Construction method for in-situ expansion of existing highway tunnel and tunnel structure

By using the construction method of expanding existing highway tunnels in situ, the existing tunnels are used as the initial support for the expansion. Combined with channel steel and pad plates, the problems of wasteful resources and high costs in the reconstruction and expansion of existing tunnels are solved, and resource conservation, improved safety and construction efficiency are achieved.

CN116006189BActive Publication Date: 2026-11-24HEBEI PROVINCIAL COMM PLANNING & DESIGN INST
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310158412.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-23
Publication Date
2026-11-24
Estimated Expiration
2043-02-23

AI Technical Summary

Technical Problem

Existing highway tunnel reconstruction and expansion plans are wasteful of resources, costly, and time-consuming, and cannot effectively utilize existing tunnels.

Method used

The construction method of in-situ expansion of existing highway tunnels is adopted. Through advanced geological forecasting, demolition and reconstruction of tunnel structures, the existing tunnel is used as the initial support for the expansion. Combined with the connection of channel steel and pad plates, the stability and safety of the surrounding rock are ensured.

Benefits of technology

To conserve resources, reduce renovation and expansion costs, shorten construction cycles, improve expansion efficiency, maintain surrounding rock stability, prevent local damage to the secondary lining of existing tunnels, and achieve green development.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116006189B_ABST
    Figure CN116006189B_ABST
Patent Text Reader

Abstract

The present application relates to a kind of construction method and tunnel structure of in situ expansion of existing highway tunnel, belong to the technical field of tunnel design construction, solve the problem of waste resource, large input, high cost of reconstruction and expansion of existing construction method.The construction method mainly includes the following steps: removing the secondary lining of the arch part of the existing tunnel on the expansion side;Carrying out the advance support of the arch part of the newly-built tunnel on the expansion side and the initial support of the arch part of the newly-built tunnel;Removing the secondary lining of the arch wall of the existing tunnel on the expansion side;Carrying out the advance support of the arch wall of the newly-built tunnel on the expansion side and the initial support of the arch wall of the newly-built tunnel;Carrying out the inverted arch of the newly-built tunnel;Carrying out the secondary lining of the newly-built tunnel.The present application effectively shortens the construction time on site, reduces the cost of reconstruction and expansion, and improves the quality and stability of the tunnel structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of tunnel design and construction technology, and in particular to a construction method and tunnel structure for in-situ expansion of an existing highway tunnel. Background Technology

[0002] With my country's continued economic growth, its infrastructure construction has reached the forefront of the world, and the number of cars on the road has been increasing, resulting in many operating highways being unable to meet the growing traffic demand.

[0003] To meet the needs of increasing traffic volume, the reconstruction and expansion of existing expressways is imperative, and the reconstruction and expansion of expressways will inevitably involve the reconstruction and expansion of highway tunnels.

[0004] The existing highway tunnel reconstruction and expansion plans mainly take the following forms: First, abandon the existing tunnel and completely re-excavate a new tunnel; Second, start arching from the bottom of the existing tunnel, which results in low utilization of the existing tunnel.

[0005] The aforementioned highway tunnel reconstruction and expansion plans result in low utilization of existing tunnels, significant waste of resources, high reconstruction and expansion costs, and long construction periods. Summary of the Invention

[0006] Based on the above analysis, the present invention aims to provide a construction method and tunnel structure for in-situ expansion of existing highway tunnels, in order to solve the problems of waste of resources, large investment, and high cost of reconstruction and expansion in existing construction methods.

[0007] The objective of this invention is mainly achieved through the following technical solutions:

[0008] On the one hand, the present invention provides a construction method for in-situ expansion of existing highway tunnels, including the following steps:

[0009] Step 1: Conduct advanced geological forecasting for the widened excavation side;

[0010] Step 2: Remove the secondary lining of the existing tunnel arch on the widened side;

[0011] Step 3: Construct advance support for the arch of the newly built tunnel on the widened side and initial support for the arch of the newly built tunnel;

[0012] Step 4: Install temporary steel supports;

[0013] Step 5: Remove the secondary lining of the existing tunnel arch wall on the widened side;

[0014] Step 6: Construct advance support and initial support for the new tunnel arch wall on the widened excavation side;

[0015] Step 7: Fill the voids in the surrounding rock behind the initial support of the new tunnel arch and the initial support of the new tunnel arch wall.

