A multi-objective optimization-oriented new energy-energy storage station collaborative control method
By generating prior performance matrix scores and weight coefficients, the problem of significant subjective influence in multi-objective optimization of new energy-storage power plants is solved, improving the objectivity and accuracy of optimization results and enhancing the collaborative control performance of the power plants.
Patent Information
- Application Number
- CN202211351893.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-31
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2042-10-31
AI Technical Summary
Existing technologies in the multi-objective optimization control of new energy-storage power plants suffer from significant subjective influences, making it difficult to objectively unify multiple objective functions and resulting in inaccurate optimization results.
By generating a prior performance matrix, scoring is performed based on the optimization results of each individual objective function, forming weight coefficients, and then combining them into a single objective function for optimization, thus reducing the influence of subjectivity.
It has improved the coordinated control performance of new energy and energy storage stations, and enhanced the objectivity and accuracy of optimization results.
Smart Images

Figure CN115642621B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a collaborative control method for new energy and energy storage power plants oriented towards multi-objective optimization, specifically involving a comprehensive optimization control process considering multiple service objectives of new energy and energy storage power plants. Background Technology
[0002] Configuring energy storage systems at renewable energy power plants is an effective way to address the uncertainty and intermittency of renewable energy generation. How energy storage systems can assist renewable energy systems in meeting the power system's demands is a key research topic. The essence of the joint control problem of renewable energy / energy storage systems lies in the optimization problem among multiple stakeholders, and the control process and results are the solution to this optimization problem. However, in practical applications, the system will face optimization under multiple objectives, including grid requirements for power fluctuations, renewable energy output levels, and the economic viability of energy storage applications. Therefore, rationally solving the multi-objective optimization problem of joint control of renewable energy / energy storage systems has become a difficult and crucial aspect of current control technology research.
[0003] Currently, there are generally two approaches to solving multi-objective optimization problems: 1) Constructing a single-objective function from multiple objectives through weighted summation or correlational functional relationships, and then solving the single objective. The advantage is its simple structure and ease of solution, but the problem is that the form of the weighted summation or the constructed functional relationship directly affects the optimization result; 2) Directly optimizing the multi-objective function to form a set of feasible solutions, and then selecting the optimal solution according to principles. This is generally a subjectively determined optimal solution. The advantage is that it reduces the influence of the constructed functional relationships, calculating only effective feasible solutions for the multi-objective optimization problem, and then selecting the best solution. However, the problem lies in the subjective influence of the selection process. Therefore, the main problem with multi-objective optimization problems can be understood as how to unify multiple objective functions into a single objective through objective and scientific methods, or how to establish objective rules for evaluating the merits of feasible solutions.
[0004] The advantage of this scheme is that the single-objective optimization and weighted integration process are not affected by human subjective factors. It is an autonomous selection optimization completed entirely based on the distribution of the collaborative control results of new energy-energy storage power plants on the values of various objective functions. This is conducive to improving the collaborative control performance of new energy-energy storage power plants from the operating characteristics of the power plants themselves, and is of great significance to the widespread application of new energy-energy storage power plants in new power systems. Summary of the Invention
[0005] To address the aforementioned issues, this invention proposes a collaborative control method for new energy-storage power stations that uses prior information scoring to guide multi-objective integration and is oriented towards multi-objective optimization. The method focuses on objectively integrating multiple objective functions into a single objective function. By optimizing each single objective and calculating the prior performance matrix, the performance of each objective function is scored, thereby achieving objective integration of all objective functions.
[0006] This invention provides a collaborative control method for new energy and energy storage power plants with multi-objective optimization, which specifically includes the following steps:
[0007] Step 1: Generate the typical daily operating conditions of the new energy power station based on historical data, design multiple objective functions and corresponding constraints according to actual application requirements, establish a mathematical model for the operation control of the new energy-storage power station, and simulate the operation of the new energy-storage power station.
[0008] Step 2: Based on the mathematical model of the operation control of the new energy-storage power station obtained in Step 1, optimize the operation control model of the new energy-storage power station according to each single objective function, obtain the control command of the new energy / storage system, calculate the values of other objective functions under this control command, and construct the prior performance matrix.
[0009] Step 3: Based on the distribution of elements in the prior performance matrix at the current moment, score the performance of each objective function and form its weight coefficient.
