A sub-module fast voltage equalization method of a modular multilevel converter
By dividing the MMC submodules into input and output groups, and utilizing bucket sorting and voltage adjustment coefficient α, the problems of high switching frequency and large energy loss during the capacitor voltage balancing process of the MMC submodules are solved, achieving fast balancing and stable voltage control.
Patent Information
- Application Number
- CN202211315843.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-10-26
AI Technical Summary
In the existing MMC submodule capacitor voltage balancing process, the fully controlled components have a high switching frequency, large energy loss, and slow voltage balancing speed. Traditional sorting algorithms are complex and difficult to control energy balance.
The MMC submodule is divided into an input group and a cut-off group. Taking advantage of the fact that the voltage of the capacitor in the cut-off group remains constant, the voltage of the input group is controlled within the allowable range by using the bucket sort algorithm and the voltage adjustment coefficient α, thereby achieving rapid voltage equalization.
The switching frequency of the fully controlled electronic components was reduced, energy loss was reduced, sorting speed and voltage balancing efficiency were improved, and the normal operation of the MMC bridge arm was guaranteed.
Smart Images

Figure CN115580119B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power system transmission and distribution technology, specifically relating to a method for fast voltage equalization of cascaded capacitors suitable for modular multilevel converter (MMC) converter stations. Background Technology
[0002] Grid-commutated converters (LCCs) have been developed for many years and are technically mature and reliable, widely used in long-distance, high-capacity high-voltage power transmission and submarine cable power transmission. However, this technology has drawbacks such as the possibility of commutation failure and the inability to supply power to weak AC systems, which limits its development to some extent. Voltage source converters (VSCs), based on fully controlled power electronic devices, have many advantages, including independent control of active and reactive power, no risk of commutation failure, and the ability to supply power to passive islanded microgrids. They are a good technical means to realize long-distance, high-capacity power transmission and renewable energy grid integration. DC transmission is developing towards longer transmission distances, larger transmission capacities, and lower transmission losses. VSC-LCC hybrid multi-terminal DC transmission is the main development trend of future high-voltage DC transmission.
[0003] Modular multilevel converters (MMCs) are a topology of variable frequency drives (VSCs) and possess all the advantages of VSCs. Furthermore, due to their unique structure, MMCs also offer advantages such as low switching frequency, low switching losses, no need for AC filter banks, and strong scalability. Many flexible DC transmission projects in recent years have adopted MMC topologies or improved versions thereof.
[0004] Each MMC has 6 arms, and each arm consists of n identical sub-modules (SMs) and one reactor (L) connected in series. The capacity of the converter station can be flexibly adjusted by increasing or decreasing the number of sub-modules in the MMC. The distributed arrangement of the MMC's energy storage capacitors makes balancing the voltage of the sub-module capacitors a challenge.
[0005] Currently, MMC submodule voltage equalization control mainly employs voltage equalization strategies based on sorting algorithms and carrier phase-shifting techniques. The traditional voltage equalization method combines Nearest Level Modulation (NLM) technology with a bubble sorting algorithm. Assuming each phase's upper and lower arms contain N submodules, during normal operation, the total number of submodules engaged in each phase must remain constant at N. The number of submodules engaged in the upper arm is N. up The number N of sub-modules deployed in the lower bridge arm down They can be represented as follows:
[0006]
[0007]
[0008] In the formula, N is the total number of bridge arm submodules, u s Here, Uc represents the modulated voltage of the bridge arm, Uc is the rated capacitor voltage of a single submodule, and round is the round-down function. Traditional voltage equalization strategies first calculate the number N of submodules that should be deployed in the upper and lower bridge arms based on the bridge arm voltage reference values. c Then, based on the bridge arm current i s In the direction of the algorithm, the sub-modules are arranged in ascending or descending order of voltage using the bubble sort algorithm, and then the N modules with the smallest or largest voltage are added. c Sub-modules. For example, when the bridge arm current i s When the voltage is greater than 0, the bridge arm is charged, and the sub-modules are arranged in ascending order, with the N module having the lowest voltage being charged. c Each submodule; when the bridge arm current i s When the voltage is less than 0, the bridge arm discharges, and the submodules are arranged in descending order, with the N module receiving the highest voltage. c Sub-modules.
