Control method and device for auxiliary machine operation, readable storage medium and electronic equipment

By acquiring the operating data of auxiliary and main units and combining it with the total power node correspondence, the auxiliary units are dynamically controlled to operate during periods of low electricity prices. This solves the problem of mismatch between the operating time of auxiliary units and the fluctuation of spot electricity prices, thereby achieving cost reduction and profit maximization for power plants.

CN115912498BActive Publication Date: 2026-11-24SHANDONG GUODIAN POWER GENERATION MAINTENANCE CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211237036.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-10
Publication Date
2026-11-24
Estimated Expiration
2042-10-10

AI Technical Summary

Technical Problem

The mismatch between the operating hours of auxiliary equipment and the fluctuations in spot electricity prices leads to increased power supply costs for power plants and affects their power supply capacity.

Method used

By acquiring the operating data of auxiliary and main machines and combining it with the total power node correspondence, the auxiliary machines are dynamically controlled to operate during periods of low electricity prices, thereby optimizing raw material production and consumption.

Benefits of technology

Reduce power plant supply costs, improve power supply capacity, and maximize power plant profits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115912498B_ABST
    Figure CN115912498B_ABST
Patent Text Reader

Abstract

This disclosure relates to a control method, apparatus, readable storage medium, and electronic device for auxiliary equipment operation. The method includes: acquiring first auxiliary equipment operation data within a first target time period and first host equipment operation data within the first target time period; when it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the host equipment, acquiring second host equipment operation data within a second target time period; and controlling the auxiliary equipment to operate within the second target time period based on the first auxiliary equipment operation data, the first host equipment operation data, the second host equipment operation data, and the total power node correspondence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to the field of power dispatching technology, and more specifically, to a control method, apparatus, readable storage medium, and electronic device for auxiliary equipment operation. Background Technology

[0002] When generator sets, especially thermal power units, are in operation, in addition to the main unit (boiler, steam turbine, generator, etc.), some auxiliary equipment (i.e., auxiliary machines) also operate intermittently to produce the raw materials needed by the main unit during operation. However, the electricity used by the auxiliary machines is counted in the plant's electricity consumption and is directly connected to the power plant without needing to be taken from the power grid. Therefore, the less electricity the auxiliary machines consume, the more electricity the generator set supplies to the power grid.

[0003] In related technologies, the operating periods of auxiliary equipment often do not match the fluctuations in spot electricity prices. This situation can lead to increased power supply costs for power plants and hinder the improvement of power supply capacity. Summary of the Invention

[0004] The purpose of this disclosure is to provide a control method, apparatus, readable storage medium, and electronic device for auxiliary machine operation.

[0005] To achieve the above objectives, according to a first aspect of the present disclosure, a control method for auxiliary machine operation is provided, the method comprising:

[0006] Acquire the first auxiliary machine operation data of the auxiliary machine and the first host machine operation data of the host machine within the first target time period; the first auxiliary machine operation data includes the first auxiliary machine operation status of the auxiliary machine and the first raw material supply information of the production, and the first host machine operation data includes the first host machine operation status of the host machine and the first raw material consumption information of the raw materials produced by the auxiliary machine.

[0007] If it is determined that the raw materials produced by the auxiliary equipment are insufficient to meet the operating consumption of the main equipment, the second main equipment operating data within a second target time period is obtained, where the second target time period is the next time period after the first target time period;

[0008] Based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence, the auxiliary machine equipment is controlled to operate within the second target time period.

[0009] Optionally, controlling the auxiliary equipment to operate within the second target time period based on the first auxiliary machine operating data, the first host machine operating data, the second host machine operating data, and the total power node correspondence includes:

[0010] Based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence, the second auxiliary machine operation data within a second preset time period is determined; the total power node correspondence includes power value information corresponding to different time periods.

[0011] Based on the second auxiliary machine operation data, the auxiliary machine is controlled to operate within the second target time period.

[0012] Optionally, determining that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment includes:

[0013] Based on the operating status of the first auxiliary machine and the first raw material supply information, determine the total quantity of production raw materials produced by the auxiliary machine during the first target time period;

[0014] Based on the operating status of the first host and the first raw material consumption information, determine the total amount of raw materials consumed by the host device within the first target time period.

[0015] If the total quantity of raw materials for production is less than or equal to the total quantity of raw materials consumed, it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment.

[0016] Optionally, the second host machine operation data includes the second host machine operation status and second raw material consumption information of the host equipment during the second target time period; the second auxiliary machine operation data includes the second auxiliary machine operation status and first raw material supply information of the auxiliary machine during the second target time period.

[0017] The step of determining the second auxiliary machine operation data of the auxiliary equipment within a second preset time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence includes:

[0018] The raw material difference is determined based on the total quantity of raw materials produced and the total quantity of raw materials consumed;

[0019] Based on the first raw material supply information, the raw material difference, and the total power node correspondence, the second auxiliary machine operation status of the auxiliary equipment within the second target time period is determined;

[0020] Based on the operating status of the second auxiliary machine and the first raw material supply information, determine the second auxiliary machine operating data within the second target time period.

[0021] Optionally, the second auxiliary machine operating status includes an on-state. Determining the second auxiliary machine operating status within a second target time period based on the first raw material supply information, the raw material difference, and the total power node correspondence includes:

[0022] Based on the total power node correspondence, determine the power value information corresponding to different time periods within the second target time period;

[0023] Based on the electricity value information and a preset value threshold, a time period corresponding to multiple electricity value information that meets the preset value threshold is determined. The time period is the time period corresponding to multiple electricity value information that meets the preset value threshold among the multiple time periods.

[0024] The auxiliary equipment is determined to be in the "on" state during the specified operating time period.

