A transformer method and device of a transformer substation, an edge computing gateway and a storage medium

CN115604312BActive Publication Date: 2026-10-09GUANGDONG POWER GRID CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211209426.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-30
Publication Date
2026-10-09
Estimated Expiration
2042-09-30

AI Technical Summary

Technical Problem

[0003]目前,在变电站中进行变压操作,主要是依赖视频数据进行监控,如果视频数据的码率较高时,会导致带宽占用多,传输的延时较高,如果视频数据的码率较低时,影响识别变压操作的准确率,并且,技术人员在操作变压操作时,容易发生遮挡的情况,也会影响识别变压操作的准确率

Benefits of technology

[0074]In this embodiment, the edge computing gateway sends the transformer path in the substation and the transformer standards of each transformer point along the transformer path to the management terminal. This notifies the substation administrator to perform transformer operations at the transformer points along the transformer path according to the transformer standards. Data acquisition devices have been deployed at the transformer points within the substation. The gateway receives first sensing data collected by the data acquisition devices, which includes voltage data when voltage transformers at the transformer points change. It also receives second sensing data collected by the management terminal, which includes location data. The voltage data and location data are calibrated. If the calibrated voltage data matches the location data, it is determined that the substation administrator has performed transformer operations at the transformer points according to the transformer standards. Considering the independence of the substation and its minimal external interference, this embodiment utilizes the matching of voltage data from voltage transformers at the transformer points with location data from the management terminal to achieve reasonable monitoring of the substation. This ensures the accuracy of identifying transformer operations, thereby guaranteeing the safe and efficient operation of the substation. This process does not rely on high-definition video data, consumes less bandwidth, has lower transmission latency, and can expand the monitoring area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115604312B_ABST
    Figure CN115604312B_ABST
Patent Text Reader

Abstract

The application discloses a transformer substation transformer method, device, equipment and storage medium, the method is applied to edge computing gateway, including: sending transformer path in transformer substation and transformer standard of each transformer point on transformer path to management terminal, to inform the manager of transformer substation to execute transformer operation to transformer point along transformer path according to transformer standard, the data collector has been deployed in transformer substation for transformer point;Receive the first perception data collected by the data collector, the first perception data includes the voltage data when the voltage transformer detected by the transformer point produces change;Receive the second perception data collected by the management terminal, the second perception data includes position data;Calibrate voltage data and position data;If the calibrated voltage data and position data match, it is determined that the manager of transformer substation has executed transformer operation to transformer point according to transformer standard.Guarantee the accuracy of identifying transformer operation, thereby guaranteeing that transformer substation is safely and effectively operated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power grid technology, and in particular to a transformer method, apparatus, edge computing gateway, and storage medium for a substation. Background Technology

[0002] Substations are one of the core pieces of equipment in the power grid. Various sensors, alarm devices, and monitoring devices are installed in substations for remote viewing, management, and control, so as to realize unmanned operation of substations.

[0003] Currently, transformer operations in substations are mainly monitored using video data. If the video data bitrate is high, it will result in high bandwidth consumption and high transmission latency. If the video data bitrate is low, it will affect the accuracy of identifying transformer operations. Furthermore, obstructions can easily occur when technicians are operating transformers, which will also affect the accuracy of identifying transformer operations. Summary of the Invention

[0004] This invention provides a transformation method, device, edge computing gateway, and storage medium for substations to address the challenge of balancing the timeliness and accuracy of identifying transformation operations performed in substations.

[0005] According to one aspect of the present invention, a transformer method for a substation is provided, applied to an edge computing gateway, the method comprising:

[0006] Send the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operation on the transformer point along the transformer path according to the transformer standard. Data acquisition devices have been deployed for the transformer point in the substation.

[0007] The system receives first sensing data collected by the data acquisition device, the first sensing data including voltage data when the voltage transformer detected at the transformer point changes.

[0008] The system receives second sensing data collected by the management terminal, the second sensing data including location data.

[0009] The voltage data and the position data are calibrated;

[0010] If the voltage data matches the location data, it is determined that the substation administrator has performed the transformation operation on the transformation point in accordance with the transformation standard.

[0011] Optionally, sending the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path according to the transformer standard includes:

[0012] Send multiple substations to the management terminal;

[0013] When the management terminal receives a selection operation triggered for a certain substation, it plans each transformer point for the substation to form a transformer path;

[0014] Query the transformer standards for each of the aforementioned transformer points;

[0015] The transformer path and the transformer standards of each transformer point are sent to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path according to the transformer standards.

[0016] Optionally, the step of planning each transformer point for the substation to form a transformer path includes:

[0017] The substation is divided into multiple transformer zones, and the same type of voltage transformer is configured at the transformer points in the same transformer zone.

[0018] Multiple transformer points are planned in the transformer region to form a transformer path.

[0019] Optionally, calibrating the voltage data and the position data includes:

[0020] Query the coordinate data and first time information when the voltage data was detected from the first sensing data;

[0021] Query the second time information when the location data was detected from the second sensing data;

[0022] Calculate the first difference between the coordinate data and the position data;

[0023] Calculate the second difference between the first time information and the second time information;

[0024] If the first difference is less than or equal to a preset first threshold and the second difference is less than or equal to a preset second threshold, then the voltage data is determined to match the position data.