[0009] However, sorting based solely on capacitor voltage leads to frequent switching of components, significantly increasing the switching frequency and energy loss. Furthermore, when the number of SMs is excessive, the sorting strategy becomes complex, making energy balance difficult to control. There is still room for optimization in reducing the computational load and improving the sorting speed of the MMC's submodule capacitor voltage balancing problem. Summary of the Invention
[0010] To address the problems of high switching frequency, large energy loss, and slow voltage equalization speed of fully controlled components during the voltage equalization process of MMC submodule capacitors in existing technologies, this invention provides a fast voltage equalization method for submodules of a modular multilevel converter.
[0011] The technical solution provided by this invention is as follows:
[0012] A method for rapid voltage equalization of submodules in a modular multilevel converter includes the following steps:
[0013] (1) Based on the bridge arm current i s Direction and modulation wave voltage increment Δu s The MMC running state is divided into four cases;
[0014] (2) In the first control cycle when the running state of MMC changes, all sub-modules are sorted, the sub-modules that need to be put into operation are selected to form an input group, and the remaining sub-modules are recorded as the cut-off group.
[0015] (3) In other control cycles where the MMC operating status changes, the input groups are reordered, and the input group voltage is adjusted within the allowable deviation range by using the upper and lower limit voltage values of the input group and the upper and lower limit voltage values of the cut-off group, and the input group sub-modules are re-determined.
[0016] Based on the fact that the voltage of the cut-off group capacitors is always ordered, this invention proposes a method to achieve rapid voltage equalization of sub-modules simply by sorting the input groups, which effectively reduces the switching frequency and improves the sorting speed.
[0017] Furthermore, the method for rapid voltage equalization of submodules in a modular multilevel converter includes the following steps:
[0018] (1) Based on the bridge arm current i s Direction and modulation wave voltage increment Δu s The MMC running state is divided into four cases: State 1, i s >0, Δu s >0; State 2, i s <0, Δu s >0; State 3, i s >0, Δu s <0; State 3, i s <0, Δu s <0;
[0019] (2) Calculate the number Nc of submodules that should be put into operation in the upper and lower arms of the MMC converter station; in the first control cycle when the MMC operating state changes, sort all submodules into an operation group and a deactivation group, and record the operation and deactivation information of the current control cycle: when the arm current i s When the voltage is greater than 0, the bridge arm is charged. The sub-modules are arranged in ascending order, and the Nc sub-modules with the lowest voltage are connected in sequence and recorded in the connected group. The remaining sub-modules are recorded in the disconnected group. When the bridge arm current i s When the voltage is <0, the bridge arm discharges, the sub-modules are arranged in descending order, and the Nc sub-modules with the highest voltage are put into the input group in turn, and the remaining sub-modules are put into the cut-off group.
[0020] (3) In other control cycles where the MMC operating state changes, the input groups are reordered, and the upper limit voltage value U of the input groups is used. am , Lower limit voltage value U of the input group an and the upper limit voltage value U of the resection group bm Lower limit voltage value U of the resection group bn Adjust the voltage of the input group within the allowable deviation range, and then re-determine the input group submodule:
[0021] a) When the voltage increment of the bridge arm modulation wave is Δu s >0, the number of sub-modules added increases or remains unchanged, and the bridge arm current i s >0, when the capacitor is charging, the upper limit voltage value U of the input group is used. am Using this as a boundary, the input group is divided into two groups, sorted, and those with voltage values U below the upper limit of the input group are... amThe submodule remains in the input group, above the input group's upper limit voltage value U. am The sub-modules are moved to the end of the cut-off group, and then the sub-modules of the cut-off group are placed into the input group in order of voltage from small to large, until the input group has Nc sub-modules.
[0022] b. When the voltage increment of the bridge arm modulation wave is Δu s >0, the number of sub-modules added increases or remains unchanged, and the bridge arm current i s <0, when the capacitor is discharging, the lower limit voltage value U of the input group is used. an Using this as a boundary, the input group is divided into two groups, sorted, and those with voltage values U higher than the upper limit of the input group are included. am The submodule remains in the input group, below the input group's upper limit voltage value U. am The submodules are moved to the end of the cut-off group, and then the submodules of the cut-off group are placed into the input group in descending order of voltage, until the input group has Nc submodules.
