Integrated circuit and method of starting the same
By using non-volatile memory to store test results in integrated circuits and automatically checking them at startup, the problems of test omissions and unstable results in integrated circuit production testing are solved, achieving higher test reliability and accuracy and ensuring product quality.
Patent Information
- Application Number
- CN202210415139.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2021-09-01
- Filing Date
- 2022-04-20
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-04-20
AI Technical Summary
In the existing technology, integrated circuits are prone to missed or incomplete testing due to human or computer errors during production testing, resulting in defective products entering the market. Furthermore, the results of repeated testing are unstable, making it difficult to ensure the reliability and accuracy of the tests.
The test results are stored using non-volatile memory (such as single-use programmable OTP memory or multiple-use programmable NVM), and the test results are automatically checked when the integrated circuit is started to ensure that all irreversible tests pass and at least one reversible test passes. The reliability of the test is improved by recording the test results in memory through orthogonal programming or critical test results.
By automatically checking test results before integrated circuit startup, all irreversible tests are passed and at least one recoverable test is passed, which improves the reliability and accuracy of integrated circuit testing, reduces the inflow of defective products, and enhances product quality.
Smart Images

Figure CN115732024B_ABST
Abstract
Description
Technical Field
[0001] This invention relates primarily to integrated circuit testing, and more particularly to a method and system for improving the quality of integrated circuit testing using non-volatile memory. Background Technology
[0002] Integrated circuits (ICs) can be tested at the wafer level (wafer classification) and package unit level. Testing may include calibration, personalization, serial number insertion, etc.
[0003] In the paper (West, Burnell G. "Advanced Test Methodology and Strategies for Semiconductors." 2006 13th International Symposium on the Physical and Failure Analysis of Integrated Circuits. IEEE, 2006.), the authors describe how the testing of high-order devices has shifted from precise measurement to data management in recent years, and also describe the architecture of a transaction-based automatic test equipment (ATE).
[0004] U.S. Patent Application Publication No. 2017 / 0040067 discloses a method for testing semiconductor integrated circuits containing one-time programmable (OTP) memory devices. Program instructions are transmitted from a tester to the OTP memory device. In response to the program instructions, OTP memory cells in the OTP memory device are referenced for writing and writing verification. Summary of the Invention
[0005] This invention provides an integrated circuit (IC) including a non-volatile memory and a startup circuit. The startup circuit is configured to start the IC, including reading one or more values from the non-volatile memory indicating whether the IC's production test has been successfully completed, and initiating a reaction action if the one or more values indicate that the production test has not been successfully completed.
[0006] In some embodiments, the one or more values mentioned above are composed of a single pass / error bit. In some embodiments, the one or more values mentioned above have been written to non-volatile memory by an external automated test equipment (ATE). In some embodiments, the IC further includes control circuitry configured to receive information from the external automated test equipment (ATE) indicating whether production testing has been successfully completed, and to write one or more values to non-volatile memory based on the information.
[0007] In one embodiment, the aforementioned one or more values include one or more of the following: (i) an irrecoverable test pass indication, (ii) an irrecoverable test error indication, (iii) a recoverable test error indication, and (iv) a recoverable test pass indication. In the disclosed embodiments, the aforementioned one or more values are orthogonal to each other.
[0008] In some embodiments, the non-volatile memory is a once-to-use (OTP) programmable memory. In other embodiments, the non-volatile memory is a multiple-programmable non-volatile memory (MTP NVM).
[0009] According to an embodiment of the present invention, a method for activating an integrated circuit (IC) including non-volatile memory is further provided, comprising (i) reading one or more values from the non-volatile memory indicating whether a production test of the IC has been successfully completed, and (ii) if one or more values indicate that the production test has not been successfully completed, initiating a reaction action. Attached Figure Description
[0010] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. In the drawings:
[0011] Figure 1 This is a block diagram illustrating a production and testing system for an integrated circuit (IC) according to an embodiment of the present invention.
