网络切片业务不中断的升级方法及装置、存储介质

By performing primary/backup switching of the slice control plane and forwarding plane on the second device, independent version upgrades of multiple network slice devices are achieved, solving the problem that existing technologies can only upgrade to the same version, ensuring uninterrupted upgrade process and differentiated upgrade capabilities.

CN115580881BActive Publication Date: 2026-07-17ZTE CORP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
ZTE CORP
Filing Date
2021-06-18
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing multi-network slicing devices can only upgrade to the same version during the upgrade process, which cannot meet the differentiated version requirements of multi-slice applications. Furthermore, when the upgrade fails, all slices must be rolled back together, which cannot provide an efficient and reliable differentiated upgrade solution.

Method used

After receiving the network slice version information and configuration information synchronized by the first device, the second device performs a primary/backup switchover of the slice control plane and forwarding plane, and loads the configuration data after the switchover is completed, so as to realize independent version upgrades for each network slice and support differentiated upgrades.

Benefits of technology

It enables independent version upgrades for each slice during the upgrade process of multiple network slice devices, ensuring that the upgrade process is uninterrupted, supporting differentiated version upgrades, and avoiding overall rollback due to the failure of a single version.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115580881B_ABST
    Figure CN115580881B_ABST
Patent Text Reader

Abstract

本发明提供了一种网络切片业务不中断的升级方法及装置、存储介质,上述方法包括:所述第二设备接收第一设备同步的网络切片的版本信息和配置信息;在所述版本信息和所述配置信息同步完成的情况下,所述第一设备的第一切片控制面与所述第二设备的第二切片控制面进行主备倒换,以及所述第一设备的第一切片转发面与所述第二设备的第二切片转发面进行主备倒换;在切片控制面和切片转发面的主备倒换均完成的情况下,所述第二设备加载配置数据,并根据所述配置数据进行配置,以使所述第二设备完成升级。
Need to check novelty before this filing date? Find Prior Art