[0016] Step 8: Remove the temporary steel supports;

[0017] Step 9: Construct the invert arch of the new tunnel;

[0018] Step 10: Construct the secondary lining of the newly built tunnel;

[0019] Step 11: Repeat steps 1-10 along the longitudinal direction of the existing tunnel to complete the tunnel expansion.

[0020] Optionally, step 3 includes the following steps:

[0021] Step 31: Construct advance support for the arch of the newly built tunnel on the widened side to ensure the stability of the surrounding rock during the widening construction;

[0022] Step 32: Excavate the surrounding rock of the arch between the existing tunnel arch and the new tunnel arch on the widened side;

[0023] Step 33: Construct initial support for the arch of the new tunnel;

[0024] Step 34: Connect the initial support of the new tunnel arch to the secondary lining of the existing tunnel.

[0025] Optionally, step 34 includes the following steps:

[0026] Step 341: Install channel steel at the connection between the initial support of the new tunnel arch and the secondary lining of the existing tunnel, and place pads inside the channel steel.

[0027] Step 342: Make contact between the end of the I-beam used for the initial support of the new tunnel arch and the pad plate;

[0028] Step 343: Weld the channel steel, backing plate and I-beam.

[0029] Optionally, step 7 includes the following steps:

[0030] Step 71: Construct grouting holes at the junction of the secondary lining of the existing tunnel and the initial support of the arch of the new tunnel;

[0031] Step 72: Inject grout into the grouting hole.

[0032] Optionally, step 9 includes the following steps:

[0033] Step 91: Remove the existing tunnel invert arch on the widened side;

[0034] Step 92: Excavate the surrounding rock between the existing tunnel invert and the new tunnel invert;

[0035] Step 93: Construct the invert arch of the new tunnel and backfill it to form a closed ring with the initial support of the existing tunnel on the retained side, the initial support of the arch of the new tunnel, and the initial support of the arch wall of the new tunnel.

[0036] Optionally, step 5 can be implemented using an explosive method.

[0037] Optionally, step 5 can be achieved by mechanically shearing the reinforcing bars.

[0038] Optionally, step 343 includes the following steps: first welding the end of the I-beam to the backing plate, and then connecting the backing plate to the bottom wall of the channel steel.

[0039] Optionally, step 343 includes the following steps: first welding the end of the I-beam to the backing plate, and then connecting the backing plate to the side wall of the channel steel.

[0040] Optionally, step 1 includes determining the location for in-situ tunnel expansion, comprising the following steps:

[0041] Step 1: Determine the boundaries of the new tunnel construction;

[0042] Step 2: Compare the inner contours of the existing tunnel and the newly built tunnel to determine the boundary between the two tunnels.

[0043] On the other hand, the present invention also provides a tunnel structure after renovation and expansion on the basis of an existing tunnel, which is constructed using the above-mentioned construction method.

[0044] The tunnel structure after reconstruction and expansion based on the existing tunnel includes the existing tunnel section and the expanded tunnel section. The existing tunnel section provides initial support for the expanded tunnel section. The existing tunnel section and the expanded tunnel section are connected by connectors.

[0045] Optionally, the connector includes a channel steel and a pad, the channel steel being arranged longitudinally along the tunnel, and the pad being placed in a groove in the channel steel.

[0046] Optionally, the opening of the channel steel faces the expanded tunnel section, the end of the I-beam used for the initial support of the expanded tunnel section contacts the pad, and the channel steel, the pad, and the end of the I-beam are fixedly connected.

[0047] Optionally, the pad is made of steel.

[0048] Optionally, there may be multiple channel steels, which are connected sequentially along the longitudinal direction of the tunnel.

[0049] Optionally, the bottom wall of the channel steel, the pad plate, and the ends of the I-beam are welded.

[0050] Optionally, the sidewalls of the channel steel, the pad, and the ends of the I-beam are welded.

[0051] Optionally, the width of the pad is greater than the width of the I-beam.

[0052] Optionally, the width of the pad is smaller than the width of the channel steel.

[0053] Optionally, the channel steel has a length of 60cm.

[0054] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:

[0055] (1) The construction method of the present invention does not abandon the existing tunnel and completely re-excavate the new tunnel, nor does it start arching from the bottom of the existing tunnel. Instead, it retains a part of the existing tunnel and uses the secondary lining of one side of the existing tunnel as the initial support for the expanded tunnel. On the one hand, it maintains the stability of the surrounding rock on the unexcavated side and improves the construction safety. On the other hand, it can make full use of the existing tunnel resources, implement the concept of green development, save the expansion investment, and shorten the on-site construction time and improve the expansion efficiency.