[0012] Figure 2 This is a flowchart illustrating a first method for IC production testing according to an embodiment of the present invention.
[0013] Figure 3 This is a flowchart illustrating the startup pre-test IC according to an embodiment of the present invention.
[0014] Figure 4 It is a block diagram of test results drawn in a single-use programmable (OTP) memory according to an embodiment of the present invention.
[0015] Figure 5 This is a flowchart illustrating a method for IC testing using multiple programmable non-volatile memory (MTP-NVM) according to an embodiment of the present invention.
[0016] Figure 6A This is a flowchart illustrating a first method for IC production testing according to an embodiment of the present invention.
[0017] Figure 6BThis is a flowchart illustrating an alternative to the pre-test IC based on an embodiment of the present invention.
[0018] Symbol explanation:
[0019] 100: Production Testing System
[0020] 102: Integrated Circuits (ICs)
[0021] 104: Automated Test Equipment (ATE)
[0022] 106: Test Interface
[0023] 108: Functional Circuit
[0024] 109: Control Circuit
[0025] 110: Built-in Self-Test (BIST) circuit
[0026] 112: One-time programmable (OTP) memory
[0027] 200: Flowchart
[0028] 202-214: Steps
[0029] 300: Flowchart
[0030] 302-316: Steps
[0031] 400: Block Diagram
[0032] 402: OTP bytes
[0033] 404: Iteration
[0034] 408: Sample Box
[0035] 500: Flowchart
[0036] 502-508: Steps
[0037] 600: Flowchart
[0038] 602-606: Steps
[0039] 650: Flowchart
[0040] 652-658: Steps Detailed Implementation
[0041] Production testing (PT) of integrated circuits (ICs) is used to test ICs after manufacturing to screen out defective units. PT is also typically used for parameter adjustment, calibration, insertion of individual serial numbers, and other personalized functions.
[0042] Obviously, ICs that fail to pass the PT (Power Transmission Test) successfully and completely should not be sent to customers. However, in practice, due to human (or computer) errors, ICs that fail the PT or skip the PT may sometimes still be sent to customers.
[0043] Re-testing is common in production testing practice. Sometimes, production tests fail due to testing issues, such as poor contact between the IC pad and the ATE pad, or the use of incorrect temperature settings. In such cases, the test is repeated after the problem is identified (and fixed).
[0044] Some defects may produce unstable or critical results. In such cases, when tests are repeated, the results may alternate between "pass" and "fail". Users can define critical tests as tests that cannot fail at all (if an error occurs at any time, it indicates a manufacturing defect in the IC), and non-critical tests as tests that allow for occasional errors. We refer to critical tests as "non-recoverable tests" and non-critical tests as "recoverable tests". We also refer to the repeated execution of the same test as a "test iteration".
[0045] According to embodiments of the present invention, an apparatus and method for improving production test quality are disclosed herein, wherein test results are automatically tested when the IC is started, or verified by the IC user during IC incoming test.
[0046] In some embodiments, the IC includes a one-time-programmable (OTP) memory and stores test results in pre-assigned OTP locations, where each test result (or test iteration result) may be "pass" or "error," written into two OTP bits respectively. In one embodiment, the IC includes control circuitry that, in response to a received test result indication (e.g., from an ATE), stores the results of recoverable and non-recoverable test iterations in OTP bits. In other embodiments, the ATE, in response to the results of all recoverable and non-recoverable tests, writes a single compound test result indication into the OTP, and the writing of the test result indication may not require control circuitry. In some embodiments, the functionality of the disclosed control circuitry does not necessarily need to be implemented by dedicated hardware. For example, this functionality may be performed by a processor (e.g., a CPU or controller) within the IC.
[0047] In one embodiment, the startup circuit in the IC checks the corresponding OTP bit upon startup to verify that all iterations of all irrecoverable tests have a "pass" result, and that at least one iteration of all recoverable tests has a "pass" result. In another embodiment, there is no control circuit, and the IC checks the results of multiple test result bits (or checks the status of the composite test result indicator) upon startup.