[0025] If the first difference is greater than a preset first threshold, or the second difference is greater than a preset second threshold, then it is determined that the voltage data and the position data do not match.

[0026] Optionally, it also includes:

[0027] If the voltage data and the location data do not match, it is determined that the substation administrator did not perform the transformation operation on the transformation point in accordance with the transformation standard.

[0028] Generate error message;

[0029] The abnormality message is sent to the quality inspection terminal to notify the substation's quality inspector that the substation administrator has not performed the transformer operation at the transformer point in accordance with the transformer standard.

[0030] Optionally, it also includes:

[0031] When the substation administrator has performed a transformation operation on the transformation point according to the transformation standard, the transformation time of the transformation point is recorded.

[0032] Cost information is generated for the transformer operation based on the transformer duration.

[0033] The fee information is sent to the management terminal for display.

[0034] Optionally, it also includes:

[0035] Read the transformer data collected at the transformer point from the first sensing data;

[0036] The transformer data is sent to the management terminal for diagnosis.

[0037] According to another aspect of the present invention, a transformer device for a substation is provided, applied to an edge computing gateway, the device comprising:

[0038] The transformer information sending module is used to send the transformer path in the substation and the transformer standard of each transformer point located on the transformer path to the management terminal, so as to notify the administrator of the substation to perform transformer operation on the transformer point along the transformer path according to the transformer standard. Data acquisition devices have been deployed for the transformer point in the substation.

[0039] The first sensing data receiving module is used to receive the first sensing data collected by the data acquisition device. The first sensing data includes voltage data when the voltage transformer detected at the transformer point changes.

[0040] The second sensing data receiving module is used to receive the second sensing data collected by the management terminal, the second sensing data including location data;

[0041] A calibration module is used to calibrate the voltage data and the position data;

[0042] The execution determination module is used to determine that if the calibrated voltage data matches the location data, the substation administrator has performed a transformation operation on the transformation point in accordance with the transformation standard.

[0043] Optionally, the transformer information sending module is further configured to:

[0044] Send multiple substations to the management terminal;

[0045] When the management terminal receives a selection operation triggered for a certain substation, it plans each transformer point for the substation to form a transformer path;

[0046] Query the transformer standards for each of the aforementioned transformer points;

[0047] The transformer path and the transformer standards of each transformer point are sent to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path according to the transformer standards.

[0048] Optionally, the transformer information sending module is further configured to:

[0049] The substation is divided into multiple transformer zones, and the same type of voltage transformer is configured at the transformer points in the same transformer zone.

[0050] Multiple transformer points are planned in the transformer region to form a transformer path.

[0051] Optionally, the calibration module is further configured to:

[0052] Query the coordinate data and first time information when the voltage data was detected from the first sensing data;

[0053] Query the second time information when the location data was detected from the second sensing data;

[0054] Calculate the first difference between the coordinate data and the position data;

[0055] Calculate the second difference between the first time information and the second time information;

[0056] If the first difference is less than or equal to a preset first threshold and the second difference is less than or equal to a preset second threshold, then the voltage data is determined to match the position data.

[0057] If the first difference is greater than a preset first threshold, or the second difference is greater than a preset second threshold, then it is determined that the voltage data and the position data do not match.

[0058] Optionally, it also includes:

[0059] The determination module is not executed, which is used to determine that if the voltage data and the location data do not match, the substation administrator has not performed the transformation operation on the transformation point in accordance with the transformation standard.

[0060] An error message generation module is used to generate error message information.

[0061] An error message sending module is used to send the error message to the quality inspection terminal to notify the quality inspector of the substation that the substation administrator has not performed the transformation operation on the transformation point in accordance with the transformation standard.

[0062] Optionally, it also includes:

[0063] The transformer duration statistics module is used to count the transformer duration when the substation administrator has performed transformer operation on the transformer point in accordance with the transformer standard.

[0064] The cost information generation module is used to generate cost information for the transformer operation according to the transformer duration.

[0065] The fee information sending module is used to send the fee information to the management terminal for display.

[0066] Optionally, it also includes:

[0067] A transformer data reading module is used to read transformer data collected from the transformer point from the first sensing data;

[0068] The transformer data transmission module is used to send the transformer data to the management terminal for diagnosis.

[0069] According to another aspect of the present invention, an edge computing gateway is provided, the edge computing gateway comprising:

[0070] At least one processor; and

[0071] A memory communicatively connected to the at least one processor; wherein,

[0072] The memory stores a computer program that can be executed by the at least one processor, which enables the at least one processor to perform the substation transformation method according to any embodiment of the present invention.

[0073] According to another aspect of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium storing a computer program configured to cause a processor to execute and implement the substation transformation method according to any embodiment of the present invention.

[0074] In this embodiment, the edge computing gateway sends the transformer path in the substation and the transformer standards of each transformer point along the transformer path to the management terminal. This notifies the substation administrator to perform transformer operations at the transformer points along the transformer path according to the transformer standards. Data acquisition devices have been deployed at the transformer points within the substation. The gateway receives first sensing data collected by the data acquisition devices, which includes voltage data when voltage transformers at the transformer points change. It also receives second sensing data collected by the management terminal, which includes location data. The voltage data and location data are calibrated. If the calibrated voltage data matches the location data, it is determined that the substation administrator has performed transformer operations at the transformer points according to the transformer standards. Considering the independence of the substation and its minimal external interference, this embodiment utilizes the matching of voltage data from voltage transformers at the transformer points with location data from the management terminal to achieve reasonable monitoring of the substation. This ensures the accuracy of identifying transformer operations, thereby guaranteeing the safe and efficient operation of the substation. This process does not rely on high-definition video data, consumes less bandwidth, has lower transmission latency, and can expand the monitoring area.

