A blanking device
By introducing a buffer hopper and an electromagnetic conveyor into the feeding device, combined with a weighing sensor and a control system, uniform feeding of the screening machine was achieved, solving the problem of screen breakage and improving production stability and equipment life.
Patent Information
- Application Number
- CN202211643655.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-20
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-12-20
AI Technical Summary
In existing technologies, uneven feeding can easily lead to screen breakage in screening machines. Therefore, how to provide a feeding device that can uniformly feed materials to the screening machine has become an urgent technical problem to be solved.
Design a feeding device including multiple buffer hoppers, an electromagnetic conveyor, a screening machine, and a control system. The device uses a weighing sensor to detect the material quality and controls the start and stop of the electromagnetic conveyor and screening machine in real time to ensure uniform material supply. It also automatically adjusts the feeding and stops the machine when the material level exceeds the limit to avoid screen damage.
It achieves uniform material supply, reduces the risk of screen breakage, ensures continuous operation of the production line, and can adjust the feeding speed according to capacity demand, thereby improving production stability and equipment lifespan.
Smart Images

Figure CN115991400B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of lithium battery cathode material production technology, and more specifically, to a feeding device. Background Technology
[0002] Currently, with the increasing prevalence of modern industrialized lithium battery cathode material production lines, and the deployment of automated and even intelligent production lines, an annual production capacity of tens of thousands of tons has become a reality. In actual production, the speed and method of material flow are currently achieved through various methods within the industry, such as star feeders, conveyors, and other systems. In the post-processing stage of lithium battery cathode materials, the material needs to be uniformly screened to ensure that impurities are separated. However, for screening machines, uneven material feeding can lead to screen breakage and misproduction.
[0003] Therefore, how to provide a feeding device that can uniformly feed materials to a screening machine has become a technical problem that urgently needs to be solved in this field. Summary of the Invention
[0004] The purpose of this invention is to provide a feeding device that can uniformly feed material to a screening machine.
[0005] This invention provides a feeding device that can be connected to the feeding outlet of a feeder. It includes multiple buffer hoppers, an electromagnetic conveyor, a screening machine, and a control system. The buffer hoppers are arranged in parallel, and each buffer hopper is equipped with a first weighing sensor to detect the material mass of each buffer hopper. Each buffer hopper's outlet corresponds to an electromagnetic conveyor, and each electromagnetic conveyor's outlet is independently opened and closed. The screening machine's inlet is connected to each conveying outlet, receiving and screening the material conveyed by the electromagnetic conveyors. The control system is connected to the feeder, the first weighing sensor, the electromagnetic conveyors, and the screening machine, respectively, and is used to calculate the material level of each buffer hopper based on the weighing feedback from the first weighing sensor, determine the timing of the feeder's replenishment of different buffer hoppers, and ensure that at least one electromagnetic conveyor is in a feeding state.
[0006] Optionally, the discharge port of the screening machine is connected to a buffer silo, and a second weighing sensor is installed on the buffer silo. The second weighing sensor is connected to the control system signal to detect the material mass in the buffer silo and send a detection signal to the control system. The control system receives the detection signal and calculates the material level in the buffer silo, and controls the start and stop of the feeder and the electromagnetic conveyor according to the material level threshold of the buffer silo.
[0007] Optionally, the control system calculates the material level of each buffer hopper in real time and makes a judgment based on the set lower and upper thresholds of the material level of the hopper. When the buffer hopper does not reach the lower threshold, the buffer hopper continues to discharge material. When it is determined that the material level in the buffer hopper is lower than the lower threshold, the discharge of the buffer hopper is stopped, the feeder is controlled to replenish the material in the buffer hopper, and at the same time, the buffer hopper with the material level higher than the lower threshold is opened for feeding.
[0008] Optionally, when the material level in the buffer hopper is higher than the upper limit threshold, the control system controls the feeder to stop replenishing the buffer hopper, and the control system controls the material level in the buffer hopper between the lower limit threshold and the upper limit threshold based on the weighing feedback from the first weighing sensor.
[0009] Optionally, when the material level in the buffer silo is higher than the upper limit of the material level threshold, the control system controls the electromagnetic conveyor and screening machine to stop.
[0010] Optionally, after the control system stops the electromagnetic conveyor and the screening machine, when the material level in the buffer silo is lower than the lower limit of the material level threshold, the control system controls the screening machine and the electromagnetic conveyor to start.
