Tower crane and control method, device, processor and cloud management platform thereof
By calculating and controlling the position and speed of the moving counterweight, the problem of torque matching between the counterweight boom and the lifting boom in large tower cranes was solved, improving lifting efficiency and safety, and avoiding unnecessary enlargement of the tower structure.
Patent Information
- Application Number
- CN202211131975.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-16
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-09-16
AI Technical Summary
In large tower cranes, the torque matching requirements of the counterweight boom and the lifting boom are high, which is difficult to meet effectively with existing technologies. This leads to limitations in the tower structure design and affects safety and efficiency.
By acquiring information about the object to be lifted, the torque that it will exert on the tower crane is calculated, the pre-balancing position of the moving counterweight is determined, and its movement on the guide rail is controlled to match the torque, ensuring that the overall torque of the tower crane does not exceed the rated torque during the lifting process. Segmented control and speed control strategies are adopted to reduce torque fluctuations.
It improves hoisting efficiency, reduces the time spent moving the counterweight, enhances the safety and torque matching capability of the tower crane, and avoids excessive enlargement of the tower structure.
Smart Images

Figure CN115535887B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of construction machinery, and more specifically to a control method, processor, control device, tower crane, cloud management platform, and machine-readable storage medium for tower cranes. Background Technology
[0002] Tower cranes (also known as tower hoists or tower cranes) are widely used in the construction industry due to their large working space and large lifting capacity. A tower crane generally consists of a tower and a superstructure. The superstructure includes a jib and a counterweight jib. The jib is used to lift the load, while the counterweight jib is used to balance the torque of the jib. In some large tower crane applications (such as in nuclear power plants, bridges, and wind turbine installations), the torque matching between the counterweight jib and the jib is more critical due to the limitations of the tower structure. Summary of the Invention
[0003] The purpose of this application is to provide a control method, processor, control device, tower crane, cloud management platform, and machine-readable storage medium for tower cranes, which can better meet the requirements of torque matching.
[0004] To achieve the above objectives, the first aspect of this application provides a control method for a tower crane. The tower crane includes a tower body and a superstructure. The superstructure includes a counterweight boom, a jib boom, a fixed counterweight, and a movable counterweight. The fixed counterweight is fixed to the side of the counterweight boom. The superstructure is provided with a guide rail extending from the side of the counterweight boom to the side of the jib boom. The movable counterweight is movable along the guide rail. The control method includes:
[0005] Obtain information about the object to be lifted, including at least its weight and lifting position;
[0006] The first torque that will act on the tower crane will be determined based on the weight and lifting position of the object to be lifted;
[0007] The pre-balancing position of the moving counterweight is determined based on the first torque; and
[0008] Control the moving counterweight to move from the crane boom side to the pre-balanced position.
[0009] In this embodiment of the application, the control method further includes:
[0010] When the distance between the pre-balancing position and the tower body is greater than the distance between the set safe position and the tower body, control the moving counterweight to move from the boom side to the set safe position;
[0011] Specifically, when the tower crane moves the counterweight to a set safe position while the hook is empty, the overall torque of the tower crane shall not exceed the rated torque of the tower crane.
[0012] In this embodiment of the application, the control method further includes:
[0013] Compare the first torque with the set safe torque;
[0014] Determining the pre-balancing position of the moving counterweight based on the first torque includes: when the first torque is greater than the set safety torque, determining the pre-balancing position of the moving counterweight based on the first torque;
[0015] Among them, the safety torque is set to not exceed the rated torque of the tower crane.
[0016] In this embodiment of the application, the control method further includes:
[0017] If the initial torque is less than the set safety torque, the moving counterweight will remain in its initial position.
[0018] In this embodiment of the application, the control method further includes:
[0019] During the lifting process of the object to be lifted, the lifting torque of the tower crane is monitored;
[0020] If the lifting torque is detected to increase to a target torque range among multiple torque ranges, the lifting torque is kept constant until the moving counterweight is moved to the target position corresponding to the target torque range.
[0021] One of the multiple torque intervals corresponds to a target position of the moving counterweight.
[0022] In this embodiment of the application, when the lifting torque is detected to increase to a target torque range among multiple torque ranges, the lifting torque is kept constant until the moving counterweight is controlled to move to the target position corresponding to the target torque range, including:
[0023] When the lifting torque increases to the first torque range among multiple torque ranges, maintain the lifting torque and control the moving counterweight to move to the first target position corresponding to the first torque range;
[0024] Continue to increase the lifting torque;
[0025] When the lifting torque increases to the second torque interval that is adjacent to the first torque interval among multiple torque intervals, maintain the lifting torque and control the moving counterweight to move to the second target position corresponding to the second torque interval;
[0026] The first target location is farther away from the tower than the set safe location.
[0027] In this embodiment of the application, controlling the moving counterweight to move from the boom side to the target position includes:
[0028] Determine the first distance of the important movement for balancing based on the target position, where the target position is the pre-balancing position or a set safety position;
[0029] Determine the deceleration distance that the moving counterweight needs to move when it decelerates from its maximum permissible speed to zero with a first maximum permissible acceleration.
[0030] Determine if the deceleration distance is less than half of the first distance;
[0031] When the deceleration distance is less than half of the first distance, the moving counterweight is controlled to accelerate from zero to the maximum permissible speed at a second maximum permissible acceleration, wherein the absolute values of the first maximum permissible acceleration and the second maximum permissible acceleration are equal;
[0032] When the moving counterweight moves to a deceleration distance from the target position, control the moving counterweight to decelerate from the maximum permissible speed to zero with a first maximum permissible acceleration;
[0033] If the deceleration distance is greater than or equal to half of the first distance, control the moving counterweight to accelerate from zero to a redefined speed with a second maximum permissible acceleration, and then decelerate to zero with a first maximum permissible acceleration; or control the moving counterweight to accelerate from zero with a second maximum permissible acceleration and decelerate to zero with a first maximum permissible acceleration when the moving counterweight has moved half of the first distance.