[0075] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of the present invention, nor is it intended to limit the scope of the invention. Other features of the invention will become readily apparent from the following description. Attached Figure Description

[0076] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0077] Figure 1 This is a flowchart of a substation transformation method according to Embodiment 1 of the present invention;

[0078] Figure 2 This is a flowchart of a substation transformation method according to Embodiment 2 of the present invention;

[0079] Figure 3 This is a flowchart of a substation transformation method according to Embodiment 3 of the present invention;

[0080] Figure 4 This is a schematic diagram of the structure of a transformer device in a substation according to Embodiment 4 of the present invention;

[0081] Figure 5 This is a schematic diagram of the structure of an edge computing gateway provided in Embodiment 5 of the present invention. Detailed Implementation

[0082] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.

[0083] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of the invention described herein can be implemented in orders other than those illustrated or described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0084] Example 1

[0085] Figure 1 This is a flowchart of a substation transformation method provided in Embodiment 1 of the present invention. The method can be executed by a substation transformation device, which can be implemented in hardware and / or software and can be configured in an edge computing gateway.

[0086] The development of power grids has brought about requirements for datafication, networking, intelligence, and integration. As one of the core components of power transmission and transformation, substations are undergoing intelligent development. This intelligence is reflected in the coordinated, unified, and centralized management of video surveillance systems, fire protection systems, and perimeter alarm systems within substations. It also enables remote monitoring of the status of high-voltage operating equipment and remote monitoring of air conditioning, heating systems, lighting systems, and centralized drainage systems.

[0087] The growth of various devices in substations is very rapid, generating a large amount of data. Therefore, edge computing gateways are deployed in locations that are physically close to the substation.

[0088] Edge computing refers to processing information at the edge of a substation, close to the substation itself. It reduces the distance between equipment and operations (such as monitoring) within the substation by distributing processes. Data storage and computation are closer to the devices that create the data within the substation, rather than transmitting data to a distant central location. Storing and computing data on the devices that collect it addresses latency issues that can negatively impact application performance, especially in real-time data processing applications. By performing these processes locally, the amount of data processed in cloud-based location-based computing is significantly reduced, thus lowering costs.

[0089] An edge computing gateway (also known as an edge gateway) extends cloud functionality to local edge devices, enabling edge devices to respond quickly and autonomously to local events and provide low-latency, low-cost, privacy-preserving, and locally autonomous local computing services.

[0090] For example, an edge computing gateway can be deployed near a substation in the power grid. This edge computing gateway supports the following functions:

[0091] Dual-wide voltage (DC / AC 85V~265V) reverse connection protection;

[0092] Supports 2G / 3G / 4G / 5G mobile communication technologies;

[0093] Supports local and remote configuration maintenance and real-time data monitoring;

[0094] Data acquisition from up to 64 devices, supporting MODBUS-RTU or MODBUS-TCP protocols;

[0095] It supports data transmission via breakpoint resume, XML (eXtensible Markup Language), and JSON (JavaScript Object Notation).

[0096] Supports standard 8GB SD (Secure Digital) cards;

[0097] Multiple alarm settings for each device;

[0098] Kernel optimization enables industrial-grade chips;

[0099] The entire machine passed the Level 4 electromagnetic compatibility test.

[0100] All communication terminals have undergone a 2KV power frequency withstand voltage test;

[0101] Instrument information points can be automatically generated with one click;

[0102] Supports optional and full-selection single-table structure for forwarding datasets;

[0103] It supports batch operations and can be configured with efficient step size filling and other efficient configuration methods.

[0104] like Figure 1 As shown, the method includes:

[0105] Step 101: Send the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operation on the transformer points along the transformer path according to the transformer standard.

[0106] In practice, substation administrators log in to the management terminal using information such as account and password, for example, mobile phones, smart wearable devices (such as watches), etc.

[0107] When performing a transformer operation, the edge computing gateway can generate a valid transformer path according to the transformer specification. The transformer path contains multiple transformer points (such as electrical devices like disconnectors).

[0108] For each transformer point, a voltage transformer can be pre-set. The function of the voltage transformer is to transform the high voltage into a standard secondary voltage of 100V or lower according to a proportional relationship, so that it can be used by protection, metering and instrumentation devices.

[0109] At the same time, voltage transformers can isolate high voltage from electrical workers. Although voltage transformers also operate on the principle of electromagnetic induction, their electromagnetic structure is exactly the opposite of that of current transformers.

[0110] The primary coil of a current transformer is wound with thick wire, with only one or a few turns, resulting in extremely low impedance. When the primary coil is connected in series in the circuit under test, the voltage drop across it is minimal. Although the secondary coil has more turns, its electromotive force E2 is not high under normal conditions, only a few volts.

[0111] Therefore, the current through the load is equal to the product of the current measured by the secondary coil and the current conversion ratio Ki. If the ammeter is used with a dedicated current transformer, the scale of the ammeter can be marked according to the current value in a high-current circuit.