[0023] c. When the bridge arm modulated wave voltage increment Δu s <0, the number of sub-modules input decreases or remains unchanged, and the bridge arm current i s When the voltage value is greater than 0, the input groups are sorted in ascending order during capacitor charging, and then the cut-off groups are removed if their voltage values are lower than the lower limit U of the cut-off group. bn The submodules are moved to the front of the input group. For each submodule of the cut group moved to the front of the input group, a submodule is moved from the end of the input group to the end of the cut group. Finally, the first Nc submodules of the input group are input.
[0024] d. When the voltage increment of the bridge arm modulation wave is Δu s <0, the number of sub-modules input decreases or remains unchanged, and the bridge arm current i s When the capacitor discharges, the input groups are sorted in descending order, and then the cut-off groups are selected based on voltage values U that are higher than the upper limit of the cut-off group. bm The submodules are moved to the front of the input group. For each submodule of the cut group moved to the front of the input group, a submodule is moved from the end of the input group to the end of the cut group. Finally, the first Nc submodules of the input group are input.
[0025] This invention makes full and reasonable use of the upper and lower voltage limits of the input and output groups, adjusts the over-limit voltage back to the allowable voltage range, makes the capacitor voltage of the MMC submodule more balanced, and ensures the normal operation of the MMC bridge arm.
[0026] Furthermore, in step (3), the upper limit voltage value U of the input group is... am :U am =(1+α)U b The lower limit voltage value U of the input group an :U an =(1-α)U bThe lower limit voltage value U of the resection group bn :U bn =(1-α)U a Upper limit voltage value U of the resection group bm :U bm =(1+α)U a Where α is the voltage adjustment coefficient, U b To cut off the voltage of the last submodule of the group, U a This refers to the voltage of the first submodule in the input group.
[0027] This invention reduces the difficulty of voltage balancing by introducing a voltage adjustment coefficient α to control the voltage fluctuation range of the input and output sub-modules.
[0028] The voltage regulation factor α is selected based on the voltage fluctuation requirements (a range of 3% to 8% is recommended). As α increases, the percentage of voltage fluctuation increases while the average switching frequency decreases. Therefore, within the allowable range of voltage fluctuation, selecting the largest possible voltage regulation factor can effectively reduce the switching frequency.
[0029] The bucket sort algorithm is used when sorting all sub-modules in step (2) and when sorting input groups in step (3).
[0030] The present invention has the following advantages over the prior art:
[0031] The technical solution provided by this invention is used to solve the capacitor voltage balancing problem of MMC submodules. The submodules are divided into input groups and cut-off groups. By taking advantage of the fact that the capacitor voltage of the submodules in the cut-off group remains unchanged, the complexity of the sorting algorithm is reduced. Furthermore, a voltage adjustment coefficient α is introduced to control the voltage fluctuation range of the input and cut-off submodules, thereby reducing the difficulty of voltage balancing.
[0032] This invention categorizes the MMC operating state into four cases based on the direction of the bridge arm current and the modulation wave voltage increment. It further divides the submodule voltage sequencing into the first control cycle after the operating state change and other control cycles, processing them separately. For the first control cycle after the MMC operating state change, where the orderliness of the module voltage sequence is poor, this invention proposes using bucket sorting. Given the limited number of submodules, this trades computational space for computational time, improving sorting stability, increasing sorting speed, reducing the switching frequency of fully controllable electronic components, and minimizing energy loss. In other control cycles, this invention proposes different control schemes based on the four different operating states, and different methods for handling cut-off groups based on the increase or decrease of submodules. It fully and rationally utilizes the upper and lower voltage limits of the input and cut-off groups, adjusting out-of-limit voltages back to the allowable voltage range, making the capacitor voltages of the MMC submodules more balanced, and ensuring the normal operation of the MMC bridge arms. Attached Figure Description
[0033] Figure 1 Flowchart for the first control cycle that changes the operating state;
[0034] Figure 2 The sorting flowchart for state 1 during non-first control cycles when the running state changes;
[0035] Figure 3 The sorting flowchart for state 2 during a non-first control cycle when the running state changes;
[0036] Figure 4 The sorting flowchart for state 3 during a non-first control cycle when the running state changes;
[0037] Figure 5 The sorting flowchart for state 4 during a non-first control cycle when the running state changes. Detailed Implementation
[0038] The present invention will now be described in detail with reference to the accompanying drawings.