[0011] Optionally, when the control system determines that all buffer hoppers are empty and the empty state reaches a preset time threshold, it controls the feeding device to stop.
[0012] Optionally, the control system adjusts the feeding frequency of the electromagnetic conveyor in real time based on the weighing feedback from the first weighing sensor, thereby controlling the feeding speed.
[0013] Optionally, the feeding device also includes an iron remover, which is connected to the control system signal; the iron remover is set between the discharge end of the screening machine and the inlet end of the buffer silo, and the iron remover adsorbs the metal mixed in the screening product of the screening machine.
[0014] Optionally, when the screening machine malfunctions and / or the iron remover malfunctions, the control system controls the electromagnetic conveyor to stop.
[0015] According to the technical content disclosed in this invention, the following beneficial effects are achieved:
[0016] 1. The feeding device of this application mainly consists of several buffer hoppers, a screening machine, an iron remover, an electromagnetic conveyor, and a control system. It has a simple structure and is easy to install. The buffer hoppers can control the feeding process of the existing feeder. Specifically, a first weighing sensor is set on each buffer hopper. The first weighing sensor detects the material quality in each buffer hopper and then feeds it back to the control system in real time for analysis and control. Through the linkage of the electromagnetic conveyor, the feeding device of this application can not only maintain the material supply in real time to meet the usage requirements, but also control the uniform conveying of the material, which greatly reduces the risk of net breakage.
[0017] 2. The control system is sophisticated. In the PLC control system, if the material level in the buffer silo exceeds the upper limit of the material level threshold, the electromagnetic conveyor in front of the screening machine will automatically stop to ensure that the material will not enter the screening machine and cause the screen to break. When the material level in the buffer silo is lower than the lower limit of the material level threshold, the iron remover, screening machine and electromagnetic conveyor will be started automatically.
[0018] 3. The system automatically replenishes buffer hoppers whose material levels are below the lower threshold using program control. When the material level in a buffer hopper rises above the upper threshold, replenishment stops. During operation, if the material level in one buffer hopper falls below the lower threshold, the other buffer hopper can continue feeding material, ensuring continuous production line operation. Once all buffer hoppers have finished feeding (indicating the system is empty), the equipment will automatically shut down the magnetic separator.
[0019] 4. The electromagnetic conveyor can automatically adjust the feeding speed according to the production capacity requirements. For example, the feeding frequency of each electromagnetic conveyor can be controlled by the weighing signal of the buffer silo after the iron remover, thereby controlling the feeding speed.
[0020] 5. When material is fed into the buffer hopper and the weight of the material in the buffer hopper is higher than the lower threshold, the iron remover, screening machine, and electromagnetic conveyor will start in sequence, and the system will restart.
[0021] Other features and advantages of the invention will become clear from the following detailed description of exemplary embodiments of the invention with reference to the accompanying drawings. Attached Figure Description
[0022] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments of the invention and, together with their description, serve to explain the principles of the invention.
[0023] Figure 1 This is a schematic diagram of a feeding device according to an embodiment;
[0024] Figure 2 This is a schematic diagram of the material control logic of a feeding device according to an embodiment;
[0025] Figure 3 This is a block diagram illustrating the control principle of a material feeding device control system according to an embodiment.
[0026] Figure 4 This is a flowchart of a control system for a feeding device according to an embodiment.
[0027] Explanation of reference numerals in the attached drawings: 100-Support platform, 11-First buffer hopper, 12-Second buffer hopper, 21-First weighing sensor, 22-Second weighing sensor, 3-Electromagnetic conveyor, 4-Electromagnetic conveyor base, 5-Screening machine, 6-Discharge pipe, 7-Iron remover, 8-Main buffer hopper. Detailed Implementation
[0028] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that, unless otherwise specifically stated, the relative arrangement, numerical expressions, and values of the components and steps set forth in these embodiments do not limit the scope of the invention.
[0029] The following description of at least one exemplary embodiment is merely illustrative and is in no way intended to limit the invention or its application or use.
[0030] Techniques, methods, and equipment known to those skilled in the art may not be discussed in detail, but where appropriate, such techniques, methods, and equipment should be considered part of the specification.
[0031] In all the examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not as limitations. Therefore, other examples of exemplary embodiments may have different values.
