Overhanging girder integrated steel structure and prefabrication device thereof
By designing an integrated steel structure prefabrication device for suspended beams, and utilizing a fixing mechanism and ratchet pawl rack to achieve automatic flipping and painting of the suspended beams, the problems of high construction difficulty, low safety, and low painting efficiency of suspended beams are solved, thereby improving construction safety and painting efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CCCC FOURTH HIGHWAY ENG CO LTD
- Filing Date
- 2022-10-25
- Publication Date
- 2026-05-29
AI Technical Summary
The construction and painting of the integrated steel structure with suspended beams presents challenges such as high construction difficulty, low safety, poor construction reliability, and low painting efficiency. In particular, the flipping and hoisting operation is cumbersome and increases the workload of the workers.
An integrated steel structure for suspended beams and its prefabrication device were designed. Through a combination of a fixed mechanism, an intermittent mechanism, a ratchet and a pawl rack, and a reciprocating screw drives the moving frame to move the pawl rack and the painting mechanism, so as to realize the automatic flipping and painting of the suspended beams and reduce manual flipping operations.
The system enables automatic flipping and painting of suspended beams, reducing the workload of workers, improving painting efficiency, simplifying the construction process, and reducing construction risks.
Smart Images

Figure CN115870120B_ABST