[0112] The maximum secondary current of a current transformer is typically designed to be a standard value of 5A. Different current transformers are used for circuits with different currents, and their transformation ratios include 10 / 5, 20 / 5, 30 / 5, 50 / 5, 75 / 5, 100 / 5, etc.

[0113] In general, there is an execution sequence among multiple transformer points to ensure the safety of transformer operation.

[0114] In addition, each transformer point is configured with a valid transformer standard according to the transformer specification, that is, the standard action for performing transformer operation at that transformer point.

[0115] At this time, the edge computing gateway can send the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal, thereby notifying the substation administrator to perform transformer operation on each transformer point in sequence according to the transformer standard along the transformer path.

[0116] In one embodiment of the present invention, step 101 may include the following steps:

[0117] Step 1011: Send multiple substations to the management terminal.

[0118] In this embodiment, the edge computing gateway can manage the terminal to send multiple substations managed by the edge computing gateway. The management terminal can display multiple substations on the interface for the administrator to browse and select.

[0119] Step 1012: When a selection operation triggered by the management terminal for a certain substation is received, the transformer points of the substation are planned to form a transformer path.

[0120] The administrator can trigger a selection operation on a substation by clicking on the interface, thereby selecting the substation waiting for transformation and entering the transformation operation parameters (such as bus ID, transformation rate, etc.). At this time, the management terminal sends the selection operation (including the transformation operation parameters) to the edge computing gateway. The edge computing gateway plans the path for each transformation point in the substation selected by the administrator according to the transformation operation parameters. The transformation points are arranged in sequence to form the transformation path.

[0121] Furthermore, in enclosed substations, edge computing gateways use satellite positioning components to locate parameters such as the substation's extent, the position of each transformer point within the substation, and the distance between transformer points. Based on these parameters, the substation can be flexibly divided into multiple transformer zones. Different types of voltage transformers can be assigned to different transformer zones according to the substation's needs, allowing the same type of voltage transformer to be configured at transformer points within the same transformer zone. This facilitates substation management. Moreover, voltage transformers can be guided to sensors at specific transformer points as needed, improving transformer service quality and intelligent management levels.

[0122] Therefore, the edge computing gateway can plan multiple transformer points to form a transformer path in the transformer area.

[0123] Step 1013: Query the transformer standard for each transformer point.

[0124] In this embodiment, transformer standards can be pre-configured for each transformer point according to the transformer specifications, and the transformer standards can be stored in a database.

[0125] The transformer standard can be a general standard set for different types of transformer operations, or it can be a personalized standard set for specific transformer operations. This embodiment does not impose any restrictions on this.

[0126] For common standards, the edge computing gateway can search for transformer standards in the database based on the transformer point ID.

[0127] For specific standards, the edge computing gateway can search for transformer standards in the database based on the transformer point ID and the type of transformer operation.

[0128] Step 1014: Send the transformer path and transformer standards of each transformer point to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path and according to the transformer standards.

[0129] The edge computing gateway sends the transformer path and the transformer standards of each transformer point to the management terminal. The management terminal displays the transformer path and the transformer standards of each transformer point on the interface, thereby notifying the substation administrator to perform transformer operations on each transformer point in sequence according to the transformer standards along the transformer path.

[0130] Step 102: Receive the first sensing data collected by the data acquisition device.

[0131] Data acquisition devices have been deployed at the transformer points within the substation. These data acquisition devices are sensors that sense the transformer points. They can be configured according to the actual situation of the transformer points. They can be a single device or a sensor composed of multiple independent devices. This embodiment does not impose any restrictions on this.

[0132] In one example, the type of data acquisition device is a road high-position video surveillance device.

[0133] In another example, the data acquisition devices are disconnect switches and high-position video monitoring terminals.

[0134] Among them, a disconnecting switch is a switching device used to isolate power supply, perform switching operations, and connect and disconnect small current circuits.

[0135] A disconnecting switch is a switching device without arc extinguishing function. It opens and closes circuits when there is no load current. Its main functions are to isolate the electrical equipment to be maintained from the live parts of the power grid, so that the electrical equipment under maintenance has a clear disconnection point from the power supply to ensure the safety of maintenance work; to change the operating mode for switching operations; and to connect and disconnect small current circuits.

[0136] In practical applications, the data acquisition device can collect first sensing data at the transformer point and send the first sensing data to the edge computing gateway wirelessly (such as via 5G). Correspondingly, the edge computing gateway can receive the first sensing data collected by the data acquisition device at the transformer point wirelessly.

[0137] The first sensing data includes voltage data when the voltage transformer at the transformer point changes.

[0138] Generally, this voltage data indicates whether the voltage transformer at the transformer point is in use, and does not necessarily need to be a specific parameter such as the voltage value.

[0139] Of course, in addition to voltage data, the first sensing data may also include other data, such as coordinate data when detecting voltage data, first time information, video data, etc. This embodiment does not limit this.

[0140] Step 103: Receive the second sensing data collected by the management terminal.

[0141] The management terminal has a satellite positioning component. During the transformer operation, it can call the satellite positioning component in real time to locate the current location data, encapsulate the location data into the second sensing data, and send the second sensing data to the edge computing gateway. Correspondingly, the edge computing gateway can receive the second sensing data collected by the management terminal wirelessly.

[0142] The second sensing data includes location data.

[0143] Of course, in addition to location data, the second sensing data may also include other data, such as second time information, etc., and this embodiment does not limit this.