[0032] It should be noted that similar labels and letters in the following figures indicate similar items; therefore, once an item is defined in one figure, it does not need to be discussed further in subsequent figures.
[0033] like Figure 1 As shown, the present invention provides a feeding device that can be connected to the feeding outlet of a feeder, including a support platform 100, a first buffer hopper 11, a second buffer hopper 12, a first weighing sensor 21, a second weighing sensor 22, an electromagnetic conveyor 3, an electromagnetic conveyor base 4, a screening machine 5, a feeding pipe 6, an iron remover 7, a main buffer hopper 8, and a control system; the first buffer hopper 11 and the second buffer hopper 12 are the buffer hoppers of the present invention.
[0034] The support platform 100 is used to support the feeding device. The first buffer hopper 11 and the second buffer hopper 12 are respectively disposed on the top of the support platform 100. Each of the first buffer hopper 11 and the second buffer hopper 12 is provided with three hopper support points. The hopper support points are used to support the support platform 100 and the first buffer hopper 11 / second buffer hopper 12. The three hopper support points are evenly distributed around the first buffer hopper 11 / second buffer hopper 12, and each hopper support point is provided with a first weighing sensor 21. The accuracy class of the first weighing sensor 21 is preferably C3.
[0035] The first weighing sensor 21 can identify the weight of the materials in the first buffer hopper 11 and the second buffer hopper 12. In this embodiment, the volume of the first buffer hopper 11 and the second buffer hopper is 50L.
[0036] The screening machine 5 is located in the middle of the support platform 100. An electromagnetic conveyor 3 is installed on each of the two electromagnetic conveyor bases 4. One electromagnetic conveyor 3 is connected between the discharge end of the first buffer hopper 11 and the inlet end of the screening machine 5, and the other electromagnetic conveyor 3 is connected between the discharge end of the second buffer hopper 12 and the inlet end of the screening machine 5.
[0037] The buffer silo 8 is located below the support platform 100. The buffer silo 8 has three support points, and each support point is equipped with a second weighing sensor 22. The accuracy class of the second weighing sensor 22 is C3. The second weighing sensor 22 can identify the weight of the material inside the buffer silo 8. In this embodiment, the volume of the buffer silo 8 is 100L.
[0038] A discharge pipe 6 and a magnetic separator 7 are arranged sequentially from top to bottom between the discharge end of the screening machine 5 and the inlet end of the buffer silo 8. The inlet end of the discharge pipe 6 is connected to the discharge end of the screening machine 5, and the discharge pipe 6 is inclined vertically or arranged vertically. The magnetic separator 7 is installed at the discharge end of the discharge pipe 6 to adsorb iron mixed in with the screened material of the screening machine 5. After the iron mixed in with the screened material of the screening machine 5 is adsorbed by the magnetic separator 7, the remaining screened material enters the buffer silo 8. When the discharge pipe 6 is inclined vertically, the impact force of the screened material of the screening machine 5 on the magnetic separator 7 and the buffer silo 8 can be reduced, thereby reducing the wear and tear on the equipment.
[0039] like Figures 2 to 4As shown, in this embodiment, the control system is controlled by an S7-1500 PLC; the control system is connected to the feeder (not shown in the figure), the first weighing sensor 21, the second weighing sensor 22, the electromagnetic conveyor 3, the screening machine 5, and the iron remover 7; the control system can monitor the material level information in the first buffer hopper 11, the second buffer hopper 12, and the total buffer hopper 8; the control system can control the start and stop of the electromagnetic conveyor 3 and its conveying speed; the control system can control the start and stop of the screening machine 5.
[0040] The control system calculates the material level of the buffer silo and the buffer main silo 8 based on the material mass feedback from the first weighing sensor 21 and the second weighing sensor 22, and controls the start and stop of the feeder and the electromagnetic conveyor 3 based on the material level of the buffer silo and the buffer main silo 8.
[0041] Furthermore, the control system synchronously monitors the material level of each buffer hopper in real time. In this embodiment, two buffer hoppers are used as an example. Figure 4 As shown, these are named hopper A and hopper B, respectively. The control system determines the timing of the feeder's replenishment of different buffer hoppers, ensuring that at least one electromagnetic conveyor is in a feeding state. For buffer hoppers where the material level is below the lower threshold, the control system stops discharging from the buffer hopper, and the feeder replenishes it. For buffer hoppers where the material level is not below the lower threshold, the control system continues discharging from the buffer hopper. In this embodiment, hopper A corresponds to... Figure 1 The first buffer hopper 11 in the middle, corresponding to hopper B. Figure 2 The second buffer hopper 12 is provided. In other embodiments, three or more buffer hoppers can be set, and the number can be selected according to actual needs.