[0034] In this embodiment of the application, the redefined velocity is the square root of the absolute value of the product of the first maximum permissible acceleration and the first distance.
[0035] In this embodiment of the application, the maximum permissible speed is negatively correlated with the first torque.
[0036] A second aspect of this application provides a processor configured to execute the above-described control method for a tower crane.
[0037] A third aspect of this application provides a control device for a tower crane. The tower crane includes a tower body and a superstructure. The superstructure includes a counterweight boom, a jib, a fixed counterweight, and a movable counterweight. The fixed counterweight is fixed to the side of the counterweight boom. The superstructure is provided with a guide rail extending from the side of the counterweight boom to the side of the jib. The movable counterweight can move along the guide rail. The control device includes:
[0038] Drive mechanism, used to drive the movable counterweight to move along the guide rail, and
[0039] The processor mentioned above.
[0040] In this embodiment of the application, the driving mechanism includes:
[0041] The first pulley block is installed on the crane boom;
[0042] The second pulley system is mounted on the counterweight arm; and
[0043] The winch connects to one end of the moving counterweight via a first traction rope that passes through a first pulley block and to the other end via a second traction rope that passes through a second pulley block, thereby enabling the synchronous winding and releasing of the first and second traction ropes and driving the moving counterweight to move.
[0044] In this embodiment of the application, the control device further includes:
[0045] Position detection equipment is used to detect the position of a moving counterweight.
[0046] A fourth aspect of this application provides a tower crane, comprising:
[0047] Tower body;
[0048] The upper garment, including:
[0049] The counterweight arm is equipped with a fixed counterweight.
[0050] Crane boom; and
[0051] The mobile counterweight is equipped with a guide rail extending from the counterweight arm to the crane arm, allowing the mobile counterweight to move along the guide rail.
[0052] The aforementioned control device for tower cranes.
[0053] In this embodiment of the application, the processor is a tower crane controller.
[0054] In this application embodiment, the tower crane includes a crawler tower crane.
[0055] The fifth aspect of this application provides a cloud management platform, including the processor described above.
[0056] The sixth aspect of this application provides a machine-readable storage medium storing instructions that, when executed by a processor, cause the processor to implement the aforementioned control method for a tower crane.
[0057] By using the above technical solution, the moving counterweight can be pre-adjusted to the pre-balanced position before the tower crane lifts the load, which can save the time of moving the moving counterweight during the lifting process and improve the lifting efficiency.
[0058] Other features and advantages of the embodiments of this application will be described in detail in the following detailed description section. Attached Figure Description
[0059] The accompanying drawings are provided to further illustrate the embodiments of this application and form part of the specification. They are used together with the following detailed description to explain the embodiments of this application, but do not constitute a limitation on the embodiments of this application. In the drawings:
[0060] Figure 1 A schematic diagram of the structure of a tower crane according to an embodiment of this application is shown.
[0061] Figure 2 A schematic flowchart of a control method for a tower crane according to an embodiment of this application is shown.
[0062] Figure 3A and Figure 3B This illustration schematically shows the positional change of the moving counterweight when determining the pre-balancing position of the moving counterweight in the control method for a tower crane according to an embodiment of this application;
[0063] Figure 4 A schematic flowchart of a control method for a tower crane according to another embodiment of this application is shown.
[0064] Figure 5 A schematic flowchart of a control method for a tower crane according to another embodiment of this application is shown.
[0065] Figure 6 The schematic diagram illustrates a process flow of a control method for a tower crane according to an embodiment of this application, which controls the movement of a counterweight during the lifting process.
[0066] Figure 7 The schematic diagram illustrates a process flow of a control method for a tower crane according to an embodiment of this application, which controls the movement of a moving counterweight.
[0067] Figure 8 A schematic block diagram of a control device for a tower crane according to an embodiment of this application is shown.
[0068] Figure 9A This is a schematic diagram of the structure of the mobile counterweight system in the embodiments of this application;
[0069] Figure 9B yes Figure 9A A magnified view of part A in the middle;
[0070] Figure 9C yes Figure 9A A magnified view of part B in the middle section;
[0071] Figure 9D yes Figure 9B A schematic diagram of the structure along direction C; and
[0072] Figure 9E This is a schematic diagram of the moving counterweight in the embodiments of this application. Detailed Implementation
[0073] The specific embodiments of this application will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit the embodiments of this application.
[0074] It should be noted that if the embodiments of this application involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicators will also change accordingly.
[0075] Furthermore, if the embodiments of this application involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, features defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the technical solutions of various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed in this application.
[0076] In the application of some large or even super-large tower cranes, especially in the application of mobile (e.g., crawler-mounted) tower cranes (such as those used in nuclear power plants, bridges, and wind turbine installations), the weight of the counterweights used to match the load on the lifting and counterbalance boom sides can be very large. During the lifting process of such tower cranes, the torque on the counterbalance boom side changes significantly, resulting in a large torque acting on the tower body. To ensure safety, ideally, the tower's bending moment resistance should be increased, for example, by increasing the tower's volume. However, in actual tower structure design, it is impossible to increase the tower's volume and weight indefinitely. This means that higher requirements are placed on the torque balance on both sides of the counterbalance boom and lifting boom.
[0077] Figure 1 A schematic diagram of a tower crane according to an embodiment of this application is shown. Figure 1As shown in this embodiment, the tower crane may include a tower body 110 and a superstructure, which can rotate around the tower body 110 (e.g., the slewing mechanism of the tower body). The superstructure may include a counterweight 120, a lifting jib 130, a fixed counterweight 140, and a movable counterweight 150. The fixed counterweight 140 may be fixed to the counterweight jib side, for example, at the far end of the counterweight jib 120 (i.e., away from the slewing center of the tower crane). The superstructure may be provided with a guide rail (not shown in the figure) extending from the counterweight jib side to the lifting jib side, and the movable counterweight 150 can move along the guide rail. The lifting jib 130 may be provided with a luffing trolley 160 and a slide rail for the luffing trolley 160 to move (luff), and the luffing trolley 160 can be connected to a hook 170 via a lifting rope.