[0144] Step 104: Calibrate the voltage and position data.

[0145] The edge computing gateway can calibrate the voltage data collected by the data acquisition device with the location data collected by the management terminal to determine whether the voltage data collected by the data acquisition device and the location data collected by the management terminal are consistent with the transformer operation.

[0146] In the specific implementation, the coordinate data and first time information when detecting voltage data are queried from the first sensing data. Since the voltage transformation operation is a continuous operation, the first time information can be the start time of the voltage transformer starting to generate voltage data, the stop time of the voltage transformer ending to generate voltage data, and the duration of the voltage transformer continuously generating voltage data.

[0147] Second time information when querying detection location data from second sensing data.

[0148] The first difference between coordinate data and location data is calculated using methods such as Euclidean distance.

[0149] Calculate the second difference between the first time information and the second time information.

[0150] If the first difference is less than or equal to a preset first threshold and the second difference is less than or equal to a preset second threshold, it indicates that the data acquisition device and the management terminal are relatively close within a short period of time, and it can be determined that the voltage data and the location data match.

[0151] If the first difference is greater than the preset first threshold, or the second difference is greater than the preset second threshold, it indicates that the data acquisition device and the management terminal have not been in close proximity in a short period of time, and it can be determined that the voltage data and the location data do not match.

[0152] In cases of mismatch, it could be that the management terminal has disabled the satellite positioning component or has not authorized the satellite positioning component, resulting in empty location data collected by the management terminal. It could also be that personnel other than the substation administrator have entered the substation and performed unauthorized operations on the transformer points, and so on.

[0153] Step 105: If the calibration voltage data matches the location data, it is determined that the substation administrator has performed the transformation operation on the transformation point in accordance with the transformation standard.

[0154] If the data acquisition device and the management terminal are close to each other within a short period of time, it can be assumed that the data acquisition device and the substation administrator are close to each other within a short period of time. Under normal circumstances, the substation administrator performs legal transformation operations on the transformation point in accordance with the transformation standard. Therefore, it can be assumed that the substation administrator has performed transformation operations on the transformation point in accordance with the transformation standard.

[0155] In this embodiment, the edge computing gateway sends the transformer path in the substation and the transformer standards of each transformer point along the transformer path to the management terminal. This notifies the substation administrator to perform transformer operations at the transformer points along the transformer path according to the transformer standards. Data acquisition devices have been deployed at the transformer points within the substation. The gateway receives first sensing data collected by the data acquisition devices, which includes voltage data when voltage transformers at the transformer points change. It also receives second sensing data collected by the management terminal, which includes location data. The voltage data and location data are calibrated. If the calibrated voltage data matches the location data, it is determined that the substation administrator has performed transformer operations at the transformer points according to the transformer standards. Considering the independence of the substation and its minimal external interference, this embodiment utilizes the matching of voltage data from voltage transformers at the transformer points with location data from the management terminal to achieve reasonable monitoring of the substation. This ensures the accuracy of identifying transformer operations, thereby guaranteeing the safe and efficient operation of the substation. This process does not rely on high-definition video data, consumes less bandwidth, has lower transmission latency, and can expand the monitoring area.

[0156] Example 2

[0157] Figure 2 This is a flowchart of a substation transformation method provided in Embodiment 2 of the present invention. This embodiment adds an error message operation based on the previous embodiment. Figure 2 As shown, the method includes:

[0158] Step 201: Send the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operation on the transformer points along the transformer path according to the transformer standard.

[0159] Data acquisition devices have been deployed at the transformer points within the substation.

[0160] Step 202: Receive the first sensing data collected by the data acquisition device.

[0161] The first sensing data includes voltage data when the voltage transformer at the transformer point changes.

[0162] Step 203: Receive the second sensing data collected by the management terminal.

[0163] The second sensing data includes location data.

[0164] Step 204: Calibrate the voltage and position data.

[0165] Step 205: If the calibration voltage data does not match the location data, it is determined that the substation administrator did not perform the transformation operation on the transformation point in accordance with the transformation standard.

[0166] If the data acquisition device and the management terminal are not close together in a short period of time, it can be assumed that the data acquisition device and the substation administrator are not close together in a short period of time. There is a certain probability that the substation administrator will not perform the transformation operation on the transformation point according to the transformation standard.

[0167] Step 206: Generate an error message.

[0168] Step 207: Send the abnormality message to the quality inspection terminal to inform the substation quality inspector that the substation administrator did not perform the transformation operation at the transformation point in accordance with the transformation standard.

[0169] In practice, substation quality inspectors log in to the quality inspection terminal using information such as account and password, for example, mobile phones, smart wearable devices (such as watches), etc.

[0170] The edge computing gateway can generate anomaly alerts when a substation administrator fails to perform transformer operations according to transformer standards. These alerts are then sent wirelessly (e.g., via 5G) to a quality inspection terminal, which displays the alerts on its interface. The alerts inform the substation quality inspector that the administrator has not performed the transformer operations according to standards. Upon viewing the alerts, the quality inspector will then check the administrator's procedures for performing the transformer operations.

[0171] Example 3

[0172] Figure 3 This is a flowchart of a substation transformation method provided in Embodiment 3 of the present invention. This embodiment adds billing and diagnostic operations to the existing embodiments. Figure 3 As shown, the method includes:

[0173] Step 301: Send the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operation on the transformer points along the transformer path according to the transformer standard.