[0039] MMC converter stations typically employ Nearest Level Modulation (NLM) technology, which allows for the calculation of the number N submodules to be deployed in the upper and lower arms based on the arm voltage reference values. c Next, sort the submodule capacitor voltages by magnitude, and using a reasonable algorithm, select N modules to be put into use. c This scheme divides the submodules on the bridge arm into engaged and disengaged groups based on their engagement and disengagement status. Ideally, the electronic components and electrical parameters within the submodules are identical, and the voltage changes of the capacitors in the engaged group are also consistent, maintaining the voltage order after charging and discharging. However, in practical engineering, the voltage magnitudes and order of the disengaged submodules remain unchanged, while some capacitors in the engaged group experience excessively large or small voltage changes, disrupting the orderly voltage distribution within the engaged group. This scheme addresses this issue by proposing a method to achieve rapid voltage equalization of the submodules simply by sorting the engaged groups, thereby reducing the switching frequency and increasing the sorting speed.
[0040] First, based on the bridge arm current i s Direction and modulation wave voltage increment Δu s The MMC running state can be divided into four cases, as shown in Table 1.
[0041]
[0042]
[0043] Table 1 Four operating states of the MMC bridge arm
[0044] In the first control cycle when the MMC's operating state changes, the orderliness of the submodule voltage sequence cannot be maintained, and the control method changes. The selection criteria for submodules to be deployed differ, and the number may also vary. Therefore, all submodules need to be sorted to select those to be deployed, forming deployment groups. This scheme uses a bucket sort algorithm based on a given voltage step size λ (this voltage step size λ is selected according to actual engineering requirements). When λ is chosen to be small, the number of buckets increases, increasing space complexity but decreasing time complexity; when λ is chosen to be large, the number of buckets decreases, decreasing space complexity but increasing time complexity. The recommended range for λ is... Uc is the rated capacitor voltage value of a single submodule. The initial capacitor voltage values of the submodules are divided into multiple sub-ranges, forming multiple buckets, and then sorted within each bucket. The submodules are then arranged in descending or ascending order according to their capacitor voltage values. The required number of submodules N is calculated based on NLM. c The modules are sequentially deployed and recorded as the deployment group. The remaining sub-modules are recorded as the cut-off group, and their voltage information is also recorded. For example... Figure 1 As shown, when the bridge arm current i s When the voltage is greater than 0, the bridge arm is charged, and the sub-modules are arranged in ascending order, with the N module having the lowest voltage being charged. c Each submodule; when the bridge arm current i s When the voltage is less than 0, the bridge arm discharges, and the submodules are arranged in descending order, with the N module receiving the highest voltage. c Sub-modules.
[0045] The first control cycle has sorted all submodule voltages into ascending or descending order using bucket sort and recorded the information of the input and deselection groups. Now, the input groups will be sorted in other control cycles except for the first control cycle.
[0046] The following ordering uses the upper bridge arm as an example. α is a given voltage regulation coefficient (determined based on voltage fluctuation requirements), N... c To calculate the required number of submodules based on NLM, let U... a For the voltage of the first sub-module of the input group, U b To cut off the voltage of the last submodule in the group, U am U represents the upper limit voltage value of the input group and the lower limit voltage value of the input group. an The lower limit voltage value U of the resection group bn Upper limit voltage value U of the resection group bm Based on the different operating states in Table 1, the input groups are sorted as follows:
[0047] ① Upper bridge arm modulated wave voltage increment -Δu s >0, the number of sub-modules added increases or remains unchanged, and the bridge arm current i s>0, capacitor charging, requiring the input of a submodule with a lower voltage. Submodules are sorted in ascending order during the first control cycle. At this point, the cut-off group is fully ordered, and the input group needs to be reordered. First, based on the voltage U of the last submodule in the cut-off group... b (Maximum voltage of the cut-off group) yields the upper limit voltage value U of the input group. am =(1+α)U b The input group voltage will be set to the upper limit voltage value U of the input group. am Divide the data into two groups based on the boundary, and perform bucket sorting on each group. Then, group the data below the upper limit voltage U of the input group. am The submodule remains in the input group, and will be higher than the upper limit voltage value U of the input group. am The submodules are placed at the end of the cut-off group. Then, the submodules from the cut-off group are placed into the input group in ascending order of voltage, until the input group has N submodules. c Each submodule. At this point, the resection group remains strictly ordered. For example... Figure 2 As shown.
