Low-clearance ground wall steel reinforcement cage rapid butt joint device and butt joint method
The rapid docking device for steel cages in low-clearance wall ties, utilizing hinge flipping and anti-slip toothed structure, solves the problem of slow docking speed of steel cages under low-clearance conditions, achieving rapid and safe docking, reducing costs and improving construction efficiency.
Patent Information
- Application Number
- CN202211634026.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-19
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-12-19
AI Technical Summary
Under low clearance conditions, traditional steel cage docking methods suffer from slow welding speed, environmental pollution, and low docking efficiency. This is especially true when there are many steel bars or large diameter bars, making it difficult to achieve fast and safe docking.
A rapid docking device for low-clearance wall-connecting steel cages is adopted, including components such as steel plates, hinges, fixing bolts, nuts and lifting lugs. The hinge flips to achieve rapid docking of segmented steel cages. Combined with steel connection sleeves and anti-slip toothed structure, docking accuracy and efficiency are ensured.
It enables rapid connection of steel cages under low headroom conditions, improves construction efficiency, saves hoisting costs, and has a simple structure and is easy to operate.
Smart Images

Figure CN115961609B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of underground engineering construction technology, and in particular to a rapid connection device and method for connecting steel cages in low-clearance wall ties. Background Technology
[0002] Diaphragm walls are composed of individual unit sections connected by joints. They are cast-in-place underground structures formed by trenching with slurry lining, lowering the reinforcing cage, and underwater concrete pouring using the tremie pipe method. However, the low clearance conditions present many challenges for diaphragm wall construction, often requiring the reinforcing cage to be segmented and connected during hoisting. Currently, common methods for connecting reinforcing cages include welding and sleeve connections.
[0003] Traditional connection methods include welding and sleeve connection. Welding has disadvantages such as requiring highly skilled welders, slow connection speed, and environmental pollution. In particular, for rebar cages with a large number of rebars or large rebar diameters, the welding speed can seriously affect the connection progress. Existing sleeve connection methods for rebar cages require each rebar to be aligned vertically, horizontally, and vertically, which requires repeated adjustments to the crane for alignment, resulting in low connection efficiency.
[0004] Therefore, a docking method is needed that can achieve the lifting, placement, and docking of the underground continuous wall reinforcement cage under low clearance conditions, while also shortening the construction period, saving costs, and controlling construction quality and safety. Summary of the Invention
[0005] To address the problems existing in the prior art, the present invention provides a rapid docking device and method for connecting steel cages in low-clearance wall ties, so as to realize the rapid docking of segmented steel cages under low-clearance conditions.
[0006] A quick-connection device for a low-clearance wall-connecting steel cage includes a steel plate 1, a steel plate 2, a gasket, fixing bolts, nuts, lifting lugs, and hinges;
[0007] The first steel plate is provided with a sleeve groove, two sets of bolt fixing holes and one set of bolt fixing grooves; the second steel plate is provided with a sleeve groove, a sleeve operating hole, two sets of bolt fixing holes and one set of bolt fixing grooves.
[0008] The diameter of the bolt fixing hole matches the fixing bolt, the width of the bolt fixing groove matches the fixing bolt, several hinges are provided, the hinges are used to connect a steel plate one and a steel plate two, the lifting lugs are welded to the outer surface of two steel plates one located inside the reinforcing cage, the washer is provided with two bolt fixing holes, the position of which matches the fixing holes of the steel plate, the diameter of the bolt fixing holes matches the fixing bolt, and the nut matches the fixing bolt.
[0009] In the aforementioned rapid docking device for steel cages connecting walls in low-clearance open spaces, the inner surfaces of steel plate one and steel plate two are engraved with anti-slip tooth marks.
[0010] In the aforementioned quick-connection device for reinforcing cages in low-clearance open spaces, the nut is installed on the outside of the reinforcing cage.