[0056] (2) This invention involves conducting advanced geological surveys before construction to identify cavities behind the existing tunnel lining, and then deciding whether to carry out pre-reinforcement based on the survey results. This step can effectively save construction resources and improve construction safety.

[0057] (3) The present invention adopts a sectional excavation method, and the construction process ensures the safety of the tunnel in soft strata.

[0058] (4) By rationally selecting the connection point between the existing tunnel and the newly built tunnel, the present invention can, on the one hand, make maximum use of a portion of the original lining, reduce expansion costs, and shorten the expansion cycle; on the other hand, it can maintain the stability of the surrounding rock on the unexpanded side and improve construction safety.

[0059] (5) The tunnel structure of the present invention is not completely re-excavated, but utilizes a portion of the existing tunnel. Specifically, the tunnel structure of the present invention includes an existing tunnel section and an expanded tunnel section. The existing tunnel section provides initial support for the expanded tunnel section. On the one hand, it maintains the stability of the surrounding rock on the un-expanded side and improves construction safety; on the other hand, it can make full use of existing tunnel resources, implement the concept of green development, reduce reconstruction and expansion costs, and shorten on-site construction time, thereby improving expansion efficiency.

[0060] (6) By setting a pad at the connection between the initial support of the new tunnel arch and the secondary lining of the existing tunnel, the present invention increases the contact area between the initial support of the new tunnel arch and the secondary lining of the existing tunnel, thereby reducing the pressure and preventing stress concentration from causing local damage to the secondary lining of the existing tunnel.

[0061] (7) By setting up channel steel, the present invention prevents the pad plate from shifting and increases the welding methods, thereby improving welding flexibility. For example, the bottom wall of the channel steel can be welded to the pad plate and the I-beam, or the side wall of the channel steel can be welded to the pad plate and the I-beam, thereby realizing the connection between the initial support of the arch of the new tunnel and the secondary lining of the existing tunnel.

[0062] (8) By setting the width of the pad to be greater than the width of the I-beam and less than the width of the channel steel, the present invention can form a gap between the sidewalls of the pad and the channel steel, which facilitates welding on the one hand and improves the welding strength of the channel steel, the pad and the I-beam on the other hand.

[0063] In this invention, the above-described technical solutions can be combined with each other to achieve more preferred combinations. Other features and advantages of this invention will be set forth in the following description, and some advantages will become apparent from the description or may be learned by practicing the invention. Attached Figure Description

[0064] The accompanying drawings are for illustrative purposes only and are not intended to limit the invention. Throughout the drawings, the same reference numerals denote the same parts.

[0065] Figure 1 A construction flowchart for in-situ expansion of an existing tunnel using one side lining;

[0066] Figure 2 A detailed schematic diagram illustrating the construction steps for tunnel reconstruction and expansion.

[0067] Figure 3 for Figure 2 Enlarged view of point A (the junction of the existing tunnel's secondary lining and the new tunnel's initial support).

[0068] Figure label:

[0069] 1-Radar survey line; 2a-Existing tunnel arch; 2b-New tunnel arch; 3-Steel column; 4a-Existing tunnel arch wall; 4b-New tunnel arch wall; 5-Existing tunnel secondary lining; 6a-Existing tunnel invert; 6b-New tunnel invert; 7-Plate; 8-I-beam; 9-Channel steel. Detailed Implementation

[0070] The preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings, which constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not intended to limit the scope of the present invention.

[0071] Example 1

[0072] One specific embodiment of the present invention discloses a construction method for expanding an existing highway tunnel in complex and soft strata. This construction method utilizes the existing tunnel's single-sided lining as the initial support for the expanded tunnel, enabling in-situ expansion. This effectively ensures the safety of tunnel expansion construction, embodies the concept of green development, and effectively saves construction costs.

[0073] Before formal construction begins, it is necessary to first determine the location for in-situ tunnel expansion, that is, which parts of the existing tunnel will be retained and from which location the expansion will commence. This specifically includes the following steps:

[0074] Step 1: Determine the boundaries of the new tunnel construction;

[0075] Step 2: Compare the inner contours of the existing tunnel and the new tunnel to determine the junction between the existing tunnel and the new tunnel, that is, the joint between the secondary lining of the existing tunnel and the initial support of the new tunnel.