[0048] In some embodiments, the OTP includes OTP bytes, which contain OTP bytes (“test result bytes”) allocated to store test results. Each test result byte includes multiple fields (e.g., multiple fields per bit) to store the results of multiple iterations of the test. The IC always writes a “pass” or “error” field into the OTP byte based on the test iteration results. In embodiments, the fields used to store “pass” or “error” results are orthogonal (e.g., separate fields). In one embodiment, a “pass” result may be written into the odd-numbered bits of the OTP test result byte, while an “error” result may be written into the even-numbered bits of the OTP test result byte (or vice versa). Thus, assuming the OTP byte is 16 bits, if the test result byte is 16x5555, the test has passed 8 times; if the byte is 16xAAAA, the test has failed 8 times; if the byte is 5A55 (for example), the test has passed 6 times and failed 2 times (acceptable for a reversible test).
[0049] It should be understood that although we refer to the stored test results herein, the results stored in the IC memory may differ from the actual test results. For example, in some embodiments, the cumulative results of multiple tests and personalized operations may be stored as a single “test result” byte in memory (which may contain an indication of “pass” or “error”).
[0050] In some embodiments, the IC does not include an OTP, but instead includes non-volatile memory (NVM) that can be written to (and erased) multiple times. The control circuitry stores "pass" and "error" results in separate fields. However, in embodiments where the NVM memory needs to be erased before running additional tests, the ATE first reads the test result byte from the NVM, temporarily stores the test result byte in random access memory (RAM), erases the NVM (or erases the NVM containing the test result byte), and then continues testing, storing the result in RAM (either the same RAM used to temporarily store the NVM result or a different RAM). When the test is complete, the ATE restores the results in the IC's NVM (including the history of results stored in the temporary memory).
[0051] In general, embodiments of the present invention improve the quality of IC testing by storing test results in the NVM within the IC and by checking the test results in the NVM when the IC is powered on. In some embodiments, the IC includes circuitry for storing test results in the NVM. In other embodiments, the ATE (Automatic Test Equipment) stores the test results in the NVM. In some embodiments, the results of individual tests, including pass and error, are stored in the NVM. In other embodiments, only composite test results are stored. In other embodiments, combinations and sub-combinations of the above embodiments may be used.
[0052] System description
[0053] The embodiments disclosed herein relate to testing of integrated circuits (ICs) with non-volatile memory by IC manufacturers, incoming inspection of ICs by IC customers, and the startup of ICs when assembled into a target system. However, the disclosed techniques can also be used to test systems such as multi-chip modules (OCMs).
[0054] Figure 1 This is a block diagram illustrating a production testing system 100 for an integrated circuit (IC) according to an embodiment of the present invention. IC 102 is coupled to an automated test equipment (ATE) 104 via a test interface 106 within the IC. The IC includes functional circuitry 108 and control circuitry 109. The functional circuitry 108 is operable to implement the functions of IC 102. The ATE is configured to perform various tests on the functional circuitry. In some embodiments, the tests may include IC personalization, such as calibration, parameter programming, serial numbering, and insertion of a security key.
[0055] In some embodiments, IC 102 includes a Built-In Self-Test (BIST) circuit 110, which, under the control of ATE 104, can operate to perform tests on functional unit 108. BIST circuits are widely used in industry, for example, for memory testing. In some embodiments, BIST circuits are also used during device startup. In one embodiment, a BIST test may be triggered by software or hardware instructions, or in response to the detection of a predefined condition.
[0056] according to Figure 1In the exemplary embodiment illustrated, IC 102 includes a once-programmable (OTP) memory 112 (e.g., fuse memory), and control circuitry is configured to write test results into the OTP memory (in other embodiments, the OTP is written by the ATE without control circuitry). Thus, if the IC manufacturer delivers an IC with production test errors (or complete or partial omission of production test results) to the customer due to human or computer error, the IC customer will detect the error during incoming inspection or upon IC startup (this will be described further below).