[0011] The aforementioned quick-connection device for low-clearance wall-connecting steel cages further includes a steel bar connecting sleeve, wherein the end face of the steel bar connecting sleeve abuts against the sleeve groove, and the bottom surface of the sleeve groove holds the steel bar connecting sleeve.
[0012] The present invention also provides a connection method for the above-mentioned rapid connection device for low-clearance wall-connecting steel cages, comprising:
[0013] S1. According to the design requirements, the steel cage is processed as a whole on the steel cage processing platform on site and then cut into sections. The section length should not be too long. Thread the longitudinal steel bars at the section. The upper steel cage is threaded with long threads, the length of which is consistent with the steel bar connecting sleeve. The lower steel cage is threaded with half threads. The steel bar connecting sleeve is fully screwed onto the upper steel cage, with the bottom surface flush with the end face of the steel bar.
[0014] S2. Connect the upper and lower parts of the reinforcing cage together. Arrange the steel plates on the inner and outer sides of the longitudinal reinforcement of the reinforcing cage. Among them, the hinged steel plates 1 and 2 are arranged on the outside of the reinforcing cage. Steel plate 2 is on the upper reinforcing cage with the reinforcing sleeve. The sleeve groove abuts against the upper edge of the sleeve. Two steel plates 1 are respectively installed on the opposite sides of the hinged steel plates 1 and 2. Align the two steel plates. The fixing bolts are passed through the bolt fixing holes or fixing grooves on the steel plates on both sides of the reinforcing cage in sequence. Adjust the position of the bolts at the bolt fixing grooves, install the washers, put the nuts on the fixing bolts, and tighten the nuts with a torque wrench so that the two steel plates tightly clamp the longitudinal reinforcement.
[0015] S3. After the trenching of the diaphragm wall is completed, shackles and wire ropes are installed on the top of the upper and lower steel cages. Two truck cranes are used for hoisting. The two cranes are started to raise the steel cage to the preset height. The main crane is operated to align the bottom of the lower steel cage with the diaphragm wall dividing line. The lower steel cage is gradually lowered. When it is lowered to the first horizontal bar under the top of the cage, the lowering is paused. A steel spreader is inserted and the steel spreader is used to support the steel cage on the guide wall. The wire ropes and shackles on the hoisting bar are removed.
[0016] S4. Operate the auxiliary crane to slowly lift the upper steel cage and make it vertical;
[0017] S5. First, tighten the connecting sleeve of the opposite side rebar by unscrewing it. Then, use the rebar sleeve wrench through the sleeve operating hole to screw the connecting sleeve of the device side rebar into place, so that the sleeve is in the middle of the two rebar sections. Temporarily fix the steel plate one inside the rebar cage through the lifting lug. Loosen the nut and then remove the steel plate one and steel plate two connected by the hinge. Then remove the two steel plates one inside.
[0018] S6. Lift the hook, hoist the steel cage, pull out the steel spreader, and continue to lower the steel cage until it reaches the design elevation.
[0019] In the above docking method, the inner steel plate of the cage in step S5 is fixed and removed by lifting lugs.
[0020] The rapid connection device and method for low-clearance wall-connecting steel cages provided by the present invention have the following beneficial effects:
[0021] 1. This docking device achieves rapid docking of segmented steel cages through hinge flipping, avoiding the need for repeated crane alignment adjustments during the traditional steel cage docking process. It significantly improves the construction efficiency of segmented steel cage docking while ensuring accurate docking.