[0010] Step 4: Based on the weight coefficients of each objective function obtained in Step 3 at time t, the multiple objective functions are combined into a single objective function. Then, using traditional or intelligent optimization algorithms, the single objective function is optimized to obtain the final coordinated control command of the new energy-energy storage station at time t. It is then determined whether the new energy-energy storage station should stop optimization operation. If yes, the process exits; otherwise, t = t + 1, and the process returns to Step 2.
[0011] The advantages of this invention are:
[0012] 1. This invention relates to a collaborative control method for new energy-energy storage power plants oriented towards multi-objective optimization. It proposes a method for solving multi-objective optimization problems involving collaborative control of new energy-energy storage power plants based on prior performance scoring and weighting under independent optimization of each individual objective. The core of this method lies in obtaining prior performance information of the power plant based on the control effect of each individual objective under independent optimization, guiding the scoring and weighting of the multi-objective function. This allows for an objective evaluation of the importance of multiple objective functions, enabling a transition from multiple objective functions to a comprehensive objective function, thereby solving the multi-objective optimization problem.
[0013] 2. The new energy-energy storage power station collaborative control method of the present invention, which is oriented towards multi-objective optimization, is different from the existing technical solutions based on subjective / objective weighting of multiple objective functions or selection of multiple feasible solutions. The comprehensive approach of the present invention is based on a single objective function synthesized by performance analysis and comparison after optimization of independent objective functions. That is, the weights of each objective are obtained from local performance indicators from multiple perspectives, which reduces the subjective weighting or the subjective problem of human selection of feasible solutions. It is conducive to the autonomous selective optimization of the optimization problem, thereby improving the collaborative control performance of new energy-energy storage power stations. Attached Figure Description
[0014] Figure 1 This is a flowchart of the new energy-energy storage power station collaborative control method for multi-objective optimization according to the present invention;
[0015] Figure 2 This is a flowchart for constructing the prior performance matrix in this invention. Detailed Implementation
[0016] The invention will be further described below with reference to the accompanying drawings.
[0017] This invention provides a collaborative control method for new energy and energy storage power plants oriented towards multi-objective optimization. Figure 1 The implementation process of the method described in this embodiment is illustrated, including the following steps:
[0018] Step 1: Generate the typical daily operating conditions of the new energy power station based on historical data, design multiple objective functions and corresponding constraints according to actual application requirements, establish a mathematical model for the control of the new energy-storage power station, and simulate the operation of the new energy-storage power station.
[0019] Step 1.1 Based on historical data of local renewable energy generation, generate power generation data for typical days at renewable energy power plants. Taking wind farms and photovoltaic power plants as examples, generate wind power and photovoltaic power data for typical days (maximum power output is available). and It is represented as a data sequence with a sampling time interval of Δt and a data sequence length of T. Then, the maximum output power of wind power and photovoltaic power at time t is: and
[0020] Step 1.2 Establish a mathematical model for the operation and control of new energy-storage power stations, including constraints such as real-time power balance, energy storage charging and discharging model, rated power and capacity of energy storage, maximum output range of wind power and photovoltaic power, and grid-connected power fluctuations, as follows:
[0021]
[0022] S SOE,b (t+Δt)=(1-γ)×S SOE,b (t)+P b (t)×Δt×η / Q be (3-2)
[0023] -P be ≤P b (t)≤P be (3-3)
[0024]
[0025]
[0026] |P g (t)-P g (t-Δt)|≤δ (3-6)
[0027] Wherein, α(t), β(t), P g (t), P b (t) and S SOE,b (t) represent the photovoltaic output control quantity, wind power output control quantity, grid-connected power of the new energy-storage power station, control power of the energy storage system, and state of charge of the energy storage system at time t, respectively, while γ, η, and Q be P be , δ and δ represent the self-discharge rate, charge / discharge efficiency, rated capacity, rated power, upper limit of energy storage charging, lower limit of discharge, and grid-connected power fluctuation requirements of the energy storage system, respectively.
[0028] In the modeling process of operation control for new energy-storage power plants, this invention considers that different processes and factors will lead to different constraints on the overall model. Therefore, the specific mathematical model of operation control for new energy-storage power plants (not limited to the above) is abstracted into the following more generalized mathematical model:
[0029]
[0030] Where F(·) and G(·) represent the equality and inequality constraints of the control variables, respectively, and C i The constant is represented because both equations and inequalities can represent multiple values, so it is represented in matrix form.