[0025] Optionally, the method includes:

[0026] If it is determined that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment, the remaining raw material storage amount in the first target time period is determined based on the total quantity of the raw materials produced and the first raw material consumption information.

[0027] If the raw material storage volume is determined to meet the total amount of raw materials consumed by the main equipment within the target time period, the third auxiliary equipment operation data of the auxiliary equipment within the target time period is determined, wherein the target time period is used to characterize the length of time taken by the main equipment to consume the raw material storage volume.

[0028] Optionally, the operating state of the second auxiliary machine includes a stopped state and a powered-on state;

[0029] When the raw material storage volume meets the total amount of raw materials consumed by the main equipment within the target time period, the determination of the third auxiliary equipment operation data within the target time period includes:

[0030] If the total amount of raw materials consumed by the main equipment during the target time period is less than or equal to the amount of raw materials stored, the operating state of the auxiliary equipment during the target time period is determined to be the shutdown state; or...

[0031] If it is determined that the raw material storage amount does not meet the total amount of raw materials consumed by the main equipment within the target time period, the operating state of the auxiliary equipment within the target time period is determined as the "on" state.

[0032] According to a second aspect of the present disclosure, a control device for auxiliary machine operation is provided, the device comprising:

[0033] The first acquisition module is used to acquire the first auxiliary machine operation data of the auxiliary machine equipment within a first target time period and the first host machine operation data of the host machine within the first target time period; the first auxiliary machine operation data includes the first auxiliary machine operation status of the auxiliary machine equipment and the first raw material supply information of the production, and the first host machine operation data includes the first host machine operation status of the host machine equipment and the first raw material consumption information of the raw materials produced by the auxiliary machine equipment.

[0034] The second acquisition module is used to acquire second host operation data of the host equipment within a second target time period when it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the host equipment. The second target time period is the next time period after the first target time period.

[0035] The control module is used to control the auxiliary equipment to operate within the second target time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence.

[0036] Optionally, the first determining module includes:

[0037] The first determining submodule is used to determine the second auxiliary machine operation data of the auxiliary machine equipment within a second preset time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence; the total power node correspondence includes power value information corresponding to different time periods.

[0038] The control submodule is used to control the auxiliary equipment to operate within the second target time period based on the second auxiliary machine operation data.

[0039] Optionally, the second acquisition module includes:

[0040] The second determining submodule is used to determine the total quantity of production raw materials produced by the auxiliary equipment within the first target time period based on the operating status of the first auxiliary machine and the first raw material supply information.

[0041] The third determining submodule is used to determine the total amount of raw materials consumed by the host equipment during the first target time period based on the first host operating status and the first raw material consumption information.

[0042] The fourth determining submodule is used to determine that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment when the total quantity of the production raw materials is less than or equal to the total quantity of the consumed raw materials.

[0043] Optionally, the second host machine operation data includes the second host machine operation status and second raw material consumption information of the host equipment within the second target time period; the second auxiliary machine operation data includes the second auxiliary machine operation status and first raw material supply information of the auxiliary machine within the second target time period; the second acquisition module includes:

[0044] The fifth determining submodule is used to determine the raw material difference based on the total quantity of the production raw materials and the total quantity of the consumed raw materials;

[0045] The sixth determining submodule is used to determine the second auxiliary machine operating status of the auxiliary equipment within the second target time period based on the first raw material supply information, the raw material difference, and the total power node correspondence.

[0046] The seventh determination submodule is used to determine the second auxiliary machine operation data of the auxiliary machine within the second target time period based on the second auxiliary machine operation status and the first raw material supply information.

[0047] Optionally, the sixth determining submodule is used to determine the power value information corresponding to different time periods within the second target time period according to the total power node correspondence; determine the operating time period corresponding to multiple power value information that meet the preset value threshold according to the power value information and the preset value threshold, wherein the operating time period is the time period corresponding to multiple power value information that meet the preset value threshold among the multiple time periods; and determine that the operating state of the auxiliary equipment is the on state within the operating time period.

[0048] Optionally, the device includes:

[0049] The second determining module is used to determine the remaining raw material storage amount within the first target time period based on the total quantity of raw materials produced and the first raw material consumption information, provided that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment.

[0050] The third determining module is used to determine the third auxiliary machine operation data of the auxiliary machine within the target time period when the raw material storage amount meets the total amount of raw materials consumed by the main machine within the target time period. The target time period is used to characterize the length of time taken by the main machine to consume the raw material storage amount.

[0051] Optionally, the second auxiliary machine operating state includes a stopped state and an started state; the third determining module is used to determine the operating state of the auxiliary machine in the target time period as the stopped state if the total amount of raw materials consumed by the main machine in the target time period is less than or equal to the raw material storage amount; or, if it is determined that the raw material storage amount does not meet the total amount of raw materials consumed by the main machine in the target time period, the operating state of the auxiliary machine in the target time period is the started state.

[0052] According to a third aspect of the present disclosure, a computer-readable storage medium is provided having a computer program stored thereon that, when executed by a processor, implements the steps of the method described in any of the first aspects of the present disclosure.

[0053] According to a fourth aspect of the present disclosure, an electronic device is provided, comprising: a memory having a computer program stored thereon; and a processor for executing the computer program in the memory to implement the steps of the method described in any of the first aspects of the present disclosure.

