A suspended decoration system and a construction method thereof

CN115749110BActive Publication Date: 2026-10-23ARMSTRONG BUILDING PROD SUZHOU CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202211360097.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-02
Publication Date
2026-10-23
Estimated Expiration
2042-11-02

AI Technical Summary

Technical Problem

[0004]由于现有技术存在上述缺陷,本发明提供了一种形式多变且能够满足个性化设计需求的悬吊装饰系统,以克服现有悬吊装饰系统形式单一、规格固定且难以满足当下设计师及用户对多变的设计感、使用场景的要求的缺陷

Benefits of technology

[0035](1)本发明的悬吊装饰系统,相比于现有技术提供了一种全新的吊顶板展示形式,能够为空间提供更多的设计感及多变性,满足当前用户对审美及个性化的更高要求,让矿棉吸声板具备新的生命力,弥补了矿棉板死板单一的缺陷;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115749110B_ABST
    Figure CN115749110B_ABST
Patent Text Reader

Abstract

The application discloses a kind of suspension decoration system and its construction method, suspension decoration system includes sound-absorbing suspension plate and suspension plate fixed frame;Sound-absorbing suspension plate outer circumferential surface is equipped with the protective frame that sound-absorbing suspension plate is wrapped in, and lug position is equipped on the protective frame;Suspension plate fixed frame includes suspender, adapter assembly, T-shaped keel, hook and spring buckle, suspender is fixed in the lower side of upper floor plate, suspender is fixed with T-shaped keel by adapter assembly, T-shaped keel includes mutually perpendicular flange portion and fixed portion, fixed portion is divided flange portion and fixed portion is fixed away from flange portion and adapter assembly, hook includes hook first sub-piece and hook second sub-piece that mutually cooperate and are clamped, after hook first sub-piece and hook second sub-piece are clamped, hollow structure that is matched with T-shaped keel is left and hook is equipped with the buckle hole for fixed spring buckle, hook is clamped and fixed on T-shaped keel, spring buckle passes through buckle hole and lug position.The suspension decoration system of the application provides a kind of brand-new ceiling board display form.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of interior decoration technology, and specifically to a suspended decoration system and its construction method. Background Technology

[0002] Interior decoration, also known as interior design, is a manifestation of improved living and gathering conditions and has a long history. With the continuous improvement of people's living standards, the requirements for interior design are becoming increasingly higher. Suspended ceilings are one of the most common forms of interior decoration. For large office areas, large-area suspended ceiling panels are generally used. Mineral wool sound-absorbing panels are a common type of suspended ceiling panel, providing both heat insulation and sound absorption. Currently, most mineral wool sound-absorbing panels are suspended using a keel system. Limited by the keel, the specifications of mineral wool sound-absorbing panels are often relatively fixed (square or rectangular in shape, with 600mm*600mm being a common size). Furthermore, this type of ceiling is generally a flat structure, resulting in a monotonous overall form that fails to meet the diverse design and usage requirements of today's designers and users.

[0003] Therefore, developing a versatile suspended decoration system that can meet personalized design needs is of great practical significance. Summary of the Invention

[0004] In view of the above-mentioned defects in the existing technology, the present invention provides a suspension decoration system that is versatile and can meet the needs of personalized design, so as to overcome the defects of the existing suspension decoration system that is monotonous in form, fixed in specifications, and difficult to meet the requirements of designers and users for diverse design sense and usage scenarios.

[0005] To achieve the above objectives, the present invention provides the following technical solution:

[0006] A suspended decorative system includes a sound-absorbing suspension panel and a suspension panel mounting bracket;

[0007] The outer periphery of the sound-absorbing suspension panel is provided with a protective frame to enclose the sound-absorbing suspension panel and ensure the structural reliability of the sound-absorbing suspension panel (which increases the product life to a certain extent). Considering that the material hardness of the sound-absorbing suspension panel, namely the mineral wool sound-absorbing panel, is not high, using soft edging or no edging will affect the shape of the corners. Here, metal edging is adopted, and aluminum alloy or other hard materials are used as the frame of the mineral wool panel to suspend the entire material vertically. The installation methods are greatly enriched. On the one hand, the length and width of the mineral wool panel can be customized, no longer limited to the 600*600 form of the keel. On the other hand, there is more room for choice in the hanging spacing, splicing method, etc. The protective frame is provided with at least two hanging lug positions located on the same side of the protective frame.

