A rock mass tunnel MRQD determination method based on discrete elements and deep learning
By using discrete element method and deep learning methods, a method for determining the MRQD of rock mass tunnels is established, which solves the problem that the RQD value depends on geological experience in the existing technology, and realizes a fast and accurate evaluation of the surrounding rock quality, which is applicable to various fault conditions.
Patent Information
- Application Number
- CN202211491163.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-25
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2042-11-25
AI Technical Summary
In rock tunnels, existing technologies rely on the experience of geologists to determine RQD values, and are difficult to reflect the overall condition of the surrounding rock, leading to inaccurate evaluations.
A method for determining the MRQD of rock tunnels is established using discrete element method and deep learning. By building a discrete element model and a deep learning network, the MRQD value is quickly determined using the structural features exposed during tunnel excavation. This method is applicable to both cases with and without specific faults.
It enables rapid and accurate determination of the surrounding rock quality of tunnels, reduces reliance on the experience of geological personnel, and can reflect the comprehensive situation of the surrounding rock, especially when there are specific faults.
Smart Images

Figure CN115774956B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of rock tunnel engineering technology, and in particular to a method for determining the MRQD of rock tunnels based on discrete element method and deep learning. Rock quality index is abbreviated as RQD, and MRQD represents the comprehensive RQD of multiple locations within the tunnel support range. Background Technology
[0002] In rock engineering, the Rock Quality Determination (RQD) is the ratio (expressed as a percentage) of the cumulative length of columnar rock cores equal to or greater than 10 cm per drilling pass to the total footage per drilling cycle. RQD values are specified using a 75mm diameter diamond drill bit. Proposed by Deer, an American, RQD is widely used to evaluate rock mass integrity and serves as an important indicator for rock quality grading. Therefore, RQD has become a crucial aspect of rock mass evaluation in engineering. RQD is an important indicator in rock mass strength grading systems such as the Q system and the RMR system.
[0003] When using rock mass strength grading systems to assess rock tunnel engineering, it is typically necessary to determine the Rectified Quality Division (RQD) value. While RQD is defined as requiring borehole drilling, for rock tunnels, the RQD value is generally determined by examining the structural features of the exposed working face. This process heavily relies on the geological personnel's experience and understanding of the engineering data, thus introducing a degree of subjectivity. Furthermore, the stability characteristics of a tunnel are significantly influenced by the surrounding rock. If the determined RQD value accurately reflects the condition of the surrounding rock within the tunnel's perimeter, it will allow for a better assessment of the rock conditions, thus guiding tunnel design. Summary of the Invention
[0004] The purpose of this invention is to provide a method for determining the MRQD of rock tunnels based on discrete element method and deep learning. This method addresses the problem that existing methods for determining the RQD value in rock tunnels generally rely on the structural features of the excavation face, which is highly dependent on the personal experience of geological workers and their knowledge of engineering data. Furthermore, the determined RQD value is difficult to reflect the comprehensive condition of the surrounding rock within the tunnel support area.
[0005] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:
[0006] A method for determining the MRQD (Mean Quality Determination) of rock tunnels based on discrete element method and deep learning, characterized in that the MRQD is a comprehensive RQD (Rock Quality Determination) at multiple locations within the tunnel support area, and the RQD is a rock quality index; the method includes:
[0007] S1: Establish a discrete element model based on the structural surface characteristics of the rock mass tunnel engineering area;
[0008] S2: Set the discrete element model cutting surface according to the rock mass tunnel axis, cross-section, support design, and excavation progress;
[0009] S3: Calculate the MRQD value of the cutting surface by setting multiple RQD measurement lines on the cutting surface;
[0010] S4: Establish a deep learning prediction model for MRQD values of rock tunnels and train the deep learning network.
[0011] S5: Predict the MRQD of a tunnel based on the exposure status of the rock mass tunnel, including the determination of the MRQD of a tunnel without a specific fault and the determination of the MRQD of a tunnel with a specific fault.
[0012] S6: Apply MRQD values to evaluate the quality of tunnel rock mass;
[0013] S7: Adjustment and sample supplementation and update of the discrete element model for rock mass tunnels.
[0014] Based on the above technical solutions, the present invention can also employ the following further technical solutions, or combine these further technical solutions:
[0015] In S1, the structural surface characteristics of the engineering area mainly include the number of structural surface groups, spacing, length, and distribution characteristics. The discrete element model is established based on the structural surface characteristics obtained from the previous geological exploration activities in the engineering area.
