Overhanging girder integrated steel structure and prefabrication device thereof

By designing an integrated steel structure prefabrication device for suspended beams, and utilizing a fixing mechanism and ratchet pawl rack to achieve automatic flipping and painting of the suspended beams, the problems of high construction difficulty, low safety, and low painting efficiency of suspended beams are solved, thereby improving construction safety and painting efficiency.

CN115870120BActive Publication Date: 2026-05-29CCCC FOURTH HIGHWAY ENG CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CCCC FOURTH HIGHWAY ENG CO LTD
Filing Date
2022-10-25
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

The construction and painting of the integrated steel structure with suspended beams presents challenges such as high construction difficulty, low safety, poor construction reliability, and low painting efficiency. In particular, the flipping and hoisting operation is cumbersome and increases the workload of the workers.

Method used

An integrated steel structure for suspended beams and its prefabrication device were designed. Through a combination of a fixed mechanism, an intermittent mechanism, a ratchet and a pawl rack, and a reciprocating screw drives the moving frame to move the pawl rack and the painting mechanism, so as to realize the automatic flipping and painting of the suspended beams and reduce manual flipping operations.

Benefits of technology

The system enables automatic flipping and painting of suspended beams, reducing the workload of workers, improving painting efficiency, simplifying the construction process, and reducing construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115870120B_ABST
    Figure CN115870120B_ABST
Patent Text Reader

Abstract

The application discloses a suspended beam integrated steel structure and a prefabricating device thereof in the technical field of steel structures, which comprises a bottom plate, a first bidirectional screw rod and a reciprocating screw rod are rotationally connected in the bottom plate, two moving plates are threadedly connected to the circumferential surface of the first bidirectional screw rod, a rotating shaft is rotationally connected to the inside of the moving plate, a moving frame is threadedly connected to the circumferential surface of the reciprocating screw rod, a ratchet toothed bar is rotationally connected to the side surface of the moving frame, a supporting rod is fixedly connected to the side surface of the moving frame, a sliding plate is fixedly connected to one end of the supporting rod, a first spring is fixedly connected between the sliding plate and the ratchet toothed bar, the ratchet toothed bar and a ratchet wheel are engaged with each other, a first rotating rod is rotationally connected to the back of the moving plate, the circumferential surface of the first rotating rod is fixedly connected with the ratchet wheel, and an intermittent mechanism is arranged on the back of the moving plate. The application reduces the hoisting time and the operation strength of the staff, and therefore increases the paint spraying efficiency.
Need to check novelty before this filing date? Find Prior Art