[0078] Figure 2 A schematic flowchart of a control method for a tower crane according to an embodiment of this application is shown. Figure 2 The control method shown can be applied to Figure 1 In the tower crane shown. For example... Figure 2 As shown in the embodiments of this application, the control method may include the following steps.
[0079] In step S210, the lifting information of the object to be lifted is obtained. The lifting information may include at least the weight and lifting position of the object to be lifted.
[0080] Specifically, in the embodiments of this application, the weight and lifting position of the object to be lifted can be obtained in advance. In one example, the weight of the object to be lifted can be obtained through machine vision. For example, a mark with the weight information of the object to be lifted can be attached to the object, and an image of the mark can be acquired, and the weight information of the object to be lifted can be obtained through semantic recognition. In another example, a pre-planned lifting task can be obtained, which may include information such as the weight of the object to be lifted and the lifting path. In yet another example, the lifting position can be obtained by detecting the luffing amplitude of the luffing trolley (i.e., the distance of the luffing trolley along the boom from the center of rotation of the tower crane). In yet another example, the lifting position can be obtained based on positioning technology (e.g., RTK).
[0081] In step S220, the torque that the object to be lifted will exert on the tower crane is determined based on the weight of the object to be lifted and the lifting position.
[0082] Specifically, in the embodiments of this application, after obtaining the weight and lifting position of the object to be lifted, the distance between the line of action of the force exerted by the object on the lifting arm and the center of rotation of the tower crane (i.e., the lever arm) can be determined based on the lifting position. Based on the weight and lever arm of the object to be lifted, the torque (hereinafter referred to as the first torque) that the object to be lifted will exert on the tower crane can be obtained.
[0083] In step S230, the pre-balancing position of the moving counterweight is determined based on the first torque.
[0084] Specifically, Figure 3A and Figure 3B The illustration schematically shows the positional change of the moving counterweight during the determination of its pre-balancing position in a control method for a tower crane according to an embodiment of this application. For example... Figure 3A and Figure 3B As shown in this embodiment of the application, when the tower crane is in an empty hook state ( Figure 3A In other words, when the load to be lifted is not in place, the moving counterweight 310 can be located in the initial position (position A) on the side of the jib. At this time, the moment of the counterweight relative to the tower (e.g., the tower crane's slewing center) and the moment of the jib relative to the tower (e.g., the tower crane's slewing center) are in a state of moment balance. In one example, the moment balance state can be that the moment of the counterweight relative to the tower is equal to the moment of the jib relative to the tower. In another example, the moment balance state can be that the overall moment of the superstructure is slightly biased towards the jib, causing the superstructure to have a slight tendency to tilt forward (i.e., tilt towards the jib). That is, the moment of the jib relative to the tower is slightly greater than the moment of the counterweight relative to the tower. For example, the overall moment of the superstructure does not exceed the rated moment of the tower crane, for example, it can be 5%-30% of the rated moment. Here, the rated moment can refer to the maximum lifting moment of the tower crane set according to safety design requirements. Generally, the rated torque should be less than the ultimate torque of the tower crane, which can be the minimum torque that can cause the tower crane to overturn.
[0085] If the object to be lifted is hoisted by a tower crane, an initial torque is applied to the boom side, disrupting the torque balance. To restore torque balance, the counterweight can be moved from its initial position on the boom side towards the counterweight arm side until a pre-balanced position (position B) is reached. In one example, the pre-balanced position can be determined as follows.
[0086] Assuming that the lifting boom and counterweight boom reach torque balance after the object to be lifted are lifted, then formula (1) is satisfied:
[0087] M l +M j =W c L+M b +ΔM Formula (1)
[0088] Among them, M l It is the lifting moment, M j It is the boom torque, W c L is the weight of the moving counterweight, L is the distance from the moving counterweight to the slewing center of the tower crane, and M is the distance from the moving counterweight to the slewing center of the tower crane. bΔM is the torque of the counterweight boom and the fixed counterweight, and ΔM is the set forward tilting torque. If it is required that the torque on the counterweight boom side is equal to the torque on the boom side, then ΔM can be equal to zero.
[0089] In formula (1), M j M b And ΔM is a fixed value, while M l Satisfies formula (2):
[0090] M l =M d +W d Formula (2)
[0091] Among them, M d It is the first torque, W d W is the total weight of the luffing trolley, lifting rope, and hook; l is the distance from the luffing trolley to the slewing center of the tower crane. Since the total weight of the luffing trolley, lifting rope, and hook (i.e., W) d M can be determined in advance, and l can be determined based on the lifting position of the object to be lifted. l .
[0092] Formula (1) can be rewritten as:
[0093] L = (M l +M j –M b –Δm) / W c
[0094] Therefore, L can be obtained.
[0095] After determining L, the pre-balancing position of the moving counterweight can be determined based on L.
[0096] In step S240, the moving counterweight is controlled to move from the crane boom side to the pre-balanced position.
[0097] Specifically, in this embodiment, the upper structure may be equipped with a drive mechanism for driving the movable counterweight to move along the guide rail. In one example, the drive mechanism may include a motor, a reducer, a brake, a drum, and a pulley block. The motor may include, for example, a stepper motor or a servo motor. The motor can be connected to the drum via the reducer to drive the drum to rotate. A pull rope may be wound on the drum, one end of which can be connected to one side of the movable counterweight, and the other end can pass through the pulley block and be connected to the other side of the movable counterweight. The brake is used to brake (decelerate or stop) the drum. The reciprocating motion of the movable counterweight on the guide rail is achieved by driving the drum to rotate forward or backward by the motor.