[0008] The suspended panel fixing frame includes a hanger, a connecting assembly, a T-shaped keel, hooks, and spring buckles. The hanger is fixed to the lower side of the upper floor slab and is fixed to the T-shaped keel through the connecting assembly. The T-shaped keel includes mutually perpendicular flanges and a fixing part. The fixing part is evenly distributed across the flanges and is fixed to the connecting assembly away from the flanges. The hooks include a first hook sub-piece and a second hook sub-piece that engage with each other. After the first hook sub-piece and the second hook sub-piece engage, they have a hollow structure that matches the T-shaped keel. The first hook sub-piece and the second hook sub-piece are also provided with buckle holes for fixing the spring buckles. The first hook sub-piece and the second hook sub-piece are engaged and fixed on the T-shaped keel. The spring buckles pass through the buckle holes and the hanging lugs to fix the sound-absorbing suspended panel to the suspended panel fixing frame.

[0009] The suspended decoration system of this invention provides a brand-new form of ceiling panel display compared to the prior art, which can provide more design sense and versatility to the space, meet the current users' higher requirements for aesthetics and personalization, give mineral wool sound-absorbing panels new vitality, make up for the rigid and monotonous defects of mineral wool panels, and the sound-absorbing suspended panels are arranged in parallel with each other, so the overall suspended decoration system has good sound absorption effect and good application prospects.

[0010] As a preferred technical solution:

[0011] As described above, in a suspended decoration system, the adapter assembly includes a C-shaped light steel keel, a C-shaped keel hanger, and a hook.

[0012] The suspension rods fix the C-shaped light steel keel to the C-shaped keel hangers, and the T-shaped keel is fixed to the C-shaped light steel keel by hooks. Using the C-shaped light steel keel and T-shaped keel as a grid frame, traditional flat ceiling mineral wool sound-absorbing panels can be laid on the grid frame, making it more versatile.

[0013] In the suspended decorative system described above, both the T-shaped keel and the C-shaped light steel keel are parallel to the horizontal plane and perpendicular to each other.

[0014] As described above, in a suspended decorative system, the C-shaped keel hanger includes a C-shaped main body and a semi-enclosed panel;

[0015] The cross-section of the C-shaped main body is C-shaped, and a semi-enclosed plate is arranged on the opening side of the C-shaped main body, but the semi-enclosed plate does not completely enclose the opening side of the C-shaped main body.

[0016] The C-shaped light steel keel is arranged inside the C-shaped main body and is limited by a semi-enclosed plate. The upper end of the C-shaped light steel keel is provided with a limiting bolt, which is fixed to the C-shaped keel hanger.

[0017] In the suspended decorative system described above, the fixing part of the T-shaped keel is provided with a T-shaped keel fixing slot away from the flange;

[0018] The hook is provided with a hook keel fixing position that matches the T-shaped keel fixing position to fix the T-shaped keel.

[0019] In the suspended decorative system described above, the hanger rod is bolted to the C-shaped keel hanger;

[0020] The hook is also provided with a keel groove and a hook fixing bolt that match the C-shaped light steel keel. The hook is fitted onto the C-shaped light steel keel, and the threaded part of the hook fixing bolt is inserted into the keel groove. The hook can be fixed to the C-shaped light steel keel by adjusting the hook fixing bolt.

[0021] In the suspended decoration system described above, the adapter component is an adapter hanger;

[0022] The fixing part of the T-shaped keel is provided with a T-shaped keel fixing slot away from the flange;

[0023] One end of the adapter is bolted to the hanger rod, and the other end is provided with an adapter keel fixing position that matches the T-shaped keel fixing position to fix the T-shaped keel. This invention provides two specific forms of suspended decorative systems; however, the scope of protection of this invention is not limited to these, and only feasible technical solutions are given here.

