Technical Problem

During the construction of the caisson, the caisson descends under its own weight, which can easily cause it to tilt when the soil around the bottom of the caisson is excavated at different depths.

Method used

The method involves installing an abutment plate and a drive assembly on the well casing. Through the cooperation of a cam and a rotating rod, the abutment plate is ensured to abut against the inner wall of the well pit when the soil at the bottom of the well casing is excavated, ensuring that the excavation depth is consistent each time. After the soil around the bottom of the well casing is excavated evenly, the cam is rotated in the opposite direction to make the well casing fall down by gravity.

Benefits of technology

It effectively reduces the tilting of the well casing during the descent process, improving the stability and fixation effect of the well casing during descent.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115977130B_ABST
    Figure CN115977130B_ABST
Patent Text Reader

Abstract

本申请涉及沉井施工领域,尤其涉及一种混凝土沉井结构,其包括设置在井坑内的井筒,所述井筒上安装有用于抵接在井坑内壁上的抵接板,所述井筒上安装有用于驱动抵接板远离或靠近井坑内壁的驱动组件;所述驱动组件包括转动在井筒上的转动杆和固定在转动杆上的凸轮,所述凸轮的侧面抵接在抵接板背离井坑内壁的一侧。本申请具有减少井筒在下落过程中出现偏移的效果。