[0031] Step 1.3 Based on the operational requirements of new energy-storage power plants, establish multiple objective functions for the optimized control of new energy-storage power plants, such as new energy / storage grid-connected power fluctuation, maximizing new energy power generation, and reducing energy storage output. The calculation formulas are shown below.
[0032] min J1(t)=(ΔP g (t)) 2 (3-8)
[0033]
[0034] min J3(t)=(ΔP b (t)) 2 (3-10)
[0035] To unify the optimization direction of multiple objective functions, each objective function needs to be written in a way that finds its minimum value.
[0036] Similar to step 1.2, this invention considers that the optimization objectives of new energy-storage power stations are not entirely the same under different requirements. Therefore, the specific objective functions mentioned above (but not limited to the above) are abstracted into a more generalized mathematical model, and the n objective functions can be expressed as J i (α(t),β(t),P g (t),P b (t),S SOE,b (t)), i = 1, 2, ..., n. Therefore, the mathematical model for the optimal control of new energy-storage power stations is as follows:
[0037]
[0038] Step 2: Based on the mathematical model of the optimized control of the new energy-storage power station obtained in Step 1, optimize the operation control model of the new energy-storage power station according to each single objective function, obtain the control command of the new energy / storage system, calculate the values of other objective functions under this control command, and construct the prior performance matrix. Figure 2 The process of calculating the prior performance matrix is demonstrated;
[0039] Step 2.1 Initialization: Let i = 1. Assuming the current running time is t, update the mathematical models such as the maximum output power of the new energy source and the state of charge of the energy storage.
[0040] Step 2.2 Utilize traditional or intelligent optimization algorithms, such as quadratic programming or particle swarm optimization, with the objective function J... i The control model of the new energy-storage power station with (t) and constraints is used to obtain the control command of the output power of new energy and energy storage at time t;
[0041] Step 2.3 Based on the control commands for the output power of new energy and energy storage at time t obtained in Step 2.2, and according to the objective function J s The formula for calculating (t) is as follows: And s≠i, calculate the optimization of the i-th objective function J at time t. i The s-th objective function value J i,s (t);
[0042] Step 2.4 Determine if i is equal to n. If yes, proceed to step 2.5; otherwise, i = i + 1 and return to step 2.2.
[0043] Step 2.5 Based on all the optimizations and calculation results from steps 2.2 to 2.4, all the calculated objective function values can be written as the prior performance matrix A(t) at time t as follows:
[0044]
[0045] Wherein, the diagonal elements of the prior performance matrix A(t) at time t Let A(t) be the objective function value optimized with its row (column) as the objective function index. For example, the diagonal element in the i-th row is the objective function value calculated after optimization with the i-th objective function, while the elements in each row are other objective function values optimized with their row as the objective function index. Therefore, for elements in the same column of the prior performance matrix A(t) at time t, the element at the diagonal position has the smallest value. For ease of subsequent expression, the elements in the prior performance matrix A(t) in equation (3-12) are represented by rows and columns in the following table:
[0046]
[0047] Step 3: Based on the distribution of elements in the prior performance matrix at time t, score the performance of each objective function and form its weight coefficient.
[0048] Step 3.1 Eliminate the dimensions of the elements in the prior performance matrix A(t) obtained in Step 2 at time t, and standardize it column-wise to obtain the standardized matrix Z(t) at time t as follows, where the (i,j)th element in matrix Z(t) is...
[0049]
[0050] Step 3.2 Based on the standardized matrix Z(t) obtained in Step 3.1 at time t, find the maximum and minimum value vectors of each column, denoted as Zt and Zt respectively. + (t) and Z - (t), its calculation formula is as follows:
[0051]
[0052] Step 3.3 Based on the maximum and minimum value vectors of each column obtained in Step 3.2, calculate the evaluation score of each objective function at time t, where the score S of the i-th objective function is... i (t) is calculated as follows:
[0053]
[0054] Step 3.4 Calculate the weights of each objective function at time t based on the evaluation scores obtained in Step 3.3, where the weight ω of the i-th objective function is... i (t) is
[0055]
[0056] Step 4: Based on the weight coefficients of each objective function obtained in Step 3 at time t, combine the multiple objective functions into a single objective function. The algorithm utilizes traditional or intelligent optimization algorithms, such as quadratic programming or particle swarm optimization, to optimize J(t) and obtain the final coordinated control command for the new energy-storage station at time t. The station's management department determines whether the new energy-storage station has stopped optimized operation (whether the station has stopped operating or no longer needs to be optimized using this method). If yes, a stop command is issued, and coordinated control is exited; otherwise, t = t + 1, and the process returns to step 2.