[0022] 2. During the transportation of steel cages, two steel cage sections can be transported at once, saving half of the hoisting cost;
[0023] 3. The structure is simple, the construction method and steps are reasonable, the operation is simple and the applicability is strong. Attached Figure Description
[0024] The above and / or additional aspects and advantages of the embodiments of the present invention will become apparent and readily understood from the description of the embodiments in conjunction with the following drawings, wherein:
[0025] Figure 1 This is a structural schematic diagram of the quick-connection device for low-clearance wall-connecting steel cages of the present invention;
[0026] Figure 2 This is a schematic diagram of the installation position of the low-clearance wall-connecting steel cage quick-connection device of the present invention;
[0027] Figure 3 yes Figure 2 The left view;
[0028] Figure 4 This is a structural schematic diagram of steel plate one;
[0029] Figure 5 This is a structural schematic diagram of steel plate two;
[0030] Figure 6 yes Figure 5 A magnified view of a portion of the image;
[0031] Figure 7This is a schematic diagram of the docking process of the low-clearance wall-connecting steel cage rapid docking device of the present invention;
[0032] Figure 8 This is a schematic diagram of the continuous wall steel cage connection process in this invention.
[0033] In the diagram: 1. Steel plate one; 2. Steel plate two; 3. Washer; 4. Fixing bolt; 5. Nut; 6. Lifting lug; 7. Hinge; 8. Bolt fixing hole; 9. Bolt fixing groove; 10. Sleeve groove; 11. Sleeve operating hole; 12. Rebar cage; 13. Rebar connecting sleeve. Detailed Implementation
[0034] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0035] like Figure 1-8 As shown, a quick-connection device for a low-clearance wall-connecting steel cage includes a steel plate 1, a steel plate 2, a gasket 3, a fixing bolt 4, a nut 5, a lifting lug 6, and a hinge 7.
[0036] Steel plate 1 is provided with sleeve groove 10, two sets of bolt fixing holes 8 and one set of bolt fixing groove 9. Steel plate 2 is provided with sleeve groove 10, sleeve operating hole 11, two sets of bolt fixing holes 8 and one set of bolt fixing groove 9. The diameter of the bolt fixing hole 8 matches the fixing bolt 4, and the width of the bolt fixing groove 9 matches the fixing bolt 4. Several hinges 7 are provided to connect one steel plate 1 and one steel plate 2. Lifting lugs 6 are welded to the outer surfaces of the two steel plates 1 located inside the steel cage. Gasket 3 is provided with two bolt fixing holes 8, the position of which matches the fixing holes of the steel plate. The diameter of the fixing hole 8 matches the fixing bolt 4. Nut 5 matches the fixing bolt 4.
[0037] The function of the bolt fixing groove 9 is to allow the position of the middle fixing bolt 4 to be flexibly adjusted left and right, avoiding the position of the longitudinal reinforcement, and improving the applicability to different reinforcement layouts.
[0038] The aforementioned quick docking device for low-clearance wall-connecting steel cages also includes a steel connecting sleeve 13. The end face of the steel connecting sleeve 13 abuts against the sleeve groove 10, and the bottom surface of the sleeve groove 10 locks the steel connecting sleeve 13 to further prevent the steel cage from slipping off.
[0039] Specifically, the inner surfaces of steel plate 1 and steel plate 2 are engraved with anti-slip serrations to increase the friction between the steel plate surface and the reinforcing bar, preventing slippage during the connection process.
[0040] Specifically, nut 4 is installed on the outside of the steel cage to facilitate disassembly after connection.
[0041] The connection method of the above-mentioned quick connection device for wall-connecting steel cages in low-clearance areas includes:
[0042] S1. According to the design requirements, the steel cage 12 is processed as a whole on the steel cage processing platform on site and then cut into sections. The section length should not be too long. Thread the longitudinal steel bars at the section. The upper steel cage is threaded with long thread, the length of which is consistent with the steel bar connecting sleeve 13. The lower steel cage is threaded with half thread. The steel bar connecting sleeve 13 is fully screwed onto the upper steel cage 12, with the bottom surface flush with the end face of the steel bar.