[0054] The above technical solution acquires the operating data of the auxiliary equipment and the main equipment within a first target time period. The first auxiliary equipment operating data includes the operating status of the auxiliary equipment and the supply information of the first raw materials produced. The first main equipment operating data includes the operating status of the main equipment and the consumption information of the first raw materials consumed by the auxiliary equipment. If it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment, the second main equipment operating data is acquired within a second target time period, which is the next time period after the first target time period. Based on the first auxiliary equipment operating data, the first main equipment operating data, the second main equipment operating data, and the total power node correspondence, the auxiliary equipment is controlled to operate within the second target time period. This allows for dynamic control of the auxiliary equipment during low-electricity-price periods based on the real-time status of the raw materials produced by the auxiliary equipment and the raw materials consumed by the main equipment, thereby reducing the power plant's supply costs and improving power supply capacity.

[0055] Other features and advantages of this disclosure will be described in detail in the following detailed description section. Attached Figure Description

[0056] The accompanying drawings are provided to further illustrate the present disclosure and form part of the specification. They are used together with the following detailed description to explain the present disclosure, but do not constitute a limitation thereof. In the drawings:

[0057] Figure 1 This is a flowchart of a control method for auxiliary machine operation provided in an embodiment of this disclosure.

[0058] Figure 2 This is a flowchart of another auxiliary machine operation control method provided in the embodiments of this disclosure.

[0059] Figure 3 This is a flowchart of a third auxiliary machine operation control method provided in the embodiments of this disclosure.

[0060] Figure 4 This is a structural block diagram of a control device for auxiliary machine operation provided in an embodiment of this disclosure.

[0061] Figure 5 yes Figure 4 The illustrated embodiment provides a structural block diagram of a first determining module.

[0062] Figure 6 yes Figure 4 The illustrated embodiment provides a structural block diagram of a second acquisition module.

[0063] Figure 7 yes Figure 4 The illustrated embodiment provides a structural block diagram of another second acquisition module.

[0064] Figure 8 yes Figure 4 The illustrated embodiment provides a structural block diagram of another auxiliary machine operation control device.

[0065] Figure 9 This is a block diagram of an electronic device according to an embodiment of the present disclosure. Detailed Implementation

[0066] The specific embodiments of this disclosure will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustration and explanation only and are not intended to limit this disclosure.

[0067] It should be noted that all actions involving the acquisition of signals, information, or data in this disclosure are carried out in compliance with the relevant data protection laws and policies of the country where the location is situated, and with authorization from the owner of the relevant device.

[0068] It should be understood that the various steps described in the method embodiments of this disclosure may be performed in different orders and / or in parallel. Furthermore, method embodiments may include additional steps and / or omit the steps shown. The scope of this disclosure is not limited in this respect. The term "comprising" and its variations as used herein are open-ended, meaning "including but not limited to". The term "based on" means "at least partially based on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one additional embodiment"; the term "some embodiments" means "at least some embodiments". Relevant definitions for other terms will be given in the description below.

[0069] It should be noted that the concepts of "first" and "second" mentioned in this disclosure are used only to distinguish different devices, modules, or units, and are not used to limit the order of functions performed by these devices, modules, or units or their interdependencies. It should also be noted that the modifications of "a" and "a plurality of" mentioned in this disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise expressly indicated in the context, they should be understood as "one or more".

[0070] First, the application scenarios of this disclosure are explained. This disclosure can be applied to the control of auxiliary equipment operation. Currently, according to the "Shandong Province Electricity Spot Market Trading Rules (Trial) (2022 Trial Version V1.0)," generating units participating in the spot market are required to declare their electricity price quotations for the operating day in the day-ahead market. Due to the increasing proportion of new energy installed capacity in the power grid, the fluctuations in the time-of-use electricity price are becoming increasingly larger. Therefore, during the midday period with abundant sunshine, the more electricity a power plant supplies to the grid, the greater its losses. Since generating units, especially thermal power units, cannot temporarily shut down during the midday period and then restart to operate under load, it is necessary to minimize load and reduce power supply to the grid while maintaining unit operation in order to reduce losses. In addition to the main unit (boiler, turbine, generator, etc.) operating, generator sets, especially thermal power units, also have some auxiliary equipment operating intermittently to produce the raw materials needed by the main unit during operation. However, the electricity used by the auxiliary equipment is counted in the plant's electricity consumption and is directly connected to the power plant without needing to be taken from the power grid. Therefore, the less electricity the auxiliary equipment uses, the more electricity the generator set supplies to the power grid.

[0071] For the reasons mentioned above, if auxiliary equipment within a power plant that does not require continuous operation (such as coal conveying equipment, water treatment equipment, desulfurization and pulping equipment, hydrogen production equipment, etc.) is scheduled to operate during periods of low spot electricity prices, and its operation is minimized during periods of high prices, the power plant's electricity sales revenue will be maximized, bringing considerable economic benefits. However, in related technologies, the operating periods of auxiliary equipment often do not match the fluctuations in spot electricity prices. Sometimes, auxiliary equipment operates during periods of high grid-connected electricity prices, leading to a reduction in the amount of electricity sold at high prices, thus affecting the power plant's revenue.

[0072] To address the aforementioned issues, this disclosure provides a control method, apparatus, readable storage medium, and electronic device for auxiliary equipment operation. Based on the correspondence between electricity price and time represented by the total power node correspondence, and according to the real-time situation of the raw materials produced by the auxiliary equipment and the raw materials consumed by the main unit, the auxiliary equipment can be dynamically controlled to operate during periods of low electricity price. This can reduce the power supply cost of power plants and improve power supply capacity.

[0073] The specific embodiments of this disclosure will be described in detail below with reference to the accompanying drawings.

[0074] Figure 1 This is a flowchart of a control method for auxiliary machine operation provided in an embodiment of this disclosure, such as... Figure 1 As shown, the method includes:

[0075] S101. Obtain the first auxiliary machine operation data of the auxiliary machine and the first host machine operation data of the host machine during the first target time period.