[0042] Furthermore, for buffer silos where the material level is higher than the upper limit threshold of the buffer silo, the control system controls the feeder to stop replenishing the buffer silo. The control system controls the material level in the buffer silo between the lower limit threshold and the upper limit threshold of the buffer silo based on the weighing feedback from the first weighing sensor 21.
[0043] Furthermore, when the material level in the buffer silo 8 is higher than the upper limit of the material level threshold, the control system controls the electromagnetic conveyor 3 and the screening machine 5 to stop in sequence.
[0044] Furthermore, after the control system controls the electromagnetic conveyor 3 and the screening machine 5 to stop in sequence, when the material level in the buffer silo 8 is lower than the lower limit of the material level threshold, the control system controls the screening machine 5 and the electromagnetic conveyor 3 to start in sequence.
[0045] Furthermore, when the control system detects that several buffer hoppers are all empty, the control system will stop the feeding device after a preset time. That is, when the empty hopper status reaches the preset time threshold, the feeding device will be stopped.
[0046] Furthermore, after the feeding device stops, when the first weighing sensor 21 detects that the material level in the buffer hopper is once again higher than the lower limit threshold of the buffer hopper, the control system can control the feeding device to start.
[0047] Furthermore, the control system adjusts the feeding frequency of the electromagnetic conveyor 3 in real time based on the weighing feedback from the first weighing sensor 21, thereby controlling the feeding speed.
[0048] Furthermore, the feeding device also includes an iron remover 7, which is connected to the control system signal. The iron remover 7 is set between the discharge end of the screening machine 5 and the inlet end of the buffer silo 8. The iron remover 7 adsorbs the metal mixed in the screening product of the screening machine 5.
[0049] Furthermore, when the screening machine 5 malfunctions and / or the iron remover 7 malfunctions, the control system controls the electromagnetic conveyor 3 to stop.
[0050] Specifically, the control system can control the first buffer hopper 11 and the second buffer hopper 12 to supply material to the screening machine 5 separately, or the control system can control the first buffer hopper 11 and the second buffer hopper 12 to supply material to the screening machine 5 simultaneously. When the control system identifies, via the first weighing sensor 21, that the first buffer hopper 11 and / or the second buffer hopper 12 are below the set lower threshold of the buffer hopper, the control system controls the first buffer hopper 11 and / or the second buffer hopper 12 to replenish material; when the control system identifies, via the first weighing sensor 21, that the first buffer hopper 11 and / or the second buffer hopper 12 are above or equal to the set upper threshold of the buffer hopper, the control system controls the first buffer hopper 11 and / or the second buffer hopper 12 to stop replenishing material; the control system identifies the material level in the total buffer hopper 8 via the second weighing sensor 22 and controls the two electromagnetic conveyors 3 to operate individually, simultaneously, or both to stop operating; at the same time, the control system can control the conveying speed of the electromagnetic conveyors 3 based on the material level in the total buffer hopper 8 identified by the weighing sensor 2.