[0024] As described above, in a suspended decorative system, there are multiple buckle holes;

[0025] The sound-absorbing suspension panel is perpendicular to the T-shaped keel.

[0026] In the suspended decorative system described above, the suspension rod is fixed to the upper floor slab by expansion bolts driven into the upper floor slab.

[0027] This invention provides a construction method for a suspended decorative system as described above, comprising the following steps:

[0028] (1) Make a hole in the upper floor slab and fix the hanger to the upper floor slab with expansion bolts;

[0029] (2) Install the adapter assembly on the hanger and fix the T-shaped keel to the adapter assembly;

[0030] (3) Secure the hook to the T-shaped keel and attach the spring clip to the hook's buckle hole;

[0031] (4) The construction of the suspended decoration system is completed by attaching the spring to the lug position of the sound-absorbing suspension board.

[0032] The above construction method has a simple and convenient procedure, high overall construction efficiency, and good application prospects.

[0033] The above technical solution is only one feasible technical solution of the present invention. The scope of protection of the present invention is not limited thereto. Those skilled in the art can reasonably adjust the specific design according to actual needs.

[0034] The above invention has the following advantages or beneficial effects:

[0035] (1) The suspended decoration system of the present invention provides a new form of ceiling panel display compared with the prior art, which can provide more design sense and variability for the space, meet the higher requirements of current users for aesthetics and personalization, give mineral wool sound-absorbing panels new vitality, and make up for the rigid and monotonous defects of mineral wool panels.

[0036] (2) In the suspended decoration system of the present invention, the sound-absorbing suspension panels are arranged in parallel to each other, and the overall suspended decoration system has a good sound absorption effect;

[0037] (3) The suspended decoration system of the present invention has many styles. It can be installed alone as a sound-absorbing suspension board, and can also be combined with traditional flat mineral wool board to form a richer combination.

[0038] (4) The construction method of the suspended decoration system of the present invention is simple and convenient, with high overall construction efficiency and great application prospects. Attached Figure Description

[0039] The invention, its features, shape, and advantages will become more apparent from the following detailed description of non-limiting embodiments with reference to the accompanying drawings. Like reference numerals denote like parts throughout the drawings, the emphasis being on illustrating the gist of the invention.

[0040] Figure 1 This is a main schematic diagram of the suspended decoration system in Example 1;

[0041] Figure 2 This is a top view of the suspended decorative system of Example 1;

[0042] Figure 3 This is a left view of the suspended decorative system of Example 1;

[0043] Figure 4 for Figure 3 Enlarged view of position A in the middle;

[0044] Figure 5 This is a left schematic diagram of the suspended decoration system in Example 2;

[0045] Figure 6 for Figure 5 Enlarged view of position B in the middle;

[0046] Figure 7 This is a top view of the suspended decorative system of Example 2;

[0047] Figure 8 This is a main schematic diagram of the suspended decoration system in Example 2;

[0048] Figure 9 This is a main schematic diagram of the suspended decoration system in Example 3;

[0049] Figure 10 This is a left view of the suspended decorative system of Example 3;

[0050] Among them, 1-upper floor slab, 2-hanging rod, 3-C-type keel hanging component, 4-C-type light steel keel, 5-hook, 6-T-type keel, 61-T-type keel fixing position, 7-hook, 8-spring buckle, 9-sound-absorbing suspension plate, 10-transfer hanging component, 101-transfer hanging component keel fixing position, 11-cable, 12-bottom adjuster, 13-safety hook. Detailed Implementation

[0051] The structure of the present invention will be further described below with reference to the accompanying drawings and specific embodiments, but this is not intended to limit the present invention.