[0076] The first auxiliary machine operation data includes the first auxiliary machine operation status and the first raw material supply information of the auxiliary machine equipment, and the first main machine operation data includes the first main machine operation status and the first raw material consumption information of the raw materials produced by the auxiliary machine equipment.

[0077] The auxiliary equipment can be an auxiliary type of equipment in the generator set used to produce the raw materials required by the main unit during operation, so as to meet the needs of the main unit for water, gas (including hydrogen for cooling the generator coil), limestone slurry for desulfurization, etc. during operation. For example, the auxiliary equipment may include coal conveying equipment, water production equipment, desulfurization slurry equipment, hydrogen production equipment and other auxiliary equipment; and the main unit may include power generation equipment such as boilers, steam turbines, generators and so on.

[0078] In some embodiments, the auxiliary equipment's first auxiliary machine operation data and the host equipment's first host operation data within the first target time period can be stored in a database or the cloud. Then, the auxiliary equipment's first auxiliary machine operation data and the host equipment's first host operation data within the first target time period are retrieved in real time from the database or the cloud. The auxiliary equipment's first auxiliary machine operation data within the first target time period may include first raw material supply information such as the quantity of raw materials produced by the auxiliary equipment within a unit time period, the current stored quantity of produced raw materials, and the maximum quantity of raw materials that can be stored. The host equipment's first host operation data within the first target time period may include first raw material consumption information such as the host equipment's consumption of raw materials produced by the auxiliary equipment within a unit time period under the current operating conditions and the consumption of raw materials produced by the auxiliary equipment under subsequent planned operating conditions.

[0079] In some embodiments, the operating state of the first auxiliary machine corresponding to the auxiliary machine and the operating state of the first host machine corresponding to the host machine can be determined based on the device switch states of the host machine and the auxiliary machine. The device switch state can include an on state and a off state. For example, if the device switch state of the host machine is determined to be on, the operating state of the first host machine corresponding to the host machine can be determined to be on. If the device switch state of the auxiliary machine is determined to be off, the operating state of the first auxiliary machine corresponding to the auxiliary machine can be determined to be off.

[0080] S102. If it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment, the second main equipment operating data of the main equipment during the second target time period is obtained.

[0081] The second target time period is the next time period following the first target time period.

[0082] In some embodiments, it can be determined that the quantity of production raw materials corresponding to the first raw material supply information is less than the quantity of raw materials consumed in the first raw material consumption information, based on the first raw material supply information and the first raw material consumption information. If the quantity is less than the quantity, it can be determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment.

[0083] In other embodiments, the quantity of production raw materials and the quantity of remaining stored raw materials can be determined based on the first raw material supply information. If the total quantity of production raw materials and the quantity of remaining stored raw materials is less than the raw material consumption quantity in the first raw material consumption information, it can be determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment.

[0084] Then, if it is determined that the raw materials produced by the auxiliary equipment are insufficient to meet the operating consumption of the main equipment, the second main equipment operating data of the main equipment during the second target time period is obtained.

[0085] S103. Based on the operating data of the first auxiliary machine, the operating data of the first host machine, the operating data of the second host machine, and the correspondence of the total power nodes, control the auxiliary machine to operate within the second target time period.

[0086] The total power node correspondence includes power value information corresponding to different time periods; for example, the total power node correspondence can be the electricity price node plan table in the prior art, and the total power node correspondence can include the electricity price node plan table for the current day (the day before the operating day), the operating day, and the day after the operating day.

[0087] In this step, the auxiliary equipment's second auxiliary machine operation data within a second preset time period can first be determined based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence; then, based on the second auxiliary machine operation data, the auxiliary equipment is controlled to operate within the second target time period.

[0088] For example, firstly, based on the operating data of the first auxiliary machine, the total quantity of raw materials produced by the auxiliary machine after the first target time period can be determined; then, based on the operating data of the first main machine, the total quantity of raw materials consumed by the main machine after the first target time period can be determined; based on the total quantity of raw materials produced and the total quantity of raw materials consumed, the raw material difference can be determined; then, based on the raw material difference and the operating data of the second main machine, the total quantity of raw materials that the auxiliary machine needs to produce in the second target time period can be determined; secondly, based on the total power node correspondence, the power value information corresponding to different time periods in the second target time period can be determined; based on the power value information and the preset value threshold, the operating time periods corresponding to multiple power value information that meet the preset value threshold can be determined; then, the operating status of the auxiliary machine in the operating time period can be determined as the on-state; then, based on the operating status of the second auxiliary machine and the first raw material supply information, the second auxiliary machine operating data of the auxiliary machine in the second target time period can be determined.

[0089] By adopting the above method, based on the correspondence between electricity price and time represented by the total power node correspondence, the auxiliary equipment can be dynamically controlled to operate during periods of low electricity price according to the real-time situation of the raw materials produced by the auxiliary equipment and the raw materials consumed by the main equipment. This can reduce the power supply cost of the power plant and improve the power supply capacity.

[0090] Figure 2 This is a flowchart of another auxiliary machine operation control method provided in this disclosure embodiment, such as... Figure 2As shown, the method includes:

[0091] S201. Obtain the first auxiliary machine operation data of the auxiliary machine and the first host machine operation data of the host machine during the first target time period.

[0092] The first auxiliary machine operation data includes the first auxiliary machine operation status and the first raw material supply information of the auxiliary machine equipment, and the first main machine operation data includes the first main machine operation status and the first raw material consumption information of the raw materials produced by the auxiliary machine equipment.

[0093] The auxiliary equipment can be an auxiliary type of equipment in the generator set used to produce the raw materials required by the main unit during operation, so as to meet the needs of the main unit for water, gas (including hydrogen for cooling the generator coil), limestone slurry for desulfurization, etc. during operation; as well as the power generation equipment in the main unit, including boilers, steam turbines, generators, etc.