[0016] In S2, the cutting surfaces are arranged perpendicular to the tunnel axis, and the spacing between the cutting surfaces is set to be less than or equal to half of the tunnel excavation advance. n cutting surfaces Gk (k = 1, 2, 3, ..., n) are determined. The size of the cutting surfaces needs to exceed the tunnel + surrounding rock support range.
[0017] In S3, there are m RQD survey lines arranged around the tunnel, and the length of each RQD survey line is l. i (i=1,2,3,…,m) is greater than or equal to the support length, and the spacing of the RQD survey lines can be consistent with the spacing of the support along the tunnel perimeter;
[0018] In S3, RQD on a single measuring line i The values (i = 1, 2, 3, ..., m) are calculated using the RQD formula. For the MRQD within the surrounding rock support area, the weighted average value is taken based on the length of each survey line.
[0019]
[0020] In S4, the n samples in the sample library are information for each cutting surface Gk (k = 1, 2, 3, ..., n), including the number of structural surface groups, spacing, length, and distribution characteristics within the tunnel body on section k, as well as the MRQD calculated for section k based on S3. k value.
[0021] In S4, the deep learning prediction model takes the structural information of k profiles—number of groups, spacing, length, and distribution features—as input, corresponding to MRQD. k The value is the output; the input layer is structural surface information—number of groups, spacing, length, and distribution features—and the output layer is MRQD. k The deep learning network is trained by setting values and including two hidden layers. When the mean square error (MSE) of the test samples is less than 1 / 1000 after more than 500 training iterations, the deep learning prediction model network is considered to meet the accuracy requirements, and the trained deep learning model is saved.
[0022] In S5, the application of a deep learning model to determine the MRQD value of a rock tunnel falls into two categories:
[0023] Q1: For tunnel excavation without encountering faults, given the exposed structural features of the tunnel face, including the number of groups, spacing, length, and distribution characteristics, a pre-trained deep learning network model in S4 can quickly predict the MRQD under this exposure condition. t .
[0024] Q2: When encountering a specific fault during the excavation of a rock tunnel, since this specific fault was not reflected in the previous discrete element modeling, perform MQRD prediction and adjustment according to the following steps:
[0025] Step 1: Without considering specific faults, collect information on structural surfaces within the tunnel body.
[0026] Step 2: Input the structural surface information into the deep learning model to predict the MQRDt of the tunnel at that location;
[0027] Step 3: Among the multiple cutting surfaces of the discrete element model, find the cutting surface Gt that is closest to MRQDt;
[0028] Step 4: Cut out a specific fault on the cutting surface Gt;
[0029] Step 5: Consider the information of specific faults and structural planes on the cutting surface Gt, and recalculate MRQD. This value is the MRQD value when encountering a specific fault.
[0030] There can be one or more specific faults.
[0031] In S6, the MRQD value is used to classify and evaluate the tunnel rock mass, as shown in Table 1.
[0032] Table 1. Classification of Surrounding Rocks under MRQD
[0033] MRQD value 0-20 20-40 40-60 60-85 85-100 Tunnel rock mass quality assessment Very bad Difference generally good very good
[0034] In S7, after every 100-200 meters of tunnel excavation, newly exposed structural features are added, and steps S1-S4 are repeated. Then, based on S5, the MRQD of subsequent rock tunnel excavation is predicted.
[0035] By adopting the above technical solution, the present invention has at least the following technical effects or advantages:
[0036] This method establishes the MRQD value, an evaluation index for the surrounding rock quality of rock masses in tunnels. Through discrete element modeling and deep learning methods, it enables rapid determination of the MRQD value of rock masses based on the characteristics of the tunnel face exposed during excavation. This solves the problems that RQD mainly relies on the experience of geologists and that RQD is difficult to reflect the anisotropy of rock mass and the characteristics of the support range. In particular, it expands the applicability of the method for determining MRQD values in the presence of specific faults. Attached Figure Description
[0037] Figure 1 This is a flowchart of a method for determining the RQD of rock tunnels based on discrete element method and deep learning according to the present invention.
[0038] Figure 2 This is a discrete element model of a rock tunnel engineering project established based on the structural surface characteristics of the engineering area in an embodiment of the present invention (in the figure, 201-surrounding rock, 202-tunnel, 203-structural surface);
[0039] Figure 3 This is a diagram showing the cutting surface configuration according to an embodiment of the present invention. In the diagram, 301 represents cutting surface 1, and 302 represents cutting surface 2.