[0052] Example 1

[0053] A suspended decoration system, such as Figures 1-4 As shown, it includes a sound-absorbing suspension plate 9 and a suspension plate fixing frame;

[0054] The outer periphery of the sound-absorbing suspension panel 9 is provided with a protective frame that encloses the sound-absorbing suspension panel, and the protective frame is provided with at least two lifting lugs 14 located on the same side of the protective frame;

[0055] The suspended panel fixing frame includes a hanger rod 2, a C-shaped light steel keel 4, a C-shaped keel hanger 3, a hook 5, a T-shaped keel 6 (both the T-shaped keel 6 and the C-shaped light steel keel 4 are parallel to the horizontal plane and perpendicular to each other, and the sound-absorbing suspended panel 9 is perpendicular to the T-shaped keel 6), a hook 7, and a spring buckle 8. The hanger rod 2 is fixed to the lower side of the upper floor slab 1 (the hanger rod 2 is fixed to the upper floor slab 1 by expansion bolts driven into the upper floor slab 1), and the hanger rod 2 fixes the C-shaped light steel keel 4 through the C-shaped keel hanger 3 (the hanger rod 2 is fixed to the upper floor slab 1 by expansion bolts driven into the upper floor slab 1). Rod 2 is bolted to C-shaped keel hanger 3. C-shaped keel hanger 3 includes a C-shaped main body and a semi-enclosed plate. The cross-section of the C-shaped main body is C-shaped. The semi-enclosed plate is arranged on the open side of the C-shaped main body but does not completely close the open side of the C-shaped main body. C-shaped light steel keel 4 is arranged inside the C-shaped main body and is limited by the semi-enclosed plate. The upper end of C-shaped light steel keel 4 is provided with a limiting bolt (the limiting bolt is fixed to C-shaped keel hanger 3). T-shaped keel 6 is fixed to C-shaped light steel keel 4 by hook 5. The upper hook 5 is equipped with a keel groove and hook fixing bolt that match the C-shaped light steel keel 4. The hook 5 is fitted onto the C-shaped light steel keel 4, and the threaded part of the hook fixing bolt is inserted into the keel groove. The hook 5 can be fixed to the C-shaped light steel keel 4 by adjusting the hook fixing bolt. The T-shaped keel 6 includes mutually perpendicular flanges and fixing parts. The fixing part is evenly distributed on the flanges, and the fixing part is provided with a T-shaped keel fixing slot 61 away from the flanges. The hook 5 is equipped with a hook that matches the T-shaped keel fixing slot 61. The keel fixing position is used to fix the T-shaped keel 6. The hook 7 includes a first hook sub-piece and a second hook sub-piece that are engaged with each other. After the first hook sub-piece and the second hook sub-piece are engaged, they have a hollow structure that matches the T-shaped keel 6. The first hook sub-piece and the second hook sub-piece are also provided with multiple buckle holes for fixing spring buckles 8. The first hook sub-piece and the second hook sub-piece are engaged and fixed on the T-shaped keel 6. The spring buckle 8 passes through the buckle hole and the hanging lug position 14 to fix the sound-absorbing suspension plate 9 to the suspension plate fixing frame.

[0056] Specifically, the above-mentioned sound-absorbing suspension panels can be 36mm thick, and the standard sizes are 1200mm*300mm, 1200mm*400mm, 1200mm*600mm, and 1500mm*300mm.

[0057] Weight: 4.24 kg per piece for 1200mm*300mm, 5.60 kg per piece for 1200mm*400mm, 5.47 kg per piece for 1200mm*600mm, and 7.96 kg per piece for 1500mm*300mm;

[0058] Sound absorption performance NRC=0.8, fire resistance rating A2, moisture resistance rating RH99%.

[0059] The construction method of the above-mentioned suspended decoration system includes the following steps:

[0060] (1) Make a hole in the upper floor slab and fix the hanger to the upper floor slab with expansion bolts;

[0061] (2) Install the C-type keel hanger on the hanger rod, restrict the C-type light steel keel in the C-type keel hanger by the limit bolt, install the hook on the C-type light steel keel, and install the T-type keel on the hook;

[0062] (3) Secure the hook to the T-shaped keel and attach the spring clip to the hook's buckle hole;

[0063] (4) The construction of the suspended decoration system is completed by attaching the spring to the lug position of the sound-absorbing suspension board.