[0057] Therefore, the quality of the delivered IC can be enhanced by writing the test results into the embedded OTP memory and by testing the test results stored in the OTP at the client end.
[0058] It should be understood that, at Figure 1 The structures of IC 102 and production test system 100 illustrated and described above are exemplary structures cited for illustrative purposes. In alternative embodiments, other suitable structures may be used. For example, BIST 110 may include RAM storing BIST codes. During testing, the ATE may store the codes into the BIST RAM. In another example, a single ATE may test multiple ICs simultaneously.
[0059] In other embodiments, the control circuit 109 may operate to program any or all of the OTP bits, including test results in response to instructions from the ATE, and other bits (e.g., calibration data or security keys) in response to instructions from the ATE and / or other sources (e.g., from an embedded processor).
[0060] exist Figure 1 In the illustrated and described exemplary embodiments, IC 100 includes control circuitry 109 to write the NVM using the test results. However, in alternative embodiments, an external ATE directly writes the NVM using the test results, without the need for control circuitry 109.
[0061] Figure 2 This is a flowchart 200 illustrating a method of IC production testing according to an embodiment of the present invention. The flowchart is drawn from (…). Figure 1 The test is performed by control circuits 109 and ATE 104. Here it is assumed that the user (e.g., a product engineer) uses a predefined set of tests.
[0062] The flowchart begins at the start test step 202, where the ATE sets the test number N to 1 (N can be a software variable or a register). It should be understood that at the start test step 202, the ATE 104 can perform other test initialization functions, such as setting voltage and timing thresholds.
[0063] Next, in step 204 of running test N, ATE runs the predefined test N (which may sometimes involve...). Figure 1 (Enabling BIST110). Next, the ATE proceeds to the pass check step 206 and checks whether test N has passed (e.g., by checking the test pass pad of BIST110). If the test has passed, the control circuit proceeds to the write pass step 208 and writes the pre-specified bit of OTP 112 to indicate that test N has passed. If the test fails at step 206, the control circuit proceeds to the write error step 210 and writes the pre-specified bit of OTP to indicate that test N has failed. (Although the above description describes writing the OTP bit to indicate whether the test has passed or failed, in some embodiments the indication is written in an OTP field of more than one bit).
[0064] After steps 208 and 210, ATE proceeds to the final check step 212 and checks whether N is the last predefined test. If so, the test flowchart is complete. If N is not the last test, in the increment N step 214, ATE increments N and proceeds again to step 204 to perform the next test.
[0065] Therefore, based on Figure 2 In the illustrated and described exemplary embodiments, the control circuit stores all test results, including indications of test pass and indications of test error, into the OTP on the chip.
[0066] It should be understood that, Figure 2 The flowcharts illustrated and described herein are examples used to illustrate concepts. In alternative embodiments, other suitable flowcharts may be used. For example, in some embodiments, if test N fails, the test can be automatically repeated (after step 210, ATE can re-enter step 204 to loop through the test retries (iterations) a predetermined number of times. The results of such test iterations can be stored in more OTP bits).
[0067] In some embodiments, the ATE records pass and fail indications, and the test results can be displayed (or communicated) to the user without having to read the corresponding OTP field.
[0068] In some embodiments, IC 100 does not include control circuitry 109, and the entire flowchart 200 is executed by ATE.
[0069] Recoverable and Non-recoverable Tests
[0070] According to embodiments of the present invention, production testing may include tests that must never fail, and tests that allow for accidental errors (e.g., tests that fail due to contamination caused by the IC or tester, but pass after the contamination is removed). We will refer to the former as non-recoverable tests and the latter as recoverable tests. For example, BIST testing is generally considered non-recoverable, while continuity testing is generally recoverable. If the parameter is marginal, then parameterized testing can be recoverable (e.g., tests performed due to inaccurate temperature settings).