[0094] In this step, the first raw material supply information, such as the quantity of raw materials produced by the auxiliary equipment during the first target time period, the current storage quantity of the produced raw materials, and the maximum quantity of raw materials that can be stored, can be stored in advance in a database or in the cloud and retrieved directly when needed. The first raw material consumption information, such as the consumption of raw materials produced by the auxiliary equipment by the main equipment under the current operating conditions during the first target time period and the consumption of raw materials produced by the auxiliary equipment under the subsequent planned operating conditions, can also be stored in advance in a database or in the cloud and retrieved directly when needed. Similarly, the operating status of the first auxiliary equipment and the operating status of the first main equipment can be determined based on the on / off status of the main equipment and the auxiliary equipment.

[0095] S202. Based on the operating status of the first auxiliary machine and the first raw material supply information, determine the total quantity of raw materials produced by the auxiliary machine during the first target time period.

[0096] In this step, the first raw material supply information that the auxiliary equipment can produce per unit time can be determined based on the first raw material supply information, and the operating status of the auxiliary equipment can be determined based on the first auxiliary equipment operating status. Then, based on the relationship between the first target time period and the unit time, the total quantity of production raw materials that the auxiliary equipment can produce within the first target time period can be determined.

[0097] S203. Based on the operating status of the first host and the first raw material consumption information, determine the total amount of raw materials consumed by the host equipment during the first target time period.

[0098] In this step, the first raw material consumption information that the host equipment can consume per unit time can be determined based on the first raw material consumption information, and the operating status of the host equipment can be determined based on the first host operating status. Then, based on the relationship between the first target time period and the unit time, the total amount of raw materials that the host equipment can consume within the first target time period can be determined.

[0099] S204. If it is determined that the total quantity of raw materials produced is less than or equal to the total quantity of raw materials consumed, it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment.

[0100] In this step, given the total quantity of raw materials produced and the total quantity of raw materials consumed, the two quantities can be compared. If the total quantity of raw materials produced is less than or equal to the total quantity of raw materials consumed, it can be determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment.

[0101] S205. Determine the raw material difference based on the total quantity of raw materials produced and the total quantity of raw materials consumed.

[0102] In this step, since the total quantity of raw materials produced is less than or equal to the total quantity of raw materials consumed, when the total quantity of raw materials produced is less than the total quantity of raw materials consumed, the difference between the total quantity of raw materials consumed and the total quantity of raw materials produced can be used as the raw material difference; when the total quantity of raw materials produced is equal to the total quantity of raw materials consumed, the raw material difference can be determined to be zero.

[0103] S206. Based on the total power node correspondence, determine the power value information corresponding to different time periods within the second target time period.

[0104] The total power node correspondence includes power value information corresponding to different time periods; for example, the total power node correspondence can be the electricity price node plan table in the prior art, and the total power node correspondence can include the electricity price node plan table for the current day (the day before the operating day), the operating day, and the day after the operating day.

[0105] S207. Based on the electricity value information and the preset value threshold, determine the operating time periods corresponding to multiple electricity value information that meet the preset value threshold.

[0106] The operating time period refers to the time period corresponding to multiple power value information that meet the preset value threshold within a multiple time period.

[0107] In some embodiments, multiple time periods that are less than the preset value threshold among the operating time periods corresponding to multiple power value information in the total power node correspondence can be used as the operating time period, wherein the duration of the operating time period is less than or equal to the duration of the second target time period; when the total power node correspondence is used to represent the relationship between different time periods and the electricity prices corresponding to different time periods, the highest electricity price in the total power node correspondence can be used as the preset value threshold.

[0108] S208. Determine that the auxiliary equipment is in the "on" state during the operating period.

[0109] S209. Based on the operating status of the second auxiliary machine and the first raw material supply information, determine the operating data of the second auxiliary machine within the second target time period.

[0110] In this step, after determining the multiple operating time periods of the auxiliary equipment within the second target time period, the operating status of the second auxiliary equipment within the second target time period can be determined. Since the supply information of the first raw material that the auxiliary equipment can produce per unit time is fixed, the operating data of the second auxiliary equipment within the second target time period can be determined based on the operating status of the second auxiliary equipment and the supply information of the first raw material.

[0111] S210. Based on the operating data of the second auxiliary machine, control the auxiliary machine to operate within the second target time period.

[0112] By adopting the above method, based on the correspondence between electricity price and time represented by the total power node correspondence, the auxiliary equipment can be dynamically controlled to operate during periods of low electricity price according to the real-time situation of the raw materials produced by the auxiliary equipment and the raw materials consumed by the main equipment. This can reduce electricity sales losses and maximize the electricity sales revenue of the power plant.

[0113] Figure 3 This is a flowchart of the third auxiliary machine operation control method provided in the embodiments of this disclosure, such as... Figure 3 As shown, the method includes:

[0114] S301. Obtain the first auxiliary machine operation data of the auxiliary machine and the first host machine operation data of the host machine during the first target time period.

[0115] The first auxiliary machine operation data may include the first auxiliary machine operation status and the first raw material supply information of the auxiliary machine, as well as the maximum quantity that the auxiliary machine can store.

[0116] In some embodiments, the functional relationship between the amount of raw materials consumed by the auxiliary machine and the running time can be obtained first, for example, Q1 = F1(t1), where Q1 is the amount of raw materials consumed by the machine during operation and t1 is the running time of the machine; then the functional relationship between the amount of raw materials produced by the auxiliary machine and the running time can be obtained, for example, Q2 = F2(t2), where Q2 is the maximum amount of raw materials Q3 produced by the auxiliary machine during operation.