[0048] ② Upper bridge arm modulated wave voltage increment -Δu s >0, the number of sub-modules added increases or remains unchanged, and the bridge arm current i s <0, capacitor discharge, requiring the input of a submodule with a higher voltage. During the first control cycle, submodules are arranged in descending order. At this point, the cut-off group is completely ordered, and the input group needs to be reordered. First, based on the voltage U of the last submodule in the cut-off group... b (Minimum voltage of the cut-off group) yields the lower limit voltage value U of the input group. an =(1-α)U b The input voltage will be set to the input group's lower limit voltage value U. an Divide the system into two groups based on the boundary, and perform bucket sorting on each group. Then, group the voltage values U that are higher than the lower limit of the input group. an The submodule remains in the input group, and the voltage value U below the input group's lower limit will be used. an The submodules are placed at the end of the cut-off group. Then, the submodules from the cut-off group are sequentially placed into the input group in descending order of voltage, until the input group has N modules. c Each submodule. At this point, the resection group remains strictly ordered. For example... Figure 3 As shown.
[0049] ③ Upper bridge arm modulated wave voltage increment -Δu s <0, the number of sub-modules added increases, decreases, or remains unchanged, the bridge arm current i s >0, capacitor charging, requiring the input of a submodule with a lower voltage. During the first control cycle, submodules are arranged in ascending order. At this point, the cut-off group is completely ordered, and the input group needs to be reordered. First, based on the voltage U of the first submodule in the input group... a (Minimum voltage of the input group) yields the lower limit voltage value U of the cut-off group. bn=(1-α)U a Based on a given voltage step size λ, the capacitor voltages of the input group submodules are divided into multiple sub-intervals, forming multiple buckets, and then sorted in ascending order within each bucket. Then, voltages below the lower limit U of the cut-off group are... bn The submodules are moved to the front of the input group. For each submodule moved from the cut-off group to the front of the input group, a corresponding submodule is moved from the back of the input group to the back of the cut-off group. Then, the first N submodules of the input group are... c Each submodule is put into operation. At this time, the disconnection group is not strictly ordered, but because the number of submodules is decreasing or remaining unchanged, the voltage fluctuation range can still be kept within a certain range. For example... Figure 4 As shown.
[0050] ④ Upper bridge arm modulated wave voltage increment -Δu s <0, the number of sub-modules added increases, decreases, or remains unchanged, the bridge arm current i s <0, capacitor discharge, requiring the input of a submodule with a higher voltage. During the first control cycle, submodules are arranged in descending order. At this point, the cut-off group is completely ordered, requiring reordering of the input group. First, based on the voltage U of the first submodule in the input group... a (Maximum voltage of the input group) yields the upper limit voltage value U of the output group. bm =(1+α)U a Based on a given voltage step size λ, the capacitor voltages of the input group submodules are divided into multiple sub-intervals, forming multiple buckets, and then sorted in descending order within each bucket. Voltages exceeding the upper limit U of the cut-off group are then... bn The submodules are moved to the front of the input group. For each submodule moved from the cut-off group to the front of the input group, a corresponding submodule is moved from the back of the input group to the back of the cut-off group. Then, the first N submodules of the input group are... c Each submodule is put into operation. At this time, the disconnection group is not strictly ordered, but because the number of submodules is decreasing or remaining unchanged, the voltage fluctuation range can still be kept within a certain range. For example... Figure 5 As shown.
