During the installation of the wind turbine foundation ring, the deformation of the foundation ring caused by high-temperature welding makes it difficult to meet the levelness requirement within 2mm, affecting the installation accuracy of the wind turbine unit.
The welding process involves first welding the steel beams to the bottom of the foundation ring, and then gradually welding upwards. This is combined with real-time monitoring using a laser level to ensure consistent welding parameters. Stiffening steel plates and steel pipe piles are used for support to minimize deformation of the foundation ring during the welding process.
The levelness variation of the foundation ring was effectively controlled, ensuring the installation accuracy of the wind turbine, reducing the workload of re-welding and adjustment, improving construction efficiency and reducing costs.