[0098] After determining the pre-balancing position, the distance the counterweight needs to move from the initial position to the pre-balancing position can be determined (i.e., L+L).inl L inl The initial position of the moving counterweight is the distance from the slewing center of the tower crane. The control drive mechanism moves the moving counterweight along the guide rail this distance, and the moving counterweight reaches the pre-balanced position. Taking a stepper motor as an example, (for example, a processor) after determining the distance the moving counterweight needs to move from the initial position to the pre-balanced position, it can convert this distance into the angular displacement that the stepper motor needs to operate, and output the corresponding control signal to the motor to drive the motor to rotate by this angular displacement. In one example, a position sensor (such as an encoder or a distance sensor) can be set to detect the distance the moving counterweight has moved, so as to perform closed-loop control of the movement of the moving counterweight. Pre-adjusting the moving counterweight to the pre-balanced position before the tower crane lifts it can save time in moving the moving counterweight during the lifting process and improve lifting efficiency.
[0099] If the weight of the object to be lifted is small and the tower crane's structure is sufficient to withstand the torque applied by the object, then there is no need to adjust the position of the moving counterweight. Figure 4 A schematic flowchart of a control method for a tower crane according to another embodiment of this application is shown. Figure 4 The same steps as those in Figure 3 use the same reference numerals. Figure 4 As shown, in a preferred embodiment of this application, the control method may further include the following steps.
[0100] In step S410, the first torque is compared with a set safety torque. Specifically, the set safety torque can be set according to actual design requirements. Generally, the set safety torque does not exceed the rated torque of the tower crane. In one example, the set safety torque can be 20% to 60% of the maximum torque. If the first torque is greater than the set safety torque, the step of determining the pre-balancing position of the moving counterweight based on the first torque is performed (step S230).
[0101] In step S420, if the first torque is less than the set safety torque, the moving counterweight is held in its initial position.
[0102] In some applications, for safety reasons, it may be desirable that the torque of the superstructure relative to the tower body (or the tower crane's slewing center) when the tower crane is in an empty hook state (i.e., without a load being lifted) does not exceed a set value, and correspondingly, it may be desirable that the movement of the counterweight toward the counterweight boom does not exceed a set position. Figure 5 A schematic flowchart of a control method for a tower crane according to another embodiment of this application is shown. Figure 5 In the middle of Figure 3 or Figure 4 The same steps are illustrated using the same reference numerals. For example... Figure 5As shown, in a preferred embodiment of this application, the control method may further include the following steps.
[0103] In step S510, it is determined whether the distance between the pre-balancing position and the tower body is greater than the distance between the set safe position and the tower body;
[0104] In step S520, when the distance between the pre-balancing position and the tower body is greater than the distance between the set safe position and the tower body, the movable counterweight is controlled to move from the boom side to the set safe position.
[0105] If the distance between the pre-balancing position and the tower body is less than the distance between the set safe position and the tower body (i.e., the pre-balancing position does not exceed the set safe position), control the moving counterweight to move from the boom side to the pre-balancing position.
[0106] Specifically, the maximum torque (maximum torque on the counterweight side) of the tower crane when it is empty can be determined. This maximum torque does not exceed the rated torque of the tower crane. For example, in one example, this maximum torque can be 20% to 40% of the rated torque. The set safe position can then be determined according to formula (3). When the tower crane moves the counterweight to this set safe position while it is empty, the torque of the load can be this maximum torque.
[0107] M max +M j =W c L+M b Formula (3)
[0108] Among them, M max M is the maximum torque mentioned above. j It is the boom torque, W c L is the weight of the moving counterweight, L is the distance from the moving counterweight to the slewing center of the tower crane, and M is the distance from the moving counterweight to the slewing center of the tower crane. b It is the balance arm and the fixed balance torque.
[0109] According to formula (3), the distance L from the moving counterweight to the slewing center of the tower crane can be obtained, and the set safe position can be determined. The method of controlling the moving counterweight to move to the set safe position can be the same as the method of controlling the moving counterweight to move to the pre-balance position, which will not be repeated here.
[0110] After the moving counterweight has moved to the target position (e.g., a pre-balanced position or a set safety position), lifting operations are permitted. In one application scenario, the control method of the above embodiments can be executed by the tower crane controller of the tower crane. In other application scenarios, the control method of the above embodiments can be executed by an entity other than the tower crane controller. In one example, the control method can be executed by a separate processor. In this case, the processor can communicate with the tower crane controller (e.g., via a communication module). After the moving counterweight has moved to the target position, the processor can send a signal to the tower crane controller permitting lifting operations. Upon receiving this signal, the tower crane controller can issue a notification that lifting operations are permitted (e.g., through sound, light, or displaying relevant information on a screen in the tower crane operator's cab). In another example, the control method can be executed by a cloud management platform. In this case, the cloud management platform can communicate with the tower crane controller. After the moving counterweight has been moved to the target position, the cloud management platform can send a signal to the tower crane controller authorizing the lifting operation. Upon receiving this signal, the tower crane controller can issue a notification that the lifting operation is permitted (e.g., through sound, light, or by displaying the relevant information on a screen in the tower crane operator's cab). Additionally, the cloud management platform can also send information related to the movement of the moving counterweight (e.g., real-time location) to the tower crane controller, which can then display this information on a screen.
[0111] If the moving counterweight moves to the set safe position while the hook is empty, further control over its movement can be exercised when lifting begins. Specifically, in the embodiments of this application, in the application of large or even super-large tower cranes, during the lifting process, since the weight of the load may be very large, it is desirable to minimize torque fluctuations in the superstructure while controlling the movement of the moving counterweight to match the torque. This can be addressed by using a segmented control method for the movement of the moving counterweight.
[0112] When a change in lifting torque is detected (e.g., by a processor), it is desirable that the overall torque of the superstructure (including the counterweight boom and the lifting boom) remains within a safe range. Multiple torque intervals can be defined, each associated with a target position of a moving counterweight. If the lifting torque is within a certain torque interval, the moving counterweight is moved to the corresponding target position to minimize the difference between the lifting boom side torque and the counterweight boom side torque, ensuring that the overall torque of the superstructure remains within a safe range (e.g., the counterweight boom and lifting boom torques are balanced, or the overall torque of the superstructure is less than n% of the rated torque, where n can be determined according to safety requirements, e.g., n = 3, 5, 10, 15, etc.). Specifically, when the lifting torque changes and enters one of the multiple torque intervals, the lifting torque can be kept constant, the moving counterweight can be moved to the target position corresponding to that torque interval, and then the restriction on the change in lifting torque can be lifted. When the lifting torque changes to another torque interval, the lifting torque is again kept constant, and the moving counterweight is moved to another target position corresponding to that other torque interval. This process continues until the lifting torque no longer changes.