[0071] In some embodiments, the control circuitry writes an OTP (Over-The-Top) indicating whether a test passes or fails. In some embodiments, the user defines a list of recoverable and non-recoverable tests. In one embodiment, the user defines the maximum number of iterations that the same test can tolerate for each recoverable test. In another embodiment, the user defines an extreme value for the ratio of successful to unsuccessful test iterations (e.g., for a given recoverable test, the number of successful iterations should be at least 90% of the total number of test iterations). In other embodiments, for some recoverable tests, they must pass in just one test iteration.
[0072] Figure 3 This is a flowchart 300 illustrating the startup pre-test IC according to an embodiment of the present invention. This flowchart is drawn from (… Figure 1 The control circuit 109 executes the process (IC 102 typically includes a processor that runs the startup sequence including flowchart 200. Therefore, control circuit 109 can refer to either the processor or a corresponding part of the startup program). The following description assumes that the method is implemented by the disclosed control circuit. More generally, the method can be implemented by any suitable startup circuit that starts the IC.
[0073] As mentioned above, the IC includes OTP bytes that store the results of production tests run by the IC manufacturer. We assume that each OTP byte stores the results of all iterations of a single test.
[0074] The flowchart begins with test initiation step 302, where the control circuit sets the test number parameter (e.g., a register) to the value 1 (the test number is referred to as N). Next, in step 304, the control circuit reads the test result corresponding to test number N from the OTP.
[0075] In step 306 of the validity check, the control circuit checks whether the stored OTP byte is valid. For example, if neither a pass nor an error indication is written, the byte is invalid (see below for details). Figure 4(Other examples of invalid OTP bytes are described). If the OTP byte is invalid, the start-up is aborted. Additionally or alternatively, if the OTP byte is invalid, the control circuitry may take any other appropriate action.
[0076] If the OTP byte is valid in step 306, the control circuit proceeds to step 307, which checks whether the number of stored test N results is equal to a preset value for the number of test results. If the number of results differs from the preset value, the startup process is aborted. In some embodiments, the list of recoverable and non-recoverable tests is stored in non-volatile memory. In other embodiments, this list may be read from an external memory device during the startup phase before the test begins.
[0077] If, at step 307, the result number equals the preset value, the control circuit proceeds to step 308 to check for recoverability and verifies whether test N is recoverable. If, at step 308, test N is not recoverable, the control circuit proceeds to step 310 to check for everything being good and verifies whether all iterations of test N have passed (e.g., all corresponding fields of OTP have been set). If any test execution fails, the control circuit indicates a startup error and aborts the startup, or takes other appropriate actions.
[0078] If test N recovers successfully in step 308, the control circuit will proceed to step 310, where it will check if any iteration of test N has passed. If all iterations fail, the control circuit will indicate a startup error and abort the startup.
[0079] If all test iterations have passed in step 312, or if any test iteration has passed in step 310, the control circuit will proceed to the final check step 314 and check whether N is the last test (the number of tests can be, for example, preset). If so, the startup test has been successfully completed, and the IC will continue to execute other startup functions. If N is not the last test in step 314, the control circuit will increment the value N in the increment N step 316, and then proceed to step 304 again to perform the next test.
[0080] Therefore, according to Figure 3 In the illustrated and described example embodiments, the IC, for which production test results have been written, can verify successful operation during startup by checking whether all iterations of each irreversible test and at least one iteration of each reversible test have passed.
[0081] It should be understood that, Figure 3The flowcharts illustrated and described herein are cited to illustrate concepts. The flowcharts according to the invention are not limited to the illustrations and descriptions herein. For example, in some embodiments, a single composite test result is stored in the NVM, and flowchart 300 is thus shortened. In embodiments, the IC is not a processor and cannot be started. Instead, the flowchart is performed by an incoming inspection system that includes a processor and a zero-insertion-force (ZIF) socket with the IC inserted.