Claims
1. A method for rapid voltage equalization of submodules in a modular multilevel converter, characterized in that, The method for rapid voltage equalization of submodules in the modular multilevel converter includes the following steps: According to the bridge arm current i s Direction and modulation wave voltage increment Δu s, The MMC operating states are divided into four cases: State 1, i s >0, Δu s >0; State 2, i s <0, Δu s >0; State 3, i s >0, Δu s <0; State 3, i s <0, Δu s <0; Calculate the number Nc of submodules that should be engaged in the upper and lower arms of the MMC converter station; in the first control cycle when the MMC operating state changes, sort all submodules into engaged and disengaged groups, and record the engaged / disengaged information for the current control cycle: when the arm current i s When the voltage is greater than 0, the bridge arm is charged. The sub-modules are arranged in ascending order, and the Nc sub-modules with the lowest voltage are connected in sequence and recorded in the connected group. The remaining sub-modules are recorded in the disconnected group. When the bridge arm current i s When the voltage is <0, the bridge arm discharges, the sub-modules are arranged in descending order, and the Nc sub-modules with the highest voltage are put into the input group in turn, and the remaining sub-modules are put into the cut-off group. In other control cycles where the MMC operating state changes, the switching groups are reordered, using the upper limit voltage value U of the switching groups. am , Lower limit voltage value U of the input group an and the upper limit voltage value U of the resection group bm Lower limit voltage value U of the resection group bn Adjust the voltage of the input group within the allowable deviation range, and then re-determine the input group submodule: When the bridge arm modulated wave voltage increment Δu s >0, the number of sub-modules added increases or remains unchanged, and the bridge arm current i s >0, when the capacitor is charging, the upper limit voltage value U of the input group is used. am Using this as a boundary, the input group is divided into two groups, sorted, and those with voltage values U below the upper limit of the input group are... am The submodule remains in the input group, above the input group's upper limit voltage value U. am The sub-modules are moved to the end of the cut-off group, and then the sub-modules of the cut-off group are placed into the input group in order of voltage from small to large, until the input group has Nc sub-modules. When the bridge arm modulated wave voltage increment Δu s >0, the number of sub-modules added increases or remains unchanged, and the bridge arm current i s <0, when the capacitor is discharging, the lower limit voltage value U of the input group is used. an Using this as a boundary, the input group is divided into two groups, sorted, and those with voltage values U higher than the upper limit of the input group are included. am The submodule remains in the input group, below the input group's upper limit voltage value U. am The submodules are moved to the end of the cut-off group, and then the submodules of the cut-off group are placed into the input group in descending order of voltage, until the input group has Nc submodules. When the bridge arm modulated wave voltage increment Δu s <0, the number of sub-modules input decreases or remains unchanged, and the bridge arm current i s When the voltage value is greater than 0, the input groups are sorted in ascending order during capacitor charging, and then the cut-off groups are removed if their voltage values are lower than the lower limit U of the cut-off group. bn The submodules are moved to the front of the input group. For each submodule of the cut group moved to the front of the input group, a submodule is moved from the end of the input group to the end of the cut group. Finally, the first Nc submodules of the input group are input. When the bridge arm modulated wave voltage increment Δu s <0, the number of sub-modules input decreases or remains unchanged, and the bridge arm current i s When the capacitor discharges, the input groups are sorted in descending order, and then the cut-off groups are selected based on voltage values U that are higher than the upper limit of the cut-off group. bm The submodules are moved to the front of the input group. For each submodule of the cut group moved to the front of the input group, a submodule is moved from the end of the input group to the end of the cut group. Finally, the first Nc submodules of the input group are input.
2. The method for rapid voltage equalization of submodules in a modular multilevel converter according to claim 1, characterized in that, In step (3), the upper limit voltage value U of the input group is... am :U am =(1+α)U b The lower limit voltage value U of the input group an :U an =(1-α)U b The lower limit voltage value U of the resection group bn :U bn =(1-α)U a Upper limit voltage value U of the resection group bm :U bm =(1+α)U a Where α is the voltage adjustment coefficient, U b To cut off the voltage of the last submodule of the group, U a This refers to the voltage of the first submodule in the input group.
3. The method for rapid voltage equalization of submodules in a modular multilevel converter according to claim 2, characterized in that, The value of α is 3% to 8%.
4. The method for rapid voltage equalization of submodules in a modular multilevel converter according to claim 2 or 3, characterized in that, The sorting of all sub-modules in step (2) and the sorting of input groups in step (3) both use the bucket sort algorithm.
Citation Information
Patent Citations
Voltage-sharing control method for optimizing average switching frequency of MMC (Modular Multilevel Converter)
CN112865568A