[0076] Construction will commence only after the location for the on-site expansion has been determined. For example... Figure 1 As shown, the construction method in this embodiment includes the following steps:

[0077] Step 1: Conduct advanced geological forecasting for the excavation side.

[0078] Before construction, it is necessary to conduct advanced geological exploration on the excavation side and use detection methods such as ground-penetrating radar to detect the voids behind the tunnel lining in order to determine whether pre-reinforcement measures are needed for the existing tunnel.

[0079] This embodiment involves conducting advanced geological surveys before construction to identify cavities behind the existing tunnel lining, and then deciding whether to carry out pre-reinforcement based on the survey results. This step can effectively save construction resources and improve construction safety.

[0080] Specifically, this embodiment uses ground-penetrating radar to conduct advanced geological surveys on the excavation side. For example... Figure 2 As shown, in this embodiment, three radar survey lines 1 are arranged longitudinally along the tunnel at the arch crown, arch waist, and arch wall on the side of the existing tunnel widening.

[0081] It should be noted that the reason for setting the radar survey line position at the top of the arch in this embodiment is that: on the one hand, the top of the arch is the weakest point in the construction; on the other hand, when lining, shotcreting and other operations are carried out on the top of the arch, the construction materials are prone to fall off due to gravity, resulting in construction defects and voids behind the lining.

[0082] In addition, the arch waist and arch wall are also locations prone to construction defects. This embodiment places radar survey lines at three locations: the arch crown, the arch waist, and the arch wall. This allows for accurate understanding of the voids behind the tunnel lining, improving guidance on whether pre-reinforcement measures for existing tunnels are necessary.

[0083] If pre-reinforcement is required, the reinforcement measure adopted in this embodiment is: drive a grouting pipe into the voided area, and then inject concrete into the grouting pipe.

[0084] Step 2: Remove the secondary lining of the existing tunnel arch 2a on the widened side.

[0085] Specifically, this is achieved through methods such as blasting and mechanical shearing of steel bars.

[0086] Step 3: Construct the pre-support for the 2b section of the newly built tunnel arch on the enlarged excavation side and the initial support for the upper bench (i.e., the newly built tunnel arch). This includes the following steps:

[0087] Step 31: Construct 2b advance support for the arch of the newly built tunnel on the widened side to ensure the stability of the surrounding rock during the widening construction;

[0088] Step 32: Excavate the surrounding rock of the arch between the existing tunnel arch 2a and the newly built tunnel arch 2b on the expanded side by means of blasting or mechanical excavation. The excavation advance should not exceed 2 rings of steel frame.

[0089] Step 33: Construct initial support for the arch of the newly built tunnel on the widened side (2b);

[0090] Step 34: Connect the initial support of the newly built tunnel arch 2b on the widened side to the secondary lining 5 of the existing tunnel.

[0091] like Figure 3 As shown, step 34 includes the following steps:

[0092] Step 341: Set up channel steel 9 at the connection between the initial support of the new tunnel arch 2b and the secondary lining 5 of the existing tunnel, and arrange pad plate 7 inside the channel steel 9.

[0093] Specifically, the channel steel 9 is placed along the longitudinal direction of the tunnel (i.e., along the length of the tunnel), with the opening of the channel steel 9 facing the side of the newly built tunnel. The pad 7 is also placed along the longitudinal direction of the tunnel and is placed in the groove of the channel steel 9.

[0094] Step 342: Make contact between the end of the I-beam 8 used for the initial support of the new tunnel arch 2b and the pad 7.

[0095] Step 343: Weld the channel steel 9, the backing plate 7, and the I-beam 8.

[0096] Step 343 is implemented in the following two ways: the first way is to weld the end of the I-beam 8 to the pad 7, and then connect the pad 7 to the bottom wall of the channel steel 9; the second way is to weld the end of the I-beam 8 to the pad 7, and then connect the pad 7 to the side wall of the channel steel 9.

[0097] In a preferred embodiment, the channel steel 9 should be closely attached to the concrete surface of the existing tunnel secondary lining 5, and the gaps should be filled with concrete blocks or the like.