[0043] S2. Connect the upper and lower parts of the reinforcing cage 12 together. Arrange the steel plates on the inner and outer sides of the longitudinal reinforcement of the reinforcing cage. Among them, the steel plate 1 and steel plate 2 connected by the hinge 7 are arranged on the outside of the reinforcing cage 12. The steel plate 2 is on the upper part of the reinforcing cage 12 with the reinforcing sleeve 13. The sleeve groove 10 abuts against the upper edge of the sleeve 13. The two steel plates 1 are respectively installed on the opposite sides of the hinged steel plates 1 and 2. Align the two steel plates. The fixing bolts 4 pass through the bolt fixing holes 8 or fixing grooves 9 on the steel plates on both sides of the reinforcing cage in sequence. Adjust the position of the fixing bolts 4 at the bolt fixing grooves 9. Install the washers 3. Put the nuts 5 on the fixing bolts 4. Tighten the nuts 5 with a torque wrench so that the two steel plates tightly clamp the longitudinal reinforcement.
[0044] S3. After the diaphragm wall trench is completed, shackles and wire ropes are installed on the top of the upper and lower steel cages. Two truck cranes are used for hoisting. The two cranes are started to raise the steel cage to a certain height. The main crane is operated to align the bottom of the lower steel cage with the diaphragm wall dividing line. The lower steel cage is gradually lowered. When it is lowered to the first horizontal bar under the top of the cage, the lowering is paused. A steel spreader is inserted and the steel spreader is used to support the steel cage on the guide wall. The wire ropes and shackles on the hoisting bar are removed.
[0045] S4. Operate the auxiliary crane to slowly lift the upper steel cage and make it vertical;
[0046] S5. First, tighten the opposite side rebar connecting sleeve 13 by screwing it down. Then, use the rebar sleeve wrench through the sleeve operating hole 11 to screw the device side rebar connecting sleeve 13 down into place, so that the sleeve is in the middle of the two rebars. Temporarily fix the steel plate 1 inside the rebar cage 12 through the lifting lug 6. Loosen the nut 5, remove the washer 3 and fixing bolt 4, and then remove the steel plate 1 and steel plate 2 connected by the hinge 7. Then remove the two inner steel plates 1.
[0047] S6. Lift the hook and hoist the steel cage 12, then pull out the steel spreader; continue to lower the steel cage until it reaches the design elevation.
[0048] In step S5, the inner steel plate 1 of the cage is fixed and removed using the lifting lug 6.
[0049] In summary, the rapid connection device and method for low-clearance wall-connecting steel cages provided by this invention have the following beneficial effects:
[0050] 1. This docking device achieves rapid docking of segmented steel cages through hinge flipping, avoiding the need for repeated crane alignment adjustments during the traditional steel cage docking process. It significantly improves the construction efficiency of segmented steel cage docking while ensuring accurate docking.
[0051] 2. During the transportation of steel cages, two steel cage sections can be transported at once, saving half of the hoisting cost;
[0052] 3. The structure is simple, the construction method and steps are reasonable, the operation is simple and the applicability is strong.
[0053] In the description of this specification, references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of the invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0054] Although embodiments of the invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims
1. A rapid connection device for steel cages used in low-clearance wall ties, characterized in that, Includes steel plate one (1), steel plate two (2), gasket (3), fixing bolt (4), nut (5), lifting lug (6), hinge (7); The first steel plate (1) is provided with a sleeve groove (10), two sets of bolt fixing holes (8) and one set of bolt fixing groove (9), and the second steel plate (2) is provided with a sleeve groove (10), a sleeve operation hole (11), two sets of bolt fixing holes (8) and one set of bolt fixing groove (9); The diameter of the bolt fixing hole (8) matches the fixing bolt (4), the width of the bolt fixing groove (9) matches the fixing bolt (4), the hinge (7) is provided in several parts, the hinge (7) is used to connect a steel plate one (1) and a steel plate two (2), the lifting lug (6) is welded to the outer surface of the two steel plates one (1) located inside the steel cage (12), the gasket (3) is provided with two bolt fixing holes (8), the position matches the fixing hole of the steel plate, the diameter of the bolt fixing hole (8) matches the fixing bolt (4), and the nut (5) matches the fixing bolt (4).