[0113] In a preferred embodiment of this application, the control method may further include:
[0114] In step S610, the lifting torque of the tower crane is monitored during the lifting of the object to be lifted.
[0115] In step S620, when it is detected that the lifting torque increases to a target torque range among multiple torque ranges, the lifting torque is kept constant until the moving counterweight is controlled to move to the target position corresponding to the target torque range;
[0116] One of the multiple torque intervals corresponds to a target position of the moving counterweight.
[0117] Specifically, in this embodiment, when the lifting torque is detected to increase to a target torque range among multiple torque ranges, the lifting torque is kept constant until the moving counterweight is controlled to move to the target position corresponding to the target torque range, including:
[0118] When the lifting torque increases to the first torque range among multiple torque ranges, maintain the lifting torque and control the moving counterweight to move to the first target position corresponding to the first torque range;
[0119] Continue to increase the lifting torque;
[0120] When the lifting torque increases to the second torque interval that is adjacent to the first torque interval among multiple torque intervals, maintain the lifting torque and control the moving counterweight to move to the second target position corresponding to the second torque interval;
[0121] The first target location is farther away from the tower than the set safe location.
[0122] Specifically, in one example, the weight of the load applied to the jib can be detected using a weight detection device. For example, an example of a weight detection device could include a load cell, which could be positioned at the hook to detect the weight of the load. The luffing radius of the luffing trolley (i.e., the distance of the luffing trolley along the jib from the tower crane's slewing center) can be detected, for example, using a position sensor (e.g., a rotary encoder or a drawbar sensor) to determine the lever arm of the load relative to the tower crane's slewing center (the position of the tower crane's slewing center is known). Based on the weight of the load and the lever arm, the lifting moment can be determined. Here, the tower crane's lifting load can include the sum of the weight of the load and the weight of the hook and rope, and the weights of the hook and rope can be predetermined. Therefore, obtaining the weight of the load yields the lifting load (lifting load), and based on the lifting load and the lever arm, the lifting moment (lifting moment) can be obtained. In another example, the lifting moment can be directly measured using a torque sensor.
[0123] In this embodiment, the multiple torque ranges can be continuous. Multiple torque ranges can be divided based on the tower crane's rated torque and a set safe position. Specifically, in one example, as described above, assuming that the overall torque of the superstructure when moving the counterweight in the set safe position with an empty hook is 20% of the rated torque and tends towards the counterweight boom (i.e., the counterweight boom tends to tilt downwards), if the maximum allowable torque of the superstructure tending towards the boom side does not exceed 30% of the rated torque, then the counterweight can be controlled to move from the set safe position towards the far end of the counterweight boom (i.e., away from the tower body) when the lifting torque exceeds 50% of the rated torque. Therefore, the multiple torque ranges can include a first torque range: [50% rated torque, 75% rated torque), a second torque range: [75% rated torque, 100% rated torque), a third torque range: [100% rated torque, 110% rated torque), and a fourth torque range: ≥110% rated torque. In this example, the limiting torque can be 120% of the rated torque. After determining the torque range, the target position corresponding to each torque range can be determined. The method for determining the target position is the same as that for setting the safe position, that is, select a torque value in the torque range, and determine the position where the moving counterweight generates that torque value based on that torque value; this position is the target position for that torque range. When the lifting torque exceeds the rated torque, for safety reasons, the movement of the moving counterweight can be prohibited.
[0124] Because the moving counterweight is heavy, it also has a large inertia. In order to accurately control the moving counterweight to the target position (such as the pre-balancing position) without causing a large impact on the rope due to its large inertia, a speed control strategy for the moving counterweight can be added.
[0125] In a preferred embodiment of the present application, a speed control strategy for moving the movable counterweight may be determined according to a distance the movable counterweight needs to move.
[0126] Specifically, the movable counterweight may be controlled to accelerate to a speed first, and then a distance (displacement) the movable counterweight moves when decelerating from the speed to zero at a set acceleration may be determined according to the speed and the set acceleration. When the movable counterweight moves at the speed to a position that is at the distance away from a target position (e.g., a pre-balanced position), the movable counterweight is controlled to start decelerating at the acceleration (e.g., a brake or a motor braking is controlled), and when the speed of the movable counterweight decreases to zero, the movable counterweight stops at the target position.
[0127] In order to minimize time consumed in a moving process of the movable counterweight, a set maximum pull force allowed to be borne by a pull rope (i.e., a pull force borne by the pull rope is specified to not exceed the set maximum pull force) and a maximum allowable speed of the movable counterweight may be set. It can be known according to a relationship among force, mass and acceleration F=ma that a=F / m. Since F (the set maximum pull force) and m (a mass of the movable counterweight) are determined values, a maximum acceleration ±a (i.e., a maximum allowable acceleration of the movable counterweight (a positive sign represents acceleration and a negative sign represents deceleration)) is also known. The maximum allowable speed is denoted as v max , and there is formula (4):
[0128]
[0129] where t2 is time for which the movable counterweight moves at the maximum allowable speed, l1 is a displacement the movable counterweight moves when accelerating from zero to the maximum allowable speed, l2 is a position where the movable counterweight moves at a constant speed at the maximum allowable speed, and l3 is a displacement the movable counterweight moves when decelerating from the maximum allowable speed to zero.
[0130] Assuming that a distance the movable counterweight needs to move is L, if L>l1+l3, it may be determined that the movable counterweight may be controlled to accelerate (with acceleration a) to a maximum allowable speed v max first, and then decelerate from the maximum allowable speed v max to zero (with acceleration -a) at a position that is l3 away from the target position (e.g., the pre-balanced position). In this case, with the speed control strategy, the moving time of the movable counterweight is shorter.