[0117] S302. If it is determined that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment, the remaining raw material storage amount in the first target time period is determined based on the total quantity of the raw materials produced and the first raw material consumption information.

[0118] In some embodiments, a functional relationship between the raw material storage quantity and the unit operating time and auxiliary machine operating time can be established first based on the functional relationship in step S301. For example, Q = F2(t2) - F1(t1) + Q4, where Q is the raw material storage quantity, Q ≤ Q3; t1 is the unit operating time, t2 is the auxiliary machine operating time, Q4 is the initial raw material storage quantity, and Q3 is the maximum quantity that the raw material storage device can store. Based on the initial raw material storage quantity and auxiliary machine operating time in the auxiliary machine operation plan, and establishing the functional relationship between the raw material storage quantity and the unit operating time and auxiliary machine operating time, the raw material storage quantity at each shutdown is calculated. The time and time margin for the storage quantity to maintain unit operation after the auxiliary machine is shut down are confirmed. When the time and time margin can prevent the auxiliary machine from restarting during the shutdown period on the predetermined electricity price curve, it indicates that the auxiliary machine operation plan meets the unit operation needs. The time and time margin can be a conservative estimate. If the raw material storage quantity can supply the unit for 2 hours, it is calculated as 1.5 hours, which means there is a time margin of 0.5 hours.

[0119] Furthermore, the initial raw material storage quantity mentioned above can be obtained by the following method: Collect the current actual value of the storage quantity, substitute this value into the aforementioned function relationship, and the raw material storage quantity at the end of the first operating period, the end of the first shutdown period, and the raw material storage quantity for each subsequent period can be calculated. The current value of the storage quantity can be calculated by collecting relevant parameters. For example, if the water produced by the water treatment equipment is stored in a water tank, the water storage volume can be calculated using the water level, cross-sectional area, etc.

[0120] S303. Determine the operating data of the third auxiliary machine within the target time period.

[0121] The target time period is used to characterize the length of time it takes for the main equipment to consume the raw material storage amount, and the second auxiliary machine's operating status includes a shutdown state and a startup state.

[0122] In this step, if it is determined that the raw material storage amount meets the total amount of raw materials consumed by the main equipment within the target time period, the auxiliary equipment is determined to be in the shutdown state within the target time period; or if it is determined that the raw material storage amount does not meet the total amount of raw materials consumed by the main equipment within the target time period, the auxiliary equipment is determined to be in the start-up state within the target time period.

[0123] S304. Based on the operating data of the third auxiliary machine and the corresponding relationship of the total power nodes, control the auxiliary machine to operate within the target time period.

[0124] By using the above method, if it is determined that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment, the operation of the auxiliary equipment can be controlled within the target time period based on the raw material storage and the corresponding relationship of the total power nodes. This allows the auxiliary equipment to operate during the low electricity price period of the target time period, thereby reducing power supply costs.

[0125] Figure 4 This is a structural block diagram of a control device for auxiliary machine operation provided in an embodiment of this disclosure, such as... Figure 4 As shown, the device includes:

[0126] The first acquisition module 401 is used to acquire the first auxiliary machine operation data of the auxiliary machine and the first host machine operation data of the host machine during the first target time period. The first auxiliary machine operation data includes the first auxiliary machine operation status and the first raw material supply information of the auxiliary machine. The first host machine operation data includes the first host machine operation status and the first raw material consumption information of the raw materials produced by the auxiliary machine.

[0127] The second acquisition module 402 is used to acquire the second host operation data of the host equipment within a second target time period when it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the host equipment. The second target time period is the next time period after the first target time period.

[0128] The control module 403 is used to control the auxiliary equipment to operate within the second target time period based on the operating data of the first auxiliary machine, the operating data of the first host machine, the operating data of the second host machine, and the correspondence of the total power nodes.

[0129] Figure 5 yes Figure 4 The illustrated embodiment provides a structural block diagram of a first determining module, as shown below. Figure 5 As shown, the first determining module 403 includes:

[0130] The first determining submodule 4031 is used to determine the second auxiliary machine operation data of the auxiliary machine within a second preset time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence; the total power node correspondence includes power value information corresponding to different time periods;

[0131] The control submodule 4032 is used to control the auxiliary equipment to operate within the second target time period based on the operating data of the second auxiliary machine.

[0132] Figure 6 yes Figure 4 The illustrated embodiment provides a structural block diagram of a second acquisition module, as shown below. Figure 6 As shown, the second acquisition module 402 includes:

[0133] The second determining submodule 4021 is used to determine the total quantity of production raw materials produced by the auxiliary equipment within the first target time period based on the operating status of the first auxiliary machine and the first raw material supply information.

[0134] The third determining submodule 4022 is used to determine the total amount of raw materials consumed by the host equipment during the first target time period based on the first host operating status and the first raw material consumption information.

[0135] The fourth determining submodule 4023 is used to determine that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment when the total quantity of the production raw materials is less than or equal to the total quantity of the consumed raw materials.

[0136] Figure 7 yes Figure 4 Another structural block diagram of the second acquisition module provided in the illustrated embodiment is shown below. Figure 7 As shown, the second host machine operation data includes the second host machine operation status and second raw material consumption information within the second target time period; the second auxiliary machine operation data includes the second auxiliary machine operation status and first raw material supply information within the second target time period; the second acquisition module 402 includes:

[0137] The fifth determining submodule 4024 is used to determine the raw material difference based on the total quantity of the production raw materials and the total quantity of the consumed raw materials;

[0138] The sixth determining submodule 4025 is used to determine the second auxiliary machine operating status of the auxiliary equipment within the second target time period based on the first raw material supply information, the raw material difference, and the total power node correspondence.