[0174] Data acquisition devices have been deployed at the transformer points within the substation.

[0175] Step 302: Receive the first sensing data collected by the data acquisition device.

[0176] The first sensing data includes voltage data when the voltage transformer at the transformer point changes.

[0177] Step 303: Receive the second sensing data collected by the management terminal.

[0178] The second sensing data includes location data.

[0179] Step 304: Calibrate the voltage and position data.

[0180] Step 305: If the calibration voltage data matches the location data, it is determined that the substation administrator has performed the transformation operation on the transformation point in accordance with the transformation standard.

[0181] Step 306: When the substation administrator has performed the transformation operation on the transformation point in accordance with the transformation standard, the transformation time of the transformation point is recorded.

[0182] In this embodiment, when it is determined that the substation administrator has performed the transformation operation on the transformation point in accordance with the transformation standard, a timer can be started and used to count the duration of the transformation operation on the transformation point, which is recorded as the transformation duration.

[0183] Step 307: Generate cost information for transformer operation based on transformer duration.

[0184] Step 308: Send the fee information to the management terminal for display.

[0185] In this embodiment, the edge computing gateway can generate cost information for the voltage transformation operation based on the voltage transformation duration.

[0186] In an example of cost information, the transformation time can be multiplied by the unit price corresponding to the transformation operation to obtain the total price. Discount information can then be generated based on the total price, and so on.

[0187] In another example of cost information, the duration of the pressure change can be divided into multiple gradient periods. The gradient is positively correlated with the unit price corresponding to the pressure change operation. That is, the higher the gradient, the higher the unit price corresponding to the pressure change operation, and the lower the gradient, the lower the unit price corresponding to the pressure change operation. Multiply the period by the unit price corresponding to the pressure change operation to obtain the stage price, and sum the stage prices to obtain the total price.

[0188] The edge computing gateway wirelessly sends the cost information to the management terminal, which displays the cost information in real time on the interface for the substation administrator to view and refer to.

[0189] Step 309: Read the transformer data collected from the transformer point from the first sensing data.

[0190] Step 310: Send the transformer data to the management terminal for diagnosis.

[0191] In this embodiment, the edge computing gateway can read the transformer data collected from the transformer point from the first sensing data, such as transformer path, sensor operating status, voltage value, etc., encapsulate the transformer data into a data packet, and send the data packet to the management terminal wirelessly.

[0192] When the management terminal receives a data packet, it reads the transformer data from the data packet and uses the transformer data to diagnose the transformer operation.

[0193] The diagnosis includes self-diagnosis and manual diagnosis. Taking self-diagnosis as an example, a self-diagnosis applet can be written in advance using a combination of HTML5 (HyperText Markup Language 5), CSS (Cascading Style Sheets), Java, etc. The management terminal inputs the transformer data into the self-diagnosis applet to diagnose the transformer operation and detect whether there are any abnormalities in the transformer operation, thereby ensuring the safe execution of the transformer operation.

[0194] Example 4

[0195] Figure 4 This is a schematic diagram of the structure of a transformer device in a substation according to Embodiment 4 of the present invention. Figure 4 As shown, this device is used in an edge computing gateway and includes:

[0196] Transformer information sending module 401 is used to send the transformer path in the substation and the transformer standard of each transformer point located on the transformer path to the management terminal, so as to notify the administrator of the substation to perform transformer operation on the transformer point along the transformer path according to the transformer standard. Data acquisition devices have been deployed for the transformer point in the substation.

[0197] The first sensing data receiving module 402 is used to receive the first sensing data collected by the data acquisition device. The first sensing data includes voltage data when the voltage transformer detected at the transformer point changes.

[0198] The second sensing data receiving module 403 is used to receive the second sensing data collected by the management terminal, the second sensing data including location data;

[0199] Calibration module 404 is used to calibrate the voltage data and the position data;

[0200] The execution determination module 405 is used to determine that if the voltage data and the location data match, the substation administrator has performed a transformation operation on the transformation point in accordance with the transformation standard.

[0201] In one embodiment of the present invention, the transformer information sending module 401 is further configured to:

[0202] Send multiple substations to the management terminal;

[0203] When the management terminal receives a selection operation triggered for a certain substation, it plans each transformer point for the substation to form a transformer path;

[0204] Query the transformer standards for each of the aforementioned transformer points;

[0205] The transformer path and the transformer standards of each transformer point are sent to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path according to the transformer standards.

[0206] In one embodiment of the present invention, the transformer information sending module 401 is further configured to:

[0207] The substation is divided into multiple transformer zones, and the same type of voltage transformer is configured at the transformer points in the same transformer zone.

[0208] Multiple transformer points are planned in the transformer region to form a transformer path.

[0209] In one embodiment of the present invention, the calibration module 404 is further configured to:

[0210] Query the coordinate data and first time information when the voltage data was detected from the first sensing data;

[0211] Query the second time information when the location data was detected from the second sensing data;

[0212] Calculate the first difference between the coordinate data and the position data;

[0213] Calculate the second difference between the first time information and the second time information;

[0214] If the first difference is less than or equal to a preset first threshold and the second difference is less than or equal to a preset second threshold, then the voltage data is determined to match the position data.