[0131] If L<l1+l3, it indicates that the distance the movable counterweight needs to move is insufficient for the movable counterweight to accelerate to the maximum allowable speed v maxThen, when the weight decelerates to zero with an acceleration of -a, it reaches the target position (e.g., the pre-equilibrium position). Therefore, in this case, moving the counterweight can involve a process of acceleration followed by deceleration. Assuming the counterweight first accelerates to a speed v with an acceleration of a1, and moves a distance l1, then we have... A moving counterweight starts from velocity v and decelerates to zero with an acceleration of -a², moving a distance of l². Then we have: Where l1 + l2 = L. Assume |a1| = |a2| = |a|, then we have... l2 = L / 2. In this case, the moving counterweight can be controlled to accelerate to velocity v with acceleration a and then decelerate to zero with acceleration -a, and / or the moving counterweight can be controlled to start decelerating with acceleration -a when the distance between the moving counterweight and the target position (e.g., the pre-balancing position) is determined to be L / 2.
[0132] Figure 7 The illustration schematically depicts a process flow of a control method for a tower crane according to an embodiment of this application, controlling the movement of a moving counterweight. In this preferred embodiment, controlling the movement of the moving counterweight to a target position may include the following steps.
[0133] In step S710, the distance (first distance) of the important movement for the movement balance is determined according to the target position;
[0134] In step S720, the deceleration distance that the moving counterweight needs to move when it decelerates from the maximum permissible speed to zero at the first maximum permissible acceleration is determined based on the maximum permissible speed of the moving counterweight and the first maximum permissible acceleration.
[0135] In step S730, it is determined whether the deceleration distance is less than half of the distance that needs to be moved;
[0136] In step S740, if the deceleration distance is less than half of the distance to be moved, the counterweight is controlled to accelerate from zero to the maximum allowable speed at a second maximum allowable acceleration, where the absolute values of the first maximum allowable acceleration and the second maximum allowable acceleration are equal.
[0137] In step S750, when the moving counterweight moves to the deceleration distance from the target position, the moving counterweight is controlled to decelerate from the maximum permissible speed to zero with a first maximum permissible acceleration;
[0138] In step S760, if the deceleration distance is greater than or equal to half of the distance to be moved, the counterweight is controlled to accelerate from zero to a redefined speed with a second maximum permissible acceleration and then decelerate to zero with a first maximum permissible acceleration; or the counterweight is controlled to accelerate from zero with a second maximum permissible acceleration and decelerate to zero with a first maximum permissible acceleration when the counterweight has moved half of the distance to be moved.
[0139] In this embodiment of the application, the target position may be a pre-balanced position or a set safe position.
[0140] In this embodiment of the application, the re-determined speed can be the square root of the absolute value of the product of the first maximum permissible acceleration and the distance to be moved.
[0141] In this embodiment, the maximum permissible speed can be associated with a first torque. Specifically, the larger the first torque, the smaller the maximum permissible speed; that is, the maximum permissible speed is negatively correlated with the first torque. In one example, multiple torque intervals can be set, each torque interval being associated with a maximum permissible speed. Once the first torque is determined, it can be determined which torque interval it belongs to, and the maximum permissible speed corresponding to that torque interval is the desired (interested) maximum permissible speed.
[0142] In this embodiment of the application, the movement of the moving counterweight can be controlled by PID control.
[0143] In this application embodiment, a processor is provided that can be configured to execute the control method for tower cranes in any of the above embodiments.
[0144] In the embodiments of this application, the processor may be, or the functions performed by the processor may be integrated into the tower crane controller of the tower crane.
[0145] In this embodiment, the processor can be a separate processor that can communicate with the tower crane controller (e.g., via a communication module). After the moving counterweight has been moved to the target position, the processor can send a signal to the tower crane controller permitting the lifting operation. Upon receiving the signal, the tower crane controller can issue a notification that the lifting operation is permitted (e.g., through sound, light, or by displaying relevant information on a screen in the tower crane operator's cab).
[0146] In this embodiment, the cloud management platform may include the processor. In this case, the cloud management platform can communicate with the tower crane controller. After the moving counterweight has moved to the target position, the cloud management platform can send a signal to the tower crane controller permitting the lifting operation. Upon receiving the signal, the tower crane controller can issue a notification that the lifting operation is permitted (e.g., through sound, light, or by displaying the corresponding information on a screen in the tower crane operator's cab). Additionally, the cloud management platform can also send information related to the movement of the moving counterweight (e.g., real-time position) to the tower crane controller, which can then display this information on a screen.
[0147] Figure 8 A schematic block diagram of a control device for a tower crane according to an embodiment of this application is shown. Figure 8 As shown in the embodiments of this application, a control device for a tower crane is provided. The tower crane may include a tower body and a superstructure. The superstructure may include a counterweight boom, a jib boom, a fixed counterweight, and a movable counterweight. The fixed counterweight may be fixed to the side of the counterweight boom. The superstructure is provided with a guide rail extending from the side of the counterweight boom to the side of the jib boom. The movable counterweight can move along the guide rail. The control device may include:
[0148] Drive mechanism 812 is used to drive the movable counterweight to move along the guide rail, and
[0149] The processor 814 is configured to execute the control method for a tower crane according to any of the above embodiments.
[0150] Figures 9A-9E A schematic block diagram of a drive mechanism according to an embodiment of this application is shown. Figures 9A-9E As shown, specifically in a particular embodiment of this application, the upper assembly may include a guide wheel 41 disposed on the movable counterweight 4 and moving in cooperation with the guide rail.
[0151] In this embodiment of the application, the upper structure can be a truss structure, which includes an upper truss structure and a lower truss structure arranged vertically. The upper truss structure has a channel for the movement of the movable counterweight 4, and the upper truss structure includes two parallel upper chords 51. The bottom of the upper chords 51 is a lower cover plate 52. The flanges of the two lower cover plates 52 extend inward to form guide rails. The guide wheels 41 are symmetrically arranged on the left and right sides of the movable counterweight 4.