[0139] The seventh determining submodule 4026 is used to determine the second auxiliary machine operation data of the auxiliary machine within the second target time period based on the second auxiliary machine operation status and the first raw material supply information.

[0140] Optionally, the sixth determining submodule 4025 is used to determine the power value information corresponding to different time periods within the second target time period based on the total power node correspondence; determine the operating time periods corresponding to multiple power value information that meet the preset value threshold based on the power value information and the preset value threshold, wherein the operating time period is the time period corresponding to multiple power value information that meet the preset value threshold among the multiple time periods; and determine that the operating status of the auxiliary equipment is the on state within the operating time period.

[0141] Figure 8 yes Figure 4 The illustrated embodiment provides a structural block diagram of another auxiliary machine operation control device, as shown in the figure. Figure 8 As shown, the device includes:

[0142] The second determining module 405 is used to determine the remaining raw material storage amount in the first target time period based on the total quantity of raw materials produced and the first raw material consumption information, when it is determined that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment.

[0143] The third determining module 406 is used to determine the third auxiliary machine operation data of the auxiliary machine within the target time period when the raw material storage amount meets the total amount of raw materials consumed by the main machine within the target time period. The target time period is used to characterize the length of time taken by the main machine to consume the raw material storage amount.

[0144] Optionally, the second auxiliary machine's operating state includes a shutdown state and an on-state; the third determining module 406 is used to determine the auxiliary machine's operating state as the shutdown state during the target time period if the total amount of raw materials consumed by the main machine during the target time period is greater than or equal to the raw material storage amount; or, if the raw material storage amount is determined to be less than the total amount of raw materials consumed by the main machine during the target time period, the auxiliary machine's operating state as the on-state during the target time period.

[0145] Using the aforementioned apparatus and technical solution, the system acquires the operating data of the first auxiliary machine and the first main machine during a first target time period. The first auxiliary machine operating data includes the operating status of the auxiliary machine and information on the supply of the first raw materials produced. The first main machine operating data includes the operating status of the main machine and information on the consumption of the raw materials produced by the auxiliary machine. If it is determined that the raw materials produced by the auxiliary machine do not meet the operating consumption of the main machine, the system acquires the second main machine operating data during a second target time period, which is the period following the first target time period. Based on the first auxiliary machine operating data, the first main machine operating data, the second main machine operating data, and the total power node correspondence, the system controls the operation of the auxiliary machine during the second target time period. This allows for dynamic control of the auxiliary machine's operation during low-electricity-price periods based on the real-time status of the raw materials produced by the auxiliary machine and consumed by the main machine, according to the correspondence between electricity price and time represented by the total power node correspondence. This reduces electricity sales losses and maximizes the power plant's electricity sales revenue.

[0146] Regarding the apparatus in the above embodiments, the specific manner in which each module performs its operation has been described in detail in the embodiments related to the method, and will not be elaborated upon here.

[0147] Figure 9 This is a block diagram illustrating an electronic device 900 according to an embodiment of the present disclosure. For example... Figure 9 As shown, the electronic device 900 may include a processor 901 and a memory 902. The electronic device 900 may also include one or more of a multimedia component 903, an input / output (I / O) interface 904, and a communication component 905.

[0148] The processor 901 controls the overall operation of the electronic device 900 to complete all or part of the steps in the aforementioned auxiliary operation control method. The memory 902 stores various types of data to support the operation of the electronic device 900. This data may include, for example, instructions for any application or method operating on the electronic device 900, and application-related data such as contact data, sent and received messages, pictures, audio, video, etc. The memory 902 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as Static Random Access Memory (SRAM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Erasable Programmable Read-Only Memory (EPROM), Programmable Read-Only Memory (PROM), Read-Only Memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. Multimedia component 903 may include a screen and an audio component. The screen may be, for example, a touchscreen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signals may be further stored in memory 902 or transmitted via communication component 905. The audio component also includes at least one speaker for outputting audio signals. I / O interface 904 provides an interface between processor 901 and other interface modules, such as a keyboard, mouse, buttons, etc. These buttons may be virtual or physical buttons. Communication component 905 is used for wired or wireless communication between the electronic device 900 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G, 4G, NB-IoT, eMTC, or other 5G technologies, or combinations thereof, is not limited here. Therefore, the corresponding communication component 905 may include: a Wi-Fi module, a Bluetooth module, an NFC module, etc.

[0149] In an exemplary embodiment, the electronic device 900 may be implemented by one or more application-specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field-programmable gate arrays (FPGAs), controllers, microcontrollers, microprocessors, or other electronic components to perform the control method for auxiliary machine operation described above.

[0150] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, which, when executed by a processor, implement the steps of the auxiliary machine operation control method described above. For example, the computer-readable storage medium may be the memory 902 including program instructions described above, which may be executed by the processor 901 of the electronic device 900 to complete the auxiliary machine operation control method described above.

[0151] The preferred embodiments of this disclosure have been described in detail above with reference to the accompanying drawings. However, this disclosure is not limited to the specific details of the above embodiments. Within the scope of the technical concept of this disclosure, various simple modifications can be made to the technical solutions of this disclosure, and these simple modifications all fall within the protection scope of this disclosure.

[0152] It should also be noted that the various specific technical features described in the above embodiments can be combined in any suitable manner without contradiction. To avoid unnecessary repetition, this disclosure will not describe the various possible combinations separately.

[0153] Furthermore, various different embodiments of this disclosure can be combined in any way, as long as they do not violate the spirit of this disclosure, they should also be regarded as the content disclosed in this disclosure.