[0098] It should be noted that, due to the small cross-sectional area of ​​the I-beam 8, the pressure on the contact surface between the initial support of the new tunnel arch 2b and the existing secondary lining 5 is relatively high, which can easily cause localized damage to the existing secondary lining 5. This embodiment addresses this by installing a pad 7 at the connection between the initial support of the new tunnel arch 2b and the existing secondary lining 5, thereby increasing the contact area and reducing the pressure to prevent stress concentration from causing localized damage to the existing secondary lining.

[0099] The advantage of using channel steel in this embodiment is that the channel steel has two upright sidewalls, which increases the welding methods and improves welding flexibility when welding the channel steel, the backing plate, and the I-beam. For example, the bottom wall of the channel steel can be welded to the backing plate and the I-beam, or the sidewalls of the channel steel can be welded to the backing plate and the I-beam.

[0100] Step 4: Install temporary steel supports.

[0101] Specifically, steel columns 3 are installed between one end of the initial support of the newly formed tunnel arch and the bottom wall of the existing tunnel to form temporary support.

[0102] This embodiment, by installing temporary steel supports between the existing tunnel pavement structure and the initial support of the newly built tunnel arch on the excavated side, can prevent the newly formed initial support from shifting or deviating, thereby maintaining the stability of the surrounding rock and providing favorable conditions for the next step of excavating the surrounding rock on the sidewall.

[0103] Step 5: Remove the secondary lining of the existing tunnel arch wall 4a on the widened side.

[0104] Specifically, this is achieved through methods such as blasting and mechanical shearing of steel bars.

[0105] Step 6: Construct the pre-support and initial support for the new tunnel arch wall 4b on the widened excavation side, as well as the lower bench (i.e., the new tunnel arch wall). This includes the following steps:

[0106] Step 61: Construct 4b advance support for the newly built tunnel arch wall on the widened excavation side to ensure the stability of the surrounding rock during the widening construction;

[0107] Step 62: Excavate the surrounding rock between the existing tunnel arch wall 4a and the newly built tunnel arch wall 4b by means of blasting or mechanical excavation. The excavation advance should not exceed 2 rings of steel frame.

[0108] Step 63: Construct initial support for the new tunnel arch wall.

[0109] Step 7: Fill the voids in the surrounding rock behind the initial support of the new tunnel arch and the initial support of the new tunnel arch wall. This includes the following steps:

[0110] Step 71: Construct grouting holes at the junction of the existing tunnel secondary lining 5 and the initial support of the new tunnel arch;

[0111] Step 72: Inject grout into the grouting holes. Grouting fills the voids in the surrounding rock behind the initial support, thereby reinforcing the surrounding rock, reducing settlement, and controlling deformation.

[0112] Step 8: Remove the temporary steel supports.

[0113] Step 9: Construct the new tunnel invert. This includes the following steps:

[0114] Step 91: Demolish the existing tunnel invert arch 6a on the excavation side using methods such as blasting and mechanical shearing of steel bars;

[0115] Step 92: Excavate the surrounding rock between the existing tunnel invert 6a and the new tunnel invert 6b;

[0116] Step 93: Construct the new tunnel invert arch 6b and backfill it with C15 concrete to form a closed ring with the existing tunnel initial support on the retained side, the new tunnel arch initial support, and the new tunnel arch wall initial support.

[0117] Step 10: Construct the secondary lining of the new tunnel.

[0118] After the initial support is closed into a ring, drainage and waterproofing construction is carried out, followed by the secondary lining of the newly built tunnel.

[0119] Step 11: Repeat steps 1-10 along the longitudinal direction of the existing tunnel to complete the tunnel expansion.

[0120] Example 2

[0121] Another specific embodiment of the present invention discloses a tunnel structure after reconstruction and expansion based on an existing tunnel, which is obtained by using the construction method of Embodiment 1.

[0122] like Figure 2 As shown, the reconstructed and expanded tunnel structure includes the existing tunnel section and the expanded tunnel section. The secondary lining of the existing tunnel section provides initial support for the expanded tunnel section.

[0123] Existing tunnel sections and expanded tunnel sections are connected by connectors. For example... Figure 3 As shown, the connector includes a channel steel and a pad. The channel steel is arranged along the longitudinal direction of the tunnel (i.e., along the length of the tunnel), and the pad is placed in the groove of the channel steel.