[0082] In other embodiments, flowchart 300 is executed by the processor of functional circuitry 108 as part of the IC's startup sequence. In one embodiment, the processor accesses control circuitry to read test results from the NVM.
[0083] In some embodiments, an error limit number is defined for various recoverable test iterations, and the IC checks that the number of error indications does not exceed this limit. In one embodiment, the control circuit calculates the pass-to-fail ratio of recoverable test iterations and compares this ratio with a preset limit.
[0084] Figure 4 This is a block diagram 400 illustrating the structure of orthogonal programming of test results in a once-to-use programmable (OTP) memory according to an embodiment of the present invention. Figure 4 In the illustrated example embodiment, each test is allocated a 16-bit OTP byte 402, which can be used to store eight pass or fail results from eight test iterations numbered 0 to 7. When iteration 404 fails, the odd-numbered bits of OTP 402 are written. When a test iteration passes, the even-numbered bits of the OTP byte are written. In the first iteration, bit 0 or bit 1 is written; in the second iteration, bit 2 or bit 3 is written, and so on.
[0085] It should be noted that even-numbered and odd-numbered positions are orthogonal to each other, and therefore error records and pass records do not affect each other.
[0086] Some possible examples of the OTP byte are shown in example box 408. In the first example, the OTP byte is 0x5555, where all even-numbered bits are written, indicating that all eight iterations of the test have passed. In the second example, the OTP byte is 0x55A5. Even-numbered bits 0, 2, 8, 10, 12, and 14 are written, but odd-numbered bits 5 and 7 are also written. The test has passed six iterations, but failed twice (this can be considered as the IC being poor for non-recoverable tests and good for recoverable tests).
[0087] In the third example, the OTP byte is 0x0555. Even bits 0, 2, 4, 6, 8, and 10 are written, but bits 12 through 15 are not written. According to... Figure 4 In the illustrated embodiment, all tests must include at least eight test pass iterations or test fail iterations. Therefore, OTP byte 0x0555 indicates that the test has not yet been completed.
[0088] In the fourth example, the test result OTP byte is 0xD555. This indicates that test iterations 0 to 6 have passed, but in test iteration 7, both the pass bit (14) and the error bit (15) have been set, so the test program has been corrupted.
[0089] It should be understood that, Figure 4 The orthogonal programming structure illustrated and described above serves as an example. In alternative embodiments, other structures may be used. For example, in some embodiments, different bytes may be allocated to store the pass and fail results for each test. In some embodiments, the number of iterations for each test is not fixed but varies depending on the test. In one embodiment, the irrecoverable test does not have an OTP unit for storing the fail test result. Instead, in the case of an irrecoverable test failure, a total error bit is written, and the test is aborted.
[0090] Use multiple programmable nonvolatile memory
[0091] While the above description refers to storing test results in on-chip single-time programmable (OTP) non-volatile memory (NVM), the technology can also be used when the IC includes multiple-time programmable NVM (hereinafter referred to as "MTP"), or when the IC includes both OTP and MTP but using MTP is preferable (e.g., OTP is limited in size).
[0092] When MTP is used to store test results, care must be taken to ensure that the stored test results are not lost during the manufacturing phase when the NVM is erased (this will not happen with OTP).
[0093] Figure 5 This is a flowchart 500 illustrating a method for IC testing using multiple programmable non-volatile memory (MTP-NVM) according to an embodiment of the present invention. Figure 5 In the illustrated example embodiment, the IC will undergo a new set of tests, which will expand upon rather than replace the results of the previous test cycles. We assume that the tests must begin with an erasure of the entire NVM.
[0094] This flowchart is created by ( Figure 1The process is executed by ATE 104, starting with step 502, where ATE reads the accumulated results from the MTP NVM and stores them in random access memory (RAM). Next, in step 504, ATE erases the entire contents of the NVM. Then, ATE proceeds to step 506, which involves running additional tests. Step 506 is similar to flowchart 200 (starting from step 204), except that errors (step 210) and successes (step 208) are written into the ATE RAM.