[0051] The control system can control the conveying frequency of the electromagnetic conveyor 3 and control the feed rate (based on a fuzzy algorithm program for weight within the control system, the specific process is as follows). Figure 2 and 4 As shown), the control system will prioritize the second buffer hopper 12 (corresponding to...). Figure 4 The B hopper in the middle is the priority feeder. When there is no material supply from upstream, the first buffer hopper 11 (corresponding to the second buffer hopper 12) will be opened after the material is fed out of the second buffer hopper 12. Figure 4Material is discharged from hopper A in the system until the discharge is completed, at which point the system will automatically stop. The electromagnetic conveyor 3 discharges material continuously and at a constant speed, ensuring the normal operation of downstream equipment. When the screening machine 5 malfunctions, it sends a signal to the PLC via hardwired connection, causing the electromagnetic conveyor 3 to stop automatically. Alternatively, when the iron remover 7 malfunctions, it sends a signal to the PLC via a combination of hardwired connection and communication, causing the electromagnetic conveyor 3 to stop automatically. Or, when the first weighing sensor 21 detects that the weight of the material in the first buffer hopper 11 and the second buffer hopper 12 has reached the upper limit threshold of the buffer hopper, the discharge valve of the upstream equipment is closed. When one of the first buffer hopper 11 and the second buffer hopper 12 falls below the low material level, the other hopper can continue to feed material to ensure normal production line operation. The PLC in the system automatically processes the data provided by the weighing sensor 2 of the buffer hopper 8 below the iron separator 7 and controls the upstream equipment (the large hopper equipped with a pneumatic butterfly valve and a star feed valve) to replenish the first buffer hopper 11 and the second buffer hopper 12. When the material in the buffer hopper 8 reaches the upper limit of the material level threshold (the weight parameter can be set according to the actual situation, such as 100kg for the high material level and 20kg for the low material level), the electromagnetic conveyor 3 automatically stops, and the screening machine 5 and the iron separator 7 stop in sequence, thereby achieving the purpose of energy saving, environmental protection and emission reduction.
[0052] Upon startup, the system automatically detects and weighs the first and second buffer silos 11 and the main buffer silo 8 using a first weighing sensor. When the weight of the first and second buffer silos 11 and 12 falls below the lower threshold of the set buffer silo, the system controls the upstream equipment to feed material into the first and second buffer silos 11 and 12. When the weight of the material in the first and second buffer silos 11 and 12 reaches the upper threshold of the set buffer silo, the upstream equipment stops operating. The material in the first and second buffer silos 11 and 12 is then evenly fed into the screening machine 5 via the electromagnetic conveyor 3. During this process, the feed rate of the electromagnetic conveyor 3 can be controlled by adjusting the conveying frequency, thereby achieving uniform production on the production line. This solution feeds material from a 2000L silo to a 50L first buffer silo 11 and a second buffer silo 12 via a star feeder. The material is then conveyed to the screening machine 5 via an electromagnetic conveyor 3, which controls the feeding speed. Specifically, the first buffer silo 11 and the second buffer silo 12 are used to control the material level between the large silo and the screening machine 5. The weighing module automatically determines the weight in the silo and replenishes the material accordingly.
[0053] In summary, the feeding device of this application mainly consists of a first buffer hopper 11, a second buffer hopper 12, a screening machine 5, an iron remover 7, an electromagnetic conveyor 3, and a control system. It has a simple structure and is easy to install. The first and second buffer hoppers 11 and 12 can control the feeding process of existing feeders. Specifically, a first weighing sensor is installed on the first and second buffer hoppers 11 and 12 to detect the material mass within them and provide real-time feedback to the control system for analysis and control. Through the linkage of the electromagnetic conveyor 3, the feeding device of this application can not only maintain a real-time material supply to meet usage requirements but also control the uniform conveying of materials, greatly reducing the risk of mesh breakage. The control system is sophisticated. In the PLC control system, if the material level in the main buffer hopper exceeds the upper limit of the material level threshold, the electromagnetic conveyor 3 before the screening machine 5 automatically stops, ensuring that material does not enter the screening machine 5 and cause screen damage. When the material level in the main buffer hopper falls below the lower limit of the material level threshold, the iron separator 7, screening machine 5, and electromagnetic conveyor 3 automatically start. The system automatically replenishes the smaller buffer hoppers whose material levels are below the lower threshold through program control. When the material level in a smaller buffer hopper exceeds the upper threshold, replenishment stops. During equipment operation, if the material level in one smaller buffer hopper falls below the lower threshold, the other smaller buffer hopper can continue to discharge material, ensuring continuous production line operation. When all smaller buffer hoppers have discharged material (indicating the system is empty), the equipment automatically controls the iron separator 7 to stop. The electromagnetic conveyor 3 can automatically adjust the feeding speed according to the production capacity requirements. For example, the feeding frequency of each electromagnetic conveyor can be controlled by the weighing signal of the buffer hopper after the iron remover 7, thereby controlling the feeding speed. When the material in the buffer hopper is fed and the material in the buffer hopper is higher than the lower limit threshold, the iron remover 7, the screening machine 5, and the electromagnetic conveyor 3 are started in sequence, and the system restarts.