[0215] If the first difference is greater than a preset first threshold, or the second difference is greater than a preset second threshold, then it is determined that the voltage data and the position data do not match.

[0216] In one embodiment of the present invention, it further includes:

[0217] The determination module is not executed, which is used to determine that if the voltage data and the location data do not match, the substation administrator has not performed the transformation operation on the transformation point in accordance with the transformation standard.

[0218] An error message generation module is used to generate error message information.

[0219] An error message sending module is used to send the error message to the quality inspection terminal to notify the quality inspector of the substation that the substation administrator has not performed the transformation operation on the transformation point in accordance with the transformation standard.

[0220] In one embodiment of the present invention, it further includes:

[0221] The transformer duration statistics module is used to count the transformer duration when the substation administrator has performed transformer operation on the transformer point in accordance with the transformer standard.

[0222] The cost information generation module is used to generate cost information for the transformer operation according to the transformer duration.

[0223] The fee information sending module is used to send the fee information to the management terminal for display.

[0224] In one embodiment of the present invention, it further includes:

[0225] A transformer data reading module is used to read transformer data collected from the transformer point from the first sensing data;

[0226] The transformer data transmission module is used to send the transformer data to the management terminal for diagnosis.

[0227] The transformer device of the substation provided in the embodiments of the present invention can execute the transformer method of the substation provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects for executing the transformer method of the substation.

[0228] Example 5

[0229] Figure 5 A schematic diagram of an edge computing gateway 10, which can be used to implement embodiments of the present invention, is shown. The edge computing gateway is intended to represent various forms of digital computers, such as laptops, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframes, and other suitable computers. The edge computing gateway can also represent various forms of mobile devices, such as personal digital processors, cellular phones, smartphones, wearable devices (such as helmets, glasses, watches, etc.), and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely illustrative and are not intended to limit the implementation of the invention described and / or claimed herein.

[0230] like Figure 5As shown, the edge computing gateway 10 includes at least one processor 11 and a memory, such as a read-only memory (ROM) 12 or a random access memory (RAM) 13, communicatively connected to the at least one processor 11. The memory stores computer programs executable by the at least one processor. The processor 11 can perform various appropriate actions and processes based on the computer program stored in the ROM 12 or loaded from storage unit 18 into the RAM 13. The RAM 13 can also store various programs and data required for the operation of the edge computing gateway 10. The processor 11, ROM 12, and RAM 13 are interconnected via a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0231] Multiple components in the edge computing gateway 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, optical disk, etc.; and a communication unit 19, such as a network interface card, modem, wireless transceiver, etc. The communication unit 19 allows the edge computing gateway 10 to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunications networks.

[0232] Processor 11 can be a variety of general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special-purpose artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any suitable processor, controller, microcontroller, etc. Processor 11 performs the various methods and processes described above, such as the transformation methods in a substation.

[0233] In some embodiments, the substation transformation method can be implemented as a computer program tangibly contained in a computer-readable storage medium, such as storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the edge computing gateway 10 via ROM 12 and / or communication unit 19. When the computer program is loaded into RAM 13 and executed by processor 11, one or more steps of the substation transformation method described above can be performed. Alternatively, in other embodiments, processor 11 can be configured to perform the substation transformation method by any other suitable means (e.g., by means of firmware).

[0234] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), systems-on-a-chip (SoCs), payload-programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include implementations in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor, capable of receiving data and instructions from a storage system, at least one input device, and at least one output device, and transmitting data and instructions to the storage system, the at least one input device, and the at least one output device.

[0235] Computer programs used to implement the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, such that when executed by the processor, the computer programs cause the functions / operations specified in the flowcharts and / or block diagrams to be performed. The computer programs may be executed entirely on a machine, partially on a machine, or as a standalone software package, partially on a machine and partially on a remote machine, or entirely on a remote machine or server.

[0236] In the context of this invention, a computer-readable storage medium can be a tangible medium that may contain or store a computer program for use by or in conjunction with an instruction execution system, apparatus, or device. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination thereof. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fibers, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination thereof.

[0237] To provide user interaction, the systems and techniques described herein can be implemented on an edge computing gateway, which includes: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user provides input to the edge computing gateway. Other types of devices can also be used to provide user interaction; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including voice input, speech input, or tactile input).

[0238] The systems and technologies described herein can be implemented in computing systems that include backend components (e.g., as data servers), or computing systems that include middleware components (e.g., application servers), or computing systems that include frontend components (e.g., user computers with graphical user interfaces or web browsers through which users can interact with implementations of the systems and technologies described herein), or any combination of such backend, middleware, or frontend components. The components of the system can be interconnected via digital data communication of any form or medium (e.g., communication networks). Examples of communication networks include local area networks (LANs), wide area networks (WANs), blockchain networks, and the Internet.

[0239] A computing system can include clients and servers. Clients and servers are generally located far apart and typically interact through communication networks. The client-server relationship is created by computer programs running on the respective computers and having a client-server relationship with each other. The server can be a cloud server, also known as a cloud computing server or cloud host, which is a hosting product within the cloud computing service system to address the shortcomings of traditional physical hosts and VPS services, such as high management difficulty and weak business scalability.

[0240] Example 6

[0241] This invention also provides a computer program product, which includes a computer program that, when executed by a processor, implements the substation transformation method provided in any embodiment of this invention.