[0152] In this embodiment of the application, the upper truss structure and the lower truss structure are connected by a pin 53.
[0153] In this embodiment, the drive mechanism 812 may include a winch 6, a first pulley block, and a second pulley block. The first pulley block is mounted on the lifting arm 1, and the second pulley block is mounted on the counterweight arm 2. The winch 6 is connected to one end of the movable counterweight 4 via a traction rope that passes around the first pulley block, and the winch 6 is connected to the other end of the movable counterweight 4 via another traction rope that passes around the second pulley block, so that the winch 6 can simultaneously release the other traction rope while winding up one traction rope, thereby driving the movable counterweight 4 to move.
[0154] In this embodiment, the first pulley group includes a first pulley 71 and a second pulley 72. The first pulley 71 is installed on the inner surface of the top of the upper truss structure of the lifting arm 1, and the second pulley 72 is installed on the pin 53 between the upper truss structure and the corresponding lower truss structure. One end of a traction rope is connected to the winch 6, and the other end passes through the second pulley 72 and the first pulley 71 in sequence and is connected to one end of the moving counterweight 4. The second pulley group includes a third pulley 73 and a fourth pulley 74. The third pulley 73 is installed on the inner surface of the top of the upper truss structure of the counterweight arm 2, and the fourth pulley 74 is installed on the pin 53 located between the upper truss structure and the corresponding lower truss structure. One end of another traction rope is connected to the winch 6, and the other end passes through the fourth pulley 74 and the third pulley 73 in sequence and is connected to the other end of the moving counterweight 4.
[0155] In this embodiment, the other end of the movable counterweight 4 is provided with a mounting base 42 for connecting to the traction rope.
[0156] In this embodiment of the application, a diagonal brace 54 is provided in the lower truss structure.
[0157] In this embodiment, the winch 6 may include a motor, a reducer, a brake, and a drum. The motor may include, for example, a stepper motor or a servo motor. The motor can be connected to the drum via the reducer to drive the drum to rotate. A traction rope may be wound on the drum, and the traction rope is connected to the moving counterweight 4 as described above. The brake is used to brake the drum (decelerate or stop it). The reciprocating motion of the moving counterweight on the guide rail is achieved by driving the drum to rotate forward or backward by the motor, and the moving speed of the moving counterweight 4 can be controlled by controlling the speed of the motor.
[0158] In a preferred embodiment of this application, the control device may further include: a position detection device 816 for detecting the position of the moving counterweight.
[0159] Specifically, the position detection device 816 can be implemented in various forms. In one example, the position detection device 816 may include an encoder, examples of which may include, but are not limited to, absolute encoders and incremental encoders. The encoder can be configured to detect the angular displacement of a motor or reducer (e.g., number of revolutions), determine the angular displacement of the drum based on the angular displacement of the motor or reducer, and thus determine the length of rope winding or unwinding on the drum. Alternatively, the encoder can be configured to detect the angular displacement of the drum to determine the length of rope winding or unwinding on the drum. Based on this length, the distance the moving counterweight has moved (e.g., relative to its initial position) can be determined to determine the position of the moving counterweight. In another example, the position detection device 816 may include a distance sensor (e.g., a laser distance sensor). The distance sensor can be positioned appropriately, such as at either end of a guide rail. The distance of the moving counterweight relative to the distance sensor can be detected by the distance sensor to determine the position of the moving counterweight. In one example, the encoder or distance sensor can also be used to detect the speed at which the moving counterweight moves.
[0160] In this embodiment of the application, the control device may further include an amplitude detection device (e.g., an encoder, a draw wire sensor, etc.) for detecting the amplitude of the luffing trolley.
[0161] In this application embodiment, a tower crane is provided, which may include:
[0162] Tower body;
[0163] The upper garment, including:
[0164] The counterweight arm is equipped with a fixed counterweight.
[0165] Crane boom; and
[0166] The mobile counterweight is equipped with a guide rail extending from the counterweight arm to the crane arm, allowing the mobile counterweight to move along the guide rail.
[0167] The control device for tower cranes in any of the above embodiments.
[0168] In this embodiment, the processor of the control device may be a tower crane controller.
[0169] In this embodiment of the application, the tower crane can be a fixed tower crane or a mobile tower crane, and the mobile tower crane can include a crawler tower crane.
[0170] In this application embodiment, a cloud management platform is provided, which is a processor configured to execute the control method for tower cranes of any of the above embodiments.
[0171] In this application embodiment, a machine-readable storage medium is provided, on which instructions are stored, which, when executed by a processor, cause the processor to implement the control method for tower cranes described in any of the above embodiments.
[0172] The technical solution described in this application allows for the pre-balancing position of the moving counterweight to be determined in advance based on the torque acting on the crane boom before lifting the object. The moving counterweight is then moved to the pre-balancing position before lifting to adjust the overall torque of the superstructure, preparing for the lifting operation. This solution, through pre-adjustment control, reduces the time required for the moving counterweight to reach the desired position during the lifting operation, thereby improving lifting efficiency.
[0173] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0174] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of this application. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart... Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0175] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0176] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0177] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0178] Memory may include non-persistent memory in computer-readable media, such as random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. Memory is an example of computer-readable media.
[0179] Computer-readable media includes both permanent and non-permanent, removable and non-removable media that can store information using any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic magnetic disk storage or other magnetic storage devices, or any other non-transferable medium that can be used to store information accessible by a computing device. As defined herein, computer-readable media does not include transient computer-readable media, such as modulated data signals and carrier waves.
[0180] It should also be noted that the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element.
[0181] The above are merely embodiments of this application and are not intended to limit the scope of this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the scope of the claims of this application.