[0064] Example 2

[0065] A suspended decoration system, such as Figures 5-8 As shown, it includes a sound-absorbing suspension plate 9 and a suspension plate fixing frame;

[0066] The outer periphery of the sound-absorbing suspension panel 9 is provided with a protective frame that encloses the sound-absorbing suspension panel, and the protective frame is provided with at least two lifting lugs 14 located on the same side of the protective frame;

[0067] The suspension board fixing frame includes a hanger 2, a transition hanger 10, a T-shaped keel 6 (the T-shaped keel 6 is perpendicular to the sound-absorbing suspension board 9), a hook 7, and a spring buckle 8. The hanger 2 is fixed to the lower side of the upper floor slab 1 (the hanger 2 is fixed to the upper floor slab 1 by expansion bolts driven into the upper floor slab 1). One end of the transition hanger 10 is bolted to the hanger 2, and the other end is provided with a transition hanger keel fixing position 101. The fixing part of the T-shaped keel 6, away from the flange, is provided with a T-shaped keel fixing slot 61 that matches the transition hanger keel fixing position 101 to fix the T-shaped keel 6. The T-shaped keel 6 includes mutually perpendicular... The flange and the fixing part are straight. The fixing part is evenly divided into the flange and is provided with a T-shaped keel fixing position 61 away from the flange. The hook 7 includes a first hook sub-piece and a second hook sub-piece that are engaged with each other. After the first hook sub-piece and the second hook sub-piece are engaged, they have a hollow structure that matches the T-shaped keel 6. The first hook sub-piece and the second hook sub-piece are also provided with multiple buckle holes for fixing spring buckles 8. The first hook sub-piece and the second hook sub-piece are engaged and fixed on the T-shaped keel 6. One end of the spring buckle 8 is fixed on the buckle hole, and the other end is fixed on the lifting lug position 14 on the sound-absorbing suspension plate protective frame.

[0068] The construction method of the above-mentioned suspended decoration system includes the following steps:

[0069] (1) Make a hole in the upper floor slab and fix the hanger to the upper floor slab with expansion bolts;

[0070] (2) Install the adapter on the lifting rod and fix the T-shaped keel to the adapter;

[0071] (3) Secure the hook to the T-shaped keel and attach the spring clip to the hook's buckle hole;

[0072] (4) The construction of the suspended decoration system is completed by attaching the spring to the lug position of the sound-absorbing suspension board.

[0073] Example 3

[0074] A suspended decoration system, such as Figures 9-10 As shown, it includes sound-absorbing suspension plate 9 and steel wire suspension assembly;

[0075] The outer periphery of the sound-absorbing suspension panel 9 is provided with a protective frame that encloses the sound-absorbing suspension panel, and the protective frame is provided with at least two lifting lugs 14 located on the same side of the protective frame;

[0076] The steel wire suspension assembly includes a cable 11, a bottom adjuster 12, and a safety hook 13 connected in sequence. The safety hook 13 is fixed to the lifting lug 14. The sound-absorbing suspension plate 9 can be fixed to the upper floor slab through the cable 11 to form a suspended decoration system.

[0077] Those skilled in the art should understand that variations can be implemented by combining existing technology with the above embodiments, which will not be elaborated here. Such variations do not affect the essence of the present invention, and will not be elaborated here either.

[0078] The preferred embodiments of the present invention have been described above. It should be understood that the present invention is not limited to the specific embodiments described above, and the devices and structures not described in detail should be understood as being implemented in a conventional manner in the art. Any person skilled in the art can make many possible variations and modifications to the technical solutions of the present invention using the methods and techniques disclosed above, or modify them into equivalent embodiments with equivalent changes, without departing from the scope of the present invention. This does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes, and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the present invention's technical solutions still fall within the protection scope of the present invention.