[0242] In implementing the computer program product, computer program code for performing the operations of this invention can be written in one or more programming languages ​​or a combination thereof. Programming languages ​​include object-oriented programming languages ​​such as Java, Smalltalk, and C++, as well as conventional procedural programming languages ​​such as C or similar languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network—including a local area network (LAN) or a wide area network (WAN)—or can be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0243] It should be understood that the various forms of processes shown above can be used, with steps reordered, added, or deleted. For example, the steps described in this invention can be executed in parallel, sequentially, or in different orders, as long as the desired result of the technical solution of this invention can be achieved, and this is not limited herein.

[0244] The specific embodiments described above do not constitute a limitation on the scope of protection of this invention. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this invention should be included within the scope of protection of this invention.

Claims

1. A method for transforming voltage in a substation, characterized in that, Applied to an edge computing gateway, the method includes: Send the transformer path in the substation and the transformer standard of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operation on the transformer point along the transformer path according to the transformer standard. Data acquisition devices have been deployed for the transformer point in the substation. The system receives first sensing data collected by the data acquisition device, the first sensing data including voltage data when the voltage transformer detected at the transformer point changes. The system receives second sensing data collected by the management terminal, the second sensing data including location data. Query the coordinate data and first time information when the voltage data was detected from the first sensing data; Query the second time information when the location data was detected from the second sensing data; Calculate the first difference between the coordinate data and the position data; Calculate the second difference between the first time information and the second time information; If the first difference is less than or equal to a preset first threshold and the second difference is less than or equal to a preset second threshold, then the voltage data is determined to match the position data. If the first difference is greater than a preset first threshold, or the second difference is greater than a preset second threshold, then it is determined that the voltage data and the position data do not match. If the voltage data is determined to match the location data, then it is determined that the substation administrator has performed a voltage transformation operation on the transformer point in accordance with the voltage transformation standard.

2. The method according to claim 1, characterized in that, Sending the transformer path in the substation and the transformer standards of each transformer point on the transformer path to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path according to the transformer standards includes: Send multiple substations to the management terminal; When the management terminal receives a selection operation triggered for a certain substation, it plans each transformer point for the substation to form a transformer path; Query the transformer standards for each of the aforementioned transformer points; The transformer path and the transformer standards of each transformer point are sent to the management terminal to notify the substation administrator to perform transformer operations on the transformer points along the transformer path according to the transformer standards.

3. The method according to claim 2, characterized in that, The planning of various transformer points for the substation to form a transformer path includes: The substation is divided into multiple transformer zones, and the same type of voltage transformer is configured at the transformer points in the same transformer zone. Multiple transformer points are planned in the transformer region to form a transformer path.

4. The method according to any one of claims 1-3, characterized in that, Also includes: If it is determined that the voltage data does not match the location data, then it is determined that the substation administrator did not perform the transformation operation on the transformation point in accordance with the transformation standard. Generate error message; The abnormality message is sent to the quality inspection terminal to notify the substation's quality inspector that the substation administrator has not performed the transformer operation at the transformer point in accordance with the transformer standard.

5. The method according to any one of claims 1-3, characterized in that, Also includes: When the substation administrator has performed a transformation operation on the transformation point according to the transformation standard, the transformation time of the transformation point is recorded. Cost information is generated for the transformer operation based on the transformer duration. The fee information is sent to the management terminal for display.

6. The method according to any one of claims 1-3, characterized in that, Also includes: Read the transformer data collected at the transformer point from the first sensing data; The transformer data is sent to the management terminal for diagnosis.

7. A transformer device for a substation, characterized in that, The device, applied to an edge computing gateway, includes: The transformer information sending module is used to send the transformer path in the substation and the transformer standard of each transformer point located on the transformer path to the management terminal, so as to notify the administrator of the substation to perform transformer operation on the transformer point along the transformer path according to the transformer standard. Data acquisition devices have been deployed for the transformer point in the substation. The first sensing data receiving module is used to receive the first sensing data collected by the data acquisition device. The first sensing data includes voltage data when the voltage transformer detected at the transformer point changes. The second sensing data receiving module is used to receive the second sensing data collected by the management terminal, the second sensing data including location data; The calibration module is configured to: query coordinate data and first time information from the first sensing data when detecting the voltage data; query second time information from the second sensing data when detecting the position data; calculate a first difference between the coordinate data and the position data; calculate a second difference between the first time information and the second time information; if the first difference is less than or equal to a preset first threshold and the second difference is less than or equal to a preset second threshold, then determine that the voltage data and the position data match; if the first difference is greater than a preset first threshold or the second difference is greater than a preset second threshold, then determine that the voltage data and the position data do not match. The execution determination module is used to determine that if the voltage data matches the location data, then the substation administrator has performed a transformation operation on the transformation point in accordance with the transformation standard.

8. An edge computing gateway, characterized in that, The edge computing gateway includes: At least one processor; and A memory communicatively connected to the at least one processor; wherein, The memory stores a computer program that can be executed by the at least one processor, the computer program being executed by the at least one processor to enable the at least one processor to perform the substation transformation method according to any one of claims 1-6.

9. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores a computer program that, when executed by a processor, implements the transformer method of the substation according to any one of claims 1-6.

Citation Information

Patent Citations

  • Self-adaptive programmed operation method for power grid regulation and control

    CN114172274A

  • Intelligent pressure transmitter calibration system

    CN212059232U