2. The rapid connection device for low-clearance wall-connecting steel cages according to claim 1, characterized in that, The inner surfaces of both steel plate one (1) and steel plate two (2) are engraved with anti-slip serrations.
3. The rapid connection device for low-clearance wall-connecting steel cages according to claim 1, characterized in that, The nut (5) is installed on the outside of the steel cage (12).
4. The rapid connection device for low-clearance wall-connecting steel cages according to claim 1, characterized in that, The low-clearance wall-connecting steel cage quick docking device also includes a steel bar connecting sleeve (13), the end face of the steel bar connecting sleeve (13) abuts against the sleeve groove (10), and the bottom surface of the sleeve groove (10) holds the steel bar connecting sleeve (13).
5. The docking method of the rapid docking device for low-clearance wall-connecting steel cages according to any one of claims 1 to 4, characterized in that, include: S1. According to the design requirements, the steel cage is processed as a whole on the steel cage processing platform on the site and then cut into sections. At the section, the longitudinal steel bars are threaded. The upper steel cage is threaded with long threads, the length of which is consistent with the steel bar connecting sleeve (13). The lower steel cage is threaded with half threads. The steel bar connecting sleeve (13) is completely screwed onto the upper steel cage (12), with the bottom surface flush with the end face of the steel bar. S2. Connect the upper and lower parts of the steel cage together. Arrange the steel plates on the inner and outer sides of the longitudinal reinforcement of the steel cage (12). Among them, the steel plate one (1) and steel plate two (2) connected by the hinge (7) are arranged on the outside of the steel cage. The steel plate two (2) is on the upper part of the steel cage (12) with the steel connecting sleeve (13). The sleeve groove (10) abuts against the upper edge of the sleeve. The two steel plates one (1) are respectively installed on the opposite side of the steel plate one (1) and steel plate two (2) connected by the hinge (7). Align the two steel plates. The fixing bolts (4) pass through the bolt fixing holes (8) or fixing grooves on the steel plates on both sides of the steel cage in sequence. Adjust the bolt position at the bolt fixing groove (9). Install the shim (3). Put the nut (5) on the fixing bolt (4). Tighten the nut (5) with a torque wrench so that the two steel plates tightly clamp the longitudinal reinforcement. S3. After the trenching of the diaphragm wall is completed, shackles and wire ropes are installed on the top of the upper and lower steel cages. Two truck cranes are used for hoisting. The two cranes are started to raise the steel cage to the preset height. The main crane is operated to align the bottom of the lower steel cage with the diaphragm wall dividing line. The lower steel cage is gradually lowered. When it is lowered to the first horizontal bar under the top of the cage, the lowering is paused. A steel spreader is inserted and the steel spreader is used to support the steel cage on the guide wall. The wire ropes and shackles on the hoisting bar are removed. S4. Operate the auxiliary crane to slowly lift the upper steel cage and make it vertical; S5. First, tighten the opposite side rebar connecting sleeve (13) by screwing it down. Then, use the rebar sleeve wrench through the sleeve operation hole (11) to screw the device side rebar connecting sleeve (13) down into place so that the sleeve is in the middle of the two rebars. Temporarily fix the steel plate one (1) inside the rebar cage (12) through the lifting lug (6). Loosen the nut (5) and then remove the steel plate one (1) and steel plate two (2) connected by the hinge (7). Then remove the two inner steel plates one (1). S6. Lift the hook, hoist the steel cage, pull out the steel spreader, and continue to lower the steel cage until it reaches the design elevation.
6. The connection method of the rapid connection device for low-clearance wall-connecting steel cages according to claim 5, characterized in that, In step S5, the inner steel plate 1 (1) of the cage is fixed and removed by the lifting lug (6).
Citation Information
Patent Citations
Underground diaphragm wall steel bar cage structure and construction method thereof
CN103938616A
Primary hoisting and quick groove entering construction method for even wall ultralong steel reinforcement cage
CN109626213A