双极功率传输系统和用于该系统的故障检测器

By using fault detectors to alternately configure grounding circuits and current/voltage sensors in a bipolar power transmission scheme for high-voltage DC power transmission networks, the challenge of neutral area fault detection is solved, improving detection sensitivity and system availability while reducing losses.

CN116018737BActive Publication Date: 2026-07-17GENERAL ELECTRIC TECH GMBH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
GENERAL ELECTRIC TECH GMBH
Filing Date
2021-09-02
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In high-voltage DC power transmission networks, especially in bipolar power transmission schemes, existing technologies struggle to effectively detect and identify faults between the neutral area and ground, leading to power divider revenue loss and reduced overall utilization.

Method used

A fault detector is employed, which uses a switchable grounding circuit and a current/voltage sensor between the neutral area and the ground. Combined with a fault detector controller, the operating state of the grounding circuit is configured alternately. Ground faults in the neutral area are identified by current and voltage measurements, and loop conduit faults are detected by current imbalance.

Benefits of technology

It improves the sensitivity of neutral region fault detection, reduces revenue loss of power dividers, enhances the overall utilization and availability of bipolar power transmission schemes, and ensures the accuracy and rapid response of fault detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116018737B_ABST
    Figure CN116018737B_ABST
Patent Text Reader

Abstract

在高压直流(HVDC)功率传输方案领域,存在对改进的地故障检测的需要。双极功率传输系统(12;112)通常包括远离第二转换器站(16)定位的第一转换器站(14),连同将第一和第二转换器站(14,16)互连以允许第一和第二转换器站(14,16)之间的功率传输的第一和第二传输导管(18,20)。第一转换器站(14)通常具有第一和第二功率转换器(22,24)。通常,第二转换器站(16)具有第三和第四功率转换器(46,48)。双极功率传输系统还包括故障检测器(10;100;110;130),其包括故障检测器控制器(96;104;122;132),故障检测器控制器被编程为检测第一和第二中性区域(38,62)中的一个或另一个中的地故障(150)。
Need to check novelty before this filing date? Find Prior Art