[0095] Next, in step 508 of writing the MVM, the ATE copies the updated test results from the ATE RAM to the MTP NVM, and the process ends.
[0096] Therefore, by using RAM to temporarily store test results, enhanced testing can be achieved by replacing OTP with MTP NVM.
[0097] It should be understood that, Figure 5 The flowcharts shown and described above are exemplary. In alternative embodiments, other flowcharts may be used. For example, in some embodiments, after erasing the MTP NVM, a backup of the test results stored in ATERAM is copied back to the MTP NVM, and the results of further tests are written to the MTP NVM.
[0098] Figure 6A This is a flowchart 600 illustrating a first method for IC production testing according to an embodiment of the present invention. This flowchart is coupled to ( Figure 1 The ATE 104 of IC 100 is executed. According to Figure 6A In the illustrated example embodiment, IC 102 does not require control circuitry (unlike...). Figure 2 Flowchart 200).
[0099] The flowchart begins with IC test step 602, where the ATE runs various tests on the IC 100. As explained above, tests may include reversible tests that must always pass, reversible tests that may sometimes fail (but must pass at least once), and various non-test procedures such as calibration, personalization, etc.
[0100] Next, in step 604 of determining the composite test result, the ATE determines the composite test result based on the test results performed in step 602. This result can be either pass or fail.
[0101] Finally, in step 606 of writing the composite test results, ATE writes the composite test results into the NVM memory 112, and the flowchart ends.
[0102] It should be understood that, Figure 6A The illustrated flowchart is cited as an example. In alternative embodiments, other suitable flowcharts may be used. For example, in one embodiment, ATE 104 may compile all test results, including or excluding composite test results, into NVM 112.
[0103] Figure 6B This is a flowchart 650 illustrating an alternative to starting a pre-test IC according to an embodiment of the present invention. This flowchart is executed by IC 102 (e.g., the processor in IC 102).
[0104] The flowchart begins with startup sequence step 652, where the IC runs a startup task (e.g., running BIST). Next, in step 654, the IC reads the composite test results (which have already been written in the IC's production test) from the NVM.
[0105] Next, in step 656, the IC checks whether the read test result is passed. If so, the IC proceeds to step 658, executes additional startup tasks, and then exits the flowchart (startup complete).
[0106] If the composite test result is an error in step 656, the IC will abort the startup (e.g., reset).
[0107] Therefore, by eliminating the possibility of using untested ICs (or ICs that have failed the test), the reliability of the test can be significantly improved.
[0108] Figures 1 to 5 The production test system 100, IC 102, OTP memory 112, and OTP byte 402 shown and described above are exemplary configurations, and flowcharts 200, 300, 500, 600, and 650 are used to illustrate concepts. In alternative embodiments, other suitable configurations and flowcharts may be used. Different sub-units of IC 102 may be implemented using suitable hardware, such as one or more application-specific integrated circuits (ASICs) or field-programmable gate arrays, or using software, hardware, or a combination of software and hardware components.
[0109] ATE 104 and / or IC 102 may include one or more general-purpose processors programmed in software to perform the functions described herein. For example, the software may be downloaded to the processor electronically, either over a network or from a host. Alternatively or additionally, the software may be provided and / or stored by a non-transitory tangible medium such as magnetic storage, optical storage, or electronic storage.
[0110] Although the embodiments described herein are primarily for IC production testing, the methods and systems described herein can also be used in other applications, such as in module production testing.
[0111] It should be understood that the above embodiments are illustrated by way of example, and the present invention is not limited to the content specifically shown or described above. Rather, the scope of the present invention includes combinations and sub-combinations of the various features described above, as well as variations or modifications thereof that would be conceived by one of ordinary skill in the art upon reading the above description and which are not disclosed in the prior art. The documents incorporated herein by reference should be considered an integral part of this application, and unless any terminology defined in these incorporated documents conflicts with the definitions express or implied in this specification, only the definitions in this specification should be considered.
