一种开机阶段高压旁路自动控制装置及其控制方法

By introducing redundant external controllers and high-precision main steam pressure transmitters into thermal power plants, the problem of insufficient automatic adjustment of high-pressure bypass control during the start-up phase was solved, achieving efficient automatic control, reducing manual operation and start-up time, and improving the reliability and accuracy of the system.

CN115751278BActive Publication Date: 2026-07-17HUANENG (FUJIAN) ENERGY DEVELOPMENT LIMITED COMPANY FUZHOU BRANCH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
HUANENG (FUJIAN) ENERGY DEVELOPMENT LIMITED COMPANY FUZHOU BRANCH
Filing Date
2022-11-11
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing technologies have insufficient automatic adjustment functions in high-voltage bypass control during the start-up phase of thermal power plants, resulting in a large amount of manual operation and long start-up time. Furthermore, the data acquisition accuracy of traditional DCS systems is insufficient, which cannot meet the requirements of complex operating conditions and can easily lead to increased energy consumption and equipment damage.

Method used

A redundant external controller is used to communicate with the original DCS system. Combined with a high-precision main steam pressure transmitter and start-up control loop, automatic control of the high-pressure bypass is achieved. Precise control is achieved through deviation calculation and switching modules, and a redundancy judgment mechanism is set up to ensure system reliability.

Benefits of technology

It achieves automated control of high-voltage bypass, reduces manual operation, shortens start-up time, improves control accuracy, avoids equipment damage, and saves fuel consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115751278B_ABST
    Figure CN115751278B_ABST
Patent Text Reader

Abstract

本发明涉及一种开机阶段高压旁路自动控制装置,包括:通信连接的原DCS系统和冗余外挂控制器;原DCS系统包括依次连接的采集模块、偏差控制回路、切换模块和执行机构,采集模块用于采集高压旁路相关数据信号,偏差控制回路用于根据高压旁路相关数据信号与设定的阈值的偏差输出第一控制信号;冗余外挂控制器包括高精度主蒸汽压力变送器和开机阶段控制回路;高精度主蒸汽压力变送器用于检测高压旁路的主蒸汽压力数据信号,开机阶段控制回路用于根据高压旁路相关数据信号信号和主蒸汽压力数据信号与设定的阈值进行偏差计算,并根据计算结果输出第二控制信号;切换模块用于切换输出至执行机构的控制信号,执行机构根据控制信号控制高压旁路的开度。