Claims
1. A control method for a tower crane, characterized in that, A tower crane includes a tower body and a superstructure. The superstructure includes a counterweight boom, a jib, a fixed counterweight, and a movable counterweight. The fixed counterweight is fixed to the side of the counterweight boom. The superstructure is provided with a guide rail extending from the side of the counterweight boom to the side of the jib. The movable counterweight can move along the guide rail. The control method includes: Obtain information about the object to be lifted, including at least the weight and lifting position of the object to be lifted; The first torque that will act on the tower crane for the object to be lifted is determined based on the weight and the lifting position. The pre-balancing position of the moving counterweight is determined based on the first torque; and Control the moving counterweight to move from the side of the lifting arm to the pre-balanced position.
2. The control method according to claim 1, characterized in that, Also includes: If the distance between the pre-balancing position and the tower body is greater than the distance between the set safe position and the tower body, the moving counterweight is controlled to move from the boom side to the set safe position; Specifically, when the tower crane is in an empty hook state and the moving counterweight is located at the set safe position, the overall torque of the tower crane does not exceed the rated torque of the tower crane.
3. The control method according to claim 1, characterized in that, Also includes: Compare the first torque with the set safety torque; Determining the pre-balancing position of the moving counterweight based on the first torque includes: when the first torque is greater than the set safety torque, determining the pre-balancing position of the moving counterweight based on the first torque; The set safety torque shall not exceed the rated torque of the tower crane.
4. The control method according to claim 3, characterized in that, Also includes: When the first torque is less than the set safety torque, the moving counterweight is held in its initial position.
5. The control method according to claim 2, characterized in that, Also includes: During the lifting of the object to be lifted, the lifting torque of the tower crane is monitored; If the lifting torque is detected to increase to a target torque range among multiple torque ranges, the lifting torque is kept constant until the moving counterweight is controlled to move to the target position corresponding to the target torque range. One of the plurality of torque intervals corresponds to a target position of the moving counterweight.
6. The control method according to claim 5, characterized in that, The step of maintaining the lifting torque unchanged when the lifting torque is detected to increase to a target torque range among multiple torque ranges, until the moving counterweight is controlled to move to the target position corresponding to the target torque range, includes: When the lifting torque increases to the first torque range among the plurality of torque ranges, the lifting torque is maintained, and the moving counterweight is controlled to move to the first target position corresponding to the first torque range; Continue to increase the lifting torque; When the lifting torque increases to the second torque interval that is adjacent to the first torque interval among the plurality of torque intervals, the lifting torque is maintained, and the moving counterweight is controlled to move to the second target position corresponding to the second torque interval; The first target location is farther away from the tower than the set safe location.
7. The control method according to any one of claims 1 to 6, characterized in that, Controlling the moving counterweight to move from the boom side to the target position includes: A first distance for important movement of the moving balance is determined based on the target position, wherein the target position is the pre-balancing position or a set safe position; Determine the deceleration distance that the moving counterweight needs to move when it decelerates from its maximum permissible speed to zero with a first maximum permissible acceleration. Determine whether the deceleration distance is less than half of the first distance; If the deceleration distance is less than half of the first distance, the moving counterweight is controlled to accelerate from zero to the maximum permissible speed at a second maximum permissible acceleration, wherein the absolute values of the first maximum permissible acceleration and the second maximum permissible acceleration are equal; When the moving counterweight moves to the deceleration distance from the target position, the moving counterweight is controlled to decelerate from the maximum permissible speed to zero at the first maximum permissible acceleration; If the deceleration distance is greater than or equal to half of the first distance, the moving counterweight is controlled to accelerate from zero to a redefined speed at the second maximum permissible acceleration, and then decelerate to zero at the first maximum permissible acceleration; or the moving counterweight is controlled to accelerate from zero at the second maximum permissible acceleration and decelerate to zero at the first maximum permissible acceleration when the moving counterweight has moved half of the first distance.
8. The control method according to claim 7, characterized in that, The redefined velocity is the square root of the absolute value of the product of the first maximum permissible acceleration and the first distance.
9. The control method according to claim 7, characterized in that, The maximum permissible speed is negatively correlated with the first torque.
10. A processor, characterized in that, It is configured to perform the control method for tower cranes according to any one of claims 1 to 9.
11. A control device for a tower crane, characterized in that, A tower crane includes a tower body and a superstructure. The superstructure includes a counterweight boom, a jib, a fixed counterweight, and a movable counterweight. The fixed counterweight is fixed to the side of the counterweight boom. The superstructure is provided with a guide rail extending from the side of the counterweight boom to the side of the jib. The movable counterweight is movable along the guide rail. The control device includes: A drive mechanism is used to drive the movable counterweight to move along the guide rail, and The processor according to claim 10.
12. The control device according to claim 11, characterized in that, The drive mechanism includes: The first pulley block is installed on the lifting boom; The second pulley system is mounted on the counterweight arm; and The winch connects to one end of the moving counterweight via a first traction rope that passes over the first pulley group and to the other end of the moving counterweight via a second traction rope that passes over the second pulley group, thereby enabling the synchronous winding and releasing of the first and second traction ropes and driving the moving counterweight to move.
13. The control device according to claim 11, characterized in that, Also includes: A position detection device is used to detect the position of the moving counterweight.
14. A tower crane, characterized in that, include: Tower body; Upper body, the upper body includes: The counterweight arm is equipped with a fixed counterweight. Crane boom; and A mobile counterweight is provided with a guide rail extending from the counterweight arm side to the lifting arm side, and the mobile counterweight can move along the guide rail. The control device for a tower crane according to any one of claims 11 to 13.
15. The tower crane according to claim 14, characterized in that, The processor is a tower crane controller.
16. The tower crane according to claim 14, characterized in that, The tower cranes include crawler tower cranes.
17. A cloud management platform, characterized in that, Includes the processor according to claim 10.
18. A machine-readable storage medium, characterized in that, The machine-readable storage medium stores instructions that, when executed by a processor, cause the processor to implement the control method for a tower crane according to any one of claims 1 to 9.
Citation Information
Patent Citations
Bridge crane speed regulation control method based on 0-1 planning
CN114148917A
Automatic counterweight adjusting system of tower crane
CN202912596U