Claims
1. An integrated circuit, characterized in that, include: One non-volatile memory; as well as A startup circuit, configured to start the integrated circuit, includes reading multiple values from the non-volatile memory indicating whether the production test of the integrated circuit has been successfully completed, and initiating a reaction action if the multiple values indicate that the production test has not been successfully completed. If the multiple numerical values indicate that the production test has been successfully completed, the startup circuit further starts the integrated circuit; The reaction action mentioned above includes stopping the startup of the integrated circuit.
2. The integrated circuit as described in claim 1, characterized in that, The multiple values are composed of a pass / fail bit.
3. The integrated circuit as described in claim 1, characterized in that, The multiple values have been written to the non-volatile memory by an external automated testing device.
4. The integrated circuit as described in claim 1, characterized in that, It also includes control circuitry configured to receive information from an external automated testing device indicating whether the production test has been successfully completed, and to write the plurality of values to the non-volatile memory based on the information.
5. The integrated circuit as described in claim 1, characterized in that, The plurality of values include an irreversible test pass indicator, an irreversible test error indicator, a recoverable test error indicator, and a recoverable test pass indicator, wherein the irreversible test is not allowed to be judged as a pass test when there is an error in the test result, and the recoverable test is allowed to be judged as a pass test when there is an error in the test result.
6. The integrated circuit as claimed in claim 1, characterized in that, The plurality of values includes values corresponding to a passed test and values corresponding to a failed test, wherein the values corresponding to a passed test and the values corresponding to a failed test are stored in different fields of the non-volatile memory and are orthogonal to each other.
7. The integrated circuit as claimed in claim 1, characterized in that, The non-volatile memory is a once-programmable memory.
8. The integrated circuit as claimed in claim 1, characterized in that, The non-volatile memory is a reprogrammable non-volatile memory.
9. A method for starting an integrated circuit, characterized in that, The integrated circuit includes non-volatile memory, and the method includes: Read from the non-volatile memory multiple values indicating whether the production testing of the integrated circuit has been successfully completed; and If the multiple numerical values indicate that the production test has not been successfully completed, initiate a reaction action; If the multiple numerical values indicate that the production test has been successfully completed, the integrated circuit is then activated. The reaction action mentioned above includes stopping the startup of the integrated circuit.
10. The method as described in claim 9, characterized in that, The multiple values are composed of a pass / fail bit.
11. The method as described in claim 9, characterized in that, The multiple values have been written to the non-volatile memory by an external automated testing device.
12. The method as described in claim 9, characterized in that, Furthermore, the integrated circuit includes receiving information from an external automated testing device indicating whether the production test has been successfully completed, and writing the plurality of values to the non-volatile memory based on the information.
13. The method as described in claim 9, characterized in that, The plurality of values include an irreversible test pass indicator, an irreversible test error indicator, a recoverable test error indicator, and a recoverable test pass indicator, wherein the irreversible test is not allowed to be judged as a pass test when there is an error in the test result, and the recoverable test is allowed to be judged as a pass test when there is an error in the test result.
14. The method as described in claim 9, characterized in that, The plurality of values includes values corresponding to a passed test and values corresponding to a failed test, wherein the values corresponding to a passed test and the values corresponding to a failed test are stored in different fields of the non-volatile memory and are orthogonal to each other.
15. The method as described in claim 9, characterized in that, The non-volatile memory is a once-programmable memory.
16. The method as described in claim 9, characterized in that, The non-volatile memory is a reprogrammable non-volatile memory.
Citation Information
Patent Citations
Method of programming one-time programmable (OTP) memory device and method of testing semiconductor integrated circuit including the same
US20170040067A1
Semiconductor integrated circuit and rotation detection device
JP6611877B1