[0124] The opening of the channel steel faces the expanded tunnel section. The end of the I-beam used for the initial support of the expanded tunnel section contacts the base plate. The channel steel, base plate, and the end of the I-beam are fixedly connected. The fixed connection method can be, for example, welding. The material of the base plate can be, for example, steel.

[0125] Specifically, for the welding parts of channel steel, backing plate and I-beam, the bottom wall of the channel steel, the backing plate and the end of the I-beam can be welded together, or the side wall of the channel steel, the backing plate and the end of the I-beam can be welded together.

[0126] In one specific embodiment, there are multiple channel steels, which are connected sequentially along the longitudinal direction of the tunnel. For example, the length of the channel steel is 60cm.

[0127] Specifically, the width of the backing plate is greater than the width of the I-beam and less than the width of the channel steel, so that a gap is formed between the backing plate and the side wall of the channel steel. On the one hand, this facilitates welding; on the other hand, it improves the weld strength of the channel steel, backing plate and I-beam.

[0128] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in the present invention should be included within the scope of protection of the present invention.

Claims

1. A construction method for in-situ expansion of an existing highway tunnel, characterized in that, Includes the following steps: Step 1: Conduct advanced geological forecasting for the widened excavation side; Step 2: Remove the secondary lining of the existing tunnel arch on the widened side; Step 3: Construct advance support for the arch of the newly built tunnel on the widened side and initial support for the arch of the newly built tunnel; Step 4: Install temporary steel supports; Step 5: Remove the secondary lining of the existing tunnel arch wall on the widened side; Step 6: Construct advance support and initial support for the new tunnel arch wall on the widened excavation side; Step 7: Fill the voids in the surrounding rock behind the initial support of the new tunnel arch and the initial support of the new tunnel arch wall. Step 8: Remove the temporary steel supports; Step 9: Construct the invert arch of the new tunnel; Step 10: Construct the secondary lining of the newly built tunnel; Step 11: Repeat steps 1-10 along the longitudinal direction of the existing tunnel to complete the tunnel expansion; Step 3 includes the following steps: Step 31: Construct advance support for the arch of the newly built tunnel on the widened side to ensure the stability of the surrounding rock during the widening construction; Step 32: Excavate the surrounding rock of the arch between the existing tunnel arch and the new tunnel arch on the widened side; Step 33: Construct initial support for the arch of the new tunnel; Step 34: Connect the initial support of the new tunnel arch to the secondary lining of the existing tunnel. Step 34 includes the following steps: Step 341: Install channel steel at the connection between the initial support of the new tunnel arch and the secondary lining of the existing tunnel, and place pads inside the channel steel. Step 342: Make contact between the end of the I-beam used for the initial support of the new tunnel arch and the pad plate; Step 343: Weld the channel steel, backing plate, and I-beam; The width of the pad is greater than the width of the I-beam and less than the width of the channel steel; In step 1, the advanced geological prediction of the excavation side includes: arranging three radar survey lines along the longitudinal direction of the tunnel at the arch crown, arch waist and arch wall of the existing tunnel excavation side, and using ground-penetrating radar to conduct advanced geological exploration of the excavation side; Step 4, installing temporary steel supports includes: installing steel columns between one end of the initial support of the newly formed tunnel arch and the bottom wall of the existing tunnel to form temporary supports; Step 7 includes the following steps: Step 71: Construct grouting holes at the junction of the secondary lining of the existing tunnel and the initial support of the arch of the new tunnel; Step 72: Inject grout into the grouting hole; Step 9 includes the following steps: Step 91: Remove the existing tunnel invert arch on the widened side; Step 92: Excavate the surrounding rock between the existing tunnel invert and the new tunnel invert; Step 93: Construct the new tunnel invert arch and backfill it to close the existing tunnel initial support, the new tunnel arch initial support, and the new tunnel arch wall initial support into a closed ring. Step 5 is achieved by blasting. Step 5 is achieved by mechanically shearing the reinforcing bars. Step 343 includes the following steps: first, welding the end of the I-beam to the backing plate, and then connecting the backing plate to the bottom wall of the channel steel; Step 343 includes the following steps: first, welding the end of the I-beam to the backing plate, and then connecting the backing plate to the side wall of the channel steel.

2. A tunnel structure after renovation and expansion based on an existing tunnel, characterized in that, The method described in claim 1 is used to construct the work.

Citation Information

Patent Citations

  • In-situ extension construction method for multi-arch tunnel

    CN115653618A