[0040] Figure 4 This is an embodiment of the present invention. Figure 3 Information diagram of surrounding rock, tunnel and structural plane on the middle cutting surface 301;
[0041] Figure 5 This is an embodiment of the present invention. Figure 4 Information diagram of surrounding rock, tunnel and structural plane on the middle cutting surface 302;
[0042] Figure 6 A diagram illustrating the MRQD calculation method for rock tunnels according to an embodiment of the present invention (the location of the 601-RQD survey line in the diagram);
[0043] Figure 7 This is a schematic diagram of the intersection between a tunnel and a defined fault space according to an embodiment of the present invention (in the figure, 701 - specific fault);
[0044] Figure 8 This is a diagram showing the MRQD calculation under the condition of a deterministic fault in an embodiment of the present invention. Detailed Implementation
[0045] This application provides a method for determining the rock mass tunnel RQD based on discrete element method and deep learning. This method enables rapid determination of the RQD within the support range based on the structural surface characteristics exposed during rock mass tunnel excavation. It solves the problems that RQD mainly relies on the experience of geological personnel and that RQD is difficult to reflect the characteristics of the rock mass support range.
[0046] To better understand the above technical solutions, the following will describe the above technical solutions in detail with reference to the accompanying drawings and specific embodiments. It should be understood that the specific features in the implementation of the present invention are detailed descriptions of the technical solutions of this application, rather than limitations on the technical solutions of this application. In the absence of conflict, the embodiments of this application and the technical features in the embodiments can be combined with each other.
[0047] See Figure 1 The present invention provides a method for determining the RQD of rock tunnels based on discrete element method and deep learning, comprising the following steps:
[0048] S1: Establish a discrete element model based on the structural surface characteristics of the rock mass tunnel engineering area;
[0049] S2: Set the discrete element model cutting surface according to the rock mass tunnel axis, cross-section, support design, and excavation progress;
[0050] S3: Calculate the MRQD value of the cutting surface by setting multiple RQD measurement lines on the cutting surface;
[0051] S4: Establish a deep learning prediction model for MRQD values of rock tunnels and train the deep learning network.
[0052] S5: Predict the MRQD of a tunnel based on the exposure status of the rock mass tunnel, including the determination of the MRQD of a tunnel without a specific fault and the determination of the MRQD of a tunnel with a specific fault.
[0053] S6: Apply MRQD values to evaluate the quality of tunnel rock mass;
[0054] S7: Adjustment and sample supplementation and update of the discrete element model for rock mass tunnels.
[0055] As described in S1, a discrete element model is established based on the structural surface characteristics of the rock mass tunnel engineering area, such as... Figure 2 As shown, in this embodiment, tunnel 202 is 6m wide and 9m high. The structural surface 203 in the discrete element model comes from the statistics of structural surface information at the engineering site, mainly including the number of groups, spacing, length, distribution characteristics, etc. In this embodiment, the structural surface follows a power law distribution, with a structural surface length of 0.5-10m and a spacing of 0.5-1.0m.
[0056] The rock mass tunnel axis, cross-section, support design, and excavation advance setting discrete element model cutting surface described in S2 are as follows: Figure 3As shown in the figure, in a certain 18m rock tunnel section of this embodiment, the tunnel excavation advance is 2m. The cutting face spacing is half of the excavation advance, that is, 16 cutting faces are set at 1m, such as cutting faces 301 and 302. The cutting faces are perpendicular to the tunnel axis. At the same time, since the length of the tunnel anchor support is 4.5m, the cutting faces are extended 10m outward from the tunnel.
[0057] The information of the cutting surfaces 301 and 302 in this embodiment is as follows: Figure 4 and Figure 5 As shown, the location of tunnel 202 is displayed on the cut surface, and the structural surface 203 information on the cut surface is shown. Due to the different cutting locations, there are certain differences in the structural surface information on each cut surface.
[0058] In S3, the MRQD value of the cutting surface is calculated by setting multiple RQD measurement lines 601 on the cutting surface, such as... Figure 6 As shown, in this embodiment, the support length is 4.5m and the support spacing is 1.5m. An RQD test reference support design was established, and 13 RQD test lines 601 were set. The length of the RQD test line 601 was 5m and the spacing was 1.5m.