[0054] While specific embodiments of the invention have been described in detail by way of examples, those skilled in the art should understand that the examples are for illustrative purposes only and not intended to limit the scope of the invention. Those skilled in the art should understand that modifications can be made to the above embodiments without departing from the scope and spirit of the invention. The scope of the invention is defined by the appended claims.
Claims
1. A feeding device for the post-processing of lithium battery cathode materials, which can be connected to the feeding outlet of a feeder to uniformly feed materials to a screening machine and prevent screen breakage due to uneven feeding, characterized in that, include: Multiple buffer silos, electromagnetic conveyors, screening machines, and control systems; Each of the buffer hoppers is arranged in parallel, and the top of each buffer hopper is independently connected to the feeding outlet of the feeder; each buffer hopper is supported on the support platform by three evenly distributed hopper support points, and a first weighing sensor is provided at each hopper support point to detect the material mass of each buffer hopper; Each of the buffer hoppers has a corresponding electromagnetic conveyor at its outlet, and the outlet of each electromagnetic conveyor can be opened and closed independently. The inlet of the screening machine is connected to the conveying outlets of each of the electromagnetic conveyors through a non-metallic collecting pipe, so as to receive the materials conveyed by the electromagnetic conveyors and perform screening. The control system is connected to the feeder, the first weighing sensor, the electromagnetic conveyor, and the screening machine respectively. It is used to calculate the material level of each buffer hopper based on the weighing feedback of the first weighing sensor, determine the timing of the feeder to replenish different buffer hoppers, and ensure that at least one electromagnetic conveyor is in the feeding state. During equipment operation, when the material level of one buffer hopper is lower than the lower threshold, the other buffer hopper can continue to feed, ensuring the continuous operation of the production line. The discharge port of the screening machine is connected to a buffer silo. A second weighing sensor is installed on the buffer silo. The second weighing sensor is connected to the control system signal and is used to detect the material mass in the buffer silo and send a detection signal to the control system. The control system receives the detection signal and calculates the material level in the buffer silo. Based on the material level threshold of the buffer silo, the control system controls the start and stop of the feeder and the electromagnetic conveyor. The control system calculates the material level of each of the buffer bins in real time and makes a judgment based on the set lower and upper thresholds of the material level of the bins. When the buffer hopper does not reach the lower threshold, the buffer hopper continues to discharge material. When the material level in the buffer hopper is lower than the lower limit threshold of the hopper, the discharge of the buffer hopper is stopped, the feeder is controlled to replenish the buffer hopper, and at the same time the buffer hopper with the material level higher than the lower limit threshold is opened for feeding. When the material level in the buffer hopper is higher than the upper limit threshold, the control system controls the feeder to stop replenishing the buffer hopper. The control system controls the material level in the buffer hopper between the lower limit threshold and the upper limit threshold based on the weighing feedback from the first weighing sensor. The feeding device also includes an iron remover, which is connected to the control system via signal. The control system adjusts the feeding frequency of the electromagnetic conveyor in real time based on the weighing feedback from the first weighing sensor, thereby controlling the feeding speed.
2. The feeding device according to claim 1, characterized in that: When the material level in the buffer silo is higher than the upper limit of the material level threshold, the control system controls the electromagnetic conveyor and the screening machine to stop.
3. The feeding device according to claim 2, characterized in that: After the control system stops the electromagnetic conveyor and the screening machine, when the material level in the buffer silo is lower than the lower limit of the material level threshold, the control system controls the screening machine and the electromagnetic conveyor to start.
4. The feeding device according to claim 1, characterized in that: When the control system determines that all the buffer hoppers are empty and the empty state reaches a preset time threshold, it controls the feeding device to stop.
5. The feeding device according to claim 1 or 3, characterized in that: The iron remover is installed between the discharge end of the screening machine and the inlet end of the buffer silo, and the iron remover adsorbs the metal mixed in the screening product of the screening machine.
6. The feeding device according to claim 5, characterized in that: When the screening machine malfunctions and / or the iron remover malfunctions, the control system controls the electromagnetic conveyor to stop.
Citation Information
Patent Citations
Powdery material scattering, screening and packaging integrated machine
CN106865281A
Columnar active coke granulation system and method
CN109395664A
High-precision and stable discharging device in lithium battery industry and control method thereof
CN113247595A
Automatic powder supply device of flour
CN207918059U
Accurate ratio and measurement air conveying system
CN208406876U