一种组合导航试验中的数据同步方法及系统
By recording the number of simulation cycles and control cycles in the satellite navigation receiver model and aligning the second pulse signal with the simulation clock signal, the problem of data misalignment caused by ground clock drift was solved, the synchronization of integrated navigation data was achieved, and the accuracy of the simulation experiment was ensured.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- BEIJING AEROSPACE AUTOMATIC CONTROL RES INST
- Filing Date
- 2022-11-14
- Publication Date
- 2026-07-17
AI Technical Summary
In long-term ground simulation tests, ground clock drift causes mis-capture of integrated navigation data, affecting the accuracy of simulation results, which is difficult to solve effectively with existing technologies.
By recording the number of simulation cycles and control cycles in the satellite navigation receiver model, and aligning the second pulse signal and simulation clock signal, the transmission cycle of the combined navigation data is adjusted in real time to ensure the synchronization of satellite navigation receiver data and inertial measurement combined data.
During the long-term simulation, the influence of ground clock drift on the test results was eliminated, ensuring the synchronization and accuracy of the integrated navigation data, and completing the hardware-in-the-loop simulation test of the control system.
Smart Images

Figure CN115932904B_ABST