[0059] In this embodiment, based on the RQD on a single measurement line i The values (i = 1, 2, 3, ..., m) are calculated using the RQD formula. For the MRQD within the surrounding rock support area, the weighted average value is taken based on the length of each survey line. The MRQD values are as follows:
[0060]
[0061] In this embodiment, the structural surface features within the tunnel body of tunnel 202 on different cross-sections are further statistically analyzed, such as... Figure 4 and Figure 5 It is evident that the structural information of tunnel 202 is different. Figure 5 The structural surfaces are significantly denser than Figure 4 , Figure 5 The structural surface information within the tunnel body of Tunnel 202 consists of three sets, with the following characteristics: ① N30~40°E, SE∠80~85°, spacing 30~50cm; ② N70~80°W, SW∠70~85°, spacing 30~50cm; ③ N75~85°E, NW∠75~85°, spacing 50~100cm.
[0062] In S4, a deep learning prediction model for the MRQD value of rock tunnels is established, and the deep learning network is trained. For multiple cutting surfaces in this embodiment, a corresponding MRQD is established using the structural surface information of the cross-section—number of groups, spacing, length, and distribution characteristics—as input. k The value is the output; the input layer is structural surface information—number of groups, spacing, length, and distribution features—and the output layer is MRQD.k The value is calculated, and two hidden layers are included. A deep learning network is trained. After training 1000 times, the deep learning prediction model has an MSE of 1e-4, which is considered to meet the accuracy requirements. The deep learning network model is then saved.
[0063] In S5, a deep learning model is used to determine the MRQD value of a rock tunnel. In this embodiment, the structural features of the tunnel body of tunnel 202 exposed by a site excavation are as follows: ① N60~70°W, SW∠75°, spacing 30~50cm; ② N~N10°E, SE(NW)∠80~85°, spacing 30~50cm. The MRQD value predicted by the trained deep learning model is 44.23.
[0064] In S6, the MRQD value is used to classify and evaluate the tunnel rock mass. As shown in Table 1, it can be seen that the quality of the surrounding rock of the tunnel at the location with an MRQD of 44.23 in this embodiment is generally good.
[0065] Table 1. Classification of Surrounding Rocks under MRQD
[0066] MRQD value 0-20 20-40 40-60 60-85 85-100 Tunnel rock mass quality assessment Very bad Difference generally good very good
[0067] In this embodiment, a specific fault 701 was encountered during the excavation of the rock tunnel, such as... Figure 7 As shown, this specific fault was not reflected in the previous discrete element modeling process. The following steps were taken to predict and adjust MQRD:
[0068] Step 1: Ignoring specific fault 701, collect information on structural surfaces within the tunnel body of tunnel 202;
[0069] Step 2: Input the structural surface information into the deep learning model to predict the MQRDt value of the tunnel at this location as 48.93;
[0070] Step 3: Among the multiple cutting surfaces in the discrete element model, find the cutting surface Gt that is closest to MRQDt = 48.93;
[0071] Step 4, as follows Figure 8 As shown, a specific fault 701 is cut out on the cutting surface Gt;
[0072] Step 5, as follows Figure 8 As shown, considering the information of the specific fault 701 and the structural plane 203 on the cutting plane Gt, the MRQD = 43.21 value is recalculated. This value is the MRQD = 43.21 value when encountering the specific fault 701.
[0073] One or more technical solutions provided in the embodiments of this application have at least the following technical effects or advantages:
[0074] This method establishes the MRQD value, an evaluation index for the surrounding rock quality of rock masses in tunnels. Through discrete element modeling and deep learning methods, it enables rapid determination of the MRQD value of rock masses based on the characteristics of the tunnel face exposed during excavation. This solves the problems that RQD mainly relies on the experience of geologists and that RQD is difficult to reflect the anisotropy of rock mass and the characteristics of the support range. In particular, it expands the applicability of the method for determining MRQD values in the presence of specific faults.
[0075] Finally, it should be noted that the above specific embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to examples, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.