Claims

1. A control method for auxiliary machine operation, characterized in that, The method includes: Acquire the first auxiliary machine operation data of the auxiliary machine and the first host machine operation data of the host machine within the first target time period; the first auxiliary machine operation data includes the first auxiliary machine operation status of the auxiliary machine and the first raw material supply information of the production, and the first host machine operation data includes the first host machine operation status of the host machine and the first raw material consumption information of the raw materials produced by the auxiliary machine. If it is determined that the raw materials produced by the auxiliary equipment are insufficient to meet the operating consumption of the main equipment, the second main equipment operating data within a second target time period is obtained, where the second target time period is the next time period after the first target time period; Based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence, the auxiliary machine equipment is controlled to operate within the second target time period; The method further includes: If it is determined that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment, the remaining raw material storage amount within the first target time period is determined based on the total quantity of raw materials produced and the first raw material consumption information; if it is determined that the raw material storage amount meets the total quantity of raw materials consumed by the main equipment within the target time period, the third auxiliary equipment operation data of the auxiliary equipment within the target time period is determined, wherein the target time period is used to characterize the length of time taken by the main equipment to consume the raw material storage amount.

2. The method according to claim 1, characterized in that, The step of controlling the auxiliary equipment to operate within the second target time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence includes: Based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence, the second auxiliary machine operation data within a second preset time period is determined; the total power node correspondence includes power value information corresponding to different time periods. Based on the second auxiliary machine operation data, the auxiliary machine is controlled to operate within the second target time period.

3. The method according to claim 1, characterized in that, The determination that the raw materials produced by the auxiliary equipment are insufficient to meet the operating consumption of the main equipment includes: Based on the operating status of the first auxiliary machine and the first raw material supply information, determine the total quantity of the production raw materials produced by the auxiliary machine during the first target time period; Based on the operating status of the first host and the first raw material consumption information, determine the total amount of raw materials consumed by the host device within the first target time period; If the total quantity of raw materials for production is less than or equal to the total quantity of raw materials consumed, it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the main equipment.

4. The method according to claim 3, characterized in that, The second main unit operation data includes the second main unit operation status and second raw material consumption information of the main unit within the second target time period; the second auxiliary unit operation data includes the second auxiliary unit operation status and first raw material supply information of the auxiliary unit within the second target time period. The step of determining the second auxiliary machine operation data of the auxiliary equipment within a second preset time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence includes: The raw material difference is determined based on the total quantity of raw materials produced and the total quantity of raw materials consumed; Based on the first raw material supply information, the raw material difference, and the total power node correspondence, the second auxiliary machine operation status of the auxiliary equipment within the second target time period is determined; Based on the operating status of the second auxiliary machine and the first raw material supply information, determine the second auxiliary machine operating data within the second target time period.

5. The method according to claim 4, characterized in that, The second auxiliary machine operating status includes the start-up status. Determining the second auxiliary machine operating status within the second target time period based on the first raw material supply information, the raw material difference, and the total power node correspondence includes: Based on the total power node correspondence, determine the power value information corresponding to different time periods within the second target time period; Based on the electricity value information and a preset value threshold, a time period corresponding to multiple electricity value information that meets the preset value threshold is determined. The time period is the time period corresponding to multiple electricity value information that meets the preset value threshold among the multiple time periods. The auxiliary equipment is determined to be in the "on" state during the specified operating time period.

6. The method according to claim 1, characterized in that, When the raw material storage volume meets the total amount of raw materials consumed by the main equipment within the target time period, the determination of the third auxiliary equipment operation data within the target time period includes: If the total amount of raw materials consumed by the main equipment during the target time period is less than or equal to the amount of raw materials stored, the auxiliary equipment is determined to be in a shutdown state during the target time period; or... If it is determined that the raw material storage quantity does not meet the total amount of raw materials consumed by the main equipment within the target time period, the auxiliary equipment is determined to be in the "on" state within the target time period.

7. A control device for the operation of an auxiliary machine, characterized in that, The device includes: The first acquisition module is used to acquire the first auxiliary machine operation data of the auxiliary machine equipment within a first target time period and the first host machine operation data of the host machine within the first target time period; the first auxiliary machine operation data includes the first auxiliary machine operation status of the auxiliary machine equipment and the first raw material supply information of the production, and the first host machine operation data includes the first host machine operation status of the host machine equipment and the first raw material consumption information of the raw materials produced by the auxiliary machine equipment. The second acquisition module is used to acquire second host operation data of the host equipment within a second target time period when it is determined that the raw materials produced by the auxiliary equipment do not meet the operating consumption of the host equipment. The second target time period is the next time period after the first target time period. The first determining module is used to determine the second auxiliary machine operation data of the auxiliary machine equipment within a second preset time period based on the first auxiliary machine operation data, the first host machine operation data, the second host machine operation data, and the total power node correspondence; the total power node correspondence includes power value information corresponding to different time periods. The control module is used to control the auxiliary equipment to operate within the second target time period based on the second auxiliary machine operation data; The second determining module is used to determine the remaining raw material storage amount within the first target time period based on the total quantity of raw materials produced and the first raw material consumption information, provided that the raw materials produced by the auxiliary equipment meet the operating consumption of the main equipment. The third determining module is used to determine the third auxiliary machine operation data of the auxiliary machine within the target time period when the raw material storage amount meets the total amount of raw materials consumed by the main machine within the target time period. The target time period is used to characterize the length of time taken by the main machine to consume the raw material storage amount.

8. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When executed by a processor, the program implements the steps of the method described in any one of claims 1-6.

9. An electronic device, characterized in that, include: A memory on which computer programs are stored; A processor for executing the computer program in the memory to implement the steps of the method according to any one of claims 1-6.

Citation Information

Patent Citations

  • Maximum energy utilization point tracking technologies

    CN108370156A

  • Equipment running time scheduling method and device, equipment and computer readable medium

    CN112183942A