed between the two main arms (7).The carrier vehicle (2) is equipped with a hydraulic system that matches the main hydraulic cylinder, auxiliary hydraulic cylinder, hydraulic lifting cylinder, and adjustment structure.
2. The petroleum geological exploration drill pipe device according to claim 1, characterized in that, The connecting assembly includes a middle plate frame (20), which is connected to the rotating slide rod (16) via a rotating shaft. A middle connecting plate (21) is fixedly connected to the front end of the middle plate frame (20), and the hydraulic push rod is connected to the middle plate frame (20).
3. The petroleum geological exploration drill pipe device according to claim 1, characterized in that, The hydraulic system includes a hydraulic oil tank (23) and a hydraulic pump. Both the hydraulic oil tank (23) and the hydraulic pump are installed on the carrier vehicle (2). The hydraulic pump is connected to the hydraulic oil tank (23). The main hydraulic cylinder, auxiliary hydraulic cylinder, hydraulic lifting cylinder and hydraulic push rod are all connected to the hydraulic pump. A protective frame for protecting the hydraulic pump is fixedly connected between the carrier vehicle (2) and the bucket (3).
4. The petroleum geological exploration drill pipe device according to claim 1, characterized in that, A rectangular bar (24) is fixedly connected to both the rotating slide bar (16) and the straight slide bar (15), and a rectangular opening matching the rectangular bar (24) is provided on both the sliding sleeve (17) and the main arm (7).
5. The petroleum geological exploration drill pipe device according to claim 1, characterized in that, A limiting ring (25) is fixedly connected to the straight slide rod (15).
Citation Information
Patent Citations
Drill pipe device for petroleum geological exploration
CN110685598A
Petroleum geological exploration drill rod device
CN112796679A
Vehicle-mounted drilling rig and downhole fiber temperature measurement and gas measurement system
CN106768472A
Vehicle for setting utility poles in a remote location
US20070134075A1