Claims
1. A method for determining the MRQD of rock tunnels based on discrete element method and deep learning, characterized in that, The MRQD is a comprehensive RQD at multiple locations within the tunnel support area, and the RQD is a rock quality index; the method includes: S1: Establish a discrete element model based on the structural surface characteristics of the rock mass tunnel engineering area; S2: Set the discrete element model cutting surface according to the rock mass tunnel axis, cross-section, support design, and excavation progress; S3: Calculate the MRQD value of the cutting surface by setting multiple RQD measurement lines on the cutting surface; S4: Establish a deep learning prediction model for MRQD values of rock tunnels and train the deep learning network. S5: Predict the MRQD of a tunnel based on the exposure status of the rock mass tunnel, including the determination of the MRQD of a tunnel without a specific fault and the determination of the MRQD of a tunnel with a specific fault. S6: Apply MRQD values to evaluate the quality of tunnel rock mass; S7: Adjustment and sample supplementation and update of the discrete element model for rock mass tunnels; In S5, the application of deep learning models to determine the MRQD value of rock tunnels falls into two categories: Q1: For tunnel excavation without encountering faults, given the exposed structural features of the tunnel face, including the number of groups, spacing, length, and distribution characteristics, a pre-trained deep learning network model in S4 can quickly predict the MRQD under this exposure condition. t ; Q2: When a specific fault is encountered during the excavation of a rock tunnel, and this specific fault was not reflected in the previous discrete element modeling, the following steps should be taken to predict and adjust the MQRD: Step 1: Without considering specific faults, collect information on structural surfaces within the tunnel body. Step 2: Input the structural surface information into the deep learning model to predict the MQRDt of the tunnel at that location; Step 3: Among the multiple cutting surfaces of the discrete element model, find the cutting surface Gt that is closest to MRQDt; Step 4: Cut out a specific fault on the cutting surface Gt; Step 5: Consider the information of specific faults and structural planes on the cutting surface Gt, and recalculate MRQD. This value is the MRQD value when encountering a specific fault.
2. The method for determining the MRQD of rock tunnels based on discrete element method and deep learning as described in claim 1, characterized in that, In S1, the structural surface characteristics of the engineering area mainly include the number of structural surface groups, spacing, length, and distribution characteristics. The discrete element model is established based on the structural surface characteristics obtained from the previous geological exploration activities in the engineering area.
3. The method for determining the MRQD of rock tunnels based on discrete element method and deep learning as described in claim 1, characterized in that, In S2, the cutting surfaces are arranged perpendicular to the tunnel axis, and the spacing between the cutting surfaces is set to be less than or equal to half of the tunnel excavation advance. n cutting surfaces Gk are determined, k=1,2,3,…,n; the size of the cutting surfaces needs to exceed the tunnel + surrounding rock support range. In S3, the RQD survey lines comprise m lines, arranged around the tunnel perimeter, with a length l. i For lengths greater than or equal to the support length, the spacing of RQD survey lines can be consistent with the spacing of the support along the tunnel perimeter, where i = 1, 2, 3, ..., m; In S3, RQD on a single measuring line i The value is calculated according to the RQD formula, i=1,2,3,…,m. For the MRQD within the surrounding rock support area, the weighted average value is taken according to the length of each survey line: 。 4. The method for determining the MRQD of rock tunnels based on discrete element method and deep learning as described in claim 1, characterized in that, In S4, the n samples in the sample library are information about each cutting surface Gk, k=1,2,3,…,n, including the number, spacing, length, and distribution characteristics of structural surface groups within the tunnel body on section k, as well as the MRQD calculated for section k based on S3. k Values, where k = 1, 2, 3, ..., n.
5. The method for determining the MRQD of rock tunnels based on discrete element method and deep learning as described in claim 1, characterized in that, In S4, the deep learning prediction model takes the structural information of k profiles—number of groups, spacing, length, and distribution features—as input, corresponding to MRQD. k The value is the output; the input layer is structural surface information—number of groups, spacing, length, and distribution features—and the output layer is MRQD. k The deep learning network is trained by taking values and including two hidden layers. When the mean square error (MSE) of the test samples is less than 1 / 1000 after more than 500 training iterations, the deep learning prediction model network is considered to meet the accuracy requirements, and the trained deep learning model is saved, where k=1,2,3,…,n.
6. The method for determining the MRQD of rock tunnels based on discrete element method and deep learning as described in claim 1, characterized in that, In S6, the MRQD value is used to classify and evaluate the tunnel rock mass, where: MRQD value 0-20 indicates very poor tunnel rock mass quality; MRQD value 20-40 indicates poor tunnel rock mass quality; MRQD value 40-60 indicates average tunnel rock mass quality; MRQD value 60-85 indicates good tunnel rock mass quality; and MRQD value 85-100 indicates very good tunnel rock mass quality.
7. The method for determining the MRQD of rock tunnels based on discrete element method and deep learning as described in claim 1, characterized in that, In S7, after every 100-200 meters of tunnel excavation, newly exposed structural features are added, and steps S1-S4 are repeated. Then, based on S5, the MRQD of subsequent rock tunnel excavation is predicted.
Citation Information
Patent Citations
Method for obtaining rock mass RQD value based on discrete fracture network method
CN113221407A