[0057] Finally, it should be noted that the described embodiments are only some, not all, of the embodiments in this application. All other embodiments obtained by those skilled in the art based on the embodiments in this application without inventive effort are within the scope of protection of this application.
Claims
1. A collaborative control method for new energy-energy storage power stations oriented towards multi-objective optimization, characterized in that: Specifically, the following steps are included: Step 1: Generate typical daily operating conditions for new energy power plants based on historical data. Design multiple objective functions and corresponding constraints according to actual application requirements, and establish a mathematical model for the operation control of new energy / energy storage power plants to simulate their operation. The specific method for establishing the mathematical model for the operation control of new energy / energy storage power plants is as follows: Step 1.1: Generate power generation data for a typical day at a new energy power plant based on historical local new energy power generation data; Step 1.2: Considering that different processes and factors will lead to different constraints on the overall model, design the following constraints: ; Where F(·) and G(·) represent the equality and inequality constraints of the control variables, respectively, and C i Denotes constants; where α(t), β(t), and P g (t), P b (t) and These represent the photovoltaic output control quantity, wind power output control quantity, grid-connected power of new energy / energy storage power station, control power of energy storage system, and state of charge of energy storage system at time t, respectively. Step 1.3: Establish multiple objective functions for the optimal control of new energy / energy storage power stations. The n objective functions are expressed as follows: Let i = 1, 2, ..., n; and write each objective function in a way that solves for the minimum value; Therefore, the mathematical model for the operation control of new energy / energy storage stations is as follows: ; Step 2: Based on the mathematical model of the operation control of the new energy / energy storage station obtained in Step 1, optimize the operation control model of the new energy / energy storage station according to each single objective function, obtain the control command of the new energy / energy storage system, calculate the values of other objective functions under this control command, and construct the prior performance matrix. Step 3: Based on the distribution of elements in the prior performance matrix at the current moment, score the performance of each objective function and form its weight coefficient; Step 4: Based on the weight coefficients of each objective function obtained in Step 3 at time t, combine the multiple objective functions into a single objective function, and use traditional or intelligent optimization algorithms to optimize the single objective function to obtain the final coordinated control command of the new energy / energy storage station at time t. Determine whether the new energy / energy storage station should stop optimization operation. If yes, exit; if no, then t=t+1, return to Step 2.
2. The new energy-energy storage power station collaborative control method for multi-objective optimization as described in claim 1, characterized in that: In step 2, the method for constructing the prior performance matrix is as follows: A: Based on the control command for the output power of new energy sources and energy storage at the current moment, and according to the objective function J s The calculation formula is given by ∀s=1,2,...,n and s≠i, which calculates the optimization of the i-th objective function J at the current time. i The s-th objective function value J i,s ; B: Determine if i is equal to n. If yes, proceed to step 2.
5. If no, i = i + 1 and return to the previous step. C: The calculated total objective function values, expressed as the prior performance matrix at time t: ; In this context, the diagonal elements of the prior performance matrix A at the current moment are the objective function values optimized with the row / column as the objective function index, while the elements in each row are other objective function values optimized with the row as the objective function index.
3. The new energy-energy storage power station collaborative control method for multi-objective optimization as described in claim 1, characterized in that: In step 3, the performance of each objective function is scored using the following method to determine its weight coefficient: Step 3.1: Eliminate the dimensions of elements in the prior performance matrix A at the current time step, and standardize it column-wise to obtain the standardized matrix at the current time step. The (i, j)th element in matrix Z ; This refers to the element in the i-th row and j-th column of the prior performance matrix A at the current moment; Step 3.2: Based on the standardized matrix obtained in Step 3.1, find the maximum and minimum value vector Z for each column. + and Z - , ; Step 3.3: Based on the maximum and minimum value vectors of each column obtained in Step 3.2, calculate the evaluation score of each objective function at the current time, where the evaluation of the i-th objective function is divided into... ; Step 3.4: Calculate the weights of each objective function at time t based on the evaluation scores obtained in Step 3.3, where the weight of the i-th objective function is... .
Citation Information
Patent Citations
Multi-objective optimization configuration method for distributed photovoltaic-energy storage system
CN111490554A
Multi-target multi-time-scale collaborative energy storage system scheduling operation method
CN115001037A