Claims

1. A suspended decorative system, characterized in that: Includes sound-absorbing suspension panels and suspension panel mounting brackets; The outer periphery of the sound-absorbing suspension panel is provided with a protective frame that encloses the sound-absorbing suspension panel, and the protective frame is provided with at least two lifting lugs located on the same side of the protective frame; The suspended panel fixing frame includes a hanger, a transition assembly, a T-shaped keel, hooks, and spring buckles. The hanger is fixed to the lower side of the upper floor slab. The hanger is fixed to the T-shaped keel through the transition assembly. The T-shaped keel includes mutually perpendicular flanges and a fixing part. The fixing part is evenly divided from the flange and is fixed to the transition assembly away from the flange. The hook includes a first hook sub-piece and a second hook sub-piece that engage with each other. After the first hook sub-piece and the second hook sub-piece engage, they have a hollow structure that matches the T-shaped keel. The first hook sub-piece and the second hook sub-piece are also provided with buckle holes for fixing the spring buckles. The first hook sub-piece and the second hook sub-piece are engaged and fixed on the T-shaped keel. The spring buckle passes through the buckle holes and the lifting lug position to fix the sound-absorbing suspended panel to the suspended panel fixing frame. The transition assembly includes a C-shaped light steel keel, a C-shaped keel hanger, and a hook. The hanger rod fixes the C-shaped light steel keel with the C-shaped keel hanger, and the T-shaped keel is fixed to the C-shaped light steel keel with the hook. The T-shaped keel and the C-shaped light steel keel are both parallel to the horizontal plane and perpendicular to each other. The C-shaped keel hanger includes a C-shaped main body and a semi-enclosed plate. The cross-section of the C-shaped main body is C-shaped, and a semi-enclosed plate is arranged on the opening side of the C-shaped main body, but the semi-enclosed plate does not completely enclose the opening side of the C-shaped main body. The C-shaped light steel keel is arranged inside the C-shaped main body and is limited by a semi-enclosed plate. The upper end of the C-shaped light steel keel is provided with a limiting bolt. The limiting bolt is fixed to the C-shaped keel hanger. The T-shaped keel fixing part is provided with a T-shaped keel fixing slot away from the flange. The hook is provided with a hook keel fixing position that matches the T-shaped keel fixing position to fix the T-shaped keel, and the lifting rod is bolted to the C-shaped keel lifting component; The hook is also provided with a keel groove and a hook fixing bolt that match the C-shaped light steel keel. The hook is fitted onto the C-shaped light steel keel, and the threaded part of the hook fixing bolt is inserted into the keel groove. The hook can be fixed to the C-shaped light steel keel by adjusting the hook fixing bolt.

2. The suspended decoration system according to claim 1, characterized in that, The adapter assembly is an adapter lifting component; The T-shaped keel is provided with a T-shaped keel fixing slot away from the flange. One end of the adapter is bolted to the hanger rod, and the other end is provided with an adapter keel fixing position that matches the T-shaped keel fixing position to fix the T-shaped keel. There are multiple buckle holes. The sound-absorbing suspension panel is perpendicular to the T-shaped keel, and the suspension rod is fixed to the upper floor slab by expansion bolts driven into the upper floor slab.

3. The construction method of a suspended decoration system as described in claim 1, characterized in that, Includes the following steps: (1) Make a hole in the upper floor slab and fix the hanger to the upper floor slab with expansion bolts; (2) Install the adapter assembly on the hanger and fix the T-shaped keel to the adapter assembly; (3) Secure the hook to the T-shaped keel and attach the spring clip to the hook's buckle hole; (4) The construction of the suspended decoration system is completed by attaching the spring to the lug position of the sound-absorbing suspension board.

Citation Information

Patent Citations

  • Metal ceiling of suspension structure

    CN107060183A

  • Ceiling mounting structure

    CN108316539A

  • Downward curtain type curtain wall and inner room suspended ceiling

    CN215290857U

  • Suspension assembly of